CITY OF ROSEMOUNT
APPLICATION FOR PAYMENT
NO. Z—
/ o
CITY PROJECT NO: /66 4- /-7/ SEH FILE NO: 87tzz
PROJECT: 5;1+ WNOIV /Oftjtw*
CONTRACTOR: R'OCO#U C0yJ119UCVd#V CONTRACT DATE
_�3 L. FoRLGS7 14VE IPPLICATION DATE: 1111616'7
/i'y'e'i /NN, SS"OSj FOR PERIOD ENDING: 1 t Ila% e7
Total Contract Amount $ I, 073,,5 0 z' Total Amount Earned $ 6 /S, 039 :'
Material Suitably Stored on Site,
Not Incorporated into Work $
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete $
GROSS AMOUNT DUE ... ............. .... $ 61S,p3j.z6
LESS RETAINAGE ................... $ 30,75/ •316
30
AMOUNT DUE TO DATE ......... ...... .. $ 5'6-f -67
LESS PREVIOUS APPLICATIONS ............ $ Z-001 4Z3
AMOUNT DUE THIS APPLICATION ... $ 383, 8-63 76
ll
APP,R0 rFD ;
-7 1'6
Richard M.a (L t`yl� ? , "?.� C' '
City Engineer/Director of Public Works
RECEIVE
SH;, ; � •;Ti h ., D
pir
APPLICATION FOR PAYMENT
-- ---- - Nov
(UNIT PRICE CONTRACT) '
NO. k LJ-P-AUI.
NOTE: QUANTITIES AND UNIT PRICES HAVE BEEN REVISED IN ACCORDANCE WITH
CHANGE ORDER NO. 1
OWNER: ROSEMOUNTMINNESOTA OWNER'S PROJECT NO.168 &
171
------------------------------------ --
ENGINEER'S PROJECT NO. --- ----87122--
LOCATION: ROSEMOUNT, MINNESOTA ----------------
-------------------------------
CONTRACTOR ARCON CONSTRUCTION CO., INC. CONTRACT DATE
------------------- ------- --------
903 E. AVE., BOX` -57 --- ----------------------- AMOUNT $1,073,560.12
--
M- --------------------
ORA, MINNESOTA 55051
---------------------------
CONTR. FOR SHANNON PARKWAY STREET AND UTILITY CONSTRUCTION - S.A.P. 208-106-02
APPLIC. DATE 11-16-87
PERIOD END. 11-13-87
APPLICATION FOR PAYMENT
-----------------------
CONTRACT QUANTITY UNIT
DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL
---
-------------- --------------------------------
2021.501 MOBILIZATION L.S. .75 1 14322.00 $ 10,741.50
2101.501 CLEARING TREE 21 20 61.38 $ 1`,288.98
2101.506 GRUBBING TREE 21 20 61.38 $ 1,288.98
2104.501 REMOVE CONCRETE CURB
AND GUTTER L.F. 1050 2.04 $
2104.521 SALVAGE CM PIPE CULVERT L.F. 20 5.11 $
2104.501 REMOVE PIPE CULVERTS L.F. 35 58 5.11 $ 178.85
2104.509 REMOVE MANHOLES OR 1 204.60
CATCH BASINS EACH 3 204.60 $
PAGE 1 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC.
0
•
6 3, �j3 da
2105.501
COMMON EXCAVATION (P)
C . Y.'*4-,94
*-
42833
1.30
$
4 'a-
2105.511
COMMON CHANNEL
EXCAVATION
C.Y.
438
1.38
$ iCJt�•D
2105.535
SALVAGED TOPSOIL (L.V.)
C.Y.
5825
1.22
2111.501
TEST ROLLING
RD. STA 41
96
102.30
$
4,194.30
2112.501
SUBGRADE PREPARATION
R.S.
41
96
153.45
$
6,291.45
2116.501
CORE EXCAVATION
C.Y.
1200
1.22
$
2211.503
AGG BASE PLACED CL 5 (P)
C.Y.
2744
8495
8.18
$
22, 445.92
2211.504
AGG. BASE PLACED FOR
WALK, CLASS 5 (P)
C.Y.
996
10.23
2221.503
AGGREGATE SHOULDERING
PLACED, CL. 2
C.Y.
30
33.75
$
2331.504
BITUMINOUS MATERIAL FOR
MIXTURE
TON
229
163.68
$
2331.514
BASE COURSE MIXTURE
TON
5077
6.64
$
2341,504
BITUMINOUS MATERIAL FOR
MIXTURE
TON
3.46
330
184.14
$
637.12
2341.508
WEARING COURSE MIXTURE
TON
57'74
5077
7.67
$
442.87
2357.502
BITUMINOUS MATERIAL FOR
TACK COAT
GAL.
2635
1.02
$
2501.515
15" RC PIPE APRON
W/TRASH GUARD
EACH
3
9
423.52
2501.515
18" RC PIPE APRON
W/TRASH GUARD
EACH
1
1
478.76
$
478.76
2501.515
21" RC PIPE APRON
1
556.51
W/TRASH GUARD
EACH
1
556.51
2501.515
24" RC PIPE APRON
W/TRASH GUARD
EACH
1
1
630.16
S
630.16
2501.515
27" RC PIPE APRON
W/TRASH GUARD
EACH
1
1
760.08
$
760.08
2501.515
42" RC PIPE APRON
W/TRASH GUARD
EACH
1
2
1265.45
$
1,265.45
2503.511
12" RCP STORM SEWER,
DES. 3006, CL. V
L.F.
1027
1298
19.14
$
19, 656.78
PAGE 2 OF
7 SHORT-ELLIOTT-HENDRICKSON,
INC.
i
2503.511
15" RCP STORM SEWER,
DES. 3006, CL. V
L.F.
987
1143
19.14
$ 18,891.18
2503.511
18" RCP STORM SEWER,
DES. 3006, CL. V
L.F.
1259
850
21.33
$ 26,854.47
2503.511
21" RCP STORM SEWER,
DES. 3006, CL. V
L.F.
685
1489
23.14
$ 15,850.90
2503.511
24" RCP STORM SEWER,
DES. 3006, CL. IV
L.F.
124
1040
26.30
$ 3,261.20
2503.511
27" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
18
18
47.21
$ 849.78
2503.511
30" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
995
1381
34.31
$ 34.138.45
2503.511
36" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
1712
1972
69.99
$ 119.822.88
2503.511
42" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
509
467
79.18
$ 40.302.62
0503.608
15" RCP STORM SEWER,
JACKED
L.F.
78
113.55
$
0503.608
36" RCP STORM SEWER,
JACKED
L.F.
120
360.02
$ v 3a.a
2504.602
ADJUST GATE VALVE BOX
EACH
6
98.20
$
2506.506
CONSTRUCT MANHOLE,
DESIGN H
L.F.
76
141
122.35
$ 9,298.60
2506.506
CONSTRUCT MANHOLE,
DESIGN C
L.F.
65
73
174.11
$ 11,317.15
2506.507
CONSTRUCT CATCH BASIN,
DESIGN Y
L.F.
56
50
123.98
$ 6,942.88
2506.509
CONSTRUCT CATCH BASIN,
DESIGN X
L.F.
70
132
139.53
$ 9.767-10
2506.511
RECONSTRUCT MANHOLE
L.F.
17
20
95.13
$
2506.516
CASTING ASSEMBLY,
TYPE R-1733
EACH
28
111.50
$-
2506.516
CASTING ASSEMBLY,
TYPE R-3067
EACH
45
176.97
$
2506.522
ADJUST FRAME AND RING
CASTING
EACH
%
3
122.76
$ /a• %lv
PAGE 3 OF
7 SHORT-ELLIOTT-HENDRICKSON,
INC.
2511.501
RANDOM RIPRAP CL II
C.Y. 29.9
44
46.03
$ 1,376.30
2513.516
GEOTEXTILE FILTER
FABRIC, TYPE IV
S.Y. 57.8
176
3.17
$ 183.23
2531.501
CONCRETE CURB S GUTTER,
DESIGN D618
L.F.
19550
4.17
$
2521.511
2" BITUMINOUS WALK
S.F.
73550
0.28
$
2531.507
8" CONCRETE DRIVEWAY
PAVEMENT
S.Y.
76
21.99
$
2545.511
LIGHTING UNITS, TYPE B
EACH
27
1115.07
$
2545.521
3" RIGID STEEL CONDUIT
L.F.
400
9.20
$
2545.532
DIRECT BURIED CABLE
L.F.
9000
1.81
$
2545.552
FEED POINT
EACH
3
1457.77
$
0563.601
TRAFFIC CONTROL
L.S.
1
2557.50
$
2564.531
SIGN PANELS - TYPE C
S.F.
280
18.82
$
0564.602
TURN LANE PAVEMENT
MESSAGE
L.S.
6
35.80
$
0564.602
CROSS WALK PAVEMENT
MESSAGE
L.S.
1
76.72
$
2564.603
4" WIDE SOLID LINE,
WHITE
L.F.
645
0.20
$
2564.603
4" WIDE SOLID LINE,
YELLOW
L.F.
10800
0.15
$
2564.603
4" WIDE BROKEN LINE,
WHITE
L.F.
'670
0.21
$
0564.603
4" WIDE BROKEN LINE,
YELLOW
L.F.
1180
0.21
$
0564.603
12" WIDE SOLID LINE,
WHITE
L.F.
26
5.11
$
0564.603
24" WIDE SOLID LINE,
YELLOW
L.F.
420
0.97
$
0565.602
HANDHOLE - TYPE C
EACH
4
358.05
$
2575.501
ROADSIDE SEEDING
ACRE
10
96.16
$
2575.502
SEED MIXTURE 5
LBS.
500
2.54
$
PAGE 4 OF
7 SHORT-ELLIOTT-HENDRICKSON,
INC.
2575.505
SODDING
S.Y.
6200
1.20-$
2575.511
MULCH MATERIAL, TYPE 1
TON
20
100.25
$
2575.519
DISC ANCHORING
ACRE
10
42.96
$
2575.523
WOOD FIBER BLANKETS
S.Y.
1000
1.16
$
0256.408
8" PVC, 12' -14' DEEP
L.F.
50
50
18.60
$
930.00
0256.408
8" FVC, 22'-24' DEEP
L.F.
100
100
25.54
$
2,554.00
0256.701
STANDARD MANHOLE,
8' DEEP
EACH
1
1
961.62
$
961.62
0256.702
EXCESS DEPTH STANDARD
MANHOLE
L.F.
14
15
55.24
$
773.36
0256.706
MANHOLE DROP SECTION ON
-915
95-9•4� 0
EXISTING MANHOLE
L.F.
9
115.59
$
-2-4-1.30-
0256.900
CONNECT TO EXISTING
SEWER
EACH
1
1
358.05
$
358.05
0256.910
8" D.I.P. FORCEMAIN
L.F.
1550
1550
12.38
$
19, 189.00
0257.406
6" DIP WATERMAIN, CL 52
L.F.
88
162
14.97
$
1,317.36
0257.408
8" DIP WATERMAIN, CL 52
L.F.
254
320
17.17
$
4,361.18
0257.412
12" DIP WATERMAIN, CL 52
L.F.
248
1945
17.75
$
4,402.00
0257.416
16" DIP WATERMAIN, CL 52
L.F.
2881
3200
24.95
$
71,880.95
0257.419
BORE 24" STEEL CASING
'`L.P.
88
105
96.16
$
8,462.08
0257.421
JACK 16" DIP THRU CASING
L.F.
105
30.28
$
0257.606
6" R. S . GATE VALVE & BOX
EACH
5
10
321.22
$
1,606.10
0257.608
8" R . S . GATE VALVE & BOX
EACH
3
4
460.35
$
1,381.05
0257.613
12" B.F.VALVE & BOX
EACH
2
731.44
$
0257.617
16" B.F. VALVE & BOX
EACH
1
2
1366.72
$ 1,366.72
0257.630
FITTINGS LESS THAN 12"
LB.
1000
585
1.52
$ 1,_52o.00
0257.631
FITTINGS 12" & LARGER
LB.
7630
10640
1.04
$ 7, q3g, _ go
0257.633
LOWER WATERMAIN
EACH
1
2
552.42
$
SS? a?
0257.640
FIRE HYDRANT
EACH
5
9
1117.11
$ 5.585 55
PAGE 5 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC.
0257.806
INSULATION
BD.FT. 512
64
0.95
$ 486.40
0257.903
CONNECT TO EXISTING
WATERMAIN
EACH 4
3
255.75
$ 1,023.00
0290.01
JAPANESE TREE LILAC 2"
EACH
5
137.08
$
0290.02
AMUR MAPLE 2"
EACH
7
137.08
$
0290.03
CANADA RED CHERRY 2"
EACH
3
132.99
0290.04
COLUMNAR BUCKTHORN 36"
EACH
1$
28.64
$
0290.05
COMMON PURPLE LILAC 36"
EACH
161
28.64
$
0290.06
GOLD DROP POTENTILLA 18"
EACH
76
18.41
$
0290.07
DWARF AMUR MAPLE 18"
EACH
33
21.48
$
0290.08
RUGOSA ROSE #2 POT
EACH
47
21.48
$
0290.09
BLACK HILLS SPRUCE 6'
EACH
15
132.99
$
0290.10
COLORADO BLUE SPRUCE 6'
EACH
15
132.99
$
0290.11
COLORADO GREEN SPRUCE 6'
EACH
27
132.99
$
0290.12
AUSTRIAN PINE 6'
EACH
11
132.99
$
0290.13
PONDEROSA PINE 6'
EACH
12
132.99
$
0290.14
RIVER ROCK, 3/4 = 1-1/2"
C.Y.
30
18.41
$
0290.15
MULCH MATERIAL, TYPE 6
C.Y.
20
18.41
$
61Sfo3y .
GROSS AMOUNT DUE ............... $ -t7� cty
10_,'7,T1. 316
LESS 5 % RETAINAGE.'........ $ rr,**r--
AMOUNT DUE TO DATE ............. $:---
LESS PREVIOUS APPLICATIONS..... $ 200,423.54 v
363,861.76
CONTRACTOR'S AFFIDAVIT AMOUNT DUE THIS APPLICATION.... $ 6 4 (a 1&44.&A,.
The undersigned Con tractor. hereby swears under penalty of perjury that (1) all previous, progress.
payments received from the Owner on account of work performed under the contract referred to
above have been applied by the undersigned to discharge in full all obligations of the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract, and (2) all
material and equipment incorporated in said Project or otherwise listed in or covered by- this
Application for Payment are free and clear of all liens, claims, security interests and
encumbrances.
Dated 11-16 1987 Arcon Construction Co. , Inc.
COUNTY OF f
STATE OF )
Before m this
SS
day of 19'�3 personally appeared
known to me, who being auTy sworn, did depose
of the Contractor above mentioned;
that he executed. #A aUvaJ4pp1e&tto&4Qr Payment and Affidavit on beh g of said Contractor;
and that all of Abe statements►contained"therein are �trt correct n tele
My Commission Expitts:
,'.. ,.,.(Notary -Public)
The undersigned has checked the Contractor's Application for Payment shown above. Apart of
this Application is the Contractor's Affidavit stating that all previous payments to him
under this Contract have been applied by him to discharge in full all of his obligationsin
connection with the work covered by all prior Applications for Payment.
In accordance with the Contract, the undersigned approves payment to the Contractor of the
Amount Due.
SHORT E TT HE RI'CKSO I
Date /Z-/ 2-/67 By
Page 7 of 7
APPLICATION FOR PAYMENT - Continued
1,0'560.12
61s039.z6
Total Contract
Amount
$
Total Amount Ea d
$ ..
w
_ Material
Suitably Stored
on Site, Not Incoporated into Work
$
Contract
Change Order
No.
Percent -Complete
$
Contract
Change Order
No.
Percent Complete
$
Contract
Change Order
No.
Percent Complete
$
L6
61Sfo3y .
GROSS AMOUNT DUE ............... $ -t7� cty
10_,'7,T1. 316
LESS 5 % RETAINAGE.'........ $ rr,**r--
AMOUNT DUE TO DATE ............. $:---
LESS PREVIOUS APPLICATIONS..... $ 200,423.54 v
363,861.76
CONTRACTOR'S AFFIDAVIT AMOUNT DUE THIS APPLICATION.... $ 6 4 (a 1&44.&A,.
The undersigned Con tractor. hereby swears under penalty of perjury that (1) all previous, progress.
payments received from the Owner on account of work performed under the contract referred to
above have been applied by the undersigned to discharge in full all obligations of the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract, and (2) all
material and equipment incorporated in said Project or otherwise listed in or covered by- this
Application for Payment are free and clear of all liens, claims, security interests and
encumbrances.
Dated 11-16 1987 Arcon Construction Co. , Inc.
COUNTY OF f
STATE OF )
Before m this
SS
day of 19'�3 personally appeared
known to me, who being auTy sworn, did depose
of the Contractor above mentioned;
that he executed. #A aUvaJ4pp1e&tto&4Qr Payment and Affidavit on beh g of said Contractor;
and that all of Abe statements►contained"therein are �trt correct n tele
My Commission Expitts:
,'.. ,.,.(Notary -Public)
The undersigned has checked the Contractor's Application for Payment shown above. Apart of
this Application is the Contractor's Affidavit stating that all previous payments to him
under this Contract have been applied by him to discharge in full all of his obligationsin
connection with the work covered by all prior Applications for Payment.
In accordance with the Contract, the undersigned approves payment to the Contractor of the
Amount Due.
SHORT E TT HE RI'CKSO I
Date /Z-/ 2-/67 By
Page 7 of 7
DATE: NOVEMBER 25, 1987
TO: MAYOR & CITY COUNCIL
C/O ADMINISTRATOR JILK
FROM: RICH HEFTI, CITY ENGINEER/PUBLIC WORKS DIRECTOR
RE: APPLICATION FOR PAYMENT NO. 2 FOR SHANNON PARKWAY STREET IMPROVEMENTS
Attached is a copy of the summary sheets for Application No. 2 broken down into
Project 168 (North of 145th Street) and Project 171 (160th Street to 145th
Street). The cost are accurate, however the final draft of the application for
payment is being prepared by S.E.H.
Because of the short week this week I would request that Council consider this
application for payment as an .additional item at the December 1, 1987 Council
meeting. I will be available to answer any questions Council may have regarding
this application for payment.
SHORT-ELLIOTT-11ENDRICKSON,
INC.
DATE
FILE N0.
PREP. BY Z%j j6r.. G,.
aaaasaasasssa=aasaaaaanmes�asaasaeaaaaaaaaaxaaaaaaaa�aaaaseas=asaasaaasaaass=aaaaa
CONSTRUCTION COST BREAKDOWN
f
PROJECT NO.
S. A. P.
NO. Zb�
CONTRACTORY'GO/'7
CONTRACT AMOUNTl,
APPLICATION FOR PAYMENT NO. Z--
APPLICATION DATE 1/)
44-,97
FOR PERIOD ENDING
saaasa==asaa�a=caaaaa=aasaaessaaaaaaxasssaaaaaaaaa�a=aaa�ssaaeaaaaaaaa�aaaaaaaabaaa.
PARTICIPATING
NON -PARTICIPATING
TOTAL COMPLETED
CONTRACT
CRANCE ORDERS
g
G
TOTAL
LESS % RETAINAGE
p
TOTAL DUE
TO DATE
/
LESS PREVIOUS
PAYMENT
- S✓✓ �S
- /�' Z3�3
PAYMENT DUE
THIS APPLICATIONS
M
SHEET OF SHEETS
SHORT-ELLIOTT-HENDRICKSON,
INC.
�
DATE
s �• s��c�i> /
FILE NO.j?,I
PREP. BY G-
-
CONSTRUCTION COST BREAKDOWN '
PROJECT N0.%
S. A. P.
N0.
CONTRACTOR
CONTRACT
AMOUNT Z- Z- �.•� • %�
APPLICATION FOR PAYMENT
NO. Z-
APPLICATION DATE
/% - 7
FOR PERIOD ENDING i/
PARTICIPATING
NON -PARTICIPATING
TOTAL COMPLETED
CONTRACT
CHANGE ORDERSJJ'f%
TOTAL
-
LESS % RETAINAGE
- Zj� t�%�. %
- 5- % id
TOTAL DUE
TO DATE%Jb•��
%d/ 9� /b
LESS PREVIOUS
PAYMENT
-- %'�_�
/
- Z % yyf7 • SZ-
PAYMENT DUE
THIS APPLICATION
Z..g 3�•.��./
p �/
I
M
SHEET OF SHEETS
G�bl1�1�
Contract Amount $ 1, 073,.12 Total Amount Earneo $`z�_1.1o.t►�
terial Suitably Stored on Site, Not Incoporated into Work $
Contract Change Order No. Percent.Complete $
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete' $
GROSS AMOUNT DUE.......... . $ 57€►; -440,03;
. .. 30 809. 7/ -
LESS 5 % RETAINAGE.........
,r' SS' 3S'•la
AMOUNT DUE TO DATE .............
LESS PREVIOUS APPLICATIONS..... $ 200,423.54 V
3Ry,9�/ FSG-
AMOUNT DUE THIS APPLICATION .... $4€ri$@U
CONTRACTOR'S AFFIDAVIT
The undersigned ontFactor hereby swears under penalty of perjury that (1) all. previous progress.
payments received from the Owner on account of work performed under the contract referred to
above have been applied by the undersigned to discharge in full all obligations of.the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract, and (2) all
material and equipment incorporated in said Project or otherwise listed in or covered by -this
Application for Payment are free and clear of all liens, claims, security interests and
encumbrances.
Dated
11-16 , 1987 Arcon Construction Co. , Inc.
Contractor
By
me and,,Title)
COUNTY OF SS
STATE OF
Before h this day of ,�- , 1947 personally appeared
nown to me, w o being &uTy sworn, did depose
and say th` t he +i he r. of the Contractor above mentioned;
ffi
that he executed.,the above Application for Payment and Affidavit on beh of said Contractor;
and that all of the statements contained therein are true, correct,_ n ,,a mplete.
My Commission Expires.
Notary ubTi,c
The undersigned has checked the Contractor's Application for Payment shown above. A part of
this Application is the Contractor's Affidavit stating that all previous payments to him
under this'Contract have been applied by him to discharge in full all of his obligations in
connection with the work covered by all prior Applications for Paym
In accordance with the Contract, the undersigned approves payment .to the Contractor of the
Amount Due.
SNORT ELLIOTT HENDRICKSON, INC.
Date By
Page,_ 7 of