Loading...
HomeMy WebLinkAbout6.g. Order Project Authorize Plans and Specifications – 132nd Street Improvements – City Project 465EXECUTIVE SUMMARY City Council Regular Meeting: July 18, 2017 AGENDA ITEM: Order Project / Authorize Plans and Specifications – 132nd Street Improvements – City Project 465 AGENDA SECTION: Consent PREPARED BY: Mitch Hatcher, PE, Project Engineer AGENDA NO. 6.g. ATTACHMENTS: Final Design Proposal, Resolution, Map APPROVED BY: LJM RECOMMENDED ACTION: Motion to Adopt a Resolution Ordering the Project, and Authorizing the Plans and Specifications for 132nd Street Improvements – City Project 465. BACKGROUND At the October 6, 2015, City Council meeting, Council received the Feasibility Report for the 132nd Street Improvement Project. No action has been taken since this meeting as the project is dependent on the construction of the adjacent Dunmore subdivision. As the Dunmore subdivision agreement and final plat were approved at the June 20, 2017, City Council meeting, and all development-related fees have now been paid, final design of the 132nd Street Improvements can now commence. The proposed project includes the upgrade of approximately 600 feet of rural gravel roadway to urban roadway along with the extension of trunk utility systems. The proposed improvements consist of: Upgrade of existing rural gravel roadway including: ▫Bituminous pavement with concrete curb & gutter ▫Storm sewer ▫Bituminous trail Extension of trunk municipal utilities including: ▫8 inch sanitary sewer ▫16 inch water main The attached proposal from WSB & Associates details the scope and fee for final design. The total estimated project cost for 132nd Street West Improvements is $426,431. The project is proposed to be funded from a combination of the following funding sources: Sanitary Sewer Core Funds, Water Core Funds, and Storm Core and Utility Funds Special Assessments to benefitting properties Only the surface and water main improvements and are proposed to be assessed to benefitting property owners. Assessments to the surrounding properties are proposed to be collected by agreement. SUMMARY Staff recommends Council adoption of a resolution ordering the project, and authorizing the preparation of plans and specifications for 132nd Street Improvements – City Project 465. 701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com K:\01928-710\Admin\Docs\Final Design Proposal\LTR Proposal - 132nd Street Final Design.docx July 12, 2017 Mr. Logan Martin City Administrator City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: Scope and Estimated Fee to Provide Professional Engineering Services for 132nd Street Improvement Project - Final Design Dear Mr. Martin: We appreciate the opportunity to present this proposal for professional services related to the 132nd Street Improvement Project. This letter proposal outlines the services required to prepare all necessary documents to complete plans and specifications. PROJECT BACKGROUND At the October 6, 2015 City Council meeting, Council received the Feasibility Report for the 132nd Street Improvement Project. No action has been taken since this meeting as the project is dependent on the construction of the adjacent Dunmore subdivision. As the Dunmore subdivision agreement and final plat were approved at the June 20, 2017 City Council meeting, and all development-related fees have now been paid, final design of the 132nd Street Improvements can now commence. The 132nd Street Improvement Project includes upgrading the existing gravel roadway to an urban section with bituminous pavement, curb and gutter, sanitary sewer, watermain, and storm sewer. The schedule for the project is to begin construction in September 2017 and it is anticipated that construction will be completed in October 2017. PROJECT APPROACH/SCOPE OF SERVICES WSB’s project scope and proposed work plan are based on our understanding of the project as previously described and contained within the feasibility report. In order to complete the project, we propose the following scope of services: Final Design WSB will complete final design services, including, but not limited to:  Plans and specifications  Quantity and cost estimates  Assessment rolls and calculations  Bidding documents  Staff reports  City Council meetings Logan Martin - City of Rosemount July 12, 2017 Page 2 of 2 K:\01928-710\Admin\Docs\Final Design Proposal\LTR Proposal - 132nd Street Final Design.docx SCHEDULE WSB will complete the project for a construction start date of September 2017. Following is a proposed detailed schedule:  Authorize Preparation of Plans and Specifications July 18, 2017  Receive Plans and Specifications/Ratify Ad for Bid August 15, 2017  Bid Opening August 25, 2017  Award Contract September 5, 2017  Begin Construction September 11, 2017  Substantial Completion October 31, 2017 PROPOSED FEE We propose to conduct Final Design work on an hourly basis for an estimated fee of $26,616. We will review our progress weekly and will not exceed this amount without your prior approval should the scope of the project change. This letter represents our entire understanding of the project scope. If you are in agreement, please sign on the space provided and return one original signed copy to us for our records. We will start immediately upon receipt of the signed agreement. If you have any questions concerning the work plan or fee as discussed, please feel free to contact me at (763) 287-7191. We look forward to working with you and greatly appreciate the opportunity to assist you and your staff in the completion of this project. Sincerely, WSB & Associates, Inc. Monica Heil, PE Senior Project Manager Attachment cc: Mitch Hatcher, WSB & Associates, Inc. Andy Brotzler, WSB & Associates, Inc. ACCEPTED BY: CITY OF ROSEMOUNT, MN I hereby authorize WSB & Associates, Inc. to complete the services identified above not to exceed $26,616 without prior approval. Signature: Date: Name: Title: Task Description11.1 Surveying 81624$3,720.001.2 Design 10 30 1656$7,062.001.3 Specifications 6 8 822$2,536.001.4 Quantity Tabulations and Cost Estimate 2 810$1,192.001.5 Meetings 2 6 614$1,954.001.6 Utility Coordination 12 1224$3,228.001.7 QA / QC 2 66822$2,868.001.8 Bidding Preparation and Analysis 8 8 824$2,856.001.9 City Coordination2020$1,200.00Task 1 Total Estimated Hours and Fee 4 50 72 20 24 22 16 8 216 $26,616.00Total Estimated Hours 4 50 72 20 24 22 16 8 216Average Hourly Billing Rate170.00 160.00 109.00 60.00 137.00 88.00 164.00 130.00Total Fee by Labor Classification $680.00 $8,000.00 $7,848.00 $1,200.00 $3,288.00 $1,936.00 $2,624.00 $1,040.00 $26,616.00TOTAL PROJECT COST $26,616.00Total HoursConstruction SpecialistFinal DesignProject EngineerProject ManagerProject Engineer (City Billing Rate)Engineering TechnicianEstimate of CostCity of Rosemount, MinnesotaProfessional Engineering Services132nd Street Improvement Project - Final DesignEstimated HoursPrincipalAdminTwo Person Survey CrewCost CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2017 - A RESOLUTION ORDERING PROJECT AND AUTHORIZING THE PREPARATION OF THE PLANS AND SPECIFICATIONS FOR 132ND STREET WEST IMRPOVEMENTS CITY PROJECT 465 WHEREAS, the City Council received and accepted the Feasibility Report on October 6, 2015 for City Project 465 NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount hereby orders the improvements of the 132nd Street Improvements – City Project 465. BE IT FURTHER RESOLVED, the City Engineer is hereby ordered to prepare plans and specifications for said improvements of City Project 465. ADOPTED this 18th day of July, 2017. ______________________________ William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk ?§A@ COACHFORDDODD BLVD132ND CT W S ROBERT TRL (STH 3)CT1 3 6 T H S T W 131 ST ST W B R ASSPKWY BONAIRE PATH W C H A R L S TO N WAY BOLIVIA AVE WBRI LLI ANTBLANCA AVE WS T W CHARLSTONAVECOUCHTOWN136TH ST W COLESHIRE PATHCORLISS TRL 137TH ST CORCORANAVECORCHMANAVEBLANCA AVE W1 2 8 T H COUCH-TOWNCORLISS132ND ST W 1 3 5 T H S T W 1 3 3 R D S T BRI CK PATHWAY AVEBRASS PKWYGEM AVEB R O N Z ECT COACHFORDAVECAR RAC H WAYC A R R A C H AVE CARRACHAVEAVECONNEMARAWAYCOACHFORDPATHCOUCHTOWN CTC O UCHTOWN C T TRLBROCKCARLINGFORDCARLINGFORDLANE134TH ST W BRICK PATHWAYDODD BLVDCARBURYWAY1 3 5 T H S T WBRONZE PKWY133R D ST BRONZE PKWYBUTTERFLY PATH1 3 4 T H S T CARBURYAVECOA C HFORDAVE KEEGANLAKE BrockwayPark BrockwayParkT:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Location Map - 465132nd Street West Improvements City Project 465, May 2015