HomeMy WebLinkAbout8.a. City Projects UpdateCity Project NumberProject NameCouncil Authorizes Plans/SpecsPublic HearingCouncil Receives Plans/Specs Authorize Ad For BidOpen BidsAward ContractStart DateAssessment HearingContractorContract AmountWork Certified To-Date% CompleteSummary416 Well 16 10/01/13 N/A 09/27/17 10/03/17 10/09/17 N/ARice Lake Construction Group$1,213,700Well house design is complete. The contract was awarded to Rice Lake Construction Group on October 3, 2017. Construction anticipated to begin in October 2017 and continue through May 2018.447145th Street Pedestrian Improvements at RR Crossing01/02/13 N/A N/AUPRR, CPRR, TBDAgreement already in place with Union Pacific. Easement Agreement signed by Canadian Pacific. An agreement with CP for the track extensions can be established now that the easement agreement has been executed. Upon execution of the agreement with CP for the track extensions, work will begin. Sidewalk work will begin after railroad work.465132nd Street West ImprovementsN/A 07/18/17 08/25/17 09/05/17 Sep 2017 N/AFriedges Contracting$288,075This project includes pavement and utility upgrades to approximately 600 feet of 132nd Street from TH3 to Dodd Boulevard. The contract was awarded to Friedges Contracting on September 5, 2017. Construction is underway and is expected to be complete by November. 467Dunmore 1st AdditionN/A 09/25/17Friedges ContractingThis development includes 30 single-family homes by developer Copper Creek. Copper Creek will administer the contract privately. Mass grading is complete; street and utility construction is underway and is expected to be complete by November. 4702017 Street Improvement Project12/20/16 05/02/17 02/21/17 03/24/17 05/02/17 06/01/17 05/02/17McNamara Contracting$934,560 $824,330 88%2017 Street improvement project included pavement reconstruction of Shannon Parkway from CSAH 42 to CSAH 46, reconstruction of Jaycee Park parking lot, and mill and overlay of the Shannon Hills neighborhood (Cobbler Ave, Crocus Way, Cranberry Way, Clover Lane). All construction is complete; awaiting final payment.473Prestwick Place 13thN/A N/A N/AThis development includes 28 single-family homes by developer KRB Development I, Inc. Sidewalks are installed; wear course will be completed by the end of summer. 474 Greystone 5th N/A N/A N/AThis development includes 23 single-family homes by developer CalAtlantic Homes (formerly Ryland Homes). The developer will administer the contract privately. Street and utilities are installed,wear course will be installed in Spring 2018. 475 Bella Vista 5th N/A N/A N/AThis development includes 41 single-family homes by developer US Home Corporation (Lennar). The developer is administering the contract privately. The site is currently being mass graded, street and utility construction will follow in September. 476Rosewood CommonsN/A N/A N/AThis development includes 7 apartment buildings (one building is expected to be completed in 2017). The project will be designed and constructed privately. The site is currently being mass graded. ENG-188Parking Lot ImprovementsN/A N/ASpring 2017N/A Valley Paving $333,611 $340,607 102%Connemara Park and City Hall parking lots were scheduled for maintenance in 2017. Improvements included curb & gutter enhancements/replacement, as well as full pavement replacement. Both City Hall and Connemara Park parking lots are complete.2017-01 Greystone 6th 04/04/17 N/A 05/16/17 06/14/17 06/20/17 07/05/17N/AFriedges Contracting$1,073,557 $796,171 74%This development includes 27 single-family homes by developer CalAtlantic Homes (formerly Ryland Homes). The project is a public city project, with the contract awarded to Friedges Contracting at the June 20 City Council meeting. Construction began in July and is substantially complete. Sidewalk and wear course will be in 2018. 2017-02 Harmony Villas N/A N/ASummer 2017N/AThis development will be done in two phases, with 16 townhomes in the first phase and 26 townhomes in the second phase. Both phases will be designed and constructed privately. Construction of the first phase began in late August and is expected to be complete in October. 2017-03RCC and Cameo Ave Parking Lot ImprovementsN/A N/A 05/25/17 06/06/17 06/19/17 N/A Hardrives, Inc. $530,687 $545,429 103%The Rosemount Community Center and National Guard parking lot received a full-depth pavement replacement. Parking improvements along Cameo Avenue included angled parking to replace the existing parallel parking. All parking lot improvements are complete.2017-07Prestwick Place 14thN/A N/A N/AThis development includes 38 single-family homes by developer KRB Development I, Inc. The developer will administer the contract privately. Mass grading is complete; street and utility construction is underway. 2017-08Well 5 AbandonmentN/A N/A 07/31/17 07/25/17 09/19/17 10/09/17 N/AMark J Traut Wells$61,365 -This project includes properly selaing and abandoning Well 5. Investigation work was completed in 2016. The contract was awarded to Traut Wells at the September 19 CC meeting. Construction is scheduled to begin in October and be completed in December. PRIVATEPRIVATEPRIVATEPRIVATEPRIVATECity Projects UpdatePRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEG:\ENGPROJ\Project Tracking\Project UpdateUpdated: 10/13/2017