Loading...
HomeMy WebLinkAbout6.g. Authorize Preparation of Feasibility Report for 2018 Street Improvement Project, City Project 2018-01I:\City Clerk\Agenda Items\Approved Items\6.g. Authorize Preparation of Feasibility Report for 2018 Street Improvement Project, City Project 2018-01.docx EXECUTIVE SUMMARY City Council Regular Meeting: December 5, 2017 AGENDA ITEM: Authorize Preparation of Feasibility Report for 2018 Street Improvement Project, City Project 2018-01 AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer AGENDA NO. 6.g. ATTACHMENTS: Resolution; Agreement APPROVED BY: LJM RECOMMENDED ACTION: Motion to Adopt a Resolution Approving a Consulting Contract for Engineering Services with TKDA for the 2018 Street Improvements Project, City Project 2018-01. BACKGROUND At their October 3, 2017 meeting, the City Council authorized the preparation of a feasibility report for the 2018 Street Improvements Project, City Project 2018-01. Staff prepared a request for proposals (RFP) that was forwarded to the four consultants that are part of the General Municipal pool. Specifically, they were: • Bolton & Menk, Inc. • SRF Consulting Group, Inc. • TKDA • WSB and Associates, Inc. Each of these firms provided proposals to complete the work associated with preparing a feasibility report, performing detailed design services, investigating existing conditions, and inspecting the construction contract. The City Engineer and Senior Engineering Technician evaluated these proposals and are recommending the award of this contract to TKDA, in the amount of $64,700. The table below shows the total proposed amount for each firm along with the number of hours estimated to complete the work. SUMMARY Staff recommends Council approval of the attached resolution approving the award of a consulting contract for engineering services to TKDA for the 2018 Street Improvements Project. Firm Task 1 Hours Task 2 Hours Total Hours Task 1 Cost Task 2 Cost Total Cost Bolton & Menk, Inc.126 514 640 15,262.00$ 65,593.00$ 80,855.00$ SRF Consulting Group, Inc.108 663 771 12,168.00$ 81,879.00$ 94,047.00$ TKDA 77 520 597 6,316.00$ 58,318.00$ 64,634.00$ WSB & Associates, Inc.90 560 650 11,470.00$ 67,280.00$ 78,750.00$ 2018 Street Improvement Project Consultant Proposals CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2017 – A RESOLUTION APPROVING A CONSULTING CONTRACT FOR ENGINEERING SERVICES FOR THE 2018 STREET IMPROVEMENT PROJECT CITY PROJECT 2018-01 WHEREAS, the City Council approved the preparation of a feasibility report for the 2018 Street Improvements Project at their October 3, 2017 meeting via Resolution 2017-75, and; WHEREAS, the City Engineer prepared a request for proposals to provide engineering services for this project, and; WHEREAS, the four firms that are part of the General Municipal pool were provided a copy of the request for proposals and provided said proposals, and; WHEREAS, TKDA’s proposal, in the amount of $64,700, was evaluated and selected as the preferred firm by the City Engineer. NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All proposal for providing engineering services for the 2018 Street Improvements Project are hereby received. 2. Based an evaluation by the City staff, the proposal provide by TKDA in the amount of $64,700 for providing engineering services associated with the 2018 Street Improvements Project is the selected firm. 3. The City Administrator is hereby authorized and directed to enter into a contract with said firm to provide engineering services associated with the 2018 Street Improvements Project. ADOPTED this 5th day of December, 2017. William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk October 18, 2017 Via Email Only: brian.erickson@ci.rosemount.mn.us mitch.hatcher@ci.rosemount.mn.us derick.anderson@ci.rosemount.mn.us Mr. Brian Erickson, PE Director of Public Works/City Engineer City of Rosemount 2875 145th Street West Rosemount, Minnesota 55068-4997 Re: Proposal for Engineering Services 2018 Street Improvement Project, City Project 2018-01 Dear Mr. Erickson: In response to your request, we propose to provide Engineering Services in connection with the 2018 Street Improvement Project. Our services will be provided in the manner described in this Proposal subject to the terms and conditions set forth in our “Technical Specialty Consulting Agreement” dated September 6, 2016, as amended. Hereinafter, the City of Rosemount is referred to as the City. I. PROJECT DESCRIPTION The City is planning for approximately three miles of street improvements in 2018. The work is located south of 150th Street between Diamond Path and Shannon Parkway. It is anticipated that the Project will be a mill and overlay, but certain segments may require full depth pavement rehabilitation based on the pavement analysis. Damaged curb will be removed and replaced as a part of the Project. The Project will also include upgrading pedestrian ramps as needed and removal and replacement of damaged sidewalk segments within the Project area. The street improvements will be assessed to benefitting property owners and must, therefore, follow MN Statutes 429 as well as City Policy. The bidding for the work should occur in March or April of 2018 with construction work occurring in the summer of 2018. II. SERVICES TO BE PROVIDED BY TKDA Based on TKDA’s understanding of the Project, we propose to provide the following services: A. FEASIBILITY REPORT FOLLOWING MN STATUTES 429 AND CITY POLICY A Feasibility Report will be prepared in accordance with MN Statutes 429 and City policy and will incorporate, at a minimum, the following sections: existing conditions, proposed improvements, estimated costs, quantity breakdown, Project funding, preliminary assessment roll, assessment calculation, conclusions, recommendations on feasibility, pavement analysis, photographs, figures, and drawings. Mr. Brian Erickson, PE City of Rosemount Proposal for Engineering Services 2018 Street Improvement Project, City Project 2018-01 October 18, 2017 Page 2 B. DESIGN 1. Survey - Survey work will include GPS survey for pedestrian curb ramp areas and rim elevations of surface utilities within the pavement. The surveying will also locate several property pins as a check of the right of way corridors. 2. Pavement Analysis - Pavement analysis assuming a minimum of 15 cores within the Project area. Subconsultant, American Engineering Testing, will provide these services under subcontract to TKDA. 3. Plans and Specifications - Prepare detailed design for an anticipated mill and overlay Project using “GIS - Grade” plan sheets for the general work and “GPS - Grade” plan sheets for pedestrian curb ramp upgrades. For bidding purposes, an educated estimate of curb removal and replacement will be incorporated in the plans, but will not specifically locate sections of curb and gutter replacement. The plans and specifications will be set up to bid portions of the work as an alternate giving the City flexibility for inclusion in 2018 or a future year. Specifications will follow MnDOT 2018 specifications and the City of Rosemount standard specifications. TKDA will participate in two public meetings as a part of the Project delivery process. 4. Bidding - Bidding services will be provided including distribution of plans, maintaining plan holders list, responding to questions, issuing addenda, facilitating the bid opening, tabulating bids, and preparing a contract award recommendation letter. 5. Assessment Roll - The preliminary assessment roll is part of the Feasibility Report. In preparation for an assessment hearing, the assessment roll will be updated to include current property ownership. An assessment recommendation letter will be prepared. C. CONSTRUCTION 1. Construction Observation/Administration - Perform construction observation of the Street Improvement Project in 2018. For the purposes of the Proposal, eight weeks were assumed, with a construction week consisting of 40 hours. Administration is included within these assumed hours and will include preparation of partial payment applications or any contract modifications. Considering the anticipated mill and overlay, the use of the anticipated full 320 hours for construction observation and administration may not be necessary. 2. Material Testing - Material testing will include testing of bituminous as well as concrete in accordance with MnDOT and City of Rosemount specifications. Subconsultant, American Engineering Testing, will provide these services under subcontract to TKDA. 3. Contract Closeout - Contract closeout will include performing as-built GPS surveying of the improved curb ramp areas and providing new rim elevation for catch basins and manholes and providing as-built drawings. Contract closeout will also include meeting with the contractor to reconcile final quantities and processing the final payment application. Mr. Brian Erickson, PE City of Rosemount Proposal for Engineering Services 2018 Street Improvement Project, City Project 2018-01 October 18, 2017 Page 3 TKDA shall not have control or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work, for acts or omissions of the Contractor, Subcontractors or any other persons performing any of the Work, or for the failure of any of them to carry out the Work in accordance with the Contract Documents. III. ADDITIONAL SERVICES If authorized in writing by the City, we will furnish or obtain from others Additional Services of the types listed below which are not considered as basic services under this Proposal. Additional Services shall be billable on an Hourly Time and Materials basis and such billings shall be over and above any maximum amounts set forth in this Proposal. A. Based on the RFQ and field inspection, the Project appears to be a straight-forward mill and overlay. However, if based on the pavement analysis, reconstruction of significant areas is needed, TKDA will negotiate with the City on an appropriate fee for reconstruction level plans. B. Ground Penetrating Radar or Falling Weight Deflectometer are additional tools which can assist in determining the structural integrity of the roadway and can be provided as an additional service if requested. C. It is assumed that notices for the public hearing and the assessment hearing will be prepared by the City and sent to the official newspaper and to impacted property owners. TKDA can provide these as additional services. D. If the City wishes to have TKDA facilitate and attend the assessment hearing, this would be an additional service. IV. CLIENT’S RESPONSIBILITIES These responsibilities shall include, but are not limited to the following: A. Designate one individual to act as a representative with respect to the work to be performed, and such person shall have complete authority to transmit instructions, receive information, interpret and define policies, and make decisions with respect to critical elements pertinent to the Project. This individual shall be identified in the signature block area of this Proposal. B. Provide TKDA with access to the site as required to perform services listed in SECTION II. C. Provide reviews of materials furnished by TKDA in a reasonable and prompt manner so that the Project schedule can be maintained. D. Provide As-Built Drawings for the streets within the Project area. V. PERIOD OF SERVICE We will expect to start our services promptly upon receipt of your written acceptance of this Proposal and to complete SECTION II services within 12 months thereafter. Segments of the work plan will be completed progressively to facilitate the Project Schedule. Mr. Brian Erickson, PE City of Rosemount Proposal for Engineering Services 2018 Street Improvement Project, City Project 2018-01 October 18, 2017 Page 4 VI. COMPENSATION Compensation to TKDA for services provided as described in SECTION II of this Proposal shall be on an Hourly Time and Materials basis for a total not to exceed amount of $64,700. Our detailed Project Fee Estimate is attached. Payment shall be made in accordance with our Agreement. The level of effort required to accomplish SECTION II services can be affected by factors which are beyond our control. Therefore, if it appears at any time that charges for services rendered under SECTION II will exceed the above, we agree that we will not perform services or incur costs which will result in billings in excess of such amount until we have been advised by you that additional funds are available and our work can proceed. VII. CONTRACTUAL INTENT We thank you for the opportunity to submit this Proposal. If acceptable to the City, please sign and return as authorization to proceed under the terms of our “Technical Specialty Consulting Agreement” or provide other appropriate authorization. This Proposal will be open for acceptance for 60 days, unless the provisions herein are changed by us in writing prior to that time. If you have any questions, please contact Larry Poppler at 651.292.4457 or larry.poppler@tkda.com. Sincerely, Lawrence P. Poppler, PE Dennis M. Postler, PE Project Manager Vice President, Municipal Services ATTACHMENT: PROJECT FEE ESTIMATE LPP:DMP:ads:adh ACCEPTED FOR THE CITY OF ROSEMOUNT, MINNESOTA By: _______________________________________________________________________________ signature) Printed Name/Title Date CLIENT’S DESIGNATED REPRESENTATIVE: Name/Title Phone Email Project Fee Estimate City of Rosemount Date: 10/17/2017 2018 Street Reconstruction Project By:LPP Sr Reg Eng Reg Eng ES I ES I Survey Tech II 159$ 80$ 96$ 74$ 89$ 53$ A Feasibility Report Meetings with City Staff 3 3 6 717$ Site Evaluation 4 4 320$ Review City Assessment Policy 2 2 160$ Prepare Construction Cost Estimate 1 2 6 9 763$ Prepare Feasibility Report 1 12 16 29 1,967$ Prepare Preliminary Assessment Roll 1 4 8 13 903$ Assessment Calculation 1 4 4 9 775$ Prepare Graphics (Location Map and Typical Section)2 2 192$ Project Management 3 3 477$ SUBTOTAL HOURS 10 31 2 10 - 24 77 SUBTOTAL COST 1,590$ 2,480$ 192$ 740$ -$ 1,272$ 6,274$ Expenses: Travel & Subsistence (TS)42$ Subtotal 6,316$ B Design 1 Survey Survey Pedestrian Ramp Areas (GPS)8 8 712$ Verify Right of Way (Find Representative Property Pins) 2 2 178$ Gopher State One Call Coordination 2 2 178$ Survey In-Pavement Surface Utilities (Rim only)8 8 712$ Project Management 1 1 159$ SUBTOTAL HOURS 1 - - - 20 - 21 SUBTOTAL COST 159$ -$ -$ -$ 1,780$ -$ 1,939$ Expenses: Travel & Subsistence (TS)17$ Survey Equipment Rental 1,400$ Subtotal 3,356$ 2 Pavement Analysis Project Management 2 2 318$ SUBTOTAL HOURS 2 - - - - - 2 SUBTOTAL COST 318$ -$ -$ -$ -$ -$ 318$ Expenses: Subconsultant (AET)4,600$ Subconsultant Mark-up 10%460$ Subtotal 5,378$ S Plans and Specifications Prepare "GIS Grade" Overlay Plan Sheets 3 6 20 29 2,437$ Prepare "GPS Grade" Pedestrian Ramp Plan Sheets 3 10 28 41 3,349$ Specifications 1 10 11 959$ Update Cost Estimate 2 4 6 456$ Meeting with City Staff 3 3 6 717$ Public Meetings (2)6 6 954$ Project Management 2 2 318$ SUBTOTAL HOURS 18 31 - 52 - - 101 SUBTOTAL COST 2,862$ 2,480$ -$ 3,848$ -$ -$ 9,190$ Expenses: Travel & Subsistence (TS)64$ Subtotal 9,254$ 4 Bidding Submit Advertisement for Bids 1 2 3 186$ Distribute Plans and Specifications to Bidders 2 2 106$ Maintain Plan Holder List 2 2 106$ Respond to Bidder's Questions; Issue Addenda 1 4 2 7 585$ Bid Opening and Tabulate Bids (@ Rosemount CH) 3 1 2 6 663$ Prepare Contract Award Recommendation Letter 1 1 1 3 292$ Project Management 1 1 159$ SUBTOTAL HOURS 6 7 - - - 11 24 SUBTOTAL COST 954$ 560$ -$ -$ -$ 583$ 2,097$ Expenses: Travel & Subsistence (TS)21$ Reproduction & Reprographics (RR)200$ Subtotal 2,318$ Total Dollars Estimated Person Hours Required Total Hours Project: Client: Task Task Description Billing Rate/Hr x Multiplier Project Fee Estimate City of Rosemount Date: 10/17/2017 2018 Street Reconstruction Project By:LPP Sr Reg Eng Reg Eng ES I ES I Survey Tech II 159$ 80$ 96$ 74$ 89$ 53$ Total Dollars Estimated Person Hours Required Total Hours Project: Client: Task Task Description Billing Rate/Hr x Multiplier 5 Assessment Roll Update Ownership of Property 6 6 318$ Update Assessment Roll 1 1 2 4 345$ Assessment Recommendation Letter 1 1 2 239$ Project Management 1 1 159$ SUBTOTAL HOURS 3 2 - - - 8 13 SUBTOTAL COST 477$ 160$ -$ -$ -$ 424$ 1,061$ Subtotal 1,061$ C Construction 1 Construction Observation/Administration Walk Project Corridor to Determine Curb Removal 4 16 20 1,504$ Staking of Pedestrian Ramp Areas 8 8 712$ Construction Observation 282 282 20,868$ Administration 4 4 8 956$ Project Management 2 2 318$ SUBTOTAL HOURS 6 8 - 298 8 - 320 SUBTOTAL COST 954$ 640$ -$ 22,052$ 712$ -$ 24,358$ Expenses: Travel & Subsistence (TS)848$ Survey Equipment Rental 560$ Subtotal 25,766$ 2 Materials Testing Coordination 2 2 318$ SUBTOTAL HOURS 2 - - - - - 2 SUBTOTAL COST 318$ -$ -$ -$ -$ -$ 318$ Expenses: Subconsultant (AET)6,400$ Subconsultant Mark-up 10%640$ Subtotal 7,358$ ROUNDED 7,400$ 3 Contract Closeout Final Payment Application 1 2 1 4 393$ As-built Surveying (Rim Elevations, Pedestrian Ramps)8 8 712$ As-built plan preparation 1 6 16 23 1,823$ Project Management 2 2 318$ SUBTOTAL HOURS 4 8 - 17 8 - 37 SUBTOTAL COST 636$ 640$ -$ 1,258$ 712$ -$ 3,246$ Expenses: Travel & Subsistence (TS)21$ Survey Equipment Rental 560$ Subtotal 3,827$ TOTAL HOURS 52 87 2 377 36 43 597 TOTAL LABOR COST 8,268$ 6,960$ 192$ 27,898$ 3,204$ 2,279$ 48,801$ TOTAL EXPENSES 15,833$ TOTAL PROJECT 64,634$ TOTAL (ROUNDED)64,700$