Loading...
HomeMy WebLinkAbout6.i. Condenser Replacement – Rosemount Arena EXECUTIVE SUMMARY City Council Regular Meeting: February 20, 2018 AGENDA ITEM: Condenser Replacement – Rosemount Arena AGENDA SECTION: Consent PREPARED BY: Dan Schultz, Parks and Recreation Director AGENDA NO. 6.i. ATTACHMENTS: None APPROVED BY: LJM RECOMMENDED ACTION: Motion to accept the bids for the replacement of the condenser at the Rosemount Arena and to award the project to the low bidder Rink Tec in the amount of $77,649.65. ISSUE The replacement of the condenser in the Rosemount Arena is part of the City’s 2018 Capital Improvement Plan (CIP). The existing condenser is the original unit that was installed when the building was constructed in 1993. The life expectancy of a condenser with proper care is 20 - 25 years. Staff recently solicited bids for the replacement of the condenser. The request that staff made to contractors bidding the project was to provide the City with a bid for a new condenser unit that would work with the City’s current refrigeration system (R-22) and also an ammonia based system. Staff received the bids listed below: Contractor Bid Price Rink Tec $ 77,649.65 Cool Air Mechanical $ 78,100.00 Gartner Refrigeration $ 89,882.00 Should the condenser replacement be approved, staff plans to have this work completed in early May of 2018 when the ice is taken out of the area. SUMMARY Staff would like for the City Council to consider accepting the bids for the condenser replacement project at the Rosemount Arena and awarding a contract to the low bidder Rink Tec in the amount of $77,649.65.