Loading...
HomeMy WebLinkAbout9.b. Request by Mark Elliot Homes for the 26 Lot Final Plat of Harmony Villas 2nd Addition EXECUTIVE SUMMARY City Council Meeting Date: April 3, 2018 AGENDA ITEM: Request by Mark Elliot Homes for the 26 Lot Final Plat of Harmony Villas 2nd Addition. AGENDA SECTION: New Business PREPARED BY: Kyle Klatt, Senior Planner AGENDA NO. 9.b. ATTACHMENTS: Final Plat Resolution, Subdivision Agreement, Location Map; Harmony Villas 2nd Addition Final Plat; Updated Harmony Village Plans: Cover Sheet, Existing Conditions (Prior to Phase 1), Site Plan, Grading Plan, Storm Water Plan, Utility Plan, Landscape Plan; City Engineer Memo 2/22/18; APPROVED BY: LJM RECOMMENDED ACTIONS: The Planning Commission and Staff recommend the City Council adopt the following motions: 1) Motion to Adopt a Resolution Approving the Final Plat for Harmony Villas 2nd Addition subject to conditions. 2) Motion to Approve the Subdivision Development Agreement for Harmony Villas 2nd Addition and Authorizing the Mayor and City Clerk to enter into this Agreement. SUMMARY The City Council is being asked to consider a Final Plat request from Mark Elliot Homes for Harmony Villas 2nd Addition to allow development of 26 single-family attached homes. Applicant: Mark Elliot Homes (Mark Pasvogel) Location: Outlot A Harmony Villas Addition Gross Acres: 4.16 Acres Met Council Net Acres: 4.16 Acres Proposed Lots: 26 Lots Gross Density: 6.25 Units/Acre Net Density: 6.25 Units/Acre Existing Comp Plan Designation: MDR – Low Density Residential Existing Zoning: R3 PUD – Medium Density Residential/Planned Unit Development 2 PLANNING COMMISSION REPORT The Planning Commission reviewed the Final Plat request on February 27, 2018. The Commission generally, discussed the timing of improvements between the two phases of the project, but did not express any concerns with the final plat as presented. The Planning Commission voted unanimously to recommend approval of the Final Plat with the conditions as recommended by Staff. BACKGROUND The applicant, Mark Elliot Homes, requests approval of a Final Plat for Harmony Villas 2nd Addition to allow development of 26 single-family attached (townhouse) lots. The final plat is necessary to facilitate subdivision of the subject property into individual residential lots. The Planning Commission previously reviewed and approved an amendment to the Harmony Planned Unit Development to allow for the two and four-unit townhouses within this subdivision in addition to a final plat for the first phase of the project. At this time, the developer is now requesting final plat approval for the second phase. The overall development plans for the site (including grading, storm water management, and utilities) have not changed from the preliminary approval with one minor exception: three feet in length has been added to each of the garage units. This change does not alter the plat or any of the approved plans, and staff finds that the resulting design is consistent with the one documented in the previous PUD amendment. Staff finds the application consistent with the Harmony Villas Addition Preliminary Plat that was approved by the City Council on June 20, 2017 and recommends approval of this application subject to the conditions within the recommended action. ISSUE ANALYSIS Legal Authority. This application is a Quasi-Judicial action. The final plat application is Quasi-Judicial because the City has a set of standards and requirements for reviewing this type of application that is described in detail below. Generally, if the final plat meets the ordinance requirements it must be approved. Streets & Access. All streets internal to the development will be private, with two entrances off of Bronze Parkway. The easternmost access to Bronze Parkway was constructed with the first project phase, and the western access point will be constructed with phase two. The streets primarily used for circulation are designed to meet the City’s specifications for public roadways at 28 feet in width, while the streets only providing access to individual units are somewhat narrower at 22 feet. The proposed street layout matches the preliminary PUD plans and will provide for adequate maneuvering space for service vehicles, residents and visitors to this neighborhood. Final Plat. The City Council approved a simple plat for the entire Harmony Villas project on March 21, 2017; however, the developer later requested to split the project into two phases to better align with the expected marketing and construction of the homes. The Council approved a final plat for the eastern 16 of the planned 42 lots at a meeting on June 20, 2017. The applicant has now submitted a request to plat the western 26 lots that are associated with phase two. The site and construction plans submitted for the overall project have been submitted in conjunction with the current request, and have been reviewed by staff for consistency with the previous approvals. 3 Grading . The mass grading for this plat was completed with the grading for the original Harmony PUD project. The final site grading will be completed following the installation of the private streets and public utilities needed to serve the subdivision. Streets and Urban Infrastructure . Although the streets internal to the development will be private, the sanitary sewer and water lines servicing each of the individual homes will be public. The developer is proposing to dedicate drainage and utility easements over all private roads to provide the City with the required access it needs to maintain these lines. Staff is recommending a condition of approval that will require the developer to enter into an agreement with the City concerning the installation of all public infrastructure. Parks and Open Space. The park dedication requirements for Harmony have been paid or been achieved through land dedication. There are no new Park fees created by the request. Engineering Comments. The Assistant City Engineer has reviewed the proposed Harmony Villas 2nd Addition Final Plat and the plans for the entire Harmony Villas Addition Preliminary Plat and has a few minor concerns. Comments regarding this application are detailed in the attached memo dated February 22, 2018. CONCLUSION & RECOMMENDATION The Planning Commission and staff recommend approval of the Final Plat for Harmony Villas Addition creating 26 single family lots. This recommendation is based on the information submitted by the applicant, findings made in this report and the conditions detailed in the attached memorandums. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2018 - A RESOLUTION APPROVING THE FINAL PLAT FOR HARMONY VILLAS 2ND ADDITION WHEREAS, Mark Elliot Homes, 17850 Kenwood Trail, Lakeville, MN (Applicant) has submitted an application to the City of Rosemount (City) for a Final Plat concerning property legally described as follows: Outlot A, HARMONY VILLAS, according to the recorded plat thereof, Dakota County, Minnesota WHEREAS, on February 27, 2018, the Planning Commission of the City of Rosemount reviewed the Final Plat for Harmony Villas 2nd Addition; and WHEREAS, on February 27, 2018, the Planning Commission recommended approval of the Final Plat for Harmony Villas 2nd Addition, subject to conditions; and WHEREAS, on April 3, 2018, the City Council of the City of Rosemount reviewed the Planning Commission’s recommendations and the Final Plat for Harmony Villas 2nd Addition. NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Rosemount hereby approves the Final Plat for Harmony Villas 2nd Addition, subject to the following conditions: 1) Dedication of standard drainage and utility easements 2) Execution of a Subdivision Agreement. 3) Compliance with the conditions and standards within the City Engineer’s Memorandum dated February 22, 2018. ADOPTED this 3rd day of April 2018, by the City Council of the City of Rosemount. __________________________________________ William H. Droste, Mayor ATTEST: ___________________________________ Erin Fasbender, City Clerk Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 1 of 11 SUBDIVISION AGREEMENT Harmony Villas 2nd AGREEMENT dated this ________ day of ________________________, 2018, by and between the CITY OF ROSEMOUNT, a Minnesota municipal corporation, (the "City"), and MARK ELLIOT HOMES LLC, a Minnesota limited liability company (the "Developer"). 1. Request for Plat Approval. The Developer has asked the City to approve the subdivision of land and a plat of land to be known as Harmony Villas 2, which land is legally described on ATTACHMENT ONE, attached hereto and hereby made a part hereof (hereinafter referred to as the “subject property”). 2. Conditions of Plat Approval. The City has approved the subdivision and the plat on the following conditions: a. Dedication of standard drainage and utility easements. b. Compliance with the conditions and standards within the City Engineer’s Memorandum dated February 22, 2018. c. Approval and execution of a subdivision agreement. 3. Phased Development. The City may refuse to approve final plats of subsequent additions of the plat if the Developer has breached this Agreement and the breach has not been remedied. Development of subsequent phases may not proceed until Subdivision Agreements for such phases are approved by the City. 4. Effect of Subdivision Approval. For two (2) years from the date of this Agreement, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Agreement to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City's Comprehensive Guide Plan, official controls, platting or dedication requirements enacted after the date of this Agreement. 5. Development Plans. The subject property shall be developed in accordance with the following plans, specifications and contract documents, original copies of which are on file with the City Engineer. The plans and contract documents may be prepared, subject to City approval, after Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 2 of 11 entering this Agreement, but before commencement of any work on the Subject Property. If the plans vary from the written terms of this Agreement, the written terms shall control. The plans are: Plan A - Plat Plan B - Soil Erosion Control Plan and Schedule Plan C - Drainage and Storm Water Runoff Plan Plan D - Plans and Specifications for Public and Private Improvements Plan E - Grading Plan and House Pad Elevations Plan F - Street Lights Plan G - Landscape Improvements All Improvements, including Developer Improvements and City-Installed Public Infrastructure Improvements (if any) that lie within the public right-of-way or easements and are improvements listed in Minnesota Statutes, Section 429.021 (hereinafter the Improvements) will be designed by the Developer at the Developer’s expense, and approved by the City Engineer. The Developer will prepare plans and specifications for the Improvements and will perform all construction administration for the Improvements, all at Developer expense. Construction administration includes but is not limited to documentation, as-builts, surveying, field staking, and testing. The City Engineer will perform inspection services at Developer’s expense. 6. Installation by Developer. The Developer shall install or cause to be installed and pay for the following, hereinafter referred to as the “Developer Improvements”: A. Surveying and staking B. Surface improvements (paved streets, sidewalks, trails, etc.) C. Water main improvements D. Sanitary sewer improvements E. Storm sewer improvements F. Setting of lot and block monuments G. Gas, electric, telephone, and cable lines H. Site grading I. Landscaping J. Streetlights K. Other items as necessary to complete the development as stipulated herein or in other agreements 7. Time of Performance. The Developer shall install all required improvements enumerated in Paragraph 6 that will serve the subject property by November 30, 2018, subject to delays due to inclement weather, casualty, labor strikes, material shortages, or other force majeure not within the Developer’s reasonable control. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 3 of 11 8. City-Installed Public Infrastructure. The following improvements, hereinafter referred to as “City- Installed Public Infrastructure Improvements” (known as City Project 2018-12), shall be designed, inspected, surveyed and administered by the City, and installed in the Subject Property at Developer expense by a Contractor selected by the City through the public bidding process: A. None 9. [This Section Intentionally Left Blank] 10. Security for Developer Improvements. To guarantee compliance with the terms of this Agreement, payment of the costs of all Developer Improvements, and construction of all Developer Improvements (as noted in Paragraph 6), the Developer shall furnish the City with a cash deposit or irrevocable letter of credit from a local bank (“security”) in the amount of Six Hundred Twenty-One Thousand, Ninety-Four Dollars ($621,094). The amount of the security was calculated as follows: Private Improvements Cost 110% Grading & Erosion Control $25,000 $27,500 Survey Monumentation $13,000 $14,300 Landscaping (82 trees) $24,600 $27,060 Street Lighting (5 lights) $20,000 $22,000 Surface Improvements $211,032 $232,135 Public Improvements Cost 125% Water Main Improvements $120,278 $150,348 Sanitary Sewer Improvements $86,857 $108,571 Storm Sewer Improvements $31,343 $39,179 Total $532,111 $621,094 Refer to Exhibit A and Exhibit B for an explanation of each item. The bank and form of the letter of credit or other security shall be subject to the approval of the City Administrator. The letter of credit shall be automatically renewable until the City releases the developer from responsibility. The letter of credit shall secure compliance with the terms of this Agreement and all obligations of the Developer under it. The City may, without notice to the Developer, draw on the letter of credit in order to ensure completion of the obligations under this Agreement if the City receives notice that the letter of credit will expire or not be renewed and no substitute letter of credit has been provided by the Developer. In the event of a default under this Subdivision Agreement by the Developer, the City shall furnish the Developer with written notice by certified mail of Developers default(s) under the terms of this Subdivision Agreement. If the Developer does not remove said default(s) within two (2) weeks of receiving notice, the City may draw on the letter of credit. Upon request by the Developer, the City will reduce the letter of credit subject to evaluation of the City’s maximum risk exposure, satisfaction of all of Developer’s financial obligations to the City, and final approval by the City Engineer. It is the intention of the parties that the City at all times have available to it a Letter of Credit in an amount adequate to ensure completion of all elements of the Subdivision Improvements and other obligations of the Developer under this Agreement. To that end and notwithstanding anything herein to the contrary, all requests by the Developer for a reduction or release of the Letter of Credit shall be evaluated by the City in light of that principle. 11. Grading Plan/Site Grading. Site grading shall be completed by the Developer at its cost and approved by the City Engineer. The completion of grading activities will need to be coordinated by Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 4 of 11 the City in conjunction with the installation of utilities. Developer shall furnish the City Engineer satisfactory proof of payment for the site grading work and shall submit a certificate of survey of the development to the City as the site grading is completed by phase, with street and lot grades. If the installation of utilities by the City is occurring simultaneously with the grading, the utility contractor shall have preference over the grading activities. No substantial grading activities can be completed over installed utilities unless otherwise protected. All improvements to the lots and the final grading shall comply with the grading plan as submitted and shall be the responsibility of the Developer. 12. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the Subject Property to perform all work and inspections deemed appropriate by the City. Such license shall terminate as to all residential lots within the subject property upon acceptance by the City of the public infrastructure improvements. 13. Erosion Control. Prior to site grading, and before any utility construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be implemented, inspected and approved by the City. All areas disturbed by the excavation and backfilling operations shall be reseeded within 72 hours after the completion of the work in that area. Except as otherwise provided in the erosion control plan, seed shall be rye grass or other fast-growing seed suitable to the existing soil to provide a temporary ground cover as rapidly as possible. All seeded areas shall be mulched and disc-anchored as necessary for seed retention. All basement and/or foundation excavation spoil piles shall be kept completely off City right-of-way and shall be completely surrounded with an approved erosion control silt fence. Approved erosion control fencing shall be installed around the perimeter of each lot or at City-approved locations at the time of building permit issuance and remain in place until the lot is seeded or sodded. A 20-foot opening will be allowed on each lot for construction deliveries. The parties recognize that time is critical in controlling erosion. If development does not comply with the erosion control plan and schedule, or supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion. This right also applies to the required erosion control for basement and/or foundation excavation spoil piles. The City will attempt to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer’s or City’s rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay any costs. No development will be allowed, and no building permits will be issued unless the Subject Property is in full compliance with the erosion control requirements. 14. Planting and Seeding. Landscaping shall be in accordance with Landscape Plans approved by the City Planner. 15. Clean up. The Developer shall clean streets of dirt and debris that has resulted from construction work by the Developer, its agents or assignees. The City will inspect the site on a weekly basis and determine whether it is necessary to take additional measures to clean dirt and debris from the streets. After a 24-hour verbal notice to the Developer, the City will complete or contract to complete the clean-up at the Developer’s expense in accordance with the procedures specified in Paragraph 13. The Developer shall inspect and, if necessary, clean all catch basins, sumps, and ponding areas of erosion/siltation and restore to the original condition at the end of home construction within this development. All silt fence and other erosion control should be removed following the establishment of turf. These items are to be secured through the letter of credit as is noted in Exhibit A. 16. Ownership of Improvements. Upon completion and City acceptance of the work and construction required by this Agreement, the Public Improvements lying within public rights-of-way and easements Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 5 of 11 shall become City property without further notice or action unless the improvements are specifically identified herein as private infrastructure. Sanitary sewer, storm sewer and water main are Public Improvements. All other improvements are Private Improvements. 17. Warranty. The Developer warrants all work required to be performed by it against poor material and faulty workmanship for a period of two (2) years after its completion and acceptance by the City. All trees, grass and sod shall be warranted to be alive, of good quality and disease free for twenty- four (24) months after planting. 18. Responsibility for Costs. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the Subject Property including, but not limited to, Soil and Water Conservation District charges, legal, planning, engineering and inspection expenses incurred in connection with approval and acceptance of the subdivision and the plat, the preparation of this Agreement and any amendments hereto, and all costs and expenses incurred by the City in monitoring and inspecting the development of the Subject Property. B. The Developer shall hold the City and its officers and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat or subdivision approval and development of the Subject Property, except for any costs or expenses arising from the negligence or other wrongful acts or omissions of the City, it’s agents, employees or contractors. The Developer shall indemnify the City and its officers and employees for all costs, damages or expenses that the City may pay or incur in consequence of such claims, including attorney’s fees. C. The Developer shall reimburse the City for costs incurred in the preparation and enforcement of this Agreement, including engineering and attorney’s fees. Upon request, the City shall provide invoices, in reasonable detail, as to any such fees. The estimated City fees of $58,511 shall be deposited with the City at the time this Agreement is signed, and represent the following amounts: $10,000 Engineering Review Fees (estimate – to be used to reimburse the City for actual review expenses) $22,476 Construction Monitoring Fees (estimate – 5% of construction costs – to be used to reimburse the City for actual construction monitoring expenses) $2,000 Attorney Fees (estimate – to be used to reimburse the City for actual legal expenses) $22,476 5% City Fees (non-refundable – based on estimate of construction costs of $412,400) $1,560 GIS Fees (non -refundable) $58,511 Total Amount Due If the actual City fees exceed this estimate, the Developer shall pay the additional costs to the City within ten (10) days of the request. If actual City fees are lower than this estimate, any surplus funds will be returned to the developer when the project fund is reconciled and closed. D. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Agreement within thirty (30) days after receipt. If the bills are not paid on time, the City may halt development work and construction including, but not limited to, the issuance of building permits for lots that the Developer may or may not have sold, until the bills are paid in Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 6 of 11 full. Bills not paid within thirty (30) days shall accrue interest at the rate of nine percent (9%) per year. E. The Developer shall pay all energy costs for street lights installed within the Subject Property incurred prior to the creation of a common interest community by recording a declaration against the Subject Property in the Office of the Dakota County Recorder or Registrar of Titles. After the creation of a common interest community, the association formed to govern the common interest community shall pay all energy costs for street lights installed within the Subject Property. 19. The Developer agrees to pay fees, charges and assessments set forth in this Section prior to, or at the time of execution of any plat by the City: A. Park dedication fees in the amount of $0 B. Storm Sewer Trunk Area Charges in the amount of $28,558 C. Sanitary Sewer Trunk Area Charges in the amount of $4,472 D. Watermain Trunk Area Charges in the amount of $27,040 Or other amounts for such fees as in effect at the time of plat approval. 20. The Developer understands that builders will be required to pay for the Subject Property fees, charges and assessments in effect at the time of issuance of building permits. The rates for each of these items will be set according to the current rate structure at the time the building permit is received. The fees, charges, and assessments in effect as of the date of this agreement are: A. Metropolitan Council Environmental Services Availability Charges per SAC unit (current rate is $2,485). B. Storm Sewer Connection Charges per single family unit and per multiple family unit (single family currently at $770; multi-family currently at $290 per housing unit). C. Sanitary Sewer Availability Charges per SAC unit (currently at $1,200/SAC unit). D. Water Availability Charges per SAC unit (currently at $2,400/SAC unit for single family residential and multi-family residential). No building permit will be issued until all building permit fees related to such permit are paid in full. No early building permits will be issued. 21. Occupancy Permits. No occupancy permits shall be issued until: A. The site grading is completed and approved by the City. B. All utilities are tested, approved by the City Engineer, and in service. C. All curbing is installed and backfilled. D. The first lift of bituminous is in place and approved by the City. The Developer, in executing this Agreement, assumes all liability and costs for damage or delays incurred by the City in the construction of the Improvements caused by the Developer, its employees, contractors, subcontractors, material men or agents. No occupancy permits shall be issued until the streets and utilities referred to in paragraph 6 are installed and approved by the City (excluding the final wear course of bituminous), unless otherwise authorized in writing by the City Engineer. Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 7 of 11 22. Record Drawings. At project completion, Developer shall submit record drawings of all public and private infrastructure improvements in accordance with the City’s Engineering Guidelines. No securities will be fully released until all record drawings have been submitted and accepted by the City Engineer. 23. Developer’s Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than 48 hours in advance. This Agreement is a license for the City to act, and it shall not be necessary for the City to seek a court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, draw on the letter of credit or other security described in section 10, or levy the cost in whole or in part as a special assessment against the Subject Property. Developer waives its rights to notice of hearing and hearing on such assessments and its right to appeal such assessments pursuant to Minnesota Statutes, Section 429.081. 24. Miscellaneous. A. The Developer represents to the City that the development of the Subject Property, the subdivision and the plat comply with all city, county, metropolitan, state and federal laws and regulations including, but not limited to: subdivision ordinances, zoning ordinances and environmental regulations. If the City determines that the subdivision, or the plat, or the development of the Subject Property does not comply, the City may, at its option, refuse to allow construction or development work on the Subject Property until the Developer does comply. Upon the City’s demand, the Developer shall cease work until there is compliance. B. Third parties shall have no recourse against the City under this Agreement. C. Breach of the terms of this Agreement by the Developer shall be grounds for denial of building permits, including lots sold to third parties. D. If any portion, section, subsection, sentence, clause, paragraph or phase of this Agreement is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Agreement. E. If building permits are issued prior to the completion and acceptance of the Public Improvements, the Developer assumes all liability and costs resulting from delays in completion of the Public Improvements and damage to the Public Improvements caused by the City, the Developer, its contractors, subcontractors, material men, employees, agents or third parties. F. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City’s failure to promptly take legal action to enforce this Agreement shall not be a waiver or release. G. This Agreement shall run with the land and may be recorded against the title to the subject property. The Developer shall take such steps, including execution of amendments to this Agreement, as are necessary to effect the recording hereof. After the Developer has completed the work required of it under this Agreement, at the Developer’s request, the City will execute and deliver to the Developer a release. Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 8 of 11 H. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to the City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. I. The Developer may not assign this Agreement without the written permission of the City Council. 25. Notices. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: Mark Pasvogel Mark Elliot Homes 7741 147th Street West Apple Valley, MN 55124 952-392-9227 mark@markelliothomes.com Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by registered mail in care of the City Administrator at the following address: City Administrator Rosemount City Hall 2875 145th Street West Rosemount, Minnesota 55068 Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 9 of 11 IN WITNESS WHEREOF, the parties have hereunto set their hands the day and year first above written. CITY OF ROSEMOUNT BY: William H. Droste, Mayor BY: Erin Fasbender, City Clerk STATE OF MINNESOTA ) ) SS COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me this day of _____________________, 2018, by William H. Droste, Mayor, and Erin Fasbender, City Clerk, of the City of Rosemount, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. Notary Public MARK ELLIOT HOMES BY: Its STATE OF MINNESOTA ) ) SS COUNTY OF _____________) The foregoing instrument was acknowledged before me this _______ day of _______________________, 2018 by , the _______________________________ of Mark Elliot Homes LLC, a Minnesota limited liability company, on behalf of said limited liability company. Notary Public Drafted By: City of Rosemount 2875 145th Street West Rosemount, MN 55068 Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 10 of 11 EXHIBIT A The following clarifies the various portions of the letter of credit for Developer Improvements that are outlined in the Subdivision Agreement: Grading & Erosion Control – A restoration and erosion control bond to ensure re-vegetation and erosion control ($3,500/acre). Note: The minimum surety amount is set at $25,000. Survey Monumentation – An amount equal to 110% of the cost to monument all lots within the development. Landscaping – An amount equal to 110% of the cost to complete the minimum required landscaping. If additional landscaping is planned, a surety for that cost is not required. Retaining Walls – An amount equal to 110% of the cost to complete the retaining wall construction. Street Lighting – An amount equal to 110% of the cost to complete the minimum required lighting. If additional lighting is planned, a surety for that cost is not required ($4,000 per light has been used to calculate this cost). Surface Improvements – In accordance with the final development plans for Harmony Villas 2nd approved by the City. Water Main Improvements – In accordance with the final development plans for Harmony Villas 2nd approved by the City. Sanitary Sewer Improvements – In accordance with the final development plans for Harmony Villas 2nd approved by the City. Storm Sewer Improvements – In accordance with the final development plans for Harmony Villas 2nd approved by the City. Harmony Villas 2 EXHIBIT B (Page 1 of 2) No.Item Cost 110%Calculation 1 Grading and Erosion Control 25,000$ 27,500$ $3500/ac x 4.16 Minimum $25,000 2 Pond Restoration and Erosion Control Removal -$ -$ N/A 3 Survey Monumentation 13,000$ 14,300$ $500/lot x 26 lots 4 Retaining Wall -$ -$ N/A 5 Landscaping 24,600$ 27,060$ Per City Planner, 82 trees x $300 6 Street Lights 20,000$ 22,000$ 5 lights x $4000/light 7 Buffer Monumentation -$ -$ N/A 8 Surface Improvements 211,032$ 232,135$ 110% 9 Water Main Improvements 120,278$ 150,348$ 125% 10 Sanitary Sewer Improvements 86,857$ 108,571$ 125% 11 Storm Sewer Improvements 31,343$ 39,179$ 125% Total 532,111$ 621,094$ No.Item Cost Estimated Construction Cost 449,511$ 1 Engineering Review Fees 10,000$ 2 Construction Monitoring Fees 22,476$ 3 Attorney Fees 2,000$ 4 5% City Administrative Fees 22,476$ 5 Street Light Energy Cost -$ 6 GIS Fees 1,560$ 7 Trail Fog Seal -$ 8 Seal Coating -$ Total 58,511$ No.Item Cost 1 Storm Sewer Trunk Charge 28,558$ 2 Sanitary Sewer Trunk Charge 4,472$ 3 Water Trunk Charge 27,040$ 4 Stormwater Ponding Fee -$ Total 60,070$ No.Item Cost 1 Park Dedication -$ Total -$ Estimate 5% of Estimated Construction Cost Developer responsible for ongoing electricity and maintenance $60/unit x 26 units, or $120/acre N/A 5% of Estimated Construction Cost Letter of Credit for Developer Improvements (due with signed agreement) City Fees (due with signed agreement) Calculation City Engineer Estimation City Engineer Estimation $6500/acre x 4.16 acres Developer responsible for sealcoating Development Fees (due before signed plat is released) None, per Parks & Recreation Director Development Fees (due with signed agreement) Calculation Calculation $6865/net developable acre 4.16 acres $1075/acre x 4.16 acres N/A Block Lots Units Block Lot Units SQ FT Acres 1 26 26 1 1 1 3330.000 0.076 1 2 1 3330.000 0.076 1 3 1 3330.000 0.076 1 4 1 3330.000 0.076 1 5 1 3330.000 0.076 1 6 1 3330.000 0.076 1 7 1 3330.000 0.076 Total 26 26 1 8 1 3330.000 0.076 1 9 1 3330.000 0.076 Total Plat Area =4.16 acres 1 10 1 3330.000 0.076 Total Park Area 0.00 acres 1 11 1 3330.000 0.076 Future Plat Area =0.00 acres 1 12 1 3330.000 0.076 Developable Area =4.16 acres *1 13 1 2436.000 0.056 Ponding to HWL = 0.00 acres 1 14 1 2436.000 0.056 Net Developable Area =4.16 acres 1 15 1 2436.000 0.056 1 16 1 2436.000 0.056 * Excludes future plat and park areas 1 17 1 2436.000 0.056 1 18 1 2436.000 0.056 1 19 1 2436.000 0.056 1 20 1 2436.000 0.056 1 21 1 2436.000 0.056 1 22 1 2436.000 0.056 1 23 1 3330.000 0.076 1 24 1 3330.000 0.076 1 25 1 3330.000 0.076 1 26 1 3330.000 0.076 1 27 103754.000 2.382 Total Boundary 181394.000 4.164 Harmony Villas 2 EXHIBIT B (Page 2 of 2) Totals Harmony Villas 2nd April / 2018 G:\ENGPROJ\2018-12 Harmony Villas 2\Subdivisionagreement 2018-12.docx Page 11 of 11 ATTACHMENT ONE Harmony Villas 2nd Final Plat LOUCKS KNOW ALL PERSONS BY THESE PRESENTS: That Mark Elliot Homes, LLC, a Minnesota limited liability company, owner of the following described property situated in the County of Dakota, State of Minnesota, to wit: Outlot A, HARMONY VILLAS, according to the recorded plat thereof, Dakota County, Minnesota. Has caused the same to be surveyed and platted as HARMONY VILLAS 2ND ADDITION and does hereby dedicate to the public for public use the drainage and utility easement as created by this plat. In witness whereof said Mark Elliot Homes, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this ______ day of __________________, 20____. MARK ELLIOT HOMES, LLC Signed: _______________________________________________ By: _______________________________________________, as _________________________ STATE OF MINNESOTA COUNTY OF _________________________ The foregoing instrument was acknowledged before me on this ______ day of __________________, 20____, by _____________________________________, as _________________________, of Mark Elliot Homes, LLC, a Minnesota limited liability company, on behalf of the company. _______________________________________________________________________________________ Notary Public, ____________________ County, Minnesota Notary Printed Name My Commission Expires January 31, 20____ I, Max L. Stanislowski, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, existing as of the date of this certificate are shown and labeled on this Plat; and all public ways are shown and labeled on this plat. Dated this ______ day of __________________, 20____. _______________________________________________ Max L. Stanislowski, Licensed Land Surveyor, Minnesota License No. 48988 STATE OF MINNESOTA COUNTY OF ____________________ The foregoing instrument was acknowledged before me on this ______ day of __________________, 20____, by Max L. Stanislowski, a Licensed Land Surveyor. _______________________________________________________________________________________ Notary Public, ____________________ County, Minnesota Notary Printed Name My Commission Expires _________________________ CITY PLANNING COMMISSION, CITY OF ROSEMOUNT, MINNESOTA Approved by the Planning Commission of the City of Rosemount, Minnesota this ______ day of __________________, 20____. By _____________________________________, Chair CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of the City of Rosemount, Minnesota, this ______ day of __________________, 20____, and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By _____________________________________, Mayor By _____________________________________, Clerk COUNTY SURVEYOR, Dakota County, Minnesota I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this ______ day of __________________, 20____. By _____________________________________, Dakota County Surveyor Todd B. Tollefson DEPARTMENT OF PROPERTY TAXATION AND RECORDS, Dakota County, Minnesota Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20___ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer has been entered on this ______ day of __________________, 20____. By _____________________________________, Department of Property Taxation and Records By _____________________________________, Deputy COUNTY RECORDER, County of Dakota, State of Minnesota I hereby certify that this plat of HARMONY VILLAS 2ND ADDITION, was filed in the Office of the County Recorder for public record on this ______ day of __________________, 20____, at ______ o'clock ____ .M. and was duly filed in Book ____________ of Plats, Page ______, as Document Number ________________________. By _____________________________________, County Recorder By _____________________________________, Deputy VICINITY MAP S.E.1/4N.E.1/4S.W.1/4 N.W.1/4 N N SCALE IN FEET 0 40 SITE HARMONY VILLAS Property Information Febru ary 14, 2017 0 450 900225 ft 0 130 26065 m 1:4,800 Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification. LOUCKS KNOW ALL PERSONS BY THESE PRESENTS: That Mark Elliot Homes, LLC, a Minnesota limited liability company, owner of the following described property situated in the County of Dakota, State of Minnesota, to wit: Outlot A, HARMONY VILLAS, according to the recorded plat thereof, Dakota County, Minnesota. Has caused the same to be surveyed and platted as HARMONY VILLAS 2ND ADDITION and does hereby dedicate to the public for public use the drainage and utility easement as created by this plat. In witness whereof said Mark Elliot Homes, LLC, a Minnesota limited liability company, has caused these presents to be signed by its proper officer this ______ day of __________________, 20____. MARK ELLIOT HOMES, LLC Signed: _______________________________________________ By: _______________________________________________, as _________________________ STATE OF MINNESOTA COUNTY OF _________________________ The foregoing instrument was acknowledged before me on this ______ day of __________________, 20____, by _____________________________________, as _________________________, of Mark Elliot Homes, LLC, a Minnesota limited liability company, on behalf of the company. _______________________________________________________________________________________ Notary Public, ____________________ County, Minnesota Notary Printed Name My Commission Expires January 31, 20____ I, Max L. Stanislowski, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, existing as of the date of this certificate are shown and labeled on this Plat; and all public ways are shown and labeled on this plat. Dated this ______ day of __________________, 20____. _______________________________________________ Max L. Stanislowski, Licensed Land Surveyor, Minnesota License No. 48988 STATE OF MINNESOTA COUNTY OF ____________________ The foregoing instrument was acknowledged before me on this ______ day of __________________, 20____, by Max L. Stanislowski, a Licensed Land Surveyor. _______________________________________________________________________________________ Notary Public, ____________________ County, Minnesota Notary Printed Name My Commission Expires _________________________ CITY PLANNING COMMISSION, CITY OF ROSEMOUNT, MINNESOTA Approved by the Planning Commission of the City of Rosemount, Minnesota this ______ day of __________________, 20____. By _____________________________________, Chair CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of the City of Rosemount, Minnesota, this ______ day of __________________, 20____, and hereby certifies compliance with all requirements as set forth in Minnesota Statutes, Section 505.03, Subd. 2. By _____________________________________, Mayor By _____________________________________, Clerk COUNTY SURVEYOR, Dakota County, Minnesota I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this ______ day of __________________, 20____. By _____________________________________, Dakota County Surveyor Todd B. Tollefson DEPARTMENT OF PROPERTY TAXATION AND RECORDS, Dakota County, Minnesota Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20___ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes, Section 272.12, there are no delinquent taxes and transfer has been entered on this ______ day of __________________, 20____. By _____________________________________, Department of Property Taxation and Records By _____________________________________, Deputy COUNTY RECORDER, County of Dakota, State of Minnesota I hereby certify that this plat of HARMONY VILLAS 2ND ADDITION, was filed in the Office of the County Recorder for public record on this ______ day of __________________, 20____, at ______ o'clock ____ .M. and was duly filed in Book ____________ of Plats, Page ______, as Document Number ________________________. By _____________________________________, County Recorder By _____________________________________, Deputy VICINITY MAP S.E.1/4N.E.1/4S.W.1/4 N.W.1/4 N N SCALE IN FEET 0 40 SITE LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C0-1 Cover SheetPlotted: 01 /09 / 2018 1:53 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM ZHW/GAJ TWM 01/11/18 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments 09/06/17 STMH 112 Addition 01/11/18 Phase 2 C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES Gopher State One Call LANDSCAPE/TREE PRESERVATION PLANL1-1 CONSTRUCTION PLANS FOR: LOUCKS ASSOCIATES 7200 HEMLOCK LANE THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 OWNER. 3 ROSEMOUNT, MINNESOTA SWPPP PLANC3-2 SANITARY SEWER & WATERMAIN PLAN & PROFILE STORM SEWER PLAN & PROFILE DETAILS OVERALL UTILITY PLAN DETAILS C8-2 C4-1 C4-2 C5-1 C8-1 LOCATION PROPOSED SITE GRADING PLAN EXISTING CONDITIONS SHEET INDEX C0-1 COVER SHEET SITE PLAN C1-1 C2-1 C3-1 STORM SEWER & STREET CONSTRUCTION VICINITY MAP SITE, GRADING, SANITARY SEWER, WATERMAIN, HARMONY VILLAS APPROVED ROSEMOUNT CITY ENGINEER JOHN MORAST, P.E. DATE: MAPLE GROVE, MINNESOTA 55369 DESIGN CONSULTANTS DEVELOPER CIVIL ENGINEER LAKEVILLE, MN 55044 17850 KENWOOD TRAIL MARK ELLIOT HOMES SUITE 300 FAX: 763-424-5822 TEL: 763-424-5505 TEL: 612-226-5060 TODD MCLOUTH MARK PASVOGEL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL WARNING: AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND 7 C3-3 SWPPP NOTES LANDSCAPE DETAILSL2-1 STORM SEWER PLAN & PROFILEC5-2 STREET PLAN & PROFILEC6-1 STREET PLAN & PROFILEC6-2 COVER SHEET C0-1 SANITARY SEWER & WATERMAIN PLAN & PROFILEC4-3 SANITARY SEWER & WATERMAIN PLAN & PROFILEC4-4 SANITARY SEWER & WATERMAIN PLAN & PROFILEC4-5 SANITARY SEWER & WATERMAIN PLAN & PROFILEC4-6 STREET PLAN & PROFILEC6-3 STREET PLAN & PROFILEC6-4 STREET PLAN & PROFILEC6-5 LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C1-1 Existing ConditionsPlotted: 01 /09 / 2018 1:53 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM ZHW/GAJ TWM 01/11/18 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments 09/06/17 STMH 112 Addition 01/11/18 Phase 2 C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES EXISTING CONDITIONS N EXISTING CONDITIONS C1-1 SURVEY LEGEND SPOT ELEVATION GATE VALVE SIGN LIGHT POLE SANITARY MANHOLE HYDRANT STORM MANHOLE CATCH BASIN CONTOUR CONCRETE CURB STORM SEWER SANITARY SEWER WATERMAIN UNDERGROUND ELECTRIC CONCRETE ELECTRIC TRANSFORMER ELECTRIC MANHOLE HAND HOLE UNDERGROUND GAS YARD LIGHT MISC FRUIT MAPLE AS FR MA CONIFEROUS TREE DECIDUOUS TREE ASH FLARED END SECTION TOP OF CURBTC SET 1/2 INCH X 14 INCH IRON MONUMENT, MARKED "LS 48988" DRILLHOLE Phase 2Phase10+001+002+003+004+00 5+00 6+00 7+00 8+009+009+83.090+001+001+790+001+002+003+003+78.940+001+002+003+004+004+09.280+001+002+000+002+26.53LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C2-1 Site PlanPlotted: 01 /09 / 2018 1:53 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM ZHW/GAJ TWM 01/11/18 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments 09/06/17 STMH 112 Addition 01/11/18 Phase 2 C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES LAYOUT PLAN N SITE PLAN C2-1 EXISTING ZONING: PUD - R-3 (MEDIUM DENSITY RESIDENTIAL) PROPOSED ZONING: PUD AMENDMENT TO PUD - R-3 MATCH EXISTING WALK MATCH EXISTING WALK MATCH EXISTING BITUMINOUS AND CURB PEDESTRIAN RAMP (TYP)B6-12 CURB &GUTTER (TYP)5' CONCRETE WALK R15' R15' R15' R15' R15' R15' R15' R15' R15' R15' R15' R15' CURB CUT CURB CUT CURB CUT TRANSITION TO B6-12 (TYP) SURMOUNTABLE CURB & GUTTER (TYP) CONCRETE CROSS GUTTER PEDESTRIAN RAMP (TYP) R5' (TYP) 18.00' 22.00'22.00' 22.00' 22.00' 22.00' 22.00' 28.00' 28.00'28.00'20.00' 20.00'30.00'20.00'SURMOUNTABLE CURB & GUTTER (TYP) R5' (TYP) 18' TYP 9'TYPZONING OUTLOT G, HARMONY ADDITION, DAKOTA COUNTY, MN LEGAL DESCRIPTION PHASE 1 LOTS 1-8, PHASE 2 LOTS 13-22 42,336 SF, 0.97 AC. PHASE 1 LOTS 9-16, PHASE 2 LOTS 1-12, 23-26 79,920 SF, 1.84 AC. TOTAL UNITS PHASE 1 16 PHASE 2 26 TOTAL 42 PLAT AREA 7.42 AC. SITE DENSITY 5.66 UNITS / AC. OPEN / GREEN SPACE 3.21 AC. (42.3%) PARKING STALLS REQUIRED - 0.5 / UNIT 21 STALLS PARKING STALLS PROPOSED 21 STALLS SITE AREAS PROPERTY BOUNDARYPROPERTY BOUNDARYPROPERT Y B O U N D A R Y PROPERTY BOUNDARYF-F F-F F-F F-F F-F F-F F-F F-F F-FBROOKSIDE PATHBROOKSTONE PATHBROOKVIEW PATHBROOK PATH137th S T. 73 PROPOSED STREET LIGHT SAWCUT & REMOVE PORTION OF BITUMINOUS SURFACE SAWCUT & REMOVE PORTION OF CONCRETE WALK SAWCUT & REMOVE PORTION OF CONCRETE RAMP SAWCUT & REMOVE CONCRETE RAMP Phase 2Phase10+001+002+003+004+00 5+00 6+00 7+00 8+009+009+83.09960962960960962962 960 9609 5 8 958958 956956954954 956958958958 960 962 964 962 960 956958 956 958 954 HP 61.5+++++++++++++++++++++++HP 63.5 63.0 TC 63.6 GL 63.3 EX 62.5 TC 63.2 EX GL 62.9 HP62.8 61.8 61.0++FFE 64.5 FFE 63.5 ++FFE 63.0 FFE 62.0 ++FFE 62.5 FFE 61.5 ++FFE 60.5 FFE 59.5 ++FFE 59.0 FFE 58.096061.5 HP62.0 1.0%1.0%++++FFE 63.3 FFE 63.3 FFE 62.3 FFE 62.3 ++++FFE 62.0 FFE 62.0 FFE 62.0 FFE 62.0 ++++FFE 61.5 FFE 61.5 FFE 62.5 FFE 62.5 ++++FFE 60.5 FFE 60.5 FFE 59.5 FFE 59.5 ++++FFE 58.5 FFE 58.5 FFE 57.5 FFE 57.5 ++++FFE 56.8 FFE 56.8 FFE 55.8 FFE 55.8 ++FFE 54.5 FFE 54.5++FFE 56.0 FFE 56.0++FFE 60.0 FFE 60.0++FFE 63.5 FFE 63.51.0%TC 61.2 GL 60.7 TC 61.0 GL 60.5 61.8++++1.96%1.96%0.94%0.94%+56.8 59.0 59.0 57.0++++++++++TC 59.8 GL 59.3 TC 59.5 GL 59.0 1.16%0.95%1.02%1.02%1.06%2.24%+62.0 +CC 60.4 61.0+59.8+58.9++CC 60.2 +63.0++++++++++++++++++++++++++++++1.01%1.01%1.01%+52.81.01%GB 54.3 54.05.0%+59.8 1.1% GB 58.6 1.14% 58.3 1.1% 58.5 58.2 56.7 958 960 956 956956958958954954TC 57.4 GL 56.9 TC 56.7 GL 56.2 CC 56.2 2.80%GB 56.9 GB 56.25.16%LP 57.8 1.28% 58.5 58.8 57.5+TC 57.4 GL 56.9 TC 56.7 GL 56.2 56.3 55.3 1.08%58.5 58.2 TC 58.8 GL 58.3 TC 58.5 GL 58.0 TC 55.7 GL 55.2 TC 54.9 GL 54.4 CC 54.3 57.7 TC 62.0 GL 61.5 TC 61.0 GL 60.5 59.5 59.0 58.2 5.0%2.83%960 61.0 63.0 EX 63.0 EX TC 63.7 EX GL 63.2EX TC 63.2 EX GL 62.7 +61.0 2.0%GB 61.0 GB 59.5 +GB 60.2 59.7 57.0 54.6 55.3 +54.0 55.5 958 59.558.5 62.8 +INV 952.0 EOFEOFEOFEOF+60.0 +59.0 1.16%+GB 61.5 61.0 +61.0++61.0+62.0+62.5 +EX TC 63.3 EX GL 62.8 +63.15 +EX TC 62.74 EX GL 62.24 6.1% 5.0% 7.6% 6.7% 8.5% 3.8% 5.6% 3.0% 8.0% 5.5% 4.3% 3.3%5.6% 6.4% 8.5% 9.4% 7.4% 8.3% 4.0% 4.8%3.9% 3.1% 6.2% 5.5% 7.4% 6.4% 8.5% 7.6% 7.6% 4.5% 4.5% 5.5%5.5% 1.9% 7.7% 4.0% 3.8% 1.2% 6.6% 8.0% 5.5% 3.0%+GL 56.8 +GL 52.9 +GL 56.9 +GL 54.72.78%88 8 8 8 8 88880+001+001+790+001+002+003+003+78.940+001+002+003+004+004+09.280+001+002+000+002+26.538 8 8 LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C3-1 Grading PlanPlotted: 01 /09 / 2018 1:54 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM ZHW/GAJ TWM 01/11/18 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments 09/06/17 STMH 112 Addition 01/11/18 Phase 2 C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES GRADING PLAN N GRADING PLAN C3-1 CB103 CB102 CB101 CB100 CB106 CB104 CB105 CB108 CB107 Gopher State One Call NOTE: SPOT ELEVATIONS AT CURB LINES INDICATE GUTTER LINE (I.E. FLOW LINE) ELEVATIONS UNLESS OTHERWISE NOTED. GRADING NOTES 1.BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS ASSOCIATES. THE CONTRACTOR SHALL REFER TO THE SITE PLANS FOR ADDITIONAL LOCATIONS AND DIMENSIONS SITE FEATURES. 2.THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO ADJACENT PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASE OF THIS PROJECT. 3.IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 4.EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED AROUND THE ENTIRE SITE PERIMETER AND IN ACCORDANCE WITH NPDES PERMIT REQUIREMENTS, BEST MANAGEMENT PRACTICES, CITY REQUIREMENTS, AND THE SWPP PLAN. 5.ALL SPOT ELEVATIONS SHOWN REPRESENT FINISHED SURFACE OR GUTTER LINE ELEVATIONS UNLESS OTHERWISE NOTED. 6.CONTRACTOR TO VERIFY EXISTING INFORMATION PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER OF ANY PLAN DISCREPANCIES. 7.EXISTING UTILITY LOCATIONS AS-PER CITY AS-BUILT PLANS AND FIELD SHOTS. 8.SEE PROJECT SWPPP FOR EROSION CONTROL INFORMATION. 9.GENERAL CONTRACTOR MUST VERIFY ALL TIE IN GRADES. 10.REFER TO GEOTECHNICAL REPORT FOR MORE INFORMATION. 11.THE CONTRACTOR SHALL PRESERVE AND AVOID ANY EXISTING BURIED UTILITY PIPING. SEE EXISTING CONDITIONS PLAN FOR EXISTING UTILITIES. ABBREVIATION LEGEND FFE=FINISHED FLOOR ELEVATION TW=TOP OF RETAINING WALL GW=GROUND AT FACE OF RETAINING WALL HP=HIGH POINT LP=LOW POINT TC=TOP OF CURB GL=GUTTER LINE CC=CURB CUT LEGEND EXISTING PROPOSED X 800.0 800 8 X.XX% TOPOGRAPHIC CONTOUR SPOT ELEVATION DRAINAGE SLOPE STORM SEWER STORM MANHOLE CATCH BASIN SANITARY SEWER WATERMAIN BENCHMARK FLOW EMERGENCY OVERFLOW THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. WARNING 22.00' 22.00' 22.00' 22.00' 22.00' 22.00' 28.00' 28.00'28.00'F-F F-F F-F F-F F-F F-F F-F F-F F-FBROOKSIDE PATHBROOKSTONE PATHBROOKVIEW PATHBROOK PATH137th ST. 137th ST. CB109 CONCRETE CROSS GUTTER EOF EXISTING STOCKPILE TO BE REMOVED BY OTHERS CB101A Phase 2Phase1960962960960962962 960 9609 5 8 958958 956956954954 956958958958 960 962 964 962 960 956958 956 958 954 HP 61.5+++++++++++++++++++++++HP 63.5 63.0 TC 63.6 GL 63.3 EX 62.5 TC 63.2 EX GL 62.9 HP62.8 61.8 61.0++FFE 64.5 FFE 63.5 ++FFE 63.0 FFE 62.0 ++FFE 62.5 FFE 61.5 ++FFE 60.5 FFE 59.5 ++FFE 59.0 FFE 58.096061.5 HP62.0 1.0%1.0%++++FFE 63.3 FFE 63.3 FFE 62.3 FFE 62.3 ++++FFE 62.0 FFE 62.0 FFE 62.0 FFE 62.0 ++++FFE 61.5 FFE 61.5 FFE 62.5 FFE 62.5 ++++FFE 60.5 FFE 60.5 FFE 59.5 FFE 59.5 ++++FFE 58.5 FFE 58.5 FFE 57.5 FFE 57.5 ++++FFE 56.8 FFE 56.8 FFE 55.8 FFE 55.8 ++FFE 54.5 FFE 54.5++FFE 56.0 FFE 56.0++FFE 60.0 FFE 60.0++FFE 63.5 FFE 63.51.0%TC 61.2 GL 60.7 TC 61.0 GL 60.5 61.8++++1.96%1.96%0.94%0.94%+56.8 59.0 59.0 57.0++++++++++TC 59.8 GL 59.3 TC 59.5 GL 59.0 1.16%0.95%1.02%1.02%1.06%2.24%+62.0 +CC 60.4 61.0+59.8+58.9++CC 60.2 +63.0++++++++++++++++++++++++++++++1.01%1.01%1.01%+52.81.01%GB 54.3 54.05.0%+59.8 1.1% GB 58.6 1.14% 58.3 1.1% 58.5 58.2 56.7 958 960 956 956956958958954954TC 57.4 GL 56.9 TC 56.7 GL 56.2 CC 56.2 2.80%GB 56.9 GB 56.25.16%LP 57.8 1.28% 58.5 58.8 57.5+TC 57.4 GL 56.9 TC 56.7 GL 56.2 56.3 55.3 1.08%58.5 58.2 TC 58.8 GL 58.3 TC 58.5 GL 58.0 TC 55.7 GL 55.2 TC 54.9 GL 54.4 CC 54.3 57.7 TC 62.0 GL 61.5 TC 61.0 GL 60.5 59.5 59.0 58.2 5.0%2.83%960 61.0 63.0 EX 63.0 EX TC 63.7 EX GL 63.2EX TC 63.2 EX GL 62.7 +61.0 2.0%GB 61.0 GB 59.5 +GB 60.2 59.7 57.0 54.6 55.3 +54.0 55.5 958 59.558.5 62.8 +INV 952.0 EOFEOFEOFEOF+60.0 +59.0 1.16%+GB 61.5 61.0 +61.0++61.0+62.0+62.5 +EX TC 63.3 EX GL 62.8 +63.15 +EX TC 62.74 EX GL 62.24 +GL 56.8 +GL 52.9 +GL 56.9 +GL 54.72.78%ROCK CONSTRUCTION ENTRANCE TYP. (SEE DETAIL) SILT FENCE TYP. (SEE DETAIL) INLET PROTECTION TYP. (SEE DETAIL) 4 4 44444444 4444444444444444444444444444444444444 4 4 4 4 4 4 4 4 4 4 444444488 8 8 8 8 8888444444444444444444444444444 4 4 4 4 4 4 4 4 4 4 4 44444444444 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 8 8 8 LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C3-2&3 SWPP Plan & NotesPlotted: 01 /09 / 2018 1:54 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM ZHW/GAJ TWM 01/11/18 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments 09/06/17 STMH 112 Addition 01/11/18 Phase 2 C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES STORMWATER POLLUTION PREVENTION PLAN N STORMWATER POLLUTION PREVENTION PLAN C3-2 Gopher State One Call WARNING: THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. SITE PLAN LEGEND SILT FENCE INLET PROTECTION EXISTING DRAINAGE PATTERN PROPOSED DRAINAGE PATTERN RECEIVING WATERS NAME OF WATER BODY TYPE OF WATER BODY SPECIAL WATER IMAIRED WATER PERMANENT STORMWATER MANAGEMENT INFILTRATION STORMWATER HARVEST AND REUSE FILTRATION WET SEDIMENTATION BASIN REGIONAL PONDING ESTIMATED QUANTITIES DESCRIPTION UNIT TEMPORARY ROCK CONSTRUCTION ENTRANCE EA SILT FENCE (STANDARD)LF INLET PROTECTION EA QUANTITY 2 ±1,580 19 WOODFIBER BLANKET SF ±0 EROSION CONTROL BLANKET X REGIONAL PONDING BIOROLL BIOROLL LF ±0 NO NOPOND Phase 2Phase10+001+002+003+004+00 5+00 6+00 7+00 8+009+009+83.09++FFE 64.5 FFE 63.5 ++FFE 63.0 FFE 62.0 ++FFE 62.5 FFE 61.5 ++FFE 60.5 FFE 59.5 ++FFE 59.0 FFE 58.0 ++++FFE 63.3 FFE 63.3 FFE 62.3 FFE 62.3 ++++FFE 62.0 FFE 62.0 FFE 62.0 FFE 62.0 ++++FFE 61.5 FFE 61.5 FFE 62.5 FFE 62.5 ++++FFE 60.5 FFE 60.5 FFE 59.5 FFE 59.5 ++++FFE 58.5 FFE 58.5 FFE 57.5 FFE 57.5 ++++FFE 56.8 FFE 56.8 FFE 55.8 FFE 55.8 ++FFE 54.5 FFE 54.5++FFE 56.0 FFE 56.0++FFE 60.0 FFE 60.0++FFE 63.5 FFE 63.5 4 4 44444444 4444444444444444444444444444444444444 4 4 4 4 4 4 4 4 4 4 444444488 8 8 8 8 88880+001+001+790+001+002+003+003+78.940+001+002+003+004+004+09.280+001+002+000+002+26.53444444444444444444444444444 4 4 4 4 4 4 4 4 4 4 4 44444444444 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 MH 8 MH 11 MH 7 MH 5 MH 4 MH 3 MH 2 MH 1 MH 9 MH 10 MH 6 CB 103 CB 102 CB 101 CB 100 CB 106 CB 104 CB 105 CB 107 CB 108 CB 109 21" FES 8 8 8 CB 101A STMH 112 LOUCKS W:\2016\16430\CADD DATA\CIVIL\_dwg Sheet Files\C16430 C4-1 Utility PlanPlotted: 01 /09 / 2018 1:55 PM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Todd W. McLouth - PE 20383 Project Lead Drawn By Checked By Loucks Project No.16430 TWM ZHW/GAJ TWM 01/11/18 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments 09/06/17 STMH 112 Addition 01/11/18 Phase 2 C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES UTILITY PLAN N OVERALL UTILITY PLAN C4-1 Gopher State One Call THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES. THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES, CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED DURING CONSTRUCTION AT NO COST TO THE OWNER. WARNING 1.BACKGROUND INFORMATION IS BASED ON A FIELD SURVEY BY LOUCKS ASSOCIATES AND RECORD UTILITY DRAWINGS FROM THE CITY OF BEMIDJI. LOUCKS ASSOCIATES DOES NOT GUARANTEE THE ACCURACY OF INFORMATION PROVIDED BY OTHERS. 2.SEE SHEETS C8-1 AND THE CONTRACT SPECIFICATIONS FOR SPECIFIC UTILITY DETAILS AND UTILITY SERVICE DETAILS. 3.THE CONTRACTOR SHALL NOTIFY GOPHER STATE ONE CALL AT 651-454-0002 AT LEAST 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION OR UNDERGROUND WORK. 4.ADJUST ALL EXISTING STRUCTURES, BOTH PUBLIC AND PRIVATE TO THE PROPOSED GRADES WHERE DISTURBED AND COMPLY WITH ALL REQUIREMENTS OF THE UTILITY OWNERS. STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC LOADING. 5.THE REMOVAL OF EXISTING SERVICES WITHIN THE CONSTRUCTION LIMITS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR AND UTILITY OWNER. ADDITIONAL SERVICES MAY EXIST. 6.INSULATE ALL CROSSINGS INVOLVING WATER AND STORM SEWER. 7.TWIN HOMES SHALL HAVE A 1" COPPER WATER SERVICE AND QUAD HOMES SHALL HAVE 11 2" COPPER WATER SERVICE. UTILITY NOTES CONNECT TO EXISTING STUB RELOCATE EXISTING 21' APRON - CONSTRUCT CB OVER EXISTING 21" RCP EXISTING CB 110 - ADJUST CASTING TO RIM ELEV. 956.6 EXISTING CB 111 - ADJUST CASTING TO RIM ELEV. 954.6 CONNECT TO EXISTING STUB CONNECT TO EXISTING STUB CONNECT TO EXISTING MH HYDRANT & VALVE (TYP) 11 2" WATER SERVICE (TYP) 4" SEWER SERVICE (TYP) CONNECT TO EXISTING STUB REPLACE EXISTING CB WITH STMH 112REMOVE EXISTING CB AND ADJACENT PIPE CORE DRILL AND CONNECT TO EXISTING CB INV. 951.7 8' x 8' INSULATION DENOTES 8' x 8' INSULATION SHEETC4-2C6-1C6-4SHEETC4-5SHEETC4-6C6-5SHEETC4-4C6-3SHEET C4-3 C6-2 BROOKSIDE PATHBROOKSTONE PATHBROOKVIEW PATHBROOK PATH137th ST. 137th ST. UTILITY STRUCTURE SCHEDULE STRUCTURE NO.CASTING MANHOLE SIZE CBMH 102 48" CB 103 CBMH 104 CB 105 48" 48" CBMH 101 2' X 3' CB 107 CB 108 48" CB 100 CB 106 CBMH 109 R-3067-V R-4342 2' X 3' 2' X 3' 2' X 3' 2' X 3' 48" 48"CBMH 101A R-3067-V R-3067-V R-3067-V R-3067-V R-3067-V R-3067-V R-3067-V R-3067-V R-3067-V STMH 112 R-1642 30" 1" WATER SERVICE (TYP) 4" SEWER SERVICE (TYP) 2" IRRIGATION SERVICE LOUCKS W:\2016\16430\CADD DATA\LANDSCAPE\_dwg Sheet Files\L16430 L1-1 Landscape PlanPlotted: 09 /06 / 2017 8:40 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 16430 TWM GAJ TWM 05/08/17 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES GENERAL NOTES CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. HE SHALL INSPECT SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE NATURE AND SCOPE OF WORK. VERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE ATTENTION OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN AND/OR INTENT OF THE PROJECT'S LAYOUT. ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS GOVERNING THE WORK OR MATERIALS SUPPLIED. CONTRACTOR SHALL PROTECT ALL EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND SITE ELEMENTS DURING PLANTING OPERATIONS. ANY DAMAGE TO SAME SHALL BE REPAIRED AT NO COST TO THE OWNER. CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL UNDERGROUND AND ABOVE GRADE UTILITIES AND PROVIDE THE NECESSARY PROTECTION FOR SAME BEFORE CONSTRUCTION / MATERIAL INSTALLATION BEGINS (MINIMUM 10' - 0" CLEARANCE). ALL UNDERGROUND UTILITIES SHALL BE LAID SO THAT TRENCHES DO NOT CUT THROUGH ROOT SYSTEMS OF ANY EXISTING TREES TO REMAIN. EXISTING CONTOURS, TRAILS, VEGETATION, CURB/GUTTER AND OTHER EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO LANDSCAPE ARCHITECT BY OTHERS. CONTRACTOR SHALL VERIFY ANY AND ALL DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY LANDSCAPE ARCHITECT OF SAME. THE ALIGNMENT AND GRADES OF THE PROPOSED WALKS, TRAILS AND/OR ROADWAYS ARE SUBJECT TO FIELD ADJUSTMENT REQUIRED TO CONFORM TO LOCALIZED TOPOGRAPHIC CONDITIONS AND TO MINIMIZE TREE REMOVAL AND GRADING. ANY CHANGE IN ALIGNMENT MUST BE APPROVED BY LANDSCAPE ARCHITECT. SOD / TOPSOIL - ALL DISTURBED AREAS - SEE NOTES ORNAMENTAL TREE CONIFEROUS SHRUBS - SEE SHEET L2-1 DECIDUOUS SHRUBS - SEE SHEET L2-1 GRASSES / PERENNIALS - SEE SHEET L2-1PROPERTY BOUNDARYNPROPERTY BOUNDARYCONIFEROUS TREE OVERSTORY TREE MINIMUM LANDSCAPE REQUIREMENTS REQUIRED PROPOSED STREET TREES ONE (1) TREE PER 50 LF OF ROAD FRONTAGE ONE (1) TREE PER OPEN SPACE UNIT EXPOSURE 13 TREES 42 OVERSTORY 54 OVERSTORY ONE (1) FOUNDATION PLANTING PER 10 LF OF BLDG FOUNDATION PLANTINGS PROPERT Y B O U N D A R Y PROPERTY BOUNDARY 4'-0"DRIP EDGE OF TREEP DRIP EDGE OF TREEBRONZE PARKWAY - 623 LF TOTAL FRONTAGE CONNEMARA TRAIL W. - 642 LF TOTAL FRONTAGE 13 TREES 20 CONIFERS 13 TREES 12 TREES QUAD TOWNHOUSE - 121 LF OF BUILDING PERIMETER TWIN ROWHOUSE - 138 LF OF BUILDING PERIMETER 13 SHRUBS 14 SHRUBS 24 SHRUBS 19 SHRUBS TREE PRESERVATION NOTE: (1) EXISTING TREE ON-SITE - TO BE RETAINED AND PROTECTED DURING CONSTRUCTION - SEE 1/L1-1 LANDSCAPE / TREE PRESERVATION PLAN L1-1 35 ORNAMENTAL DECIDUOUS TREES TOTAL (OPEN SPACE + STREET TREES) PERCENTAGE OF DECIDUOUS TREES CONIFEROUS TREES 79 - 79% 20 - 21% 1 2 3 4 5 6 7 8 39 42 40 41 35 38 36 37 31 34 32 33 19 18 20 17 15 14 16 13 11 10 12 9 30 29 28 27 26 25 24 23 22 21 IRRIGATION LIMITS 09/05/17 Plant List Revisions1 1 1 LANDSCAPE INSTALLATION COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE. NO PLANTING WILL BE INSTALLED UNTIL COMPLETE GRADING AND CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA. WHERE SOD ABUTS PAVED SURFACES, FINISHED GRADE OF SOD SHALL BE HELD 1" BELOW SURFACE ELEVATION SOD ALL DESIGNATED AREAS DISTURBED DUE TO GRADING. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE STAKED TO THE GROUND. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. UNLESS NOTED OTHERWISE, ALL SHRUBS SHALL HAVE AT LEAST 5 CANES AT THE SPECIFIED MINIMUM SHRUB HEIGHT OR WIDTH. ORNAMENTAL TREES SHALL HAVE NO V CROTCHES AND SHALL BEGIN BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE FINISHED GRADE. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO THE SUBMISSION OF A BID AND/OR QUOTATION. ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN ON PLAN. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE NEEDED IN FIELD. SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE ARCHITECT MUST BE NOTIFIED. ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH A 27-3-3 SLOW RELEASE FERTILIZER MIXED IN WITH THE PLANTING SOIL PER THE MANUFACTURER'S INSTRUCTIONS. PLANTS MAY BE TREATED FOR SUMMER AND FALL INSTALLATION WITH AN APPLICATION OF GRANULAR 27-3-3 AT 6 OZ PER 2.5" CALIPER PER TREE AND 3 OZ PER SHRUB WITH AN ADDITIONAL APPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE TREE SAUCER. ALL PLANTING AREAS RECEIVING GROUND COVER, PERENNIALS, ANNUALS, AND/OR VINES SHALL RECEIVE A MINIMUM OF 12" DEPTH OF PLANTING SOIL CONSISTING OF AT LEAST 45 PARTS TOPSOIL, 45 PARTS PEAT OR MANURE AND 10 PARTS SAND. ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. REMOVE ALL FLAGGING AND LABELS FROM PLANTS. WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER IN CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY, WATERPROOF CREPE PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND REMOVE ALL WRAPPING AFTER 5-1. BLACK STEEL EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS, AND ANNUALS WHERE BED MEETS SOD/SEED UNLESS NOTED OTHERWISE. ALL ANNUAL AND PERENNIAL PLANTING BEDS TO RECEIVE 3" DEEP SHREDDED HARDWOOD MULCH WITH NO WEED BARRIER. ALL SHRUB BED MASSINGS TO RECEIVE 3" DEEP SHREDDED HARDWOOD MULCH AND FIBER MAT WEED BARRIER. ALL TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD MULCH WITH NO MULCH IN DIRECT CONTACT WITH TREE TRUNK. SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER MANUFACTURER'S RECOMMENDATIONS UNDER ALL MULCHED AREAS. IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR GUARANTEE, HE MUST BRING THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO PROCUREMENT AND/OR INSTALLATION. CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS. CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING, FERTILIZATION AND DISEASE/PEST CONTROL. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE. WARRANTY (ONE FULL GROWING SEASON) FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING PLANT MATERIAL INSTALLATION AND SEED/SOD PLACEMENT IS FROM THE TIME GROUND HAS THAWED TO JUNE 15. FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 - NOVEMBER 1. FALL CONIFEROUS PLANTING MAY OCCUR FROM AUGUST 15 - OCTOBER 1 AND DECIDUOUS PLANTING FROM THE FIRST FROST UNTIL NOVEMBER 15. PLANTING OUTSIDE THESE DATES IS NOT RECOMMENDED. ANY ADJUSTMENT MUST BE APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT. LANDSCAPE CONTRACTOR SHALL ESTABLISH TO HIS SATISFACTION THAT SOIL AND COMPACTION CONDITIONS ARE ADEQUATE TO ALLOW FOR PROPER DRAINAGE AT AND AROUND THE BUILDING SITE. EDGING LOUCKS W:\2016\16430\CADD DATA\LANDSCAPE\_dwg Sheet Files\L16430 L2-1 Landscape DetailsPlotted: 09 /06 / 2017 8:41 AM7200 Hemlock Lane, Suite 300 Maple Grove, MN 55369 763.424.5505 www.loucksinc.com PLANNING CIVIL ENGINEERING LAND SURVEYING LANDSCAPE ARCHITECTURE ENVIRONMENTAL CADD files prepared by the Consultant for this project are instruments of the Consultant professional services for use solely with respect to this project. These CADD files shall not be used on other projects, for additions to this project, or for completion of this project by others without written approval by the Consultant. With the Consultant's approval, others may be permitted to obtain copies of the CADD drawing files for information and reference only. All intentional or unintentional revisions, additions, or deletions to these CADD files shall be made at the full risk of that party making such revisions, additions or deletions and that party shall hold harmless and indemnify the Consultant from any & all responsibilities, claims, and liabilities. CADD QUALIFICATION SUBMITTAL/REVISIONS PROFESSIONAL SIGNATURE QUALITY CONTROL HARMONY VILLAS ROSEMOUNT, MINNESOTA MARK ELLIOT HOMES MARK PASVOGEL 17850 KENWOOD TRAIL LAKEVILLE, MN 55044 C0-1 COVER SHEET C2-1 C3-1 C3-2 - C3-3 C4-1 C8-1 C8-2 SITE PLAN GRADING PLAN SWPPP PLAN & NOTES OVERALL UTILITY PLAN DETAILS DETAILS L1-1 LANDSCAPE / TREE PRESERVATION PLAN L2-1 LANDSCAPE DETAILS C1-1 EXISTING CONDITIONS Review Date SHEET INDEX License No. Date I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Landscape Architect under the laws of the State of Minnesota. Gregory A. Johnson - LA Project Lead Drawn By Checked By Loucks Project No. 24610 16430 TWM GAJ TWM 05/08/17 04/13/17 04/13/17 Construction Documents 05/08/17 City Comments C4-2 - C4-6 S&W PROFILES C5-1 - C5-2 STORM SEWER PROFILES C6-1 - C6-5 STREET PROFILES 2-1/2" CAL B.B.GL GREENSPIRE LINDEN PLANT LIST IMPERIAL HONEYLOCUSTIH SIZECOMMON NAME SCIENTIFIC NAMEQTYKEY COMMENTS 2-1/2" CAL B.B. 2-1/2" CAL B.B.COMMON HACKBERRY Celtis occidentalis5CH Tilia cordata 'Greenspire' Gleditsia triacanthos inermis 'Impcole' 14 OVERSTORY TREES - STREET SPRING SNOW CRABAPPLE Malus 'Spring Snow'SS ORNAMENTAL TREES PRAIRIE ROSE CRABAPPLE Malus 'Prairie Rose'PR 1-1/2" CAL B.B. 1-1/2" CAL B.B. DWARF EUROPEAN VIBURNUM Diervilla loniceraDV SHRUBS TOR SPIREA Spirea betulifolia 'Tor'TS #5 CONT #5 CONT LITTLE PRINCESS SPIREA Spirea japonica 'Little Princess'LP TECHNITO ARBORVITAE Thuja occidentalis 'Bailjohn' (PP15,850)TN #5 CONT #5 CONT SCANDIA JUNIPER Juniperus sabina 'Scandia'SJ #5 CONT KARL FOERSTER GRASS Calamagrostis aculifloraKF #1 CONT 22 11 16 GRASSES / PERENNIALS 258 126 162 216 150 72 SOD / TOPSOIL - ALL DISTURBED AREAS SEE NOTES LANDSCAPE LEGEND ORNAMENTAL TREE - SEE SHEET L1-1 CONIFEROUS SHRUBS DECIDUOUS SHRUBS GRASSES / PERENNIALS AUTUMN FIRE SEDUM Sedum x 'Autumn Fire'AF #1 CONT282 3 DV EDGING 2 TS 5 AF 5 KF 4 LP 5 KF 4 LP 2 TS 5 AF 3 TS 3 TN 2 AD 5 BC 3 TS 3 TN 2 AD 3 DV 3 SJ 8 AF 3 DV 3 TS 6 LP 7 KF 4 TN 4 AD 6 BC 3 TS 3 DV 8 AF 3 SJ 6 LP 7 KF 4 TN 4 AD 6 BC 3 SJ 8 AF 3 DV 3 TS 6 LP 3 TS 3 DV 8 AF 3 SJ 6 LP 4 TN 4 TN 7 KF 7 KF 2-1/2" CAL B.B.AB AUTUMN BLAZE MAPLE Acer x freemannii 'Jeffersred'6 2-1/2" CAL B.B.PM PARKWAY NORWAY MAPLE Acer platanoides 'Parkway Norway'17 IVORY SILK LILAC Syringia reticulata 'Ivory silk'IS 1-1/2" CAL B.B.8 AUSTRIAN PINE Pinus nigraAP CONIFEROUS TREES COLORADO SPRUCE Picea pungensCS 1-1/2" CAL B.B. 1-1/2" CAL B.B.4 8 BLACK HILLS SPRUCE Picea glauca densataBH 1-1/2" CAL B.B.8 BLACK CHOKEBERRY Spirea japonica 'Neon Flash'BC #5 CONT117 ARCTIC FIRE DOGWOOD Cornus stonifera 'Fallow' (PPAF)AD #5 CONT84 LANDSCAPE DETAILS L2-1 IRRIGATION NOTES LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN IRRIGATION LAYOUT PLAN AND SPECIFICATION AS A PART OF THE SCOPE OF WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE LANDSCAPE ARCHITECT PRIOR TO ORDER AND/OR INSTALLATION. IT SHALL BE THE LANDSCAPE CONTRACTORS RESPONSIBILITY TO INSURE THAT ALL SODDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT MATERIAL GROWTH REQUIREMENTS. IRRIGATION SYSTEM IS NOT TO SPRAY ACROSS PAVEMENT. THE SYSTEM SHALL INCORPORATE A RAIN SENSOR INTO IRRIGATION SYSTEM. PLANTINGS OUTSIDE THE LIMITS OF IRRIGATION ARE TO BE WATERED REGULARLY UNTIL PLANTING/SOD/SEED HAS BEEN ESTABLISHED. 4" ROCK MULCH OVER GEOTEXTILE (TYP) EDGING OVERSTORY TREES 2-1/2" CAL B.B.BL BOULEVARD LINDEN Tilia american 'Boulevard'15 09/05/17 Plant List Revisions1 1 1 1 MEMORANDUM DATE: February 22, 2018 TO: Kyle Klatt, Senior Planner CC: Kim Lindquist, Community Development Director Brian Erickson, Director of Public Works/City Engineer Stacy Bodsberg, Planning & Personnel Secretary FROM: Mitch Hatcher, Project Engineer RE: Harmony Villas 2nd Addition - Engineering Review SUBMITTAL: The plans for Harmony Villas have been prepared by Loucks dated January 11, 2018. Engineering review comments were generated from the following documents included in the submittal:  Construction Plans for: Site, Grading, Sanitary Sewer, Watermain, Storm Sewer, & Street Construction (23 sheets), dated January 11, 2018  Harmony Villas 2nd Addition Final Plat GENERAL COMMENTS: 1. Development fees are required based on the current Schedule of Rates and Fees. For 2017, the estimated development fees are listed below:  Storm Sewer Trunk Charge: $ 6,865 / acre  Sanitary Sewer Trunk Charge: $ 1,075 / acre  Watermain Trunk Charge: $ 6,500 / acre 2. Street and utility construction shall be installed in accordance with the 2015 City of Rosemount General Specifications and Standard Detail Plates and the Engineering Guidelines. 3. Final construction plans and specifications for grading, street, and utilities should be submitted to the City for review. 4. City inspection of street and utility installation is required during construction. 5. The developer is required to obtain a NPDES construction Stormwater Permit and provide a copy of the approved SWPPP to the City prior to the start of any construction activity. 6. The developer is required to obtain a grading permit from the City prior to construction grading activity. 7. Upon completion of the sanitary sewer, watermain, and storm sewer construction, the City requires record drawings. See Engineering Guidelines for submittal and formatting requirements. Should you have any questions or comments regarding the items listed above, please contact me at 651-322-2015.