Loading...
HomeMy WebLinkAbout9.a. City Projects Update E X E C U T I V E S U M M A R Y Utility Commission Meeting: April 16, 2018 AGENDA SECTION: AGENDA ITEM: City Projects Update Executive Director’s Report PREPARED BY: Brian Erickson, PE, Director of Public AGENDA NO. 9.a. Works / City Engineer ATTACHMENTS: None APPROVED BY: LJM RECOMMENDED ACTION: None, Informational Report ISSUE Staff is providing an update on current city projects that affect or involve the various utilities. DISCUSSION The following projects are currently in the planning or bidding process: 1. 2018-01 – 2018 Street Improvement Project – This project is part of the city’s pavement management program and will rehabilitate a number of streets in the neighborhood bounded by Shannon Parkway, Diamond Path Road, CSAH 42 and CSAH 46. Additionally, there will be improvements to some of the existing catch basins, replace two old fire hydrants and repair and replace existing manhole castings. Bid opening is scheduled for April 19 and this project will be completed in 2018. 2. 2018-03 – Bonaire Path – This project will reconstruct the existing gravel road east of Akron Avenue and extend water main to Anderson Drive thus looping the system in that area. An extension of the sanitary system may also be involved; however, that determination has not been made at this point. Anticipated construction is 2019. 3. 2018-04 – Well 1 & Well 2 Sealing – This project will two abandoned wells in the downtown area of Rosemount. Currently, the staff is working with the Minnesota Department of Health to locate the well as they are buried under an existing parking west of T.H. 3. 4. 2018-06 – Addison Avenue – This project will extend Addison Avenue street and utilities st south of 141 St. It is being performed in cooperation with the Dakota County CDA. Bid opening is scheduled for April 20 and construction will be completed in 2018. 5. 2018-08 – Meadow Ridge – This is a new residential development approximately ½ mile north of Bonaire Path on the west side of Akron Avenue which is planned for 154 single family homes. Work will include site grading, street and utility installation and the installation of a temporary sanitary sewer lift station. 6. 2018-09 – Connemara Trail Extension – This project will provide the design for extending Connemara Trail street and utilities east of Akron Avenue. Design will be completed in 2018 and construction will begin in 2019 at the earliest. th 7. 2018-10 – Greystone 7 – This is next phase of the Greystone development east of Akron Avenue and south of Bonaire Path and will include 46 single family homes. Construction is anticipated to begin mid-summer 2018. 8. 2018-11 – Harmony Parkview – This private residential development north of Connemara C:\\Users\\jab\\AppData\\Local\\Temp\\9.a. City Projects Update_508400\\9.a. City Projects Update.docx Trail and east of T.H. 3 that will provide 22 townhomes. The utilities will be public while the streets are private. The developer will perform construction and City of Rosemount will inspect the utility installation. The following projects are a currently under construction: 1. 416 – Well #16 – This project is constructing a new municipal well on Bacardi Avenue. Currently the well has be drilled and the contractor is building the wellhouse and will be installing pumps. This well is planned to come online summer 2018. nd 2. 465 – 132 Street West Improvements – This project reconstructs the existing gravel road and extends the utilities to the intersection with Dodd Boulevard. Construction will be completed in 2018. stnd 3. 467 – Dunmore 1 – This private residential development west of T. H. 3 and south of 132 Street provides 30 single family homes. The streets and utilities are public, but are being constructed privately. Construction will be completed in 2018. th 4. 474 – Greystone 5 – This private residential development east of Akron Avenue and south of Bonaire Path provides 23 single family homes. The streets and utilities are public, but are being constructed privately. Construction will be completed in 2018. th 5. 475 – Bella Vista 5 – This private residential development north of Bonaire Path and east of Bacardi Avenue provides 41 single family homes. The streets and utilities are public, but are being constructed privately. Construction will be completed in 2018. th 6. 2017-01 – Greystone 6 – This private residential development east of Akron Avenue and south of Bonaire Path provides 27 single family homes. The streets and utilities are being constructed as a public project. Construction will be completed in 2018. 7. 2017-02 – Harmony Villas – This private residential development north of Connemara Trail and east of T.H. 3 provides 42 townhomes. The utilities will be public while the streets are private. Construction will be completed in 2018. 8. 2017-06 – Prestwick Townhomes – This private residential development east of Akron Avenue and south of Bonaire Path provides 40 townhomes and is being constructed by the Dakota County CDA. Construction will begin in 2018. th 9. 2017-07 – Prestwick Place 14 – This private residential development north of Connemara Trail and west of Akron Avenue provides 38 single family homes. The streets and utilities are public, but are being constructed privately. Construction will be completed in 2018. C:\\Users\\jab\\AppData\\Local\\Temp\\9.a. City Projects Update_508400\\9.a. City Projects Update.docx