HomeMy WebLinkAbout08.a. Acknowledgement of IGH Ice Bid Results EXECUTIVE SUMMARY City Council Regular Meeting: May 15, 2018 AGENDA ITEM: Acknowledgement of IGH Ice Bid Results AGENDA SECTION: Unfinished Business PREPARED BY: Dan Schultz, Parks and Recreation Director AGENDA NO: 8.a. ATTACHMENTS: West Rink Project Costs APPROVED BY: LJM RECOMMENDED ACTION: Motion to direct staff to provide written documentation to the City of Inver Grove Heights that the Rosemount City Council supports the City of Inver Grove Heights receiving and awarding the contract to the low bidder for the Inver Grove Heights West Rink Floor Project. ISSUE As part of the approved 10 Year Joint Powers Agreement with the City of Inver Grove Heights for the West Rink Improvement Project, the City of Rosemount needs to let the City of Inver Grove Heights know if we support them awarding a contract for the project and moving forward with the improvements. The bids for the floor portion of the project and the other costs of the project are attached for review. The floor improvements were recently publicly bid, and dasher boards and the ice resurfacer were both purchased through a purchasing co-op. When using a purchasing co-op, the vendors go through a bidding process to be chosen as a vendor to be listed as a sole provider in a co-op. BACKGROUND In the summer of 2016, Rosemount Parks and Recreation Department was contacted by staff from the City of Inver Grove Heights about an opportunity for RAHA to secure additional ice at the Inver Grove Heights Community Center (IGHCC). At the time of the call both rinks at the IGHCC were in need of major repairs. The east rink’s repairs were needed immediately and were completed in the summer of 2017. The repairs for the west rink are expected to be required in the next year or two. RAHA currently uses approximately 200 – 230 hours of ice at the IGHCC. Inver Grove Heights is offering a chance for RAHA to get a total of 550 peak hours of ice at the IGHCC from November 1, through February 28, on an annual basis. In return for getting the additional ice at IGHCC, the City of Inver Grove Heights is asking both the City of Rosemount and RAHA to help pay for repairs to their west rink. The proposed West Rink Improvement Project would include a new rink floor, supply header, electrical, dasher board improvements, a new ice resurfacer, design fees and contingency. Based on the bids and costs received, the total project cost is within the preliminary estimates utilized during discussion of this partnership opportunity. RECOMMENDATION Staff is recommending that the City Council direct staff to provide written documentation to the City of Inver Grove Heights that the Rosemount City Council supports the City of Inver Grove Heights receiving and awarding the contract to the low bidder for the Inver Grove Heights West Rink Floor Project. Bidder Amount Minnesota Ice 539,852$ Total Mechanical 556,745$ Rink Tech 614,000$ Commercial Refrigeration 763,352$ Stevens Engineering 39,300$ Design and Engineering GPRS 650$ Underground utility locates Rink Tech 4,682$ Installation of isolation valve Frank J Zamboni 136,890$ Ice Resurfacer Becker Arena Products 165,246$ Dasher Board System Minnesota Ice 539,852$ West Rink Floor Project Contingency 50,000$ 897,320$ City of Inver Grove Heights (10%)89,732$ City of Rosemount (90%)807,588$ 897,320$ 1 October 2018 80,759$ 2 October 2019 80,759$ 3 October 2020 80,759$ 4 October 2021 80,759$ 5 October 2022 80,759$ 6 October 2023 80,759$ 7 October 2024 80,759$ 8 October 2025 80,759$ 9 October 2026 80,759$ 10 October 2027 80,759$ 807,588$ Preliminary Project Cost Share Preliminary City of Rosemount Annual Payments Veterans Memorial Community Center West Rink Project Costs May 3, 2018 West Rink Floor Bids Preliminary Project Costs