HomeMy WebLinkAboutScan (4) co GRADING NOTES: r roc 8. CONTRACTOR SHALL PERFORM CALCULATIONS TO VERIFY EARTHWORK QUANTITIES. O U ( 2 1. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS INCLUDING LOCATIONS,AND RIM CONTRACTOR'S BID SHALL BE BASED ON EARTHWORK CALCULATIONS COMPLETED BY 0 - AND INVERT ELEVATIONS,OF EXISTING DRAINAGE AND SANITARY STRUCTURES. LOCATION S� AND SIZE OF EXISTING SANITARY,WATER,AND STORM SEWER STUBS,AND EXISTING THE CONTRACTOR GRADES SHALL ALSO BE VERIFIED.f co 9. SPOT ELEVATIONS ARE FLOW LINE AND/OR FINISHED GRADES,UNLESS OTHERWISE SIDE SLOPES OF TRENCH SHALL co INDICATED. TOP OF CURB ELEVATIONS ARE 6"ABOVE THE FLOW LINE SPOT MEET OSHA REQUIREMENTS ,, S u` 2. EXISTING TOPOGRAPHICAL INFORMATION WAS OBTAINED FROM A TOPOGRAPHICAL SURVEY L G HOUSEELEVATION SHOWN ON THE PLANS,UNLESS NOTED OTHERWISE. Q co Co N PROVIDED BY O'MALLEY&KRON LAND SURVEYORS,INC.,COLD SPRING,MN. (320) 685-5905 N_ O r 10. "EX"DENOTES EXISTING SPOT ELEVATIONS L (a N C9 i 3. BENCHMARK: TOP NUT OF HYDRANT LOCATED JUST EAST OF TRUCK SCALE(SEE PLAN) L C ELEV=896.82(88 DATUM) ! -� -i i- O+' 11. "SPD"DENOTES STANDPIPE STORM DRAIN i i-3_ SEE SPECIFICATIONS FOR C BACKFILL AND COMPACTION O C O A. NOTIFY ENGINEER IMMEDIATELY IF ANY INCONSISTENCIES ARE DISCOVERED BETWEEN I I�..- -�I I.... co �- z \ \_ 1 REQUIREMENTS c� S� U` ACTUAL SITE CONDITIONS AND WHAT IS SHOWN ON THE PLANS,WHICH ARE 4. ALL PROPOSED ELEVATIONS ARE TOP OF PAVING OR GUTTER,UNLESS NOTED )((_.... �.. U C O N \ OTHERWISE. PROPOSED ELEVATIONS ARE INTENDED TO PROVIDE POSITIVE DRAINAGE _{{{ '6 O O W \ - ._ SIGNIFICANT ENOUGH TO ALTER THE INTENT OF THE DRAWINGS. TOWARDS CATCH BASINS AND/OR OUTLETS. THE CONTRACTOR SHALL BEL{I,I' N C RESPONSIBLE TO PROVIDE THE REQUIRED ELEVATIONS,WHICH WILL PROMOTE II Q N U \ ! r, 5. IF REQUIRED BY THE MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY,THE POSITIVE DRAINAGE THROUGHOUT THE PROJECT SITE. I I__ �- COMPACTED GRANULAR w O O J !I - BEDDING MATERIAL Q- 12 IN INSTALLATION OF ANY STORM SEWER UTILITIES PLUMBING PERMIT PRIOR TO THE _ OWNER OR CONTRACTOR SHALL OBTAIN A PLU _ MEETING THE � y 4- NOTE: NOTE:CADD FILES FOR ESTIMATING EARTHWORK QUANTITIES ARE AVAILABLE I I 12": i- REQUIREMENTS OF Q 41 \\ IN RDER TO RECEIVE THE CADD FILES, i-_ -I I F MNDOT SPEC.3149.2H V N \ \ sj 6. THE CONTRACTOR SHALL CONTACT GOPHER ONE CALL AT(800)252-1 166 FOR A TO CONTRACTORS FOR PREPARING BIDS. O N N 3 UTILITY LOCATE PRIOR TO THE START OF CONSTRUCTION AND VERIFY LOCATIONS OF THE CONTRACTOR WILL NEED TO SIGN A HOLD-HARMLESS AGREEMENT PROVIDED O UTILITIES BEFORE BEGINNING WORK. BY SCHULTZ ENGINEERING&SITE DESIGN,AND AGREE TO PAY A$50 PROCESSING !' I- I SHAPE BEDDING TO +r W \ \ FEE. THE CADD FILES WILL BE RELEASED UPON RECEIPT OF THE CHECK _`(I 6 M1N I I' MATCH BELL SECTIONS co tl \ QayA 41 7. FINISHED ELEVATIONS OF LAWN/GREEN AREAS ADJACENT TO BUILDINGS SHALL BE _�{{-{ {-{{�_ ((I- LIN \\ \\ \\ AINING \ C l A MINIMUM OF b"BELOW FINISHED FLOOR OR TOP-OF-BLOCK ELEVATION. 'C-O -O r \ \ LS O U � E L C 0,�� / \\ \ " \ \ J 1 PIPE BEDDING DETAIL Tw m o NTS \\ WALL 4-3op co ` / \ - ' F /• qD FFE 4 0 j ' El Xu coFINISHED SURFACE 8 M O SlNEENAH R-1976 OR O r (000 APPROVED EQUAL ❑ c+� j t'. SET CASTING 1/2"BELOW M M= HED GRADE f - / € FINIS w O co C� jj N � � E 90 CIPc co � °� ENCASE PVC WYE IN D. SAND CUSHION W U/ '� r / � 3-FT VALLEY GUTTER 59 MIN.}�3 CUBIC YARD � O m / � S7 �`� @ 0.50% ' ;� l "WASHED ROCK C \\ If ONE-PIECE SCH 40 w I PVC CLEANOUT RISER N SCH 40 El O `�J: ' .� PVC WYE �/� N r31 CLEANOUT 1: NOTES: vJ C f / BENCHMARK: t9 l RIM=894.00 i N / f' 1 INV E=889.59 ' t. N T �. S INV S=886.17 t 1. CLEANOUTS SHALL BE Q \ / 1' 6 �1 1 PAVEMENT FLOW INSTALLED AS PER THE MN O c PLUMBING CODE 1 `� :DEMOLITION _ {mss v P � N j rK�u,. � S� _ SPD1 2. SEE PLAN FOR PIPE SIZE N / g h /` RIM=893.80 : LIMITS ' Lo V. . - �,: v F INV-889.80 ' AND ELEVATION �/� (r Z 48L i i RIM=890.10 v/ LOQ 8"SCH 40PVC INV=886.18 jOUT N= z x @ 1.00% NTS O I LEAN 1 4' 2 � °'-C � LF PROPOSED BUILDING SCH 40 PVC ADDITION TO MATCH _ / / S PAVEMENT @ 1.00% EXISTING FLOOR ELEVATION k DEMOLITION FFE 894 11 (FIELD VERIFY) T r v A a # z 72 LF / / \ A,. `� LIMITS � O - ,� / �. s 8"SCH 4 �C: \ �� `ST CLEANOUT 2: @ 1.00%( P) RIM=890.05 1 - � INV=885.69 � SPD3 � \ - S ;, RIM-890.10 i � � DOWNSPOUT INV=885.77 / O O ? \ \ ,iCLEANOUT 3: � CAST IRON SEE PLAN FOR PIPE DIAMETER N co / \ KIM=890.05 co / \ \ EX 890 ' f;INV=885.46 DRAIN GRATE TO NO 0 r` , PAVED �. } \ \ s 1 SURFACING ING N 70 L co - f O f \ 8"SCH 40 PVC /// Ij COMPACTED EX CULV @ 1.00% BAC L Q C] jlJ � cC SHED: •> ti 47 LF NOTE: CONTRACTOR SHALL FURNISH EL V t� \ 8 SCH 40 PVC RISER SCH 40 PVC TO AND INSTALL ALL SCH 40 PVC PIPE AND � d PAVE ENT 1 \ @ 1.00% STORM SEWER / FITTINGS AS NECESSARY TO CONNECT EACH DESIGNATED STANDPIPE DRAIN Q DEM QL ION l \ TO STORM SEWER (SEE GRADING PLAN \ LIMITS \ \\\ J' � � "`' ~•.. ;_:/� ,� PAVEMENT FOR STORM SEWER LAYOUT). FITTING r N6 DEMOLITION SHALL CONSIST OF WYES AND BENDS. z LIMITS TEES SHALL NOT BE ALLOWED. TO CLEANOUT4: F � RIM=888.90 ! 19� `� \~ IN INV=884.99 STANDPIPE STORM DRAIN SPD co ` 16 LF Jj1 NTS co (4 1 T / \ 10"SCH 40 PVC 00 O @ 1.00% C"7 F O CONNECT Ib EXISTING °-' QLo Lo Q 00 CATCH BASIN I 0 z W INV 884.83= / Q T f O N `r EX z a O J Z J O P, ° W a ff r RAMP ELEVATIONS D SLOPE EA< ' EQUIPMENT PAD FOR FORKLIFT AC SS TO BE " 0 E Q O � > W W FIELD VERIFIED WI ,OWNER m O Q L L U z m7 �:a �� , EX Z I- U N W ` 2 W N (n O ir D a a (y) 0 � WQ y % U) r U to d 3' f 00 o N ._.._.__. _._ _._..._._ / 1, O N COO O r i Sheet GRADING PLAN 0 20 40 80 C2 OF 5