Loading...
HomeMy WebLinkAbout19970812 Staff Report PC Mtg CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION Planning Commission Meeting Date: August 12, 1997 AGENDA ITEM: Cooperative Power Transmission Facility AGENDA SECTION: Public Hearing PREPARED BY: Rick Pearson, City Planner AGENDA NO. 7.C. ATTACHMENTS: Correspondence, Map excerpts APPROVED BY: 47 Applicant: William Goldrick of Cooperative Power Location: STH 3 Right -of -way, McAndrews Road (north side approximately 1/2 mile) Property Owner(s) Mostly public ROW, Olga Treise near Dodd Blvd. Area in Acres: N/A SUMMARY Cooperative Power is requesting a permit to install a high power transmission line in Rosemount from Dodd Blvd and County Road 38 (McAndrews Road) to Eagan in the STH 3 ROW. Most of the route is within ROW. The new Essential Services Facilities ordinance requires a public hearing for high power transmission lines that are more than 1/4 mile in length. The reasons for the line are essentially the need to supply power for increasing demands in a developing area, particularly in Eagan which is in the MUSA. Representatives of Cooperative Power will be present to answer technical questions regarding the proposed line. RECOMMENDED ACTION: Motion to recommend that the City Council approve the Transmission Facilities permit requested by Cooperative power. PLANNING COMMISSION ACTION: Keagan Lake to Lebanon Hilis 69 kV Transmissjon Line COOPERATIVE ELELTA /C POWER POWER RJR 173111 W 14615 Lone Oak Road 4300 -220th Street West Eden Prairie, MN 55344 (612) 937 -8599 Farmington, MN 55024 (612) 463 -7134 Project Need The Line Route This project is needed to The 2.7 miles of line will be Cooperative Power has sustain reliable service for built using single shaft wood carefully studied the area and Dakota Electric Association's poles as shown on the has proposed a route that Lebanon Hills Substation. drawing. However, steel poles utilizes existing road right -of- may be used on corners. way. The majority of the route Due to increased Toad levels, Typical poles spans are 300 to follows State Highway #3 the existing transmission 350 feet or about 17 poles per (South Robert Trail) from source can become mile. County Road #38 (McAndrews inadequate under some Road) to County Road #32 operating conditions. (Cliff Road). Along Therefore, the new line will TRANSMISSION McAndrews Road the project become the normal source, is proposed to follow the north and the existing source will side of the road. Along Cliff serve as a back -up. The new LINES Road the transmission line is line will also provide an proposed for the south side of additional path of supply into r the road which is the same as the Eagan area in general and the existing transmission line add flexibility in switching. west of the substation. operations. Two way supply is a planned future need for this -am() Easements substation. The majority of the new line is Project Goal to be built on road right -of -way 2 to 5 feet from the edge of To increase transmission the right -of -way, except along reliability and service by McAndrews Road and west of providing a second source for Manor Lake on Cliff Road, the Lebanon Hills Substation I where private easements are and to replace the lost 1 necessary in anticipation of transmission source serving i road expansion in the future. the cities of Eagan, Inver Grove Heights, and Rosemount. PROJECT MAP I r CONTACTS Average Height of Poles ON BACK 57 Feet PAGE PROJECT MAP R23W m ii \a tk,,,�,� litir 7- 7 77 I ft ve lf;; T 1 1 1 11 1'.. *-tjii ,7 a i tLI NORTH Les o HIL4S. to tlt pt9 toldw tt m tr: SUBSTATI•NJ_ \pS,�r 1� t��� y #�pykltit�, d W 1997 PROJECT aR,aa, W`M �R 0 SCHEDULE rigt1Mr/ 0 Routin (g J /March y l t le, 6 74 Survey Aril killiptil Meetings w /Landowners May 21 Z I.. c E Red Pine Elementary School....? T09 P.M. I; I Permits J 3 gli Pr! 0 Environmental June /July i 9 aw f 4 ��Cpl Construction September/October .,..f..,- i Energize November f M EAGAN a -cov i i..r c;.. cor iu z. ic. s TRANSMISSION LINES UHderbuilt t TA T A fir R19W Two areas as shown in blue +w.••■* PROPOSED TRANSMISSION ROUTE where existing lines will be underbuilt on the new WITH UNDERBUILT transmission line poles. if you have any questions contact: Bill McGoldrick or Kevin Maas Sue Mohlis of the Land Use Department Right of Way Engineer Cooperative Power Dakota Electric Association 14615 Lone Oak Road 4300 -220th Street West Eden Prairie, Minnesota 55344 -2287 Farmington, Minnesota 55024 (612) 949-1566 or (612) 949 -8287 (612) 463 -6373 or (612) 463 -6260 gra I a r o `i Cam w o r S c e T. A 4'T__ f o o t ry tip:1711" p 1 A 1 t... 111. o O 1 a ea O I O er i ik I n I I t I 1 I j j e 4 `..x.3• li 7 o k\ e r F� t I o I I g P.• \--"n 1 I i l f i I E I -r s O N. ix O u 1 op 2 -a:. V r i W..