HomeMy WebLinkAboutPublic Informational Meeting Invitations Keagan Lake to Lebanon Hills
69 kV Transmission Line
iyaffo C
COOPERATIVE
ELECTRIC
14615 Lone Oak Road 4300 -220th Street West
Eden Prairie, MN 55344 (612) 937 -8599 Farmington, MN 55024 (612) 463 -7134
INVITATION
YOU ARE ALL INVITED TO A
PUBLIC INFORMATION MEETING TO BE HELD
AT THE RED PINE ELEMENTARY SCHOOL
ON MAY 21, 1997 FROM 7 TO 9 P.M.
THE ADDRESS IS 530 RED PINE LANE.
Project Need The Line Route
This project is needed to The 2.7 miles of line will be Cooperative Power has
sustain reliable service for built using single shaft wood carefully studied the area and
Dakota Electric Association's poles as shown on the has proposed a route that
Lebanon Hills Substation. drawing. However, steel poles utilizes existing road right -of-
may be used on corners. way. The majority of the route
Due to increased load levels, Typical poles spans are 300 to follows State Highway #3
the existing transmission 350 feet or about 17 poles per (South Robert Trail) from
source can become mile. County Road #38 (McAndrews
inadequate under some Road) to County Road #32
operating conditions. (Cliff Road). Along
Therefore, the new line will TRANSMISSION McAndrews Road the project
become the normal source, is proposed to follow the north
and the existing source will LINES side of the road. Along Cliff
serve as a back -up. The new Road the transmission line is
line will also provide an proposed for the south side of
additional path of supply into zi the road which is the same as
the Eagan area in general and the existing transmission line
add flexibility in switching west of the substation.
operations. Two way supply is
a planned future need for this i
substation. Easements
1
The majority of the new line is
Project Goal to be built on road right -of -way
2 to 5 feet from the edge of
To increase transmission the right -of -way, except along
reliability and service by McAndrews Road and west of
providing a second source for Manor Lake on Cliff Road,
the Lebanon Hills Substation where private easements are
and to replace the lost necessary in anticipation of
transmission source serving road expansion in the future.
the cities of Eagan, Inver
Grove Rosemount. Heights, and PROJECT MAP
s''',: M' C ONTACTS
Average Height of Poles ON BACK
57 Feet PAGE EW
PROJECT MAP
R
t
I
NORTH L 0 HILLS.- di R40.1 '4
e want 4'% ilif INF,t,,,v, nustr,...: V- 1
LiWiRrimusgrit .1. in 997 PROJECT 4*
Al A 77 SCHEDULE /111011Wftri
Routing IP January/March x I O S�� n
Survey April
I Eli'
Meetings w /Landowners May 21 Z I
Red Pine Elementary School....7 TO 9 RM. N
F I 1 If x ,0' 0 NI ICI
Permits
I N Q� c e I., S mi
Environmental June /July iffo
p A /g
Construction September/October
1' NORM
Energize November
O
I
CWY WY.
°•GOV'1 L COV'1 101 7. SLC. 9
ROSEMOUNT �I
TRANSMISSION LINES
s r' Underbuilt
r f r.; 1
14 le -1 41"
ill-.-
St' d ,1 �I'
j
i', J
TAps
R19W
Two areas as shown in blue
PROPOSED TRANSMISSION ROUTE where existing lines will be
underbuilt on the new
4.4.4......•■ WITH UNDERBUILT transmission line poles.
If you have any questions contact:
Bill McGoldrick or Kevin Maas Sue Mohlis
of the Land Use Department Right of Way Engineer
Cooperative Power Dakota Electric Association
14615 Lone Oak Road 4300 -220th Street West
Eden Prairie, Minnesota 55344 -2287 Farmington, Minnesota 55024
(612) 949-1566 or (612) 949 -8287 (612) 463 -6373 or (612) 463 -6260