Loading...
HomeMy WebLinkAboutPublic Informational Meeting Invitations Keagan Lake to Lebanon Hills 69 kV Transmission Line iyaffo C COOPERATIVE ELECTRIC 14615 Lone Oak Road 4300 -220th Street West Eden Prairie, MN 55344 (612) 937 -8599 Farmington, MN 55024 (612) 463 -7134 INVITATION YOU ARE ALL INVITED TO A PUBLIC INFORMATION MEETING TO BE HELD AT THE RED PINE ELEMENTARY SCHOOL ON MAY 21, 1997 FROM 7 TO 9 P.M. THE ADDRESS IS 530 RED PINE LANE. Project Need The Line Route This project is needed to The 2.7 miles of line will be Cooperative Power has sustain reliable service for built using single shaft wood carefully studied the area and Dakota Electric Association's poles as shown on the has proposed a route that Lebanon Hills Substation. drawing. However, steel poles utilizes existing road right -of- may be used on corners. way. The majority of the route Due to increased load levels, Typical poles spans are 300 to follows State Highway #3 the existing transmission 350 feet or about 17 poles per (South Robert Trail) from source can become mile. County Road #38 (McAndrews inadequate under some Road) to County Road #32 operating conditions. (Cliff Road). Along Therefore, the new line will TRANSMISSION McAndrews Road the project become the normal source, is proposed to follow the north and the existing source will LINES side of the road. Along Cliff serve as a back -up. The new Road the transmission line is line will also provide an proposed for the south side of additional path of supply into zi the road which is the same as the Eagan area in general and the existing transmission line add flexibility in switching west of the substation. operations. Two way supply is a planned future need for this i substation. Easements 1 The majority of the new line is Project Goal to be built on road right -of -way 2 to 5 feet from the edge of To increase transmission the right -of -way, except along reliability and service by McAndrews Road and west of providing a second source for Manor Lake on Cliff Road, the Lebanon Hills Substation where private easements are and to replace the lost necessary in anticipation of transmission source serving road expansion in the future. the cities of Eagan, Inver Grove Rosemount. Heights, and PROJECT MAP s''',: M' C ONTACTS Average Height of Poles ON BACK 57 Feet PAGE EW PROJECT MAP R t I NORTH L 0 HILLS.- di R40.1 '4 e want 4'% ilif INF,t,,,v, nustr,...: V- 1 LiWiRrimusgrit .1. in 997 PROJECT 4* Al A 77 SCHEDULE /111011Wftri Routing IP January/March x I O S�� n Survey April I Eli' Meetings w /Landowners May 21 Z I Red Pine Elementary School....7 TO 9 RM. N F I 1 If x ,0' 0 NI ICI Permits I N Q� c e I., S mi Environmental June /July iffo p A /g Construction September/October 1' NORM Energize November O I CWY WY. °•GOV'1 L COV'1 101 7. SLC. 9 ROSEMOUNT �I TRANSMISSION LINES s r' Underbuilt r f r.; 1 14 le -1 41" ill-.- St' d ,1 �I' j i', J TAps R19W Two areas as shown in blue PROPOSED TRANSMISSION ROUTE where existing lines will be underbuilt on the new 4.4.4......•■ WITH UNDERBUILT transmission line poles. If you have any questions contact: Bill McGoldrick or Kevin Maas Sue Mohlis of the Land Use Department Right of Way Engineer Cooperative Power Dakota Electric Association 14615 Lone Oak Road 4300 -220th Street West Eden Prairie, Minnesota 55344 -2287 Farmington, Minnesota 55024 (612) 949-1566 or (612) 949 -8287 (612) 463 -6373 or (612) 463 -6260