Loading...
HomeMy WebLinkAbout6.p. Accept Public Street and Utilities – Greystone 5th Addition, City Project 474 EXECUTIVE SUMMARY I:\City Clerk\Agenda Items\Approved Items\6.p. Accept Public Street and Utilities – Greystone 5th Addition, City Project 474.docx City Council Meeting: February 5, 2019 AGENDA ITEM: Accept Public Street and Utilities – Greystone 5th Addition, City Project 474 AGENDA SECTION: Consent PREPARED BY: Stephanie Smith, PE (MN), Assistant City Engineer AGENDA NO. 6.p. ATTACHMENTS: Resolution, WSB Letter, Payment Voucher, Map APPROVED BY: LJM RECOMMENDED ACTION: Approve Resolution to Accept Greystone 5th Addition, City Project 474, Public Improvements for Perpetual Maintenance. BACKGROUND Public improvements installed as part of Greystone 5th Addition, City Project 474, included streets, sanitary sewer, watermain and storm sewer during the 2016 construction season. The developer requested final acceptance of the public improvements and has submitted documentation required for public acceptance, including warranty deeds, lien waivers, as-builts and the final pay voucher. WSB, the City’s designer/inspector for the project, submitted a letter October 11, 2018 that recommends approval and acceptance of the public improvements. RECOMMENDATION Upon City acceptance of the work, the public improvements constructed in Greystone 5th Addition, City Project 474, shall become City property per the subdivision agreement. Staff recommends that City Council approve the resolution accepting the improvements for perpetual maintenance. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 – 10 A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR GREYSTONE 5TH ADDITION CITY PROJECT 474 WHEREAS, the developer has submitted documentation for City acceptance of the public improvements; WHEREAS, the City received a letter from WSB & Associates, Inc. confirming the public improvements were installed in accordance with the approved plans and specifications and finds the improvements acceptable; BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota. The work completed under said agreement is hereby accepted for perpetual maintenance and ownership. ADOPTED this 5th day of February, 2019. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\02235-350\Admin\Docs\20190129 Memo - Greystone 5th Project Closeout.docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM Memorandum To: Stephanie Smith, PE, Assistant City Engineer City of Rosemount From: Mitch Hatcher, PE, Project Engineer Date: January 29, 2019 Re: Greystone 5th Addition Street & Utility Construction City Project No. 474 WSB Project No. 02235-350 The City of Rosemount is in the process of closing out and accepting the street and utility improvements within Greystone 5th Addition. The improvements, consisting of sanitary sewer, watermain, storm sewer, street, and sidewalk, within Greystone 5th Addition were designed and inspected by WSB & Associates in accordance with the City’s Standard Specifications and Engineering Guidelines. The public improvements were administered and constructed privately by the developer CalAtlantic Homes, formerly Ryland Homes, and S.M. Hentges & Sons Inc. Improvements were constructed from April 2017 to October 2018. WSB & Associates recommends approval and acceptance of the street and utility improvements. Please contact me at mhatcher@wsbeng.com or 612-360-1315 with any comments or questions. Sincerely, WSB & Associates, Inc. Mitch Hatcher, PE Project Engineer