Loading...
HomeMy WebLinkAbout6.i. Bonaire Path East, City Project 2018-03 Receive Plans & Specifications Authorize Ad for Bid Restrict ParkingI:\City Clerk\Agenda Items\Approved Items\6.i. Bonaire Path East, City Project 2018-03 Receive Plans & Specifications Authorize Ad for Bid Restrict Parking.docx EXECUTIVE SUMMARY City Council Meeting: March 19, 2019 AGENDA ITEM: Bonaire Path East, City Project 2018-03: Receive Plans & Specifications / Authorize Ad for Bid / Restrict Parking AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 6.i. ATTACHMENTS: Resolution; Map APPROVED BY: LJM RECOMMENDED ACTION: Motion to 1. Adopt a Resolution Receiving Plans and Specifications and Authorizing the Advertisement for Bids for Bonaire Path East, City Project 2018-03. 2. Adopt a Resolution Restricting Parking on Bonaire Path E from Akron Avenue (CR 73) to Anderson Drive. BACKGROUND City Project 2018-03 is proposed to convert Bonaire Path East from the existing rural gravel section to a paved section. The project will also include utility work and safety improvements at the existing railroad crossing on Bonaire Path E to facilitate extending the City’s Quiet Zone. On October 30, 2018, City staff hosted a public informational meeting for nearby property owners to address questions and comments regarding the project and proposed assessments. On November 5, 2018 the Council held a public hearing where they ordered these improvements and authorized the preparation of plans and specifications. The plans and specifications are available in the Engineering Department for viewing. The resolution would accept the plans and authorize advertising this project for bidding. Advertisements for bid will appear in the Rosemount Town Pages and Finance & Commerce on March 22th, 29th and April 5th, 2019. Bids will be opened on April 11, 2019. The Minnesota State Aid Office is requiring restricted parking on Bonaire Path for the length of the project improvements, in order to use Minnesota State Aid funding for this project. This is a standard requirement, and parking is currently restricted on Bonaire Path West from South Roberts Trail (TH 3) to Akron Avenue (CR 71). The proposed resolution would extend that existing “no parking” area from Akron Avenue (CR 71) to Anderson Drive. PROPOSED IMPROVEMENTS The existing gravel roadway is proposed to be paved to a three lane typical section with a center turn lane for most of the length, and a concrete median at the rail crossing. A new 10-foot wide asphalt trail is proposed as there is currently no pedestrian facility on this section of Bonaire Path. 2 Two watermain lines are proposed: one with potable water and one with raw water for the future well house planned for this area of Rosemount. An empty casing pipe will be installed to carry future sanitary sewer north-south of Bonaire Path. In order to treat runoff stormwater from the new impervious surface created by the project, two new infiltration basins are proposed along the roadway. The project would also expand the existing infiltration basin at the southeast corner of the Flint Hills Athletic Complex. A concrete median, signals and crossing arms are proposed at the railroad intersection to meet Quiet Zone standards. Once the proposed improvements are completed, the City would apply for a Quiet Zone at this crossing. COSTS & FUNDING The Feasibility Report estimated the project cost at $3,833,000 as tabulated below: This project is scheduled in the 2019-2028 CIP. It is proposed to be funded by a combination of MN State Bonding funds, MN State-Aid funds, utility core funds, and special assessments of benefitting properties. A preliminary assessment roll is included in the Feasibility Report. 3 SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Items marked “CC” will require City Council approval in order to move forward with the project. CC Set Assessment Hearing April 2, 2019 Bid Opening April 11, 2019 Public Open House April 2019 CC Assessment Hearing and Award Contract May 7, 2019 Construction Start May 2019 Substantial Completion Fall 2019 RECOMMENDATION Staff recommends Council adopt (1) the resolution to receive the plans and specifications and authorize the advertising for bids for Bonaire Path East, City Project 2018-03; and (2) the resolution to restrict parking on Bonaire Path East from Akron Avenue (CR 73) to Anderson Drive. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 - 27 A RESOLUTION RECEIVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE ADVERTISEMENT FOR BIDS FOR BONAIRE PATH E, CITY PROJECT 2018-03 WHEREAS, the City Council of the City of Rosemount has ordered the preparation of plans and specifications for Bonaire Path East, City Project 2018-03, and such plans and specifications have been presented to this Council for approval: NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota: 1. Such plans and specifications are hereby approved and ordered placed on file in the office of the City Clerk. 2. The City Clerk shall prepare and cause to be inserted in the official City newspaper and the Finance and Commerce an advertisement for bids upon the making of such improvements under such approved plans and specifications for City Project 2018-03. 3. The advertisement shall be published in each of said publications at least once not less than three (3) weeks before the date set for opening bids, specifying the work to be done, stating the bids will be publicly opened on April 11, 2019 at 10:00 o’clock a.m. at the Rosemount City Hall in said City, and that no bids will be considered unless sealed and filed with the City Clerk and accompanied by a cash deposit, cashier’s check, bid bond or certified check payable to the City Clerk for five (5%) percent of the amount of such bid. 4. Such advertisement for bids is hereby authorized by the Council. ADOPTED this 19th day of March, 2019. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 - 29 A RESOLUTION ESTABLISHING PARKING RESTICTIONS ON BONAIRE PATH E FROM AKRON AVENUE (CR 73) TO ANDERSON DRIVE FOR BONAIRE PATH E, CITY PROJECT 2018-03, SAP 208-105-002 WHEREAS, the City of Rosemount is planning the improvement of Bonaire Path in the 2019 construction season as City Project 2018-03, State Aid Project 208-105-002; and WHEREAS, the City Council of the City of Rosemount is interested in the safety of its residents; and WHEREAS, the improvement project does not provide adequate width for parking on either side of Bonaire Path; and WHEREAS, approval of the proposed construction as a State Aid project must be conditioned on the establishment of no parking restrictions on Bonaire Path. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota that the City shall prohibit parking of motor vehicles on both sides of Bonaire Path from Akron Avenue to Anderson Drive at all times. ADOPTED this 19th day of March, 2019. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk