Loading...
HomeMy WebLinkAbout9. Brockway Draw Trunk Sanitary Sewer Improvements, City Project #286 �s- ,�. . CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: October 7, 1997 AGENDA ITEM: Brockway Draw Trunk Sanitary Sewer AGENDA SECTION: Improvements, City Project #286 Public Hearing PREPARED BY: Bud Osmundson AGENDA NA� � City Engineer/Public Works Director � � �� ATTACHMENTS: Resolution, Map, Funding Table, APPROVED BY: Schedule The purpose of this item is to conduct a Public Hearing to receive input and consider for approval the Brockway Draw Trunk Sanitary Sewer Improvements, City Project #286. The City received a petition and ordered a Feasibility Report on July 1 , 1997 and received the Feasibility Report on September 2, 1997. The Feasibility Report outlines the proposed project which would provide sanitary sewer service to the new MUSA addition. The proposed facility will connect with the existing MCES interceptor in Section 28 north of CSAH 42 in the CMC Heartland Partners 226 acre site. It will extend northwesterly crossing the CP/UP Railroad tracks and into the Biscayne Pointe plat. We are considering only a Phase I construction with this Public Hearing. The total estimated project cost for the first phase is 5498,000. Most of the cost will be assessed through lateral benefit or trunk area assessments to the benefiting area. A portion of the cost, 552,030 is proposed to come from the City's sanitary sewer core fund. The schedule is attached which allows for the time needed to deal with a railroad crossing permit and to substantiate the alignment through the CMC Heartland Partners site. We have had disc�ssions with CMC's engineer and will be awaiting the proposed concept plan which has been received by the City and is beginning the review process. Short-Elliott-Hendrickson, Inc. the consultant used for this project and Staff recommend that the action be taken as stated below. � RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION APPROVING THE PROJECT AND ORDERING PLANS AND SPECIFICATIONS FOR THE BROCKWAY DRAW TRUNK SANITARY SEWER IMPROVEMENTS, CITY PROJECT #286. COUNCIL �oCT10N: G� �— d 8 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1997 - 99 A RESOLUTION FOR THE APPROVAL AND ORDERING THE PREPARATION OF PLANS AND SPECIFICATIONS FOR THE BROCKWAY DRAW TRUNK SANITARY SEWER IMPROVEMENTS CITY PROJECT #286 WHEREAS, the City Council of the City of Rosemount ordered a feasibility report for the Brockway Draw Trunk Sanitary Sewer Improvements, City Project #286; and WHEREAS, the City Council has received and accepted the Feasibility Report on September 2, 1997 for City Project #286; and WHEREAS, the City Council ordered and held a public hearing on October 7, 1997 to receive input of this project. NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount hereby orders the improvements of the Brockway Draw Trunk Sanitary Sewer Improvements, City Project #286. BE IT FURTHER RESOLVED, that the City Council of the City of Rosemount orders the preparation of plans and specifications for said improvements of City Project No. 286. ADOPTED this 7th day of October, 1997. � Cathy Bush Mayor ATTEST: � � /, � Su n M. Ish, City Clerk Motion by: Carroll Second by: Edwards Votedinfavor: Wippermann, Busho, Carroll, Edwards, Anderson. Voted against: None. , � � �, � �, _ � ���� �- � �� � 91 w" _ �O 1 0�3 as_' f �' � � � � � �/� � / / ,�=J� ota-a� jir\~, > � I�� " ���� � I ` �� � � �'�� �� ��, � �� � � � �, � { � _, . '���.3t �� �� � � ���� � - `� - ���' I ofo-n a' ✓ ��i�� - 1�1 i� r ���� 4i� �i � t � ,•�� 'i \J I 0��.• � l 'l� _�1 � � \. I� //� �� �\ ' .._ \ __ i � V I`" �' . � �l I � � , _�� .� � �� 1 Q�Y.)I 7 r \� — � \_ �� � .� ���- .� r,� �, ,--- ._ , '��Y� '1L� q,F ,,i�0�� - _ l �.i� � � oi3�5'm � ��`�� � �' _� --�� �`�,� Q/ � � I � � r� , cv� c„ � ' ��on-so � ���- `-- , �' � ' �� (�-'` � � � � --- � � %�� '�'� � p� `.-� oia-�s - � �� \.j� '� � � ��' J . Q. \ � . - - ��.I ��_ /N �9720 . / ��I �/�/� , O � r , . 0 88�\ � „N � 40.0 9J5.7� f 'I c/� . �� . . . ' .�^ .. I � . . . � .Jll�! � J1J�J � � . . 3 �I�� ��I . . .. . -� .,'HML 9 .7 . ' -_-" I 070-55 � . . . '� ..i � .._.—. \ � _ , � . CONNE�1Af8� TRAIL' � _ �"� �'` i , �._,_ - Y E II __ _--- , __ _-- _ ;_ — — ` �� �i PHAS � ,� 250 �� A� � o no � - � �/ � �l r� ��� � � � o�o-�s � � � 4'� i�l 4 � C. "x�'es�, � ��/ ��� ar` s' �i S AL�E IN F ET 0 0�50� v � � 415' / � �',ZII p�l����,;fl��l ,�ai,L.11all�,ti '�, �i� ��'�� � �\ �' ,�, , I � �� � �__ 1 / �� I�' '=i �I�'�����'���'J'��iq�V�4Q ��i,/ �; � � ���� ryy 1 � '�i � � � �p����ry-�ll L��i���u"�n�i�°�tw t5j��ll�.11��o��� �� � . ��`_er — ���`�[�j�'�'�s��� �� 4�� C�� ///f � � Nvti=eso.a ��� � � � �y/ 061-60 �� � HvrL=952 I �I o�s 5s.�_ 4 .� � ^.l�1��_C,�`P��r��� �i�/ i, � i� � i 050-8b -� , - '1; ' i I ( __ � ' � � � _ 1���98' ��I� '. � " Q�O�80 r_� �Y C I� Y � I 1K- 1 0 � /P2z�6� S >... ' i ' ' t'' �' ; � -�`� r/,�i �� � �� ��i _sx� � � � ; t� � � r� ��t � - � ��� , �,��° �`d� } ,�, ,'�;,,,� � ° ri � �'S+�-+ea% , � � „�.r_s, ��_, � � ���:,��� � /� � 6 8 � `� � � I c'� , �� , � �a3ns0 '� �-J� �� — ---- L. Bl . ,� 7, �—�-.—�—� � n �1�f I� �---�� / --��_-- - , �� � _ -r----- �I /��/' . _ _ ' SG�A��NE��_ �� o�o-oi , I . ,i,. - - �� � �POltiT� E/ - �� i ��,��.., .^_.- �T • .. � ��� � _ PROJECT _ � o,a �s , �:; , � _ --� � � �'� , , r. r ,� � , � J �� � � r —� ' ���'�(/�LOCATION � % ��� ` ��— � �� �����;� � �� �`�. _a,e �/y�� � /n,=— I �'/� / '_)1 11. �;n� l �h wl 9 a '� G'�1Pf,I/� f �� �/ � U/ 1� I '---1�r`".-- �i a� ��y/ w <,; ,1 �� =1�� v� �. �J � � � � P � � -1 I�/�� Q'' z J'� ��C7y��f !.A�� -��'� �� � � � —, i c� i ' .� ;�r � >tOrl �,� , / __�_ �/i �• �� �� p� _ ���,��� � ��. ��;�j� � , � i -- - �! � f �% �¢��� �� a i � O���;[7�n� � ���1�� =-=� � , �� �� i T 5 ' �i� 1\ ar \ ._,\yr �Q� � � ^-n-� ���4\i'�:l���j�" � �x._ I`, � i � � � i �,� � ��,', ���� �,r� � �� �% Q _��,� '° ����,�� �� PHASE I y —� `� �;� ; � , ��� � ; , _��1< /i �� � = �� � / r � �'�� _ �� �_ _\'�_ _ rt f ---—---'4 i - - f � _ _ / --�— , T`� _ � ( - ` � _. ���� . .{ _ _ ___ . . _-- m � �� ._J /l � _I'�— i R - � �DENT CH. 19 %� �or a i� � <�� , i _���06 �T � i� � _ _ �, o z 1 a� ��,� � � �/ �� � b , Ts � � ,, i _ -j�\ \� � �� a D K. COUNTY i /�.�. � M �' � a���� � � � �� I �00-3� ���, ,; i ,1 �� o � � � � � (� , �;---_ , ,�, �z..� � _ �, . � _ �, �� � — �: � � � — _ �__� ,��. i � , � � � — � , �q-_. � � � � �� � oze-oo �� ��_��_1�"r � � �� �- ', � . �+ � �r _r e- 'T- r ,�,`�% � �T 2 n,y�,,a T_� _ � � �� ��4.��',, � � .kJ F � � — � °�'L__ -I � � ------ �-�?. � —� �i � �� nc w CITY PROJECT NO. 286 ROSEMOUNT, MMNESOTA ��.� PROJECT LOCATION MAP � ;, BROCKWAY DRAW TRUNK SANITARY SEWER IMPROVEMENTS �J� �;;, 6 � ____ _ — ____.. --._ �I► � . Breakdown of Funding - Phase I CMC Biscayne City of Total Pointe Rosemount �ateral ' $121,000 $132,000 --- $253,000 (Residential) Cost Sanitary Sewer Trunk 2 $102,710 $90,260 --- $192,970 Assessment Sanitary Sewer Core --- --- $52,030 $52,030 Facility Cost Total $223,710 $222,260 $52,030 $498,000 � Based on Residential Equivalent Cost Estimate. See Appendix A. Z Based on half of the City SAC per lot ($1,245.00 = 2 = $622.50 / lot). . ., REVISED SCHEDULE • Order Feasibility Report July 1 , 1997 • Receive Feasibility Report September 2, 1997 � Public Hearing October 7, 1997 • Order Plans & Spec's October 7, 1997 • Receive Plans & Spec's/Order Ad for Bid November 4, 1997 • Receive Bids/Award Contract December 16, 1997 • Begin Construction December, 1997 • Complete Construction Spring, 1998