HomeMy WebLinkAbout6.i. Bonaire Path East, City Project 2018-03 Receive Bids and Award ContractI:\City Clerk\Agenda Items\Approved Items\6.i. Bonaire Path East, City Project 2018-03 Receive Bids and Award Contract.docx
EXECUTIVE SUMMARY
City Council Meeting: May 7, 2019
AGENDA ITEM: Bonaire Path East, City Project 2018-03:
Receive Bids and Award Contract
AGENDA SECTION:
Consent
PREPARED BY: Brian Erickson, PE, Director of Public
Works/City Engineer
Stephanie Smith, PE, Assistant City
Engineer
AGENDA NO. 6.i.
ATTACHMENTS: Resolution; Bid Abstract; Union Pacific
Railroad Agreement APPROVED BY: LJM
RECOMMENDED ACTION: Motion to:
1. Adopt a Resolution Receiving Bids and Awarding the Contract for Bonaire Path East,
City Project 2018-03.
2. Authorize the Mayor and City Clerk to enter into a Pipeline Crossing Agreement with
Union Pacific Railroad for the Construction of Public Watermain.
BACKGROUND
City Project 2018-03 is proposed to convert Bonaire Path East from the existing rural gravel section to a
paved section. The project will also include utility work and safety improvements at the existing railroad
crossing on Bonaire Path E to facilitate extending the City’s Quiet Zone.
On October 30, 2018, City staff hosted a public informational meeting for nearby property owners to
address questions and comments regarding the project and proposed assessments.
On November 5, 2018 the Council held a public hearing where they ordered these improvements and
authorized the preparation of plans and specifications.
On March 19, 2019 the Council authorized advertisement for bids for Bonaire Path E, City Project 2018-
03.
PROPOSED IMPROVEMENTS
The existing gravel roadway is proposed to be paved to a three lane typical section near the Flint Hills
Athletic Fields and then narrowing to a two-lane section east of the Complex entrance. A new, asphalt trail
is proposed as there are currently no pedestrian facilities on this section of Bonaire Path.
Two watermain lines are proposed: one with potable water and one with raw water for the future well
house planned for this area of Rosemount. An empty casing pipe will be installed to carry future sanitary
sewer from the north side of Bonaire Path to the undeveloped agricultural parcel south of Bonaire. This
will allow a possible future connection without the need to excavate across the reconstructed roadway.
A trail connection to the Flint Hills Athletic Complex will be constructed. From the Complex to Anderson
Drive, the trail will be 10-feet wide and act as an eastern extension of the Dakota County Rosemount
Greenway Trail. Additionally, a water hydrant will be provided for the community gardens east of the
Complex.
2
In order to treat stormwater runoff from the new impervious surface created by the project, two new
infiltration basins are proposed along the roadway. The project would also expand the existing infiltration
basin at the southeast corner of the Flint Hills Athletic Complex.
RAILROAD RIGHT-OF-WAY
Watermain installed along Bonaire Path will cross the Union Pacific Railroad right-of-way. The pipe will be
directionally bored under the rail surface, which avoids excavation and disruption of the rail. Union Pacific
requires the City enter into an agreement for this work which outlines costs, safety and insurance
requirements. The agreement is attached and requires Council approval.
Track surface improvements, a concrete median, signals and crossing arms are proposed at the railroad
intersection to meet Quiet Zone standards. The signals, crossing arms and track surface improvements will
be performed by Union Pacific Rail Road (UPRR) as a separate contract. City staff is working with UPRR
on an agreement for this work, and it is likely to be constructed in 2020. Once the proposed
improvements are completed, the City would apply for a Quiet Zone at this crossing.
Because of the extreme angle of the crossing MnDOT’s rail safety and coordination office is
recommending that improvements within the UPRR right of way not be performed until the crossing
arms, medians and track surface improvements are completed. As a result, the existing gravel crossing
area will remain in place at the current width. The final roadway work would be finished in 2020 in
conjunction with the UPRR work.
COSTS & FUNDING
This project is scheduled in the 2019-2028 CIP. It is proposed to be funded by a combination of MN State
Bonding funds, MN State-Aid funds, utility core funds, and special assessments of benefitting properties.
Funding also includes railroad improvements which will be performed by the rail company’s contractor.
The funding as shown in the Feasibility Report is broken out in the table below:
* Includes 25% Indirect Cost
Note, staff is obtaining benefit appraisals for some of the properties proposed for assessment on Bonaire
Path. The proposed assessment amounts will be finalized at an Assessment Hearing scheduled for August
5, 2019. Notice will be given prior to the hearing in accordance with MN State Statute 429.
On April 24, 2019, five bids were received for the Bonaire Path E, City Project 2018-03, and were read
aloud publicly. The low bidder is Eureka Construction, who submitted a bid in the amount of
$1,794,313.04. The bid from Eureka Construction is approximately 18% lower than the engineer’s
estimated construction cost of $2,117,225.50. Eureka Construction has completed acceptable work in
nearby communities.
Item Feasibility Estimate Estimate Adjusted
for Bids Received*
State Bonding Proceeds
(Rail Safety Improvements) $1,000,000 $1,000,000
Water Core Fund
$907,000
$825,000
Sanitary Sewer Core Fund $10,000
Special Assessments $616,000 $616,000
State Aid Construction Fund $1,310,000 $795,000
Total $3,833,000 $3,246,000
3
Engineer’s
Estimate
Eureka
Construction
Minger
Construction Veit Kuechle
Underground
DSM
Excavating
Base Bid $1,869,943.50 $1,630,369.54 $1,760,834.95 $1,866,651.50 $2,045,622.44 $1,904,831.72
Schedule A* $247,282.00 $163,943.50 $177,645.30 $212,469.50 $184,069.60 $193,734.00
Total
Amount Bid $2,117,225.50 $1,794,313.04 $1,938,480.25 $2,079,121.00 $2,229,692.04 $2,098,565.72
*Schedule A – City’s surface improvements inside the Union Pacific Railroad right-of-way.
SCHEDULE
Should the Council approve this resolution, the proposed project schedule is shown below. Items marked
“CC” will require City Council approval in order to move forward with the project.
Public Open House May 16, 2019
Construction Start June, 2019
CC Set Assessment Hearing July 2, 2019
Public Hearing on Proposed Assessments August 5, 2019
CC Approve the Assessment Roll
Substantial Completion Fall 2019
Construction of Railroad Improvements Summer/Fall 2020
RECOMMENDATION
Staff recommends Council adopt the attached resolution receiving the bids and awarding the contract for
Bonaire Path East, City Project 2018-03. Additionally, staff recommends that the Mayor and City Clerk be
authorized to enter into an agreement with Union Pacific Rail Road to allow the extension of city utilities
under the existing rail line.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2019 – 37
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR BONAIRE PATH EAST, CITY PROJECT 2018-03.
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of Bonaire Path E, City Project 2018-03, are hereby received and
tabulated.
2. Based on the Total Bid, the bid of Eureka Construction, Inc. in the amount of $1,794,313.04
for the construction of said improvements is in accordance with the plans and specifications
and advertisement for bids, and is the lowest responsible bid and shall be and hereby is
accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposit of the successful bidder and the next two lowest
bidders shall be retained until a contract has been executed.
ADOPTED this 7th day of May, 2019.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
ABSTRACT OF BIDS2019 BONAIRE PATH IMPROVEMENTS - S.A.P. 208-105-002CITY OF ROSEMOUNTPROJECT NO. T18.115935BID DATE:4/23/2019TIME:11:00 AM12345ITEM APPROX.NO.ITEMQUANT.UNITUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNT1 2021.501 MOBILIZATION1 LUMP SUM $175,000.00 $175,000.00 $89,800.00 $89,800.00 $85,000.00 $85,000.00 $82,944.80 $82,944.80 $195,000.00 $195,000.00 140,500.00 $140,500.002 2101.524 CLEAR18 TREE $350.00 $6,300.00 $200.00 $3,600.00 $300.00 $5,400.00 $226.00 $4,068.00 $300.00 $5,400.00 335.00 $6,030.003 2101.524 GRUBB18 TREE $300.00 $5,400.00 $120.00 $2,160.00 $100.00 $1,800.00 $130.00 $2,340.00 $100.00 $1,800.00 335.00 $6,030.004 2104.502 REMOVE SIGN11 EACH $150.00 $1,650.00 $30.00 $330.00 $30.00 $330.00 $39.50 $434.50 $30.00 $330.00 39.00 $429.005 2104.502 SALVAGE SIGN TYPE C4 EACH $150.00 $600.00 $30.00 $120.00 $30.00 $120.00 $39.50 $158.00 $30.00 $120.00 39.00 $156.006 2104.503 SAWING BIT PAVEMENT (FULL DEPTH)250 LIN FT $4.00 $1,000.00 $2.00 $500.00 $2.00 $500.00 $2.20 $550.00 $2.00 $500.00 7.00 $1,750.007 2104.503 REMOVE CURB & GUTTER230 LIN FT $5.00 $1,150.00 $2.80 $644.00 $2.50 $575.00 $2.50 $575.00 $10.00 $2,300.00 5.00 $1,150.008 2104.503 REMOVE FENCE67 LIN FT $3.00 $201.00 $3.00 $201.00 $3.25 $217.75 $3.50 $234.50 $3.00 $201.00 3.00 $201.009 2104.503 SALVAGE FENCE1194 LIN FT $3.00 $3,582.00 $4.00 $4,776.00 $4.25 $5,074.50 $4.50 $5,373.00 $4.00 $4,776.00 4.00 $4,776.0010 2104.503 REMOVE STORM CULVERT140 LIN FT $15.00 $2,100.00 $12.50 $1,750.00 $6.00 $840.00 $10.00 $1,400.00 $38.00 $5,320.00 5.00 $700.0011 2104.504 REMOVE BITUMINOUS PAVEMENT1310 SQ YD $3.00 $3,930.00 $5.00 $6,550.00 $5.00 $6,550.00 $2.50 $3,275.00 $6.50 $8,515.00 2.00 $2,620.0012 2104.518 REMOVE CONCRETE WALK320 SQ FT $5.00 $1,600.00 $0.50 $160.00 $1.00 $320.00 $1.00 $320.00 $6.50 $2,080.00 2.00 $640.0013 2104.602 REMOVE MAILBOX3 EACH $150.00 $450.00 $65.00 $195.00 $40.00 $120.00 $220.00 $660.00 $65.00 $195.00 93.00 $279.0014 2105.507 COMMON EXCAVATION16109 CU YD $17.00 $273,853.00 $13.50 $217,471.50 $17.00 $273,853.00 $20.00 $322,180.00 $13.00 $209,417.00 11.00 $177,199.0015 2105.507 SUBGRADE EXCAVATION1650 CU YD $25.00 $41,250.00 $0.01 $16.50 $10.00 $16,500.00 $12.75 $21,037.50 $13.00 $21,450.00 20.00 $33,000.0016 2105.507 STABILIZING AGREGATE1650 CU YD $25.00 $41,250.00 $0.01 $16.50 $9.00 $14,850.00 $21.70 $35,805.00 $34.00 $56,100.00 20.00 $33,000.0017 2105.507 SELECT GRANULAR BORROW4500 CU YD $10.00 $45,000.00 $11.00 $49,500.00 $15.00 $67,500.00 $12.70 $57,150.00 $18.00 $81,000.00 14.00 $63,000.0018 2118.509 AGGREGATE SURFACING CL 251 TON $30.00 $1,530.00 $50.00 $2,550.00 $44.00 $2,244.00 $87.00 $4,437.00 $28.00 $1,428.00 46.00 $2,346.0019 2211.509 AGGREGATE BASE CLASS 56120 TON $17.00 $104,040.00 $16.50 $100,980.00 $14.00 $85,680.00 $11.75 $71,910.00 $14.00 $85,680.00 13.00 $79,560.0020 2357.506 BITUMINOUS MATERIAL FOR TACK COAT590 GAL $6.00 $3,540.00 $1.00 $590.00 $1.00 $590.00 $4.00 $2,360.00 $1.00 $590.00 2.00 $1,180.0021 2360.504 3" BITUMINOUS DRIVEWAY95 SQ YD $27.00 $2,565.00 $61.50 $5,842.50 $50.00 $4,750.00 $27.00 $2,565.00 $40.00 $3,800.00 43.00 $4,085.0022 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) 1070 TON $58.00 $62,060.00 $60.00 $64,200.00 $63.00 $67,410.00 $73.00 $78,110.00 $60.00 $64,200.00 70.00 $74,900.0023 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) 1580 TON $56.00 $88,480.00 $60.00 $94,800.00 $63.00 $99,540.00 $77.00 $121,660.00 $60.00 $94,800.00 71.00 $112,180.0024 2360.604 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) (TRAIL) 2000 SQ YD $35.00 $70,000.00 $25.50 $51,000.00 $19.00 $38,000.00 $22.00 $44,000.00 $13.00 $26,000.00 30.00 $60,000.0025 2501.502 15" RC PIPE APRON3 EACH $900.00 $2,700.00 $1,100.00 $3,300.00 $2,000.00 $6,000.00 $2,142.00 $6,426.00 $2,100.00 $6,300.00 837.00 $2,511.0026 2501.502 18" RC PIPE APRON1 EACH $1,000.00 $1,000.00 $1,200.00 $1,200.00 $1,900.00 $1,900.00 $2,430.00 $2,430.00 $2,200.00 $2,200.00 906.00 $906.0027 2501.502 24" RC PIPE APRON2 EACH $1,100.00 $2,200.00 $1,300.00 $2,600.00 $4,300.00 $8,600.00 $3,327.00 $6,654.00 $3,000.00 $6,000.00 1,038.00 $2,076.0028 2501.602 15" RC SAFETY APRON4 EACH $1,200.00 $4,800.00 $1,100.00 $4,400.00 $2,200.00 $8,800.00 $1,882.00 $7,528.00 $3,400.00 $13,600.00 878.00 $3,512.0029 2502.503 15" RC PIPE SEWER759 LIN FT $46.00 $34,914.00 $54.00 $40,986.00 $50.00 $37,950.00 $59.00 $44,781.00 $65.00 $49,335.00 66.00 $50,094.0030 2502.503 18" RC PIPE SEWER247 LIN FT $56.00 $13,832.00 $55.00 $13,585.00 $52.00 $12,844.00 $60.00 $14,820.00 $66.00 $16,302.00 72.00 $17,784.0031 2502.503 24" RC PIPE SEWER152 LIN FT $60.00 $9,120.00 $67.50 $10,260.00 $58.00 $8,816.00 $72.00 $10,944.00 $79.00 $12,008.00 126.00 $19,152.0032 2502.604 INSULATION (4" THICK)128 SQ FT $5.00 $640.00 $3.40 $435.20 $7.00 $896.00 $8.00 $1,024.00 $39.00 $4,992.00 3.00 $384.0033 2503.601 JACKING PIT1 LUMP SUM $20,000.00 $20,000.00 $16,000.00 $16,000.00 $80,000.00 $80,000.00 $14,400.00 $14,400.00 $17,000.00 $17,000.00 38,000.00 $38,000.0034 2503.603 18" STEEL CASING PIPE (OPEN CUT)63 LIN FT $75.00 $4,725.00 $120.00 $7,560.00 $150.00 $9,450.00 $98.00 $6,174.00 $230.00 $14,490.00 421.00 $26,523.0035 2503.603 30" STEEL CASING PIPE (OPEN CUT)80 LIN FT $100.00 $8,000.00 $220.00 $17,600.00 $240.00 $19,200.00 $127.00 $10,160.00 $330.00 $26,400.00 480.00 $38,400.0036 2503.603 30" STEEL CASING PIPE (TRENCHLESS)164 LIN FT $400.00 $65,600.00 $470.00 $77,080.00 $300.00 $49,200.00 $551.00 $90,364.00 $690.00 $113,160.00 520.00 $85,280.0037 2503.608 DUCTILE WATERMAIN FITTINGS4000 LB $8.00 $32,000.00 $8.50 $34,000.00 $8.00 $32,000.00 $12.00 $48,000.00 $10.00 $40,000.00 5.00 $20,000.0038 2504.602 CONNECT TO EXISTING WATERMAIN3 EACH $1,500.00 $4,500.00 $2,200.00 $6,600.00 $2,500.00 $7,500.00 $2,932.00 $8,796.00 $4,100.00 $12,300.00 365.00 $1,095.0039 2504.602 24" BUTTERFLY VALVE & BOX2 EACH $15,000.00 $30,000.00 $8,500.00 $17,000.00 $8,500.00 $17,000.00 $9,640.00 $19,280.00 $7,500.00 $15,000.00 7,000.00 $14,000.0040 2504.602 16" BUTTERFLY VALVE & BOX7 EACH $4,000.00 $28,000.00 $4,900.00 $34,300.00 $4,500.00 $31,500.00 $5,130.00 $35,910.00 $4,500.00 $31,500.00 3,725.00 $26,075.0041 2504.602 12" GATE VALVE & BOX1 EACH $3,000.00 $3,000.00 $4,200.00 $4,200.00 $4,000.00 $4,000.00 $3,668.00 $3,668.00 $3,900.00 $3,900.00 3,500.00 $3,500.0042 2504.602 6" GATE VALVE & BOX10 EACH $1,500.00 $15,000.00 $2,300.00 $23,000.00 $1,500.00 $15,000.00 $1,363.00 $13,630.00 $2,300.00 $23,000.00 1,635.00 $16,350.0043 2504.602 HYDRANT10 EACH $4,000.00 $40,000.00 $4,800.00 $48,000.00 $4,500.00 $45,000.00 $5,114.00 $51,140.00 $5,200.00 $52,000.00 4,300.00 $43,000.0044 2504.602 1" CORPORATION STOP3 EACH $350.00 $1,050.00 $930.00 $2,790.00 $780.00 $2,340.00 $480.00 $1,440.00 $440.00 $1,320.00 300.00 $900.0045 2504.602 1" CURB STOP & BOX3 EACH $400.00 $1,200.00 $500.00 $1,500.00 $910.00 $2,730.00 $604.00 $1,812.00 $550.00 $1,650.00 487.00 $1,461.0046 2504.602 YARD HYDRANT1 EACH $1,100.00 $1,100.00 $1,100.00 $1,100.00 $1,000.00 $1,000.00 $656.00 $656.00 $1,500.00 $1,500.00 776.00 $776.0047 2504.603 24" WATERMAIN DUCTILE IRON CL 521245 LIN FT $100.00 $124,500.00 $120.00 $149,400.00 $107.00 $133,215.00 $108.00 $134,460.00 $129.00 $160,605.00 131.00 $163,095.0048 2504.603 16" WATERMAIN DUCTILE IRON CL 522490 LIN FT $80.00 $199,200.00 $85.00 $211,650.00 $78.00 $194,220.00 $79.00 $196,710.00 $100.00 $249,000.00 90.00 $224,100.0049 2504.603 12" WATERMAIN DUCTILE IRON CL 5214 LIN FT $110.00 $1,540.00 $100.00 $1,400.00 $129.00 $1,806.00 $75.00 $1,050.00 $81.00 $1,134.00 120.00 $1,680.0050 2504.603 6" WATERMAIN DUCTILE IRON CL 52163 LIN FT $35.00 $5,705.00 $62.00 $10,106.00 $55.00 $8,965.00 $42.00 $6,846.00 $61.00 $9,943.00 54.00 $8,802.0051 2504.603 1" TYPE K COPPER PIPE119 LIN FT $35.00 $4,165.00 $26.50 $3,153.50 $36.00 $4,284.00 $32.00 $3,808.00 $57.00 $6,783.00 24.00 $2,856.0052 2506.502 CASTING ASSEMBLY (R-3067-V)9 EACH $700.00 $6,300.00 $710.00 $6,390.00 $575.00 $5,175.00 $795.00 $7,155.00 $1,000.00 $9,000.00 728.00 $6,552.00Engineer's EstimateEUREKA CONSTRUCTION, INC.MINGER CONSTRUCTION CO. , INC.VEITKUECHLE UNDERGROUND INC.DSM EXCAVATINGBolton & Menk, Inc.
ABSTRACT OF BIDS2019 BONAIRE PATH IMPROVEMENTS - S.A.P. 208-105-002CITY OF ROSEMOUNTPROJECT NO. T18.115935BID DATE:4/23/2019TIME:11:00 AM12345ITEM APPROX.NO.ITEMQUANT.UNITUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTEngineer's EstimateEUREKA CONSTRUCTION, INC.MINGER CONSTRUCTION CO. , INC.VEITKUECHLE UNDERGROUND INC.DSM EXCAVATINGBolton & Menk, Inc.53 2506.502 CASTING ASSEMBLY (R-3067-VB)4 EACH $750.00 $3,000.00 $710.00 $2,840.00 $575.00 $2,300.00 $795.00 $3,180.00 $1,000.00 $4,000.00 728.00 $2,912.0054 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 20.1 LIN FT $400.00 $8,040.00 $700.00 $14,070.00 $698.00 $14,029.80 $645.00 $12,964.50 $770.00 $15,477.00 572.00 $11,497.2055 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN DES R-1 (2'X3') 33 LIN FT $325.00 $10,725.00 $380.00 $12,540.00 $452.00 $14,916.00 $500.00 $16,500.00 $590.00 $19,470.00 566.00 $18,678.0056 2511.507 RANDOM RIPRAP CLASS III18.8 CU YD $100.00 $1,880.00 $100.00 $1,880.00 $170.00 $3,196.00 $105.00 $1,974.00 $107.00 $2,011.60 124.00 $2,331.2057 2521.518 6" CONCRETE WALK846 SQ FT $10.00 $8,460.00 $17.00 $14,382.00 $14.50 $12,267.00 $15.50 $13,113.00 $20.00 $16,920.00 23.00 $19,458.0058 2531.503 CONCRETE CURB & GUTTER DESIGN B4184680 LIN FT $14.00 $65,520.00 $13.50 $63,180.00 $15.50 $72,540.00 $15.40 $72,072.00 $15.00 $70,200.00 20.00 $93,600.0059 2531.518 6" CONCRETE DRIVEWAY PAVEMENT430 SQ FT $6.00 $2,580.00 $12.00 $5,160.00 $11.50 $4,945.00 $11.00 $4,730.00 $16.00 $6,880.00 8.00 $3,440.0060 2531.618 TRUNCATED DOMES150 SQ FT $55.00 $8,250.00 $60.00 $9,000.00 $63.00 $9,450.00 $68.50 $10,275.00 $60.00 $9,000.00 44.00 $6,600.0061 2540.602 MAIL BOX3 EACH $500.00 $1,500.00 $130.00 $390.00 $325.00 $975.00 $424.00 $1,272.00 $150.00 $450.00 62.00 $186.0062 2557.603 INSTALL FENCE1194 LIN FT $10.00 $11,940.00 $9.80 $11,701.20 $10.00 $11,940.00 $11.00 $13,134.00 $10.00 $11,940.00 11.00 $13,134.0063 2563.601 TRAFFIC CONTROL1 LUMP SUM $35,000.00 $35,000.00 $3,000.00 $3,000.00 $20,000.00 $20,000.00 $4,852.00 $4,852.00 $3,000.00 $3,000.00 9,400.00 $9,400.0064 2564.502 INSTALL SIGN TYPE C4 EACH $150.00 $600.00 $170.00 $680.00 $170.00 $680.00 $141.00 $564.00 $170.00 $680.00 140.00 $560.0065 2564.518 SIGN PANEL TYPE C61 SQ FT $30.00 $1,830.00 $55.00 $3,355.00 $55.00 $3,355.00 $54.00 $3,294.00 $55.00 $3,355.00 53.00 $3,233.0066 2573.502 STABILIZED CONSTRUCTION EXIT3 EACH $1,500.00 $4,500.00 $1,300.00 $3,900.00 $1,000.00 $3,000.00 $2,030.00 $6,090.00 $2,500.00 $7,500.00 1,200.00 $3,600.0067 2573.502 STORM DRAIN INLET PROTECTION18 EACH $400.00 $7,200.00 $180.00 $3,240.00 $150.00 $2,700.00 $172.00 $3,096.00 $640.00 $11,520.00 123.00 $2,214.0068 2573.503 SILT FENCE, TYPE MS3480 LIN FT $3.00 $10,440.00 $1.60 $5,568.00 $1.50 $5,220.00 $2.20 $7,656.00 $1.50 $5,220.00 2.00 $6,960.0069 2573.503 SEDIMENT CONTROL LOG, TYPE WOOD FIBER320 LIN FT $10.00 $3,200.00 $3.00 $960.00 $3.00 $960.00 $3.70 $1,184.00 $3.00 $960.00 3.00 $960.0070 2574.507 COMMON TOPSOIL BORROW (6" DEPTH)2424 CU YD $15.00 $36,360.00 $0.01 $24.24 $6.50 $15,756.00 $13.00 $31,512.00 $22.00 $53,328.00 21.00 $50,904.0071 2575.504 EROSION CONTROL BLANKET TYPE 3 (W/ SEED) 5430 SQ YD $3.00 $16,290.00 $1.20 $6,516.00 $1.40 $7,602.00 $2.30 $12,489.00 $1.10 $5,973.00 1.00 $5,430.0072 2575.504 RAPID STABILIZATION METHOD 39081 SQ YD $1.00 $9,081.00 $0.70 $6,356.70 $1.30 $11,805.30 $1.50 $13,621.50 $1.00 $9,081.00 1.00 $9,081.0073 2582.503 4" SOLID LINE MULTI COMP (WHITE)4405 LIN FT $1.00 $4,405.00 $0.40 $1,762.00 $0.45 $1,982.25 $0.65 $2,863.25 $0.58 $2,554.90 0.39 $1,717.9574 2582.503 4" SOLID LINE MULTI COMP (YELLOW)801 LIN FT $1.00 $801.00 $0.40 $320.40 $0.45 $360.45 $0.65 $520.65 $0.58 $464.58 0.39 $312.3975 2582.503 4" BROKEN LINE MULTI COMP (YELLOW)782 LIN FT $0.75 $586.50 $0.40 $312.80 $0.45 $351.90 $0.65 $508.30 $0.58 $453.56 0.39 $304.9876 2582.503 4" DBLE SOLID LINE MULTI COMP (YELLOW)2255 LIN FT $2.00 $4,510.00 $0.70 $1,578.50 $0.90 $2,029.50 $1.30 $2,931.50 $1.16 $2,615.80 1.00 $2,255.0077 2582.503 24" SOLID LINE MULTI COMP (WHITE)73 LIN FT $8.00 $584.00 $8.00 $584.00 $7.70 $562.10 $9.00 $657.00 $8.00 $584.00 9.00 $657.0078 2582.503 24" SOLID LINE MULTI COMP (YELLOW)298 LIN FT $8.00 $2,384.00 $6.00 $1,788.00 $7.70 $2,294.60 $7.00 $2,086.00 $6.00 $1,788.00 7.00 $2,086.0079 2582.518 PAVT MSSG PREF THERMO GR IN (LEFT ARROW) 60 SQ FT $25.00 $1,500.00 $36.00 $2,160.00 $27.00 $1,620.00 $34.00 $2,040.00 $30.00 $1,800.00 40.00 $2,400.0080 2582.518 PAVT MSSG PREF THERMO GR IN (RIGHT ARROW) 60 SQ FT $25.00 $1,500.00 $10.00 $600.00 $27.00 $1,620.00 $34.00 $2,040.00 $30.00 $1,800.00 11.00 $660.0081 2582.518 PAVT MSSG PREF THERMO GR IN (RAIL ROAD X) 123 SQ FT $25.00 $3,075.00 $28.00 $3,444.00 $27.00 $3,321.00 $31.50 $3,874.50 $28.00 $3,444.00 31.00 $3,813.0082 2582.518 CROSSWALK PREF THERMO GR IN144 SQ FT $20.00 $2,880.00 $12.00 $1,728.00 $13.20 $1,900.80 $13.50 $1,944.00 $12.00 $1,728.00 13.00 $1,872.00BASE BID$1,869,943.50 $1,630,369.54 $1,760,834.95 $1,866,651.50 $2,045,622.44 $1,904,831.7283 2021.501 MOBILIZATION1 LUMP SUM $10,000.00 $10,000.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 $25,000.00 $25,000.00 $17,000.00 $17,000.00 2,300.00 $2,300.0084 2104.504 REMOVE BITUMINOUS PAVEMENT500 SQ YD $3.00 $1,500.00 $5.20 $2,600.00 $4.00 $2,000.00 $3.20 $1,600.00 $6.50 $3,250.00 2.00 $1,000.0085 2105.507 COMMON EXCAVATION1630 CU YD $17.00 $27,710.00 $16.00 $26,080.00 $13.00 $21,190.00 $16.30 $26,569.00 $13.00 $21,190.00 11.00 $17,930.0086 2105.507 SUBGRADE EXCAVATION100 CU YD $25.00 $2,500.00 $0.01 $1.00 $13.00 $1,300.00 $18.00 $1,800.00 $13.00 $1,300.00 20.00 $2,000.0087 2105.507 STABILIZING AGREGATE100 CU YD $25.00 $2,500.00 $0.01 $1.00 $25.00 $2,500.00 $24.50 $2,450.00 $34.00 $3,400.00 20.00 $2,000.0088 2105.507 SELECT GRANULAR BORROW600 CU YD $10.00 $6,000.00 $0.01 $6.00 $17.00 $10,200.00 $15.50 $9,300.00 $18.00 $10,800.00 14.00 $8,400.0089 2211.509 AGGREGATE BASE CLASS 5750 TON $17.00 $12,750.00 $19.50 $14,625.00 $20.00 $15,000.00 $13.00 $9,750.00 $14.00 $10,500.00 13.00 $9,750.0090 2357.506 BITUMINOUS MATERIAL FOR TACK COAT120 GAL $6.00 $720.00 $1.00 $120.00 $1.00 $120.00 $4.00 $480.00 $1.00 $120.00 2.00 $240.0091 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,C) 180 TON $58.00 $10,440.00 $60.00 $10,800.00 $60.00 $10,800.00 $73.00 $13,140.00 $60.00 $10,800.00 79.00 $14,220.0092 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) 270 TON $56.00 $15,120.00 $60.00 $16,200.00 $60.00 $16,200.00 $77.00 $20,790.00 $60.00 $16,200.00 73.00 $19,710.0093 2360.604 TEMP BITUMINOUS PAVEMENT500 SQ YD $70.00 $35,000.00 $21.50 $10,750.00 $21.00 $10,500.00 $16.00 $8,000.00 $17.00 $8,500.00 22.00 $11,000.0094 2360.604 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) (TRAIL) 320 SQ YD $35.00 $11,200.00 $13.00 $4,160.00 $20.00 $6,400.00 $22.00 $7,040.00 $13.00 $4,160.00 22.00 $7,040.0095 2521.518 6" CONCRETE WALK590 SQ FT $10.00 $5,900.00 $18.00 $10,620.00 $15.00 $8,850.00 $16.30 $9,617.00 $21.00 $12,390.00 22.00 $12,980.0096 2531.503 CONCRETE CURB & GUTTER DESIGN B4181450 LIN FT $14.00 $20,300.00 $14.50 $21,025.00 $16.00 $23,200.00 $16.30 $23,635.00 $14.00 $20,300.00 18.00 $26,100.0097 2531.518 4" CONCRETE MEDIAN PAVEMENT2210 SQ FT $6.00 $13,260.00 $5.20 $11,492.00 $5.00 $11,050.00 $6.00 $13,260.00 $5.15 $11,381.50 5.00 $11,050.0098 2531.602 CONCRETE MEDIAN NOSE - SPECIAL4 EACH $850.00 $3,400.00 $400.00 $1,600.00 $400.00 $1,600.00 $458.00 $1,832.00 $400.00 $1,600.00 940.00 $3,760.0099 2531.618 TRUNCATED DOMES80 SQ FT $55.00 $4,400.00 $63.00 $5,040.00 $63.00 $5,040.00 $72.00 $5,760.00 $63.00 $5,040.00 44.00 $3,520.00100 2533.503 PORTABLE PRECAST CONC BARRIER DES 8337200 LIN FT $50.00 $10,000.00 $5.00 $1,000.00 $5.00 $1,000.00 $16.50 $3,300.00 $5.00 $1,000.00 24.00 $4,800.00SCHEDULE A
ABSTRACT OF BIDS2019 BONAIRE PATH IMPROVEMENTS - S.A.P. 208-105-002CITY OF ROSEMOUNTPROJECT NO. T18.115935BID DATE:4/23/2019TIME:11:00 AM12345ITEM APPROX.NO.ITEMQUANT.UNITUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTUNIT PRICEAMOUNTEngineer's EstimateEUREKA CONSTRUCTION, INC.MINGER CONSTRUCTION CO. , INC.VEITKUECHLE UNDERGROUND INC.DSM EXCAVATINGBolton & Menk, Inc.101 2545.503 4" NON-METALLIC CONDUIT65 LIN FT $10.00 $650.00 $9.30 $604.50 $19.00 $1,235.00 $5.00 $325.00 $6.94 $451.10 6.00 $390.00102 2554.615 IMPACT ATTENUATOR4 AMBY $2,500.00 $10,000.00 $1.00 $4.00 $1.00 $4.00 $2,710.00 $10,840.00 $1.00 $4.00 2,400.00 $9,600.00103 2563.601 TRAFFIC CONTROL1 LUMP SUM $35,000.00 $35,000.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 $6,660.00 $6,660.00 $15,000.00 $15,000.00 4,000.00 $4,000.00104 2564.502 OBJECT MARKER TYPE X4-22 EACH $150.00 $300.00 $100.00 $200.00 $100.00 $200.00 $85.00 $170.00 $100.00 $200.00 84.00 $168.00105 2564.518 SIGN PANEL TYPE C32 SQ FT $30.00 $960.00 $60.00 $1,920.00 $60.00 $1,920.00 $54.00 $1,728.00 $60.00 $1,920.00 54.00 $1,728.00106 2573.503 SILT FENCE, TYPE MS600 LIN FT $3.00 $1,800.00 $1.60 $960.00 $1.50 $900.00 $2.20 $1,320.00 $1.50 $900.00 2.00 $1,200.00107 2574.507 COMMON TOPSOIL BORROW (6" DEPTH)200 CU YD $15.00 $3,000.00 $0.01 $2.00 $20.00 $4,000.00 $25.50 $5,100.00 $22.00 $4,400.00 22.00 $4,400.00108 2575.504 RAPID STABILIZATION METHOD 31230 SQ YD $1.00 $1,230.00 $0.70 $861.00 $1.30 $1,599.00 $1.50 $1,845.00 $1.00 $1,230.00 1.00 $1,230.00109 2582.503 4" SOLID LINE MULTI COMP (WHITE)1450 LIN FT $1.00 $1,450.00 $0.40 $580.00 $0.45$652.50$0.65 $942.50 $0.58 $841.00 9.00 $13,050.00110 2582.503 24" SOLID LINE MULTI COMP (WHITE)24 LIN FT $8.00 $192.00 $8.00 $192.00 $7.70$184.80$9.00 $216.00 $8.00 $192.00 7.00 $168.00SCHEDULE A BID$247,282.00 $163,943.50$177,645.30$212,469.50 $184,069.60 $193,734.00TOTAL AMOUNT BID (BASE + SCHEDULE A)$2,117,225.50 $1,794,313.04$1,938,480.25$2,079,121.00 $2,229,692.04 $2,098,565.72
April 26, 2019
Folder: 03143-30
BRIAN ERICKSON
CITY OF ROSEMOUNT
12224 NICOLLET AVE
BURNSVILLE MN 55044
RE: Proposed 16.0 Inch Encased Domestic Water Pipeline Crossing of Railroad Property at Mile Post
336.10 on the Albert Lea Subdivision at or near Rosemount, Dakota County, Minnesota
Mr. Erickson:
Attached is an original of the agreement covering your use of the Railroad Company’s right of way.
Please print two copies, execute on your behalf and return ALL DOCUMENTS with a check for any
payments required, as shown below to 1400 Douglas Street, Omaha, NE 68137-1690 Attn: Norma
Reynolds.
An original copy of the fully-executed document will be returned to you, when approved and processed
by the Railroad Company. Also, please provide a resolution or other authorization for the party executing
the documents, if signature authorization is required by your Entity.
Payment in the amount of One Thousand Two Hundred Fifty Dollars ($1,250.00) is due and payable to
Union Pacific Railroad Company upon your execution of the agreement. Please include your payment,
with Folder No. 03143-30 noted on that document. If you require formal billing, you may consider this
letter as a formal bill and that 94-6001323 is this Corporation’s correct Federal Taxpayer Identification
Number.
Railroad Protective Liability Insurance (RPLI) may be obtained from any insurance company which
offers such coverage. Union Pacific has also worked with a national broker, Marsh USA, to make
available RPLI to you or your contractor. You can find additional information, premium quotes, and
application forms at (uprr.marsh.com).
Construction Observation is required by RailPros. Please see Article 12 of the Agreement.
If we have not received the executed documents within six months from the date of this letter, this
proposed offer of an agreement is withdrawn and becomes null and void.
If you have any questions, please contact me at (402) 544-8571.
Sincerely,
Norma Reynolds
Mgr II Real Estate Contracts
Union Pacific Railroad Real Estate 1400 Douglas Street Stop 1690 Omaha, Nebraska 68179-1690 fx. (402) 501-0340
Pipeline Crossing 080808 Folder No. 03143-30
Last Modified: 06/05/18
Form Approved, AVP-Law
PIPELINE CROSSING
AGREEMENT
Mile Post: 336.10, Albert Lea Subdivision
Location: Rosemount, Dakota County, Minnesota
THIS AGREEMENT (“Agreement”) is made and entered into as of April 26, 2019, (“Effective
Date”) by and between UNION PACIFIC RAILROAD COMPANY, a Delaware corporation,
(“Licensor”) and CITY OF ROSEMOUNT, a Minnesota municipal corporation, to be addressed at
12224 Nicollet Ave, Burnsville, Minnesota 55044 (“Licensee”).
IT IS MUTUALLY AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS:
Article 1. LICENSOR GRANTS RIGHT.
A. In consideration of the license fee to be paid by Licensee set forth below and in further
consideration of the covenants and agreements to be performed by Licensee, Licensor hereby grants to
Licensee the right to construct and thereafter, during the term hereof, maintain and operate 16.0 inch
encased domestic water pipeline crossing only, including any appurtenances required for the operation of
said pipeline (collectively, "Licensee's Facilities") across Licensor’s real property, trackage, or other
facilities located in Rosemount, Dakota County, State of Minnesota ("Railroad Property"). The specific
specifications and limited purpose for Licensee's Facilities on, along, across and under Railroad Property
are described in and shown on the Print and Specifications dated April 26, 2019, attached hereto as
Exhibit A and made a part hereof.
B. Licensee represents and warrants that Licensee's Facilities will (i) only be used for 16.0
inch encased domestic water pipeline crossing, and (ii) not be used to convey any other substance, any
fiber optic cable, or for any other use, whether such use is currently technologically possible, or whether
such use may come into existence during the life of this Agreement.
C. Licensee acknowledges that if it or its contractor provides Licensor with digital imagery
depicting Licensee's Facilities ("Digital Imagery"), Licensee authorizes Licensor to use the Digital
Imagery in preparing Exhibit A. Licensee represents and warrants that through a license or otherwise, it
has the right to use the Digital Imagery and to permit Licensor to use the Digital Imagery in said manner.
Article 2. LICENSE FEE.
Upon execution of this Agreement, the Licensee shall pay to the Licensor a one-time License Fee
of One Thousand Two Hundred Fifty Dollars ($1,250.00).
Article 3. TERM.
This Agreement shall take effect as of the Effective Date first herein written and shall continue in full
force and effect until terminated as provided in the "TERMINATION; REMOVAL OF LICENSEE’S
FACILITIES" Section of Exhibit B.
Article 4. LICENSEE'S COMPLIANCE WITH GENERAL TERMS.
Licensee represents and warrants that all work on Licensee's Facilities performed by Licensee or its
contractors will strictly comply with all terms and conditions set forth herein, including the General
Terms and Conditions, attached hereto as Exhibit B and made a part hereof.
Article 5. INSURANCE.
A. During the term of this Agreement, Licensee shall fully comply or cause its contractor(s) to fully
comply with the insurance requirements described in Exhibit C, attached hereto and made a part hereof.
Upon request only, Licensee shall send copies of all insurance documentation (e.g., certificates,
endorsements, etc.) to Licensor at the address listed in the "NOTICES" Section of this Agreement.
B. If Licensee is subject to statute(s) limiting its insuranc e liability and/or limiting its ability to
obtain insurance in compliance with Exhibit C of this Agreement, those statutes shall apply.
Article 6. DEFINITION OF LICENSEE.
For purposes of this Agreement, all references in this Agreement to Licensee wil l include
Licensee's contractors, subcontractors, officers, agents and employees, and others acting under its or their
authority (collectively, a "Contractor"). If a Contractor is hired by Licensee to perform any work on
Licensee's Facilities (including initial construction and subsequent relocation, maintenance, and/or repair
work), then Licensee shall provide a copy of this Agreement to its Contractor(s) and require its
Contractor(s) to comply with all terms and conditions of this Agreement, including the indemnification
requirements set forth in the "INDEMNITY" Section of Exhibit B. Licensee shall require any Contractor
to release, defend, and indemnify Licensor to the same extent and under the same terms and conditions as
Licensee is required to release, defend, and indemnify Licensor herein.
Article 7. ATTORNEYS’ FEES, EXPENSES, AND COSTS.
If litigation or other court action or similar adjudicatory proceeding is undertaken by Licensee or Licensor
to enforce its rights under this Agreement, all fees, costs, and expenses, including, without limitation,
reasonable attorneys’ fees and court costs, of the prevailing Party in such action, suit, or proceeding shall
be reimbursed or paid by the Party against whose interest the judgment or decision is re ndered. The
provisions of this Article shall survive the termination of this Agreement.
Article 8. WAIVER OF BREACH.
The waiver by Licensor of the breach of any condition, covenant or agreement herein contained to be
kept, observed and performed by Licensee shall in no way impair the right of Licensor to avail itself of
any remedy for any subsequent breach thereof.
Article 9. ASSIGNMENT.
A. Licensee shall not assign this Agreement, in whole or in part, or any rights herein granted,
without the written consent of Licensor, which must be requested in writing by Licensee. Any assignment
or attempted transfer of this Agreement or any of the rights herein granted, whether voluntary, by
operation of law, or otherwise, without Licensor's written consent, will be absolutely void and may result
in Licensor's termination of this Agreement pursuant to the "TERMINATION; REMOVAL OF
LICENSEE'S FACILITIES" Section of Exhibit B.
B. Upon Licensor's written consent to any assignment, this Agreement will be binding upon and
inure to the benefit of the parties thereto, successors, heirs, and assigns, executors, and administrators.
Article 10. SEVERABILITY.
Any provision of this Agreement which is determined by a court of competent jurisdiction to be invalid or
unenforceable shall be invalid or unenforceable only to the extent of such determination, which shall not
invalidate or otherwise render ineffective any other provision of this Agreement.
Article 11. NOTICES.
Except Licensee's commencement of work notice(s) required under Exhibit B, all other notices
required by this Agreement must be in writing, and (i) personally served upon the business address listed
below ("Notice Address"), (ii) sent overnight via express delivery by a nationally recognized overnight
delivery service such as Federal Express Corporation or United Parcel Service to the Notice Address, or
(iii) by certified mail, return receipt requested to the Notice Address. Overnight express delivery notices
will be deemed to be given upon receipt. Certified mail notices will be deemed to be given three (3) days
after deposit with the United States Postal Service.
If to Licensor: Union Pacific Railroad Company
Attn: Analyst – Real Estate Utilities (Folder No. 03143-30)
1400 Douglas Street, MS 1690
Omaha, Nebraska 68179
If to Licensee: CITY OF ROSEMOUNT
12224 Nicollet Ave
Burnsville, Minnesota, 55044
Article 12. SPECIAL PROVISION – CONSTRUCTION OBSERVATION.
Licensor requires Licensee to provide monitoring of tracks and construction observation through
Licensor approved observer named below during all construction and installation work. Licensee is to
directly coordinate services with the named inspector:
Railpros Field Services
Email: RP.Utility@railpros.com
Phone (682)223-5271
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed as of
the date first herein written.
UNION PACIFIC RAILROAD COMPANY CITY OF ROSEMOUNT
By: __________________________________
By: __________________________________
Norma J. Reynolds
Mgr II Real Estate Contracts
Name Printed: __________________________
Title: _________________________________
X
6.9
6.9
NOTES:
1) ALL DIMENSIONS MEASURED PERPENDICULAR TO THE CENTERLINE OF TRACK
2) REFER TO AREMA VOLUME 1. CHAPTER 1. PART 5. SECTION 5.1
BORED AND JACKED
AT MINIMUM SIGNS WILL BE PROVIDED AS STATED ABOVE
STEEL NA
DOMESTIC WATER
100 100
0.4 16
YES
STEEL PIPE NA
0.5 30
YES
OPEN
30 30
INDUSTRY OR SPUR TRACK
44.7535796
-93.0768371
ROSEMOUNT DAKOTA MN
0314330
NON-FLAMMABLE LIQUID
PIPELINE
Pipeline Crossing 06/05/18
Form Approved, AVP Law
EXHIBIT B
GENERAL TERMS AND CONDITIONS
Section 1. LIMITATION AND SUBORDINATION OF RIGHTS GRANTED.
A. The foregoing grant is subject and subordinate to the prior and continuing right and
obligation of Licensor to use and maintain its entire property including the right and power of Licensor to
construct, maintain, repair, renew, use, operate, change, modify or relocate railroad tracks, signal,
communication, fiber optics, or other wirelines, pipelines and other facilities upon, along or across any or
all parts of its property, all or any of which may be freely done at any time or times by Licensor without
liability to Licensee or to any other party for compensation or damages.
B. The foregoing grant is also subject to all outstanding superior rights (including those in
favor of licensees and lessees of Railroad Property) and the right of Licensor to renew and extend the
same, and is made without covenant of title or for quiet enjoyment. It shall be Licensee's sole obligation
to obtain such additional permission, license and grants necessary on account of any such existing rights.
Section 2. ENGINEERING REQUIREMENTS; PERMITS.
A. Licensee's Facilities will be designed, constructed, operated, maintained, repaired,
renewed, modified, reconstructed, removed, or abandoned in place on Railroad Property by Licensee or
its contractor to Licensor's satisfaction and in strict conformity with: (i) Licensor’s c urrent engineering
standards and specifications, including those for shoring and cribbing to protect Licensor's railroad
operations and facilities ("UP Specifications"), except for variances approved in advance in writing by
Licensor’s Assistant Vice President Engineering – Design or its authorized representative
("UP Engineering Representative"); (ii) such other additional safety standards as Licensor, in its sole
discretion, elects to require, including, without limitation, American Railway Engineering a nd
Maintenance-of-Way Association ("AREMA") standards and guidelines (collectively, "UP Additional
Requirements"); and (iii) all applicable laws, rules, and regulations, including any applicable Federal
Railroad Administration and Federal Energy Regulatory Commission regulations and enactments
(collectively, "Laws"). If there is any conflict between UP Specifications, UP Additional Requirements,
and Laws, the most restrictive will apply.
B. Licensee shall keep the soil over Licensee's Facilities thoroughly compacted, and
maintain the grade over and around Licensee's Facilities even with the surface of the adjacent ground.
C. If needed, Licensee shall secure, at Licensee's sole cost and expense, any and all
necessary permits required to perform any work on Licensee's Facilities.
Section 3. NOTICE OF COMMENCEMENT OF WORK; EMERGENCIES.
A. Licensee and it contractors are strictly prohibited from commencing any work associated
with Licensee's Facilities without Licensor's written approval that the work will be in strict compliance
with the "ENGINEERING REQUIREMENTS; PERMITS" Section of this Exhibit B. Upon Licensor's
approval, Licensee shall contact both of Licensor's field representatives ("Licensor's Field
Representatives") at least ten (10) days before commencement of any work on Licensee's Facilities.
B. Licensee shall not commence any work until: (1) Licensor has determined whether
flagging or other special protective or safety measures ("Safety Measures") are required for performance
of the work pursuant to the "FLAGGING" Section of this Exhibit B and provided Licensee written
authorization to commence work; and (2) Licensee has complied with the "PROTECTION OF FIBER
OPTIC CABLE SYSTEMS" Section of this Exhibit B.
C. If, at any time, an emergency arises involving Licensee's Facilities, Licensee or its
contractor shall immediately contact Licensor's Response Management Communications Center at
(888) 877-7267.
Section 4. FLAGGING.
A. Following Licensee's notice to Licensor's Field Representatives required under the
"NOTICE OF COMMENCEMENT OF WORK; EMERGENCIES" Section of this Exhibit B, Licensor
shall inform Licensee if Safety Measures are required for performance of the work by Licensee or its
contractor on Railroad Property. If Safety Measures are required, no work of any kind may be performed
by Licensee or its contractor(s) until arrangements for the Safety Measures have been made and
scheduled. If no Safety Measures are required, Licensor will give Licensee written authorization to
commence work.
B. If any Safety Measures are performed or provided by Licensor, including but not limited
to flagging, Licensor shall bill Licensee for such expenses incurred by Licensor, unless Licensor and a
federal, state, or local governmental entity have agreed that Licensor is to bill such expenses to the
federal, state, or local governmental entity. Additional information regarding the submission of such
expenses by Licensor and payment thereof by Licensee can be found in the "LICENSEE’S PAYMENT
OF EXPENSES" Section of this Exhibit B. If Licensor performs any Safety Measures, Licensee agrees
that Licensee is not relieved of any of responsibilities or liabilities set forth in this Agreement.
C. For flagging, the rate of pay per hour for each flagger will be the prevailing hourly rate in
effect for an eight-hour day for the class of flagmen used during regularly assigned hours and overtime in
accordance with Labor Agreements and Schedules in effect at the time the work is performed. In addition
to the cost of such labor, a composite charge for vacation, holiday, health and welfare, supplemental
sickness, Railroad Retirement and unemployment compensation, supplemental pension, Employees
Liability and Property Damage, and Administration will be included, computed on actual payroll. The
composite charge will be the prevailing composite charge in effect at the time the work is performed. One
and one-half times the current hourly rate is paid for overtime, Saturdays and Sundays, and two and one-
half times current hourly rate for holidays. Wage rates are subject to change, at any time, by law or by
agreement between Licensor and its employees, and may be retroactive as a result of negotiations or a
ruling of an authorized governmental agency. Additional charges on labor are also subject to change. If
the wage rate or additional charges are changed, Licensee (or the governmental entity, as applicable) shall
pay on the basis of the new rates and charges.
D. Reimbursement to Licensor will be required covering the full eight-hour day during
which any flagger is furnished, unless the flagger can be assigned to other railroad work during a portion
of such day, in which event reimbursement will not be required for the portion of the day during which
the flagger is engaged in other railroad work. Reimbursement will also be required for any day not
actually worked by the flaggers following the flaggers' assignment to work on the project for which
Licensor is required to pay the flaggers and which could not reasonably be avoided by Licensor by
assignment of such flaggers to other work, even though Licensee may not be working during such time.
When it becomes necessary for Licensor to bulletin and assign an employee to a flagging position in
compliance with union collective bargaining agreements, Licensee must provide Licensor a minimum of
five (5) days notice prior to the cessation of the need for a flagger. If five (5) days notice of cessation is
not given, Licensee will still be required to pay flagging charges for the days the flagger was scheduled,
even though flagging is no longer required for that period. An additional ten (10) days notice must then be
given to Licensor if flagging services are needed again after such five day cessation notice has been given
to Licensor.
Section 5. SAFETY.
A. Safety of personnel, property, rail operations and the public is of paramount importance
in the prosecution of any work on Railroad Property performed by Licensee or its contractor, and takes
precedence over any work on Licensee's Facilities to be performed Licensee or its contractors. Licensee
shall be responsible for initiating, maintaining and supervising all safety operations and programs in
connection with any work on Licensee's Facilities. Licensee and its contractor shall, at a minimum
comply, with Licensor's then current safety standards located at the below web address ("Licensor's
Safety Standards") to ensure uniformity with the safety standards followed by Licensor's own forces. As
a part of Licensee's safety responsibilities, Licensee shall notify Licensor if it determines that any o f
Licensor's Safety Standards are contrary to good safety practices. Licensee and its contractor shall
furnish copies of Licensor's Safety Standards to each of its employees before they enter Railroad
Property.
Union Pacific Current Safety Requirements
B. Licensee shall keep the job site on Railroad Property free from safety and health hazards
and ensure that their employees are competent and adequately trained in all safety and health aspects of
the work.
C. Licensee represents and warrants that all parts of Licensee's Facilities within and outside
of the limits of Railroad Property will not interfere whatsoever with the constant, continuous, and
uninterrupted use of the tracks, property, and facilities of Licensor, and nothing shall be done or suffered
to be done by Licensee at any time that would in any manner impair the safety thereof.
D. Licensor's operations and work performed by Licensor’s personnel may cause delays in
Licensee's or its contractor's work on Licensee's Facilities. Licensee accepts this risk and agrees that
Licensor shall have no liability to Licensee or any other person or entity for any such delays. Licensee
must coordinate any work on Railroad Property by Licensee or any third party with Licensor's Field
Representatives in strict compliance with the "NOTICE OF COMMENCEMENT OF WORK;
EMERGENCIES" Section of this Exhibit
E. Licensor shall have the right, if it so elects, to provide any support it deems necessary for
the safety of Licensor's operations and trackage during Licensee's or its contractor's construction,
maintenance, repair, renewal, modification, relocation, reconstruction, or removal of Licensee's Facilities.
In the event Licensor provides such support, Licensor shall invoice Licensee, and Licensee shall pay
Licensor as set forth in the "LICENSEE'S PAYMENT OF EXPENSES" Section of this Exhibit B.
F. Licensee may use unmanned aircraft systems ("UAS") to inspect Licensee's Facilities
only upon the prior authorization from and under the direction of Licensor's Field Representatives.
Licensee represents and warrants that its use of UAS on Railroad Property will comply with Licensor's
then-current Unmanned Aerial Systems Policy and all applicable laws, rules and regulations, including
any applicable Federal Aviation Administration regulations and enactments pertaining to UAS.
Section 6. PROTECTION OF FIBER OPTIC CABLE SYSTEMS.
Fiber optic cable systems may be buried on Railroad Property. Protection of the fiber optic cable
systems is of extreme importance since any break could disrupt service to users resulting in business
interruption and loss of revenue and profits. In addition to the notifications required under the "NOTICE
OF COMMENCEMENT OF WORK; EMERGENCIES" Section of this Exhibit B, Licensee shall
telephone Licensor during normal business hours (7:00 a.m. to 9:00 p.m. Central Time, Monday through
Friday, except for holidays) at 1-800-336-9193 (also a 24-hour, 7-day number for emergency calls) to
determine if fiber optic cable is buried anywhere on Railroad Property to be used by Licensee. If it is,
Licensee shall telephone the telecommunications company(ies) involved, and arrange for a cable loca tor,
make arrangements for relocation or other protection of the fiber optic cable, all at Licensee’s expense,
and will not commence any work on Railroad Property until all such protection or relocation has been
completed.
Section 7. LICENSEE'S PAYMENT OF EXPENSES.
A. Licensee shall bear the entire cost and expense of the design, construction, maintenance,
modification, reconstruction, repair, renewal, revision, relocation, or removal of Licensee's Facilities.
B. Licensee shall fully pay for all materials joined, affixed to and labor performed on
Railroad Property in connection with the construction, maintenance, modification, reconstruction, repair,
renewal, revision, relocation, or removal of Licensee's Facilities, and shall not permit or suffer any
mechanic’s or materialman’s lien of any kind or nature to be enforced against the property for any work
done or materials furnished thereon at the instance or request or on behalf of Licensee. Licensee shall
promptly pay or discharge all taxes, charges, and assessments levied upon, in respect to, or on account of
Licensee's Facilities, to prevent the same from becoming a charge or lien upon any property of Licensor,
and so that the taxes, charges, and assessments levied upon or in respect to such property shall not be
increased because of the location, construction, or maintenance of Licensee's Facilities or any
improvement, appliance, or fixture connected therewith placed upon such property, or on account of
Licensee’s interest therein. Where such tax, charge, or assessment may not be separately made or assessed
to Licensee but shall be included in the assessment of the property of Licensor, then Licensee shall pay to
Licensor an equitable proportion of such taxes determined by the value of Licensee’s propert y upon
property of Licensor as compared with the entire value of such property.
C. As set forth in the "FLAGGING" Section of this Exhibit B, Licensor shall have the right,
if it so elects, to provide any Safety Measures Licensor deems necessary for the s afety of Licensor's
operations and trackage during Licensee's or its contractor's construction, maintenance, modification,
reconstruction, repair, renewal, revision, relocation, or removal of Licensee's Facilities, including, but not
limited to supervision, inspection, and flagging services. In the event Licensor provides such Safety
Measures, Licensor shall submit an itemized invoice to Licensee's notice recipient listed in the
"NOTICES" Article of this Agreement. Licensee shall pay to Licensor the total amount listed on such
invoice within thirty (30) days of Licensee's receipt of such invoice.
Section 8. MODIFICATIONS TO LICENSEE'S FACILITIES.
A. This grant is subject to Licensor's safe and efficient operation of its railroad, and
continued use and improvement of Railroad Property (collectively, "Railroad's Use"). Accordingly,
Licensee shall, at its sole cost and expense, modify, reconstruct, repair, renew, revise, relocate, or remove
(individually, "Modification", or collectively, "Modifications") all or any portion of Licensee's Facilities
as Licensor may designate or identify, in its sole discretion, in the furtherance of Railroad's Use.
B. Upon any Modification of all or any portion of Licensee's Facilities to another location
on Railroad Property, Licensor and Licensee shall execute a Supplemental Agreement to this Pipeline
Agreement to document the Modification(s) to Licensee's Facilities on Railroad Property. If the
Modifications result in Licensee's Facilities moving off of Railroad Property, this Agreement will
terminate upon Licensee's completion of such Modification(s) and all requirements contained within the
"TERMINATION; REMOVAL OF LICENSEE’S FACILITIES" Section of this Exhibit B. Any such
Modification(s) off of Railroad Property will not release Licensee from any liability or other obligation of
Licensee arising prior to and upon completion of any such Modifications to the Licensee's Facilities.
Section 9. RESTORATION OF RAILROAD PROPERTY.
In the event Licensee, in any manner moves or disturbs any property of Licensor in connection
with the construction, maintenance, modification, reconstruction, repair, renewal, revision, reloca tion, or
removal of Licensee's Facilities, then, Licensee shall, as soon as possible and at Licensee’s sole cost and
expense, restore Licensor’s property to the same condition as the same were before such property was
moved or disturbed.
Section 10. INDEMNITY.
A. Definitions. As used in this Section:
1. "Licensor" includes Licensor, its affiliates, its and their officers, directors, agents
and employees, and other railroad companies using Railroad Property at or near
the location of Licensee’s installation and their officers, directors, agents, and
employees.
2. "Licensee" includes Licensee and its agents, contractors, subcontractors,
sub-subcontractors, employees, officers, and directors, or any other person or
entity acting on its behalf or under its control.
3. "Loss" includes claims, suits, taxes, loss, damages (including punitive damages,
statutory damages, and exemplary damages), costs, charges, assessments,
judgments, settlements, liens, demands, actions, causes of action, fines, penalties,
interest, and expenses of any nature, including court costs, reasonable attorneys’
fees and expenses, investigation costs, and appeal expenses.
B. Licensee shall release, defend, indemnify, and hold harmless Licensor from and against
any and all Loss, even if groundless, fraudulent, or false, that directly or indirectly arises out of or is
related to Licensee’s construction, maintenance, modification, reconstruction, repair, renewal, revision,
relocation, removal, presence, use, or operation of Licensee's Facilities, including, but not limited to, any
actual or alleged:
1. Bodily harm or personal injury (including any emotional injury or disease) to, or the
death of, any person(s), including, but not limited to, Licensee, Licensor, any
telecommunications company, or the agents, contractors, subcontractors,
sub-subcontractors, or employees of the foregoing;
2. Damage to or the disturbance, loss, movement, or destruction of Railroad Property,
including loss of use and diminution in value, including, but not limited to, any
telecommunications system(s) or fiber optic cable(s) on or near Railroad
Property, any property of Licensee or Licensor, or any property in the care,
custody, or control of Licensee or Licensor;
3. Removal of person(s) from Railroad Property;
4. Any delays or interference with track or Railroad’s Use caused by Lic ensee's
activity(ies) on Railroad Property, including without limitation the construction,
maintenance, modification, reconstruction, repair, renewal, revision, relocation,
or removal of Licensee's Facilities or any part thereof, any activities, labor,
materials, equipment, or machinery in conjunction therewith ;
5. Right(s) or interest(s) granted pursuant to this Agreement;
6. Contents escaping from Licensee's Facilities, including without limitation any actual
or alleged pollution, contamination, breach, or environmental Loss;
7. Licensee’s breach of this Agreement or failure to comply with its provisions,
including, but not limited to, any violation or breach by Licensee of any
representations and warranties Licensee has made in this Agreement; and
8. Violation by Licensee of any law, statute, ordinance, governmental administrative
order, rule, or regulation, including without limitation all applicable Federal
Railroad Administration regulations.
C. THE FOREGOING OBLIGATIONS SHALL APPLY TO THE FULLEST EXTENT
PERMITTED BY LAW FOR THE BENEFIT OF LICENSOR TO LOSSES CAUSED BY, ARISING
FROM, RELATING TO, OR RESULTING FROM, IN WHOLE OR IN PART, THE NEGLIGENCE OF
LICENSOR, AND SUCH NEGLIGENCE OF LICENSOR SHALL NOT LIMIT, DIMINISH, OR
PRECLUDE LICENSEE’S OBLIGATIONS TO LICENSOR IN ANY RESPECT. NOTWITHSTANDING
THE FOREGOING, SUCH OBLIGATION TO INDEMNIFY LICENSOR SHALL NOT APPLY TO THE
EXTENT THE LOSS IS CAUSED BY THE SOLE, ACTIVE AND DIRECT NEGLIGENCE, GROSS
NEGLIGENCE, OR WILLFUL MISCONDUCT OF LICENSOR AS DETERMINED IN A FINAL
JUDGMENT BY A COURT OF COMPETENT JURISDICTION.
Section 11. TERMINATION; REMOVAL OF LICENSEE'S FACILITIES.
A. If Licensee does not use the right herein granted on Licensee's Facilities for one (1) year,
or if Licensee continues in default in the performance of any provision of this Agreement for a period of
thirty (30) days after written notice from Licensor to Li censee specifying such default, Licensor may, at
its sole discretion, terminate this Agreement by written notice to Licensee at the address listed in the
"NOTICES" Article of this Agreement. This Agreement will not terminate until Licensee complies with
Paragraphs "C" and "D" of this Section found below.
B. In addition to the provisions of Paragraph "A" above, this Agreement may be terminated
by written notice given by either party, without cause, upon thirty (30) days written notice to the
non-terminating party at the address listed in the "NOTICES" Article of this Agreement. This Agreement
will not terminate until Licensee complies with Paragraphs "C" and "D" of this Section found below.
C. Prior to the effective date of any termination described in this Section, Licensee shall submit an
application to Licensor's online Utility Contracts System at this link for Licensee's removal, or if applicable,
abandonment in place of Licensee's Facilities located on Railroad Property ("Removal/Abandonment
Work"). Upon the UP Engineering Representative's approval of Licensee's application for the
Removal/Abandonment Work, Licensor and Licensee shall execute
a separate consent document that will govern Licensee's performance of the Removal/Abandonment
Work from those portions of Railroad Property not occupied by roadbed and/or trackage
("Consent Document"). Licensor shall then restore the impacted Railroad Property to the same or
reasonably similar condition as it was prior to Licensee's installation of Licensee's Facilities. For purposes
of this Section, Licensee's (i) performance of the Removal/Abandonment Work, and (ii) restoration work
will hereinafter be collectively referred to as the "Restoration Work".
D. Following Licensee's completion of the Restoration Work, Licensee shall provide
a written certification letter to Licensor at the address listed in the "NOTICES" Article of this Agreement
which certifies that the Restoration Work has been completed in accordance with the Consent Document.
Licensee shall report to governmental authorities, as required by law, and notify Licensor immediately if
any environmental contamination is discovered during Licensee's performance of the Restoration Work.
Upon discovery, the Licensee shall initiate any and all removal, remedial and restoration actions that are
necessary to restore the property to its original, uncontaminated condition. Licensee shall provide written
certification to Licensor at the address listed in the "NOTICES" Article of this Agreement that
environmental contamination has been remediated and the property has been restored in accordance with
Licensor's requirements. Upon Licensor's receipt of Licensee's restoration completion certifications, this
Agreement will terminate.
E. In the event that Licensee fails to complete any of the Restoration Work, Licensor may,
but is not obligated, to perform the Restoration Work. Any such work actually performed by Licensor will
be at the cost and expense of Licensee. In the event that Licensor performs any of the Restoration Work,
Licensee shall release Licensor from any and all Loss (defined in the "INDEMNITY" Section of th is
Exhibit B) arising out of or related to Licensor's performance of the Restoration Work.
F. Termination of this Agreement for any reason will not affect any of rights or obligations
of the parties which may have accrued, or liabilities or Loss (defined in the "INDEMNITY" Section of
this Exhibit B), accrued or otherwise, which may have arisen prior to such termination.
EXHIBIT C
INSURANCE REQUIREMENTS
In accordance with Article 5 of this Agreement, Licensee shall (1) procure and maintain at its sole
cost and expense, or (2) require its Contractor(s) to procure and maintain, at their sole cost and expense,
the following insurance coverage:
A. Commercial General Liability Insurance. Commercial general liability (CGL) with
a limit of not less than $2,000,000 each occurrence and an aggregate limit of not less than $4,000,000.
CGL insurance must be written on ISO occurrence form CG 00 01 12 04 (or a substitute form providing
equivalent coverage).
The policy must also contain the following endorsement, WHICH MUST BE STATED ON THE
CERTIFICATE OF INSURANCE:
Contractual Liability Railroads ISO form CG 24 17 10 01 (or a substitute form providing
equivalent coverage) showing "Union Pacific Railroad Company Property" as the Designated Job
Site.
B. Business Automobile Coverage Insurance. Business auto coverage written on
ISO form CA 00 01 10 01 (or a substitute form providing equivalent liability coverage) with a limit of not
less $2,000,000 for each accident, and coverage must include liability arising out of any auto (including
owned, hired, and non-owned autos).
The policy must contain the following endorsements, WHICH MUST BE STATED ON THE
CERTIFICATE OF INSURANCE:
"Coverage For Certain Operations In Connection With Railroads" ISO form CA 20 70 10 01 (or a
substitute form providing equivalent coverage) showing "Union Pacific Railroad Company
Property" as the Designated Job Site.
C. Workers' Compensation and Employers' Liability Insurance. Coverage must include
but not be limited to:
Licensee’s statutory liability under the workers' compensation laws of the state(s) affected by this
Agreement.
Employers' Liability (Part B) with limits of at least $500,000 each accident, $500,000 disease
policy limit $500,000 each employee.
If Licensee is self-insured, evidence of state approval and excess workers' compensation coverage
must be provided. Coverage must include liability arising out of the U. S. Longshoremen's and Harbor
Workers' Act, the Jones Act, and the Outer Continental Shelf Land Act, if applicable.
D. Environmental Liability Insurance. Environmental Legal Liability Insurance (ELL)
applicable to bodily injury, property damage, including loss of use of damaged property or of property
that has not been physically injured or destroyed, cleanup costs, and defense, including costs and
expenses incurred in the investigation, defense, or settlement of claims, or compliance with statute, all in
connection with any loss arising from the insured’s performance under this Agreement. Except with
respect to the limits of insurance, and any rights or duties specifically assigned to the first named insured,
this insurance must apply as if each named insured were the only named insured; and separately to the
additional insured against which claim is made or suit is brought. Coverage shall be maintained in an
amount of at least $2,000,000 per loss, with an annual aggregate of at least $4,000,000.
Licensee warrants that any retroactive date applicable to ELL insurance coverage under the
policy is the same as or precedes the Effective Date of this Agreement, and that continuous coverage will
be maintained for a period of five (5) years beginning from the time the work under this Agreement is
completed or if coverage is cancelled for any reason the policies extended discovery period, if any, will
be exercised for the maximum time allowed.
E. Railroad Protective Liability Insurance. Licensee must maintain for the duration of
work "Railroad Protective Liability" insurance written on ISO occurrence f orm CG 00 35 12 04 (or a
substitute form providing equivalent coverage) on behalf of Licensor only as named insured, with a limit
of not less than $2,000,000 per occurrence and an aggregate of $6,000,000. The definition of "JOB
LOCATION" and "WORK" on the declaration page of the policy shall refer to this Agreement and shall
describe all WORK or OPERATIONS performed under this Agreement. Notwithstanding the foregoing,
Licensee does not need Railroad Protective Liability Insurance after its initial construct ion work is
complete and all excess materials have been removed from Licensor's property; PROVIDED, however,
that Licensee shall procure such coverage for any subsequent maintenance, repair, renewal, modification,
reconstruction, or removal work on Licensee's Facilities.
F. Umbrella or Excess Insurance. If Licensee utilizes umbrella or excess policies, and
these policies must "follow form" and afford no less coverage than the primary policy.
Other Requirements
G. All policy(ies) required above (except business automobile, workers' compensation and
employers' liability) must include Licensor as "Additional Insured" using ISO Additional Insured
Endorsement CG 20 26 (or substitute form(s) providing equivalent coverage). The coverage provided to
Licensor as additional insured shall not be limited by Licensee’s liability under the indemnity provisions
of this Agreement. BOTH LICENSOR AND LICENSEE EXPECT THAT LICENSOR WILL BE
PROVIDED WITH THE BROADEST POSSIBLE COVERAGE AVAILABLE BY OPERATION OF
LAW UNDER ISO ADDITIONAL INSURED FORM CG 20 26.
H. Punitive damages exclusion, if any, must be deleted (and the deletion indicated on the
certificate of insurance), unless (a) insurance coverage may not lawfully be obtained for any punitive
damages that may arise under this Agreement, or (b) all punitive damages are prohibited by all states in
which this Agreement will be performed.
I. Licensee waives all rights of recovery, and its insurers also waive all rights of
subrogation of damages against Licensor and its agents, officers, directors and employees for damages
covered by the workers' compensation and employers' liability or commercial umbrella or excess liability
obtained by Licensee required in this Agreement, where permitted by law. This waiver must be stated on
the certificate of insurance.
J. All insurance policies must be written by a reputable insurance company acceptable to
Licensor or with a current Best's Insurance Guide Rating of A- and Class VII or better, and authorized to
do business in the state(s) in which the work is to be performed.
K. The fact that insurance is obtained by Licensee will not be deemed to release or diminish
the liability of Licensee, including, without limitation, liability under the indemnity provisions of this
Agreement. Damages recoverable by Licensor from Licensee or any third party will not be limited by the
amount of the required insurance coverage.