HomeMy WebLinkAbout7.a. Schwarz Pond Park - Nature Based PlaygroundROSEMOUNT
EXECUTIVE SUMMARY
PARKS AND RECREATION COMMISSION
Parks and Recreation Commission Meeting: June 24, 2019
AGENDA ITEM: Schwarz Pond Park — Nature Based
Playground
AGENDA SECTION:
New Business
PREPARED BY: Dan Schultz, Parks and Recreation
Director
AGENDA NO.
7 a.
ATTACHMENTS: Nature Play Design
APPROVED BY: dls
RECOMMENDED ACTION: None, discussion only.
ISSUE
In the 2018 budget, funds were identified for the replacement the playground at Schwarz Pond Park.
During the budget discussion in 2018, the City Council asked that the new play components being
installed at the park be focused on nature based play. Their vison was to have a playground that used
mostly nature based materials.
Staff has worked with nature play design firm, Fern Firm, to help design the play features. Included in the
packet is a preliminary design that the consultants and staff created. The design includes several nature play
components and also includes a 65 foot zip line. The reason this design is being called preliminary is
because the project will be more of a design build once we start seeing what natural materials we have to
work with. The border for the project will be stacked stone like what we have at Jaycee, Connemara and
Ailesbury Parks.
Staff would like the Parks and Recreation Commissioner's input on the preliminary design.
inCONSTRUCTION AND MAINTENANCE NOTES
1. GENERALSAFETYNOTES-
PROTECT
EXISTING
PATHS
DOWNED TREE
SEE PLAY
ELEMENT NOTE
1.4
WITH �\
EPTH �`7\
]QED` �
VOOD
JLCIT
VENTAEN7
FE 1.3
i
]CONCRETE
10ESS PAD,
)UIREMENTS
_JULDERS TO
BLOCK ACCESS
PROTECT
EXISTING
PATHS
LILY PAL) POND
TODDLER PLAY
AREA
SEE '_-
\\
@
1L1.
WHILETHIS PIAYSCAPE HAS BEEN DESIGNED IN ACCORDANCE WITH ASTM F1411]-11(STANDARD CONSUMER SAFETY
7
PERFORMANCE SPECIFICATION FOR PLAYGROUND EQUIPMENT FOR PUBLIC USE) WHENEVER POSSIBLE, THERE ARE NO
OR
GATED
URE BARED ONTHE
LAY
ON ISK AND
UREPIAHE
RIS
DNSIBI OWNER TO DEFT ETHEI ACCEPTABLE RISK.
IT IS ULTIMATELY THE RESPONSIBIDTY OF THE OWNER TO DEFINE THEIR LIMITS OF ACCEPTABLE RISK. WE HAVE TAKEN
ULTMEDSTAN THE WE HAVE
\
CARE TO OFFER SAFE DESIGNS BASED ON FEEDBACK RECEIVED. BUT THE OWNER ACCEPTS LIABILITY ANY
J
IMPLEMENTATION, CONSTRUCTION AND MAINTENANCE OF ANY ELEMENT OF THESE DESIGNS. BY ACCEPTING THESE
t
CONCEPT PLANS, THE DESIGNERS AS LISTED IN THE CONTRACT ARE RELEASED FROM ANY LIABILITY REGARDING ANY
IMPLEMENTATION, CONSTRUCTION AND MAINTENANCE.
_
12
NATURE PIAYSCAPES BY DEFINITION ARE MADE FROM NON -DURABLE MATERIALS. BECAUSE OF THIS, IT IB THE OWNER'S
-
RESPONSIBILITY TO ROUTINELY INSPECT AND MAINTAIN THIS PINYSCAPE TO INSURE A SAFE EXPERIENCE FOR PARK
MIRACLE RECREATION'S MANTIS
VISITORS. THESE INSPECTIONS SHOULD BE DOCUMENTED THROUGH A CHECKLIST WITH ANY MAINTENANCE ACTIONS
CABLEWAY FEATURE (MODEL 745-20)
WRITTEN. FAILURE TO PROPERLY MANAGE THIS SPACEWILL RESULT IN HEIGHTENED RISK TO PARK VISITORS,
TO BE INSTALLED PER
_ _ MANUFACTURERS REQUIREMENTS
2. ON -GOING
MAINTENANCE-
2.1,
TOTAL INSPECTION OF EVERY SITE FEATURE SHALL BE PERFORMED ON A WEEKLY BASIS DURING THE PERIOD OF MARCH
THROUGH NOVEMBER AND MONTHLY OVER THE WINTER MONTHS, AT A MINIMUM. IF ANY CONDITIONS ARE DISCOVERED
DURING THESE MAINTENANCE INSPECTIONS THAT WOULD CREATE A POTENTIALLY UNSAFE CONDITION. AS DESCRIBED
BELOW, THE SITE FEATURE SHOULD BE FLAGGED OFF AND ACCESS PREVENTED AND THE CONDITION REPAIRED
\
IMMEDIATELY.
\
3. REQUIREMENTS FOR CONSTRUCTION AND CN-GOINGMAINTERANCE-
3.1.
WHILE PLACING LOGS AND ALL OTHER MATERIALS ON SITE, IT IS CRITICAL THATALL SAFETY REQUIREMENTS ARE MET
INCLUDING BUT NOT LIMITED TO:
..'-. IT, \
3.0.1.
BROKEN GLASS, TRASH, OR FOREIGN OBJECTS SHOULD BE REMOVED
CLIMB /
3.0.2.
THE PLACEMENT OF ALL LOGS SHOULD BE STABLE. ANY MOVEMENT INCLUDING ROCKING OR PIVOTING OF THE LOG
- _
IS UNACCEPTABLE.
3.0.3.
MY BROKEN BRANCHES OR POTENTIAL SPLINTER HAZARDS SHOULD BE CUTOFF AND SANDED SMOOTH
3.0.4.
ALL COMPLETELY BOUNDED OPENINGS MUST BE UNDER 4'OR OVER IF IN DIAMETER
/Y
-
3.0.5.
ALL UNBOUNDED OPENINGS MUST FOLLOW ASTM GUIDELINES DETAILED IN F1487-116.1.4
3.0.6.
ALL PROJECTIONS MUST BE OVER 31W IN DIAMETER
3A].
ALL EDGES MUSTBE E4SEO WITH A IW ROUNDOVER
3.0A.
FALL HEIGHT MUST NOT EXCEED 4F
BUFF LIMESTONE
BOULDER PLAY
3.0.9.
SAFETY SURFACE SHOULD BE AT LEAST IT DEEP
/ S AREA PERIMETER
BOULDERS SHALL
EXTENTS OF i BE6"MIN -1B"MAX
' FORMER PLAY HEIGHT
1.
PLAY ELEMENT NOTES
AREA
12" MIN. DEPTH SHREDDED
1.1.
FORTBUILDING
1 OR CHIPPED HARDWOODWOOD
1.1.1.
A MINIMUM OF FORTY 00) PIECES OF WOOD SHALL BE PROVIDED. WOOD SHALL HAVE BARK INTACT, PIECES OF
SHALL BE 4' TO@LONG AND T TO 4 DIAMETER
MULCH PLAY SURFACING
1.1
ZIP LINE
=
1.2.1.
THE ZIP USE ELEMENT SHALL BE INSTALLED AS PER MANUFACTURER REQUIREMENTS AND SHALL MAINTAIN ALL
PROTECT
CLEARANCES AND OTHER SAFETY REQUIREMENTS.
1.3.
LOG STREAM
EXISTING
1.3.1.
LDG STREAM SHALL BE BORDERED WITH RANDOMIZED VERTICAL AND HORIZONTALLY EMBEDDED LOGS TO
\ PRAIRIE AND
CREATE A SEMI CONTINUOUS "PATH ALONG BOTH SIDES, NO GAP BETWEEN LOG "STEPS• SHALL BE GREATER
TREES
THAN 2'.
1.3.2.
ALL LOGS SHALL BE INSTALLED WITH BARK INTACT AND INSTALLED IN A STABLE MANNER, PARTIALLY EMBEDDED
--
AS NECESSARY TO PREVENT ANY ROLLING,TIPPING, OR OTHER MOVEMENT, BOTH AT INSTALLATION BUT AFTER
SETTLEMENT HAS OCCURRED.
1.3.3.
LOG STREAM SHALL BE FINISHED WITH A MINIMUM OF 12- SHREDDED OR CHIPPED HARDWOOD MULCH.
STICKS AND LOGS
FORT BUILDING
SEE PLAY
ELEMENT NOTE
1.1.
%li PLAN: OVERALL SITE LAYOUT O D ,D 2D
SCALE IN FEET
FERN°.,
FIRM
MN�
SCHWARZ POND PARK
Rosemount, MN
Nature Play Conceptual Design
Schwarz Pond Park
SHEET
L-01
°°
B'
NK
A°
OVERALL SITE LAYOUT
°w�
°
NN
PROVII
IN
POND LOG PERIMETER
SHALL CONSIST OF IT
MIN. DIAMETER LOGS,
RANDOMLY
DISTRIBUTED.
MAX HEIGHT - 24"
MIN HEIGHT-12"
4
POND LOG PERIMETER
SHALL CONSIST OF 12"
MIN, DIAMETER LOGS,
RANDOMLY DISTRIBUTED.
MAX HEIGHT- 24"
MIN HEIGHT- 12"
GRANITE GLACIAL BOULDERS, ROUNDED -
PLACED RANDOMLY WITHIN THE POND
MAX -18" FINISHED PROTRUSION FROM
SURROUNDING HARDWOOD MULCH
MIN-12"
12" MIN. DEPTH SHREDDED
OR CHIPPED HARDWOOD
MULCH PLAY SURFACING
l
GRANITE GLACIAL BOULDERS, ROUNDED
PLACED RANDOMLY WITHIN THE POND
MAX-18" FINISHED PROTRUSION FROM
SURROUNDING HARDWOOD MULCH
MIN -12"
1 DETAIL: LOG POND TODDLER PLAY AREA
145-0-
POND LOG PERIMETER
SHALL CONSIST OF 12"
MIN. DIAMETER LOGS,
RANDOMLY
DISTRIBUTED.
MAX HEIGHT- 24"
MIN HEIGHT- 12'
I—
_I
'P
EXISTING
PARTIALLY BURY B
OULDERS AND LOGS. SUBSOILS
COMPACT EXCAVATED BACKFILL TO
ENSURE ELEMENTS ARE NOTABLE TO
WOBBLE OR OTHERWISE MOVE
/ 1 SECTION: LOG POND TODDLER PLAY AREA
FORT BUILDING STARTER
-Y"s SHALL CONSIST OF
4"-6"MIN. DIAMETER LOGS,
RANDOMLY DISTRIBUTED.
FINISHED MAX HEIGHT- 6'
FINISHED MIN HEIGHT- 3'
_ 'I L'
` III !_
III
MOUNTAIN CLIMB SHALL
CONSIST OF B"-24'MIN.
DIAMETER LOGS,
RANDOMLY DISTRIBUTED.
FINISHED MAX HEIGHT - 4'
FINISHED MIN HEIGHT -1'
12" MIN. DEPTH SHREDDED
OR CHIPPED HARDWOOD
MULCH PLAY SURFACING
EXISTING
SUBSOILS
/BACKFILL LOG HOLES
WITH CLEAR ANGULAR
ROCK, COMPACT UNTIL
LOG DOES NOT WIGGLE
OR OTHERWISE MOVE
/2\ DETAIL: FORT BUILDER WITH "Y" STARTERS
11'—/ 1`6-P
NOTE:
PLACE LOGS TIGHTLY
TOGETHER TO AVOID ANY
GAPS BETWEEN THEM.
12" MIN. DEPTH SHREDDED
OR CHIPPED HARDWOOD
MULCH PLAY SURFACING
BACKFILL LOG HOLES
IIr WITH CLEAR ANGULAR
ROCK, COMPACT UNTIL
FJCISTING LOG DOES NOT WIGGLE
SUBSOILS OR OTHERWISE MOVE
/ ;i \ DETAIL: MOUNTAIN CLIMB
r=sa
SCHWARZ POND PARK
Rosemount, MN
Nature Play Conceptual Design
Schwarz Pond Park
SHEET
L-02
Pw
6 3YID19
PLAY ELEMENT DETAILS
Ts M
avYg
FlNet
or