Loading...
HomeMy WebLinkAboutII.4.b. Biscayne Business Park FP EXECUTIVE SUMMARY Planning Commission Meeting: June 25, 2019 Tentative City Council Meeting: July 16, 2019 AGENDA ITEM: 19-37-FP: Request by Appro Development for Final Plat Approval for Biscayne Business Park AGENDA SECTION: Consent PREPARED BY: Kyle Klatt, Senior Planner AGENDA NO. 4.b. ATTACHMENTS: Site Location Map; Final Plat; Updated Project Development Plans: Site Data, Overall SWPP, Existing Site and Removals, Utility Plan, Road and Utility Plans, Site Plan, Hydrant Coverage, Overall Grading, Detailed Grading, Site Restoration, Landscaping, Lighting and Photometric Plan; City Engineer Review Memo; Parks and Recreation Review Memo APPROVED BY: KL RECOMMENDED ACTION: Motion to recommend that the City Council approve the Final Plat for Biscayne Business Park, subject to the following conditions: 1. Execution of a subdivision agreement. 2. Provision of $112,880 for Fee-in-Lieu of Park Dedication for the entire subdivision. This fee may also be paid prior to the issuance of a building permit for each lot in the amount consistent with the City’s most recent fee schedule or any updates. 3. The applicant shall create a master association that will assume maintenance responsibility for all shared roads, driveways, and storm water infiltration and retention basins in accordance with the approved Stormwater Management Maintenance Plan for Biscayne Business Park. 4. Compliance with the conditions and standards within the City Engineer’s Memorandum dated June 19, 2019. SUMMARY Applicant: Jim Connelly, Appro Development, 21476 Grenada Avenue, Lakeville, MN Property Owner: Tom Stordahl, 1001 Main Street East, Wabasha, MN Comp. Guide Plan Designation: BP – Business Park Current Zoning: BP/PUD – Business Park/Planned Unit Development Gross Area: 15.32 Acres Net Area: 14.55 Acres Lots/Units: 8 Lots The Planning Commission is being asked to consider a Final Plat request from Jim Connelly of Appro Development for Biscayne Business Park to create eight lots associated with the City’s recent approval of a planned unit development (PUD) on the site. The applicant intends to build an 18,000 square foot building on Lot 1, Block 1 shortly after final plat approval, and then will market the remaining lots to individuals or companies looking for office, manufacturing, and warehousing space. The final plat is necessary to facilitate subdivision of the property into individual lots along with the required street dedication along Biscayne Avenue. Staff finds the application consistent with the Biscayne Business Park Preliminary Plat and recommends approval of this application subject to the conditions listed above. BACKGROUND The Planning Commission reviewed a preliminary plat and planned unit development (PUD) master development plan for Biscayne Business Park at its April 23, 2019 meeting. The City Council approved the preliminary plat and PUD plans at its May 21, 2019 meeting based on the recommendation of the Planning Commission. The applicant has subsequently submitted a final plat for the entire project area, which will create eight individual lots as describes within the overall master PUD development plan. The final plat will cover the entire PUD area, which will allow the applicant to complete mass grading for the entire site and install the private road to serve each of the individual lots. Future lot buyers will then be able to construct buildings consistent with the master PUD development plan without needing to further subdivide the property or perform additional mass grading on their lot. Because the property is zoned BP – Business Park/PUD, permit review for building construction will be conducted administratively consistent with the BP ordinance. The applicant has previously provided preliminary building details for Lot 1, Block 1, and these plans will serve as the template for future lot development within the business park. The approved PUD agreement allows for variation in the materials and colors of individual buildings as long as they remain consistent with the general design proposed for Lot 1. Additionally, all future buildings will need to conform to the City’s architectural review requirements listed in the BP district development standards. The first building is being constructed as a spec building, and the applicant has not identified a specific user for the site in advance of the Planning Commission meeting. Since the proposed final plat incorporates all of the Biscayne Business Park PUD area, the applicant will not need to come forward with another final plat before building any future structures within the PUD development area. ISSUE ANALYSIS Legal Authority. The final plat application is Quasi-Judicial because the City has a set of standards and requirements for reviewing this type of application that is described in detail below. Generally, if the final plat meets the ordinance requirements it must be approved. Land Use and Zoning . The proposed eight lot business park development is consistent with the land use and zoning classifications for the project area. The subject property is guided BP – Business Park and zoned BP/PUD Business Park with the Biscayne Business Park Planned Unit Development (PUD). As a result, the property is subject to all the standards of the BP – Business Park zoning district as well as the specific development standards for the project area described in the PUD. The Biscayne Business Park PUD included deviations from the base BP zoning; the including the following: 1. Section 11-5-2.C.6.d. Driveways in Commercial, Business Park, and Industrial, and Residential Developments: Shared driveways will be allowed with zero (0) setback to the adjoining property. 2. Section 11-2-7 Street Access Required: Lots will be allowed to be platted without access to a public street; all access to individual lots will occur from a private street. Overall, the final plat conforms to the BP district standards and Biscayne Business Park PUD requirements, 2 with the smallest lot within the final plat at 1.41 acres (one acre required) and the width of the narrowest lot at 214 feet (120 feet required). Many of the other standards will be addressed at the building permit stage when an individual site survey is reviewed by the City. Final Plat. Standards for reviewing subdivision requests are detailed in Title 12 of the Rosemount City Code. This section of the Code outlines the two-step Preliminary and Final Plat process for land subdivision. In this case, the preliminary plat was approved on May 21st consisting of eight lots. The current application proposes to plat all eight of these lots for Biscayne Business Park and to dedicate the easements necessary to construct the storm water retention areas within the overall project area. The developer has been working to address the City’s preliminary plat review comments and the updated site and development plans reflect some of this work. The majority of the staff review comments concerning the project were incorporated into the PUD/preliminary plat review memorandum and supporting documentation. Some of the updates to the previous review are noted as follows: Parks and Open Space. The City’s Parks and Recreation Department had previously recommended that the City accept a fee in lieu of land dedication for the entire subdivision because there are no planned municipal parks in the area. Based on the amount of land within the subdivision and City’s current fee schedule, the applicant will need to pay a fee of $112,880 for the entire plat area. The City is willing to either accept this payment with the final plat, or to allocate the fee throughout the subdivision with each individual building permit. If the applicant elects to pay the fee at the time of each building permit, the fee per lot will be calculated on a pro-rated basis consistent with the adopted fee schedule in time at the time of each permit. Storm Water Management. The City’s previous review identified two major areas of concern with the overall storm water management plan for the subdivision. First, the City wanted to see some consolidation of the storm water retention basins planned on each individual lot. After further reviewing these comments, the developer has made minor modifications to the overall system, but still is planning for a series of small interconnected ponds within each lot. Staff believes the system will function properly overall, but is concerned about the long-term ownership and maintenance of each pond, especially since the City is ultimately responsible for the basins under its city-wide MS4 (Municipal Separate Storm Sewer System) permit. To address the long-term maintenance issue, staff is recommending that an overall master association for the business park assume responsibility for maintenance of the entire storm water ponding system. This will help ensure that eight individual lot owners will not be directly responsible for eight smaller pond systems on their lots. Landscaping . The developer has updated the landscape plan to include nine additional plantings along Biscayne Avenue that will be installed in conjunction with the overall site grading and construction of the proposed building on Lot 1, Block 1. A site-specific landscape plan must be submitted with each individual building permit and final site development plan associated with all of the other lots within the subdivision. Engineering . All public improvements depicted on the preliminary development plans are included on the attached submission materials. The City Engineer has provided a review memorandum for the proposed final plat, and all issues identified by the City Engineer must be addressed prior to the release of the final plat for recording. RECOMMENDATION 3 Staff is recommending approval of the final plat, subject to conditions, based on the information provided by the applicant and reviewed within this report. 4 Location Map—Biscayne Business Park BISCAYNE BUSINESS PARK SHEET 1 OF 2 SHEETS KNOW ALL PERSONS BY THESE PRESENTS: That Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, owner of the following described property: The South Half of the Southeast Quarter of Section 32, Township 115, Range 19, except the West 1645.05 feet and except the South 656.14 feet, Dakota County, Minnesota.. Has caused the same to be surveyed and platted as BISCAYNE BUSINESS PARK and does hereby dedicate to the public for public use the public way and drainage and utility easements as created by this plat. In witness whereof said Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, has caused these presents to be signed by its proper partner this _______ day of ___________________, 20_____. Signed: Stordahl Partnership, L.L.L.P. By _____________________________________________ Tom Stordahl, Gerneral Partner State of ____________________________ County of ____________________________ This instrument was acknowledged before me on _______________________, 20_____ by Tom Stordahl, General Partner of Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, on behalf of the partnership. _______________________________________________________ Signature _______________________________________________________ Printed Notary Public ____________________________________________ My Commission Expires ___________________________________ SURVEYORS CERTIFICATE I, Mark A. Schwanz, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this _______ day of _______________________, 20_____. _____________________________________________ Mark A. Schwanz, Licensed Land Surveyor Minnesota License No. 45817 State of Minnesota County of Rice This instrument was acknowledged before me on _______________________, 20_____ by Mark A. Schwanz. _____________________________________________ Jennifer R. Canedo Notary Public, Minnesota My Commission Expires January 31, 2020 CITY PLANNING COMMISSION, CITY OF ROSEMOUNT, MINNESOTA Approved by the Planning Commission of the City of Rosemount, Minnesota this _______ day of _______________________, 20_____. By: _____________________________________________, Chair CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of the City of Apple Valley, Minnesota at a regular meeting thereof held this _______ day of _______________________, 20_____, and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. By: _____________________________________________, Mayor By: _____________________________________________, Chair COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _______ day of _______________________, 20_____. By: _____________________________________________ Todd B. Tollefson Dakota County Surveyor DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA, STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20_____ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes Section 272.12, there are no delinquent taxes and transfer entered this _______ day of ___________________, 20_____. By: _____________________________________________ Amy A. Koethe Director, Department of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of BISCAYNE BUSINESS PARK was filed in the office of the County Recorder for public record on this _______ day of ___________________, 20_____, at _______ o'clock _______.M. and was duly filed in Book _________ of Plats, Page _________, as Document Number. ______________________. By: _____________________________________________ Amy A. Koethe Dakota County Recorder N89°41'05"E 995.03N00°20'03"E 670.24N89°34'26"E 993.29 N00°11'04"E 672.15259.79 50.00303.1366.00107.3950.00 NORTH 304.56EAST 672.40 N61° 5 2' 2 3" E 70.00 70. 0 0 S6 1 ° 5 2 ' 2 3 " E L=371.10R=70.00Δ=303°44'44"260.77 70.58128.02BLOCK 1 1 N00°11'04"E 672.05OUTLOT A BISCAYNE AVENUEEAST LINE OF S 1/2 SE 1/4 SEC. 32 - T115 - R19 N89°34'26"E 254.78 NORTH 21.41 N89°34'26"E 82.15 NORTH63.26N45°59'01"E17.87N89°34'26"E 233.85 S5 0 ° 2 1 ' 4 0 "E 1 9 . 1 4 SOUTH66.50N89°34'26"E 172.78 NORTH43.57N53°2 3' 5 4 " E 15.55 N89°34'26"E 86.81S56°37'35"E16.50SOUTH41.11N89°34'26"E 59.46 N89°41'05"E 260.86NORTH45.58NORTH34.4382.10 N89°41'05"E SOUTH70.3368.82NORTHN89°41'05"E 84.33 181.1174.35 N89°41'05"E S00°11'04"W73.2921 . 4 0 S4 5 ° 3 9 ' 3 4 " E 170.48 N89°41'05"E 35.12DRAINAGE AND UTILITY EASEMENTNORTH 305.74NORTH 271.69341.34EAST 201.60328.91254.04 213.65 213.65 261.95 302.92213.65213.65257.94 136.26 213.64 EAST 610.67 EAST 610.88NORTH 299.38NORTH 300.97136.26 213.64 260.98 234 8765 L =91.38 Δ=74°4 7'2 9 "L=94.17Δ=77°04'5 3 "L=94.17Δ=77 °0 4'53" L =9 1.3 8 Δ =7 4 °4 7'29"NORTH 262.56N18°44'25 "W 108 .58 S 4 9 ° 4 0 ' 1 6 " E 1 0 3 . 2 1 2 9 . 4 3 7 3 . 7 8 N89°41'05"E 150.30 N89°41'05"E 107.23 1010 S00°11'04"W 1328.31NE CORNER S1/2 SE 1/4 SEC. 32 - T115- R19 FOUND CAST IRON MONUMENT EAST LINE OF S 1/2 OF SE 1/4 DRAINAGE AND UTILITY EASEMENT 79,082 SQ. FEET - 1.82 ACRES65,194 SQ. FEET - 1.50 ACRES63,248 SQ. FEET - 1.45 ACRES84,759 SQ. FEET - 1.95 ACRES 81,344 SQ. FEET - 1.87 ACRES 61,594 SQ. FEET - 1.41 ACRES 64,130 SQ. FEET - 1.47 ACRES 78,944 SQ. FEET - 1.81 ACRES BISCAYNE BUSINESS PARK Denotes Found Iron Monument Indicates 1/2" Dia. x 18" Long Solid Iron Pipe Set With Plastic Cap Marked By ISG, License No. 45817 LEGEND BEARING NOTE: The east line of the South Half of the Southeast Quarter of Section 32, Township 115, Range 19 is assumed to bear N00°11'04"E. SEC. 32, TWP. 115, RGE. 19 VICINITY MAP (NOT TO SCALE) Dakota County, MNNW 1/4NE 1/4SE 1/4SW 1/4Biscayne AvenueC.S.A.H. No. 46 (160th Street West) SITE 0 SCALE IN FEET 50 100 SHEET 2 OF 2 SHEETS Drainage And Utility Easements Are Shown Thus:10101010 10 Drainage And Utility Easement Lines Lot Lines Right-of-Way Line Being 10 feet in width and adjoining lot lines, right - of - way lines and rear lot lines, unless otherwise indicated on the plat. AREA TABLE: Existing: Total Area = 667,236 sq. ft. = 15.32 acres Proposed: Biscayne R/W = 33,605 sq. ft. = .77 acres Street R/W = 55,336 sq. ft. = 1.27 acres Lot 1, Block 1 = 79,082 sq. ft. = 1.82 acres Lot 2, Block 1 = 65,194 sq. ft. = 1.50 acres Lot 3, Block 1 = 63,248 sq. ft. = 1.45 acres Lot 4, Block 1 =84,759 sq. ft. = 1.95 acres Lot 5, Block 1 =81,344 sq. ft. = 1.87 acres Lot 6, Block 1 = 61,594 sq. ft. = 1.41 acres Lot 7, Block 1 = 64,130 sq. ft. = 1.47 acres Lot 8, Block 1 = 78,944 sq. ft. = 1.81 acres Total Area = 667,236 sq. ft. = 15.32 acres 06/07/19 CITY COMMENTS TTK 22185 C0-DATA DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C0-10 SITE DATA SHEET PROJECT LOCATION N S W E LOCATION MAP 0 SCALE IN FEET 2000 4000 SITE SUMMARY ZONING:BP - BUSINESS PARK SITE/LOT AREA:SITE = 667,236 SF / 15.32 AC LOT 1 = 79,082 SF / 1.82 AC IMPERVIOUS AREA:SITE = 80,720 SF / 1.85 AC LOT 1 = 45,558 SF / 1.05 AC GREENSPACE PROVIDED:SITE = 586,516 SF / 13.46 AC LOT 1 = 33,524 SF / 0.77 AC PARKING REQUIREMENTS (PER CITY CODE) TYPE UNIT / AREA STALLS REQUIRED STALLS PROVIDED OFFICE - 1 PER 200 SF GFA 3,456 SF 17 17 MANUFACTURING - 1 PER 300 SF GFA 3,456 SF 12 14 WAREHOUSE - 1 PER 2,000 SF GFA 10,368 SF 5 5 TOTAL:34 36 SETBACKS PARKING BUILDING FRONT YARD 20'-0"30'-0" SIDE YARD 10'-0"10'-0" REAR YARD 10'-0"10'-0" PROJECT LOCATION: MN05 T115M R19W SEC 32 THE NORTHERN HALF OF THE SW QUARTER OF THE SW QUARTER OF SEC 32 ROSEMOUNT TWP ROSEMOUNT, MINNESOTA B.M. ELEVATION=957.80 TIE IN NW SIDE OF PP LOCATED AT THE SOUTHEAST PROPERTY CORNER APPROX. 650' NORTH OF CR 46 1.ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS AND CLARIFICATIONS ISSUED BY THE ARCHITECT/ENGINEER. 2.CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND COMPLETE COORDINATION OF ALL WORK. 3.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4.FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 5.DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 6.ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED ACCORDING TO MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 7.ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION. 8.THE LOCATION AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS AND ELEVATIONS OF ALL INPLACE UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN. 9.THE CONTRACTOR IS TO CONTACT "GOPHER STATE ONE CALL" FOR UTILITY LOCATIONS, MINIMUM 2 BUSINESS DAYS PRIOR TO ANY EXCAVATION / CONSTRUCTION (1-800-252-1166). PROJECT GENERAL NOTES ALL CONSTRUCTION SHALL COMPLY WITH THE CITY OF ROSEMOUNT REQUIREMENTS AND MnDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION, 2018 EDITION, THE STANDARD SPECIFICATIONS FOR SANITARY SEWER, STORM DRAIN AND WATERMAIN AS PROPOSED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA 2013, AND CURRENT VERSION OF THE MINNESOTA STATE PLUMBING CODE UNLESS DIRECTED OTHERWISE. HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), 1996 ADJUSTMENT (NAD83(1996)) ON THE DAKOTA COUNTY COORDINATE SYSTEM, IN U.S. SURVEY FEET. ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND VERTICAL COORDINATES FOR THIS PROJECT. THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS OF DATA COLLECTED IN SEPTEMBER 2018 BY I&S GROUP. SPECIFICATIONS REFERENCE PROJECT DATUM TOPOGRAPHIC SURVEY LEGEND EXISTING CITY LIMITS ACCESS CONTROL SECTION LINE QUARTER SECTION LINE RIGHT OF WAY LINE PROPERTY / LOTLINE EASEMENT LINE CULVERT WATER EDGE WETLAND BOUNDARY WETLAND / MARSH WATER FENCE LINE STORM SEWER SANITARY SEWER SANITARY SEWER FORCEMAIN CONTOUR (MAJOR) UNDERGROUND TELEPHONE OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TV GAS UNDERGROUND FIBER OPTIC CONTOUR (MINOR) DECIDUOUS TREE CONIFEROUS TREE TREE LINE MANHOLE/STRUCTURE CATCH BASIN HYDRANT CURB STOP VALVE UTILITY PEDESTAL / CABINET POWER POLE 990 989 PROPOSED CULVERT STORM SEWER SANITARY SEWER SERVICE WATER SERVICE OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TV GAS CONTOUR STORM SEWER MANHOLE SANITARY SEWER MANHOLE HYDRANT VALVE EASEMENT RIGHT OF WAY 1015 LOT LINE OVERHEAD UTILITY UNDERGROUND UTILITY CITY OF ROSEMOUNT C0-10 SITE DATA SHEET 300 22185 C0-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. CIVIL SHEET INDEX Sheet Number Sheet Title C0-10 SITE DATA SHEET C0-20 CITY OF ROSEMOUNT STANDARD DETAILS C0-21 CITY OF ROSEMOUNT STANDARD DETAILS C0-22 SITE DETAILS C0-23 SITE DETAILS C0-24 SITE DETAILS C0-25 SITE DETAILS C0-26 SITE DETAILS C1-10 OVERALL SWPPP C1-20 SWPPP NOTES C1-21 SWPPP NOTES C1-22 SWPPP NOTES C1-23 SWPPP NOTES C1-24 SWPPP DETAILS C2-10 EXISTING SITE & REMOVALS PLAN C3-10 OVERALL SITE & UTILITY PLAN C3-20 PLANNED ROAD & UTILITY CONSTRUCTION C3-21 PLANNED ROAD & UTILITY CONSTRUCTION C3-22 DETAILED SITE PLAN C3-30 UTILITY SCHEDULES C3-40 HYDRANT COVERAGE PLAN C4-10 OVERALL GRADING PLAN C4-20 DETAILED GRADING PLAN C5-10 SITE RESTORATION PLAN C5-20 LANDSCAPING PLAN C5-30 LANDSCAPING DETAILS AND NOTES C6-10 SITE LIGHTING PLAN C6-11 PHOTOMETRICS PLAN CR RD 46CR RD 3BISCAYNE AVE145TH ST W BONNIE PATH W AKRON AVEPILOT KNOB RD170TH ST W 160TH ST WDIAMOND PATHCHIPPENDALE AVE W150TH ST W 145TH ST W SANITARY SEWER WATER DEVELOPER: JIM CONNELLY APPRO DEVELOPMENT 21476 GRENADA AVE LAKEVILLE, MN 55044 PROJECT MANAGER: REESE SUDTELGTE EMAIL: REESE.SUDTELGTE@IS-GRP.COM MANAGING OFFICE: 7900 INTERNATIONAL DRIVE INTERNATIONAL PLAZA SUITE 550 MINNEAPOLIS, MN 55425 PHONE: 952.426.0699 MINNEAPOLIS / ST. PAUL OFFICE R=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKING95 5954 955 953 954 950950 951 951 952 952 953 953 954 954 950 950 949949 951 951 951 952 952 952 953 953 953 953 954 940 945 939 941 942 943 944 950 948 949 951 952 953953 951951 952 952 953 953 954 954 950 950 948 948 949 949 951 951 952 952 952 953 953 953 954 953 954 950 955955955947948949951 952 953 953 953954954954 9 5 0 955955 946 9 4 7 948 949 9519519 5 1 95295295 2 9 5 3 953 953954 95 4 9 5 4 955955 955952953954954 954956 95606/07/19 CITY COMMENTS TTK 22185 C1-SWPPP DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C1-10 OVERALL SWPPP C1-10 OVERALL SWPPP 300 22185 C1-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 50 100 150 PROPERTY LINE, TYP. EROSION CONTROL LEGEND SYMBOL ITEM NO.DESCRIPTION UNITS QUANTITY 2511.507 RANDOM RIPRAP, CLASS III CY 162 2511.504 GEOTEXTILE FILTER, TYPE IV SY 100 PERIMETER CONTROL LF 9,341 2573.502 EXISTING STORM DRAIN INLET PROTECTION EACH 2 2573.502 PROPOSED STORM DRAIN INLET PROTECTION EACH 14 2573.501 STABILIZED CONSTRUCTION EXIT EACH 1 2575.504 EROSION CONTROL BLANKET, CATEGORY 3N SY 17,534 CONCRETE WASHOUT AREA EA 1 EXISTING DRAINAGE ARROW PROPOSED DRAINAGE ARROW PERIMETER CONTROL CAN BE SILT FENCE OR SEDIMENT CONTROL LOG. QUANTITIES ARE FOR INFORMATIONAL PURPOSES TO MEET THE REQUIREMENTS OF THE CONSTRUCTION STORMWATER PERMIT. NO GUARANTEE IS MADE TO THE ACTUAL QUANTITIES REQUIRED. THE QUANTITIES SHOWN ARE TOTAL FOR THE ENTIRE PROJECT NOT SPECIFIC TO THIS SHEET. SEE SITE RESTORATION PLAN FOR FINAL TURF ESTABLISHMENT NOTE: SWPPP COVERAGE INCLUDES ELECTRIC, GAS, TELEPHONE, AND CABLE INSTALLATION. EACH COMPANY OR THEIR SUBCONTRACTOR IS RESPONSIBLE TO FOLLOW THE REQUIREMENTS OF THIS SWPPP INCLUDING PROVIDING THEIR OWN RESTORATION IF INSTALLATION OCCURS AFTER PRIMARY INSTALLATION OF SEEDING/SODDING/MULCHING DURING CONSTRUCTION OF EACH UTILITY. LOT LINE, TYP. UTILITY EASEMENT, TYP. PERIMETER CONTROL, TYP.EROSION CONTROL BLANKET, TYP.INLET PROTECTION, TYP. PROPOSED SURFACE DRAINAGE ARROW, TYP. EXISTING SURFACE DRAINAGE ARROW, TYP. CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREARIGHT-OF-WAY, TYP.157TH STREET R=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 9459 5 0 955 9559559449469479489499519519 5 1 95295295 2 95 3 95395395495495 4 946947947948948 955952953954956 955951952953954956 950955951952953954956955 956 06/07/19 CITY COMMENTS TTK 22185 C2-EXIST DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C2-10 EXISTING SITE & REMOVALS PLAN C2-10 EXISTING SITE & REMOVALS PLAN 300 22185 C2-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 50 100 150 PROPERTY LINE, TYP. PROTECT POWER POLE PROTECT POWER POLE EXISTING SURFACE CONTOUR, TYP. EXITING FIELD EDGE, TYP. EXISTING OVERHEAD LINE EXISTING UNDERGROUND FIBER OPTIC LINE EXISTING GRAVEL, TYP.670.24'960.3' REMOVAL LEGEND SYMBOL DESCRIPTION REMOVE GRAVEL SURFACE CONTRACTOR SHALL VERIFY EXISTING PAVEMENT SECTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PAVEMENT REMOVALS SHALL INCLUDE FULL DEPTH SAWCUT & SECTION REMOVAL. REMOVE GRAVEL SURFACING NOTE: CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH THE MNDOT TEMPORARY TRAFFIC CONTROL MANUAL AND THE CITY OF OWATONNA REQUIREMENTS. SALVAGE SIGN FOR REINSTALLMENT REMOVE 7 LF OF WATERMAIN CONTRACTOR TO FIELD VERIFY SIZE, DEPTH AND LOCATION OF EXISTING UTILITIES 962.03' LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 012345678910A-7 FES-1A FES-2 FES-1 A-10 FES-3AFES-4 FES-3 FES-7 FES-4A FES-8A FES-8 FES-9A FES-9 FES-5A FES-5 FES-6 A-2 P-1 (15") P-3 (24")P-4 (24") P-8 (24")P-9 (24") P-10 (15")P-5 (24")P-6 (24")P- 7 ( 2 4 " )P-2 (12")S-2 S-3 EX S-1 S-5 S-4 8" PLUG SP-4 (8")SP-3 (8")SP-2 (8") SP - 1 ( 8 " ) SP-1A (8") 12''x6'' TEE 12''x6'' TEE 12''x12'' TEE 12''x6'' REDUCER 6'' GV & BOX 6'' GV & BOX 6'' GV & BOX 12" WATERMAIN (C900) 6" WATERMAIN (C900) 8'' GV & BOX 8''x45° BEND 12''x8'' TEE 12''x8'' TEE 8''x45° BEND 8'' GV & BOX 8" WATERMAIN (C900) 8" WATERMAIN (C900) 8" WATERMAIN (C900) 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 12''x8'' TEE 6" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 8" WATERMAIN (C900) 5''x 7'-6'' HYDRANT 5''x 7'-6'' HYDRANT 5''x 7'-6'' HYDRANT 12'' GV & BOX 12'' GV & BOX 8'' CAP8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP 06/07/19 CITY COMMENTS TTK 22185 C3-SITE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-10 OVERALL SITE & UTILITY PLAN C3-10 OVERALL SITE & UTILITY PLAN 300 22185 C3-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP.LOT LINE, TYP.OUTLOT A 0 SCALE IN FEET 40 80 120 FUTURE BUILDING PADS, TYP. STUB 6" SANITARY SERVICE TO ROAD EASEMENT, TYP. STUB WATER SERVICE TO ROAD EASEMENT, TYP. CONNECT TO MET COUNCIL SANITARY SEWER (SEE NOTES)RIGHT-OF-WAY, TYP.DRAINAGE AND UTILITY EASEMENT, TYP. 157TH STREET STUB P-10 TO PROPERTY LINE FOR CONNECTION TO BISCAYNE AVE FUTURE STORM CONSERVATION EASEMENT SIGN (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) MCES CONNECTION NOTES: THE CONTRACTOR IS REQUIRED TO CONTACT MIKE OLERICH AT 651-602-8908 BETWEEN 7:30 AM AND 3:30 PM AT LEAST 48 HOUTS IN ADVANCE TO ARRANGE TO HAVE AN INSPECTOR ON SITE AT THE TIME THE CONNECTION IS BEING MADE. INSPECTIONS PERFORMED OUTSIDE NORMAL HOURS, MONDAY THROUGH FRIDAY 7:00 AM - 3:30 PM, MAY REQUIRE REIMBURSEMENT TO MCES FOR OVERTIME. SHOULD THE CONTRACTOR ELECT TO PERFORM THE CONNECTION OUTSIDE OF NORMAL BUSINESS HOURS, THE CONTRACTOR SHALL PAY FOR ANY ADDITIONAL FEES. BACKUP CONTACTS ARE AS FOLLOWS: MATT AMUNDSON AT 651-262-8053 AND DAVE ELZINGA AT 651-602-8924. THE CONTRACTOR SHALL TAKE MEASUREMENTS BEFORE BEGINNING CONSTRUCTION TO ENSURE THAT SERVICE CONNECTIONS SHALL NOT BE CUT INTO MAINTENANCE ACCESS STRUCTURE JOINTS OR PIPE BARREL JOINTS. CUTTING INTO JOINTS WILL NOT BE ALLOWED. LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 012345FES-5A FES-5 FES-6 P-5 (24")P-6 (24")S-5 S-4 SP-4 (8")SP-3 (8")12''x6'' TEE 12''x6'' REDUCER 6'' GV & BOX 6'' GV & BOX 12" WATERMAIN 6" WATERMAIN 6" WATERMAIN6" WATERMAIN 8'' GV & BOX 8" WATERMAIN (C900) 8''x45° BEND 12''x8'' TEE 12''x8'' TEE 8''x45° BEND 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8" WATERMAIN (C900) 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 8" WATERMAIN (C900) 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 5''x 7'-6'' HYDRANT BREAK=953.98 5''x 7'-6'' HYDRANT BREAK=953.47 8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP MATCH LINE: 4+90STA. 5+52 S = 946.38 STA. 5+57 S = 946.36 STA. 3+99 S = 947.25 STA. 2+39 S = 948.22 STA. 2+32 S = 948.13 STA. 4+04 S = 947.22 0+00952.90+25953.2953.780+50953.6953.920+75954.0954.171+00954.4954.321+25954.6954.181+50954.9954.041+75955.1953.882+00955.3951.772+25955.5954.812+50955.6954.692+75955.7954.563+00955.8954.313+25955.8954.073+50955.8953.953+75955.6953.944+00955.3953.944+25954.4953.944+50953.6953.944+75952.8953.945+00952.1953.945+25951.4953.9440.3' @ -1.00%363.1' @ 0.00%3+11.90954.19953.943+61.90L = 50.0' K = 50.00 A.D. = 1.00% S-5 R=954.80 I=947.11 (8") SP-4 SP-4 300'x8" @0.50% S-4 R=953.94 I=945.61 (8") SP-4 I=945.51 (8") SP-3 6" WATERMAIN (C900) 6" WATERMAIN (C900) 6'' GV & BOX 12''x6'' REDUCER 12" WATERMAIN (C900) 12''x6'' TEE P-5 C C NOTE: XXX.X - EXISTING GROUND L XXX.XX - PROPOSED GRADE L 12''x8'' TEE 12''x8'' TEE 12" WATERMAIN (C900) 12''x8'' TEE12''x8'' TEE 12" WATERMAIN (C900) 12''x8'' TEE 12''x8'' TEE 930 935 940 945 950 955 960 965 970 975 930 935 940 945 950 955 960 965 970 975 06/07/19 CITY COMMENTS TTK 22185 C3-PROFILES DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-20 PLANNED ROAD & UTILITY CONSTRUCTION C3-20 PLANNED ROAD & UTILITY CONSTRUCTION 300 22185 C3-20 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 PROPOSED DITCH GRADE, 31' RIGHT OF CENTERLINE PROPOSED CENTERLINE GRADE, TYP.EXISTING GRADE, TYP. STUB WATER SERVICE TO ROAD EASEMENT, TYP. STUB 6" SANITARY SERVICE TO ROAD EASEMENT, TYP. UTILITY EASEMENT, TYP.LOT LINE, TYP.PROPERTY LINE, TYP.STA. 0+00 TO 5+50PROPOSED 66' ROAD EASEMENT30'R30' R30' R55' R70'7.5' MIN BURY DEPTH18" MIN. SEPARATION5"x7'-6" HYDRANT PROPOSED DITCH GRADE, 31' LEFT OF CENTERLINE 10' MIN. SEPARATION 10' MIN. SEPARATION 157TH STREET 0 V E R T. 5 10 NOTE: STA: 00+00 SANITARY WYE STATION S = 0.0 SANITARY STUB INVERT ELEVATION INSULATE SANITARY SERVICE UNDER DITCH CROSSING INSULATE SANITARY SERVICE UNDER DITCH CROSSING LOT 7 64,130 SF LOT 8 78,944 SF LOT 2 65,194 SF 17 19 PARKINGR=956.43 SAN MH I=919.18 FO BISCAYNE AVEEX 12" WATERMAINREGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 5678910FES-1AFES-1 A-2 P-1 (15") S-2 S-3 EX S-1 S-4 8" PLUG SP-2 (8") SP - 1 ( 8 " ) SP-1A (8")SP-3 (8")12''x6'' TEE 12''x12'' TEE 6'' GV & BOX 6" WATERMAIN12" WATERMAIN 8'' GV & BOX 12''x8'' TEE 8" WATERMAIN (C900) 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900)8" WATERMAIN (C900)5''x 7'-6'' HYDRANT BREAK=954.04 12'' GV & BOX 8'' CAP 8'' CAP 8'' CAP MATCH LINE: 4+90STA. 8+60 S = 944.74STA. 5+52 S = 946.38 STA. 5+57 S = 946.36 12'' GV & BOX 5+25951.4953.945+50951.0953.945+75950.8953.946+00950.8953.946+25951.1953.946+50951.3953.946+75951.7953.947+00952.2953.947+25952.9953.947+50953.5954.027+75954.0954.278+00954.5954.608+25954.6954.938+50954.7955.268+75954.8955.609+00954.7955.939+25954.5956.149+50954.7956.089+75955.7955.8310+00956.310+25955.410+50955.125.0' @ -1.00% 363.1' @ 0.00% 128.1' @ 1.33%7+25.00953.94954.277+75.00L = 50.0' K = 21.48 A.D. = 2.33% L = 50.0' K = 37.66 A.D. = 1.33%956.169+31.649+03.12955.97956.059+53.12SP-3 300'x8" @0.50% S-4 R=953.94 I=945.61 (8") SP-4 I=945.51 (8") SP-3 S-3 R=954.95 I=944.01 (8") SP-3 I=943.91 (8") SP-2 SP-2 114'x8" @0.50% S-2 R=956.14 I=943.34 (8") SP-2 I=943.24 (8") SP-1 I=943.24 (8") SP-1A SP-1 123'x8" @0.50% EX S-1 R=955.13 I=942.63 (8") SP-1 951.769 5 2 . 1 2 P-1 90'x15" @0.40% 12''x12'' TEE12''x6'' TEE 12" WATERMAIN (C900) 930 935 940 945 950 955 960 965 970 975 930 935 940 945 950 955 960 965 970 975 C C NOTE: XXX.X - EXISTING GROUND L XXX.XX - PROPOSED GRADE L 12''x8'' TEE 12''x8'' TEE 12''x8'' TEE 12''x8'' TEE 12" WATERMAIN (C900) 12'' GV & BOXBISCAYNE AVE06/07/19 CITY COMMENTS TTK 22185 C3-PROFILES DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-21 PLANNED ROAD & UTILITY CONSTRUCTION C3-21 PLANNED ROAD & UTILITY CONSTRUCTION 300 22185 C3-21 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 PROPOSED DITCH GRADE, 31' LEFT OF CENTERLINE PROPOSED CENTERLINE GRADE, TYP.EXISTING GRADE, TYP. STUB WATER SERVICE TO ROAD EASEMENT, TYP.STUB 6" SANITARY SERVICE TO ROAD EASEMENT, TYP.UTILITY EASEMENT, TYP.LOT LINE, TYP.PROPERTY LINE, TYP.STA. 5+00 TO 10+75 CONSTRUCT WATER SERVICE AND 6" SANITARY SERVICE TO WITHIN 5' FROM THE BUILDING. CONNECTION INTO BUILDING BY MECHANICAL CONTRACTOR. (VERIFY LOCATIONS WITH MECHANICAL PLANS)RIGHT-OF-WAY, TYP.CONTRACTOR TO DAM SP-1A UNTIL CONNECTION TO FUTURE CITY SANITARY IS ESTABLISHED NOTE: CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH THE MNDOT TEMPORARY TRAFFIC CONTROL MANUAL AND THE CITY OF ROSEMOUNT REQUIREMENTS.7.5' MIN. BURY DEPTHPROPOSED DITCH GRADE, 31' RIGHT OF CENTERLINE 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION PROVIDE TEMPORARY INSIDE DROP CONNECTION TO SANITARY MANHOLE ASSUMED DEPTH OF 947.2 CONTRACTOR TO FIELD VERIFY SIZE, DEPTH AND LOCATION. CONTRACTOR TO FIELD VERIFY SIZE, DEPTH AND LOCATION OF EXISTING UTILITIES 157TH STREET 0 V E R T. 5 10 FUTURE TRAIL (BY OTHERS) SANITARY WYE = 8+55 NOTE: STA: 00+00 SANITARY WYE STATION S = 0.0 SANITARY STUB INVERT ELEVATION PROPOSED 66' ROAD EASEMENT30'R35' R35' LOT 7 64,130 SF LOT 8 78,944 SF LOT 2 65,194 SF 17 19 PROPOSED BUILDING 18,000 SQ. FT. FFE = 955.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGG R=956.43 SAN MH I=919.18 FO BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=955.36 EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 06/07/19 CITY COMMENTS TTK 22185 C3-SITE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-22 DETAILED SITE PLAN C3-22 DETAILED SITE PLAN 300 22185 C3-22 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 PAVEMENT LEGEND SYMBOL DESCRIPTION BITUMINOUS PAVEMENT HEAVY DUTY BITUMINOUS PAVEMENT CONCRETE PAVEMENT HEAVY DUTY CONCRETE PAVEMENT CONCRETE SIDEWALK ROAD EASEMENT, TYP. PROPERTY LINE, TYP.LOT LINE, TYP.32'19'24'19'24'9'9' CONSTRUCT TURN DOWN WALK (SEE DETAIL)6'6' CONSTRUCT CONCRETE WALK (SEE DETAIL) CONSTRUCT TURN DOWN WALK (SEE DETAIL)5'20'20'5' FUTURE BUILDING PAD CONSTRUCT B618 CURB & GUTTER (SEE DETAIL) 3' CURB TAPER 3' CURB TAPER R50' R15' R15' R30'R30' R15' R39' CONSTRUCT WATER SERVICE AND 6" SANITARY SERVICE TO WITHIN 5' FROM THE BUILDING. CONNECTION INTO BUILDING BY MECHANICAL CONTRACTOR. (VERIFY LOCATIONS WITH MECHANICAL PLANS) SANITARY CLEANOUT R = 955.65 I =944.01 10'F&I: ACCESSIBLE PARKING SIGNS SOUTHEAST BASIN SOUTH BASIN 17' R50' R3', TYP.RIGHT-OF-WAYF&I: 4" WHITE STRIPING, TYP. CONSTRUCT ACCESSIBLE PARKING AREA (SEE DETAIL) CONNECT TO MET COUNCIL SANITARY SEWER PATCH GRAVEL SURFACING TO MATCH EXISTING (SEE DETAIL) SALVAGE & REINSTALL SIGNAGE AS NEEDED NOTE: CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH THE MNDOT TEMPORARY TRAFFIC CONTROL MANUAL AND THE CITY OF ROSEMOUNT REQUIREMENTS. CONTRACTOR TO PROTECT AND FIELD VERIFY SIZE, DEPTH AND LOCATION OF EXISTING UTILITIES DRAINAGE AND UTILITY EASEMENT, TYP. 157TH STREET CONSTRUCT 2' GRAVEL SHOULDER 18'18'FUTURE TRAIL (BY OTHERS) R1-1 (30x30) CONSTRUCT 12" RIBBON CURB (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 22185 C3-SITE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-40 HYDRANT COVERAGE PLAN C3-40 HYDRANT COVERAGE PLAN 300 22185 C3-40 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP. LOT LINE, TYP. ROAD EASEMENT, TYP. 0 SCALE IN FEET 50 100 150 HYDRANT COVERAGE LEGEND EXISTING HYDRANT PROPOSED HYDRANT R250' R250'RIGHT-OF-WAY, TYP. LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 95 5954 956 955 950 951 952 953 954 953 955953 954 956957951 950 951 952 953 954 951 952 953 954 950 947 948 949 951 952 953953 955 952 953 954 955 951952953 954 950 9 4 9 951 952 95 3 9539539 5 4 95 4 955951 951952952953954 950 951 952 953 953 940 945 939 941 942 943 944 952 953 954 952 953 954 -1.9%-2.3%-1.2%- 2 . 1%-2.0%-1.7%-0.6%- 3 . 3%-2.8%-3.1%-2.9%-2.9%- 3 . 6% -3.1%-2.0%954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.87954.87954.87954.87954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47956-0.7%-0.7%-0.6% -0.6% -1.7%-0.7%-1.2%-1 .5%-2.4%- 2 . 4%-2.0%-2.0%950 948949948949947948949950947948949950NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' 06/07/19 CITY COMMENTS TTK 22185 C4-GRADE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C4-10 OVERALL GRADING PLAN C4-10 OVERALL GRADING PLAN 300 22185 C4-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP. LOT LINE, TYP. UTILITY EASEMENT, TYP. 0 SCALE IN FEET 50 100 150 GRADING LEGEND EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) PROPOSED SPOT ELEVATION PROPOSED TOP BACK OF CURB SPOT ELEVATION SURFACE GRADE / DIRECTION GENERAL GRADING NOTES PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. REFER TO GEOTECHNICAL REPORT FOR SOIL INFORMATION. 101 100 101 100 XXX.XXXXX.XX-X.X%RIGHT-OF-WAY, TYP.APPROXIMATE FFE = 955.3APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.7 FUTURE PAVEMENT, TYP. GRADING NOTES: A SHRINKAGE FACTOR OF 1.15 (EMBANKMENT) & 1.20 (TOPSOIL) WERE APPLIED TO ALL EXCAVATION MATERIAL WHEN DETERMINING SITE BALANCE. NO WARRANTY IS MADE OR IMPLIED AS TO THE ACCURACY, SUFFICIENCY, OR RELIABILITY OF SHRINKAGE FACTORS. 18" OF TOPSOIL WAS CALCULATED IN ALL TOPSOIL STRIP AREAS. GREEN SPACE AREAS SHALL BE DRESSED WITH A MINIMUM OF 6" OF TOPSOIL AND A MAXIMUM OF 18" OF TOPSOIL. SEE TOPSOIL NOTES FOR FUTURE AREAS. THE SITE BALANCE PROVIDED ABOVE IS FOR INFORMATIONAL PURPOSES. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ALL QUANTITIES PRIOR TO SUBMITTING A BID FOR THE PROJECT. 157TH STREET EMERGENCY OVERFLOW @ 953.00 (SEE DETAIL) EMERGENCY OVERFLOW STRUCTURE (SEE DETAIL) TO BE CONNECTED TO FUTURE BISCAYNE STORM SEWER MAINTENANCE ACCESS ROUTEMAINTENANCE ACCESS ROUTE MAINTENANCE ACCESS NOTE: UNTIL LOTS 3-8 HAVE BEEN DEVELOPED TO A POINT WHERE THE MAINTENANCE ACCESS ROUTE SHOWN ON THE PLAN IS VIABLE, MAINTENANCE VEHICLES SHALL USE THE SHARED ACCESS DRIVE FOR LOTS 1 & 2 TO ACCESS THE STORMWATER BASINS. EMERGENCY OVERFLOW @ 953.50 (SEE DETAIL) TOPSOIL NOTES: CONTRACTOR TO ENSURE NO MORE THAN 6" OF TOPSOIL IS PLACED IN THE INFILTRATION BASIN AREAS. CONTRACTOR TO ENSURE NO MORE THAN 6" OF TOPSOIL IS PLACED IN THE FUTURE BUILDING PADS. CONTRACTOR TO ENSURE NO MORE THAN 12" OF TOPSOIL IS PLACED IN THE FUTURE PAVEMENT AREAS. CONTRACTOR SHALL STOCKPILE EXCESS TOPSOIL IN A LOCATION DETERMINED BY THE OWNER. THE STOCKPILE SHALL BE NO MORE THAN 8' HIGH AND SHALL BE TEMPORARILY SEEDED TO ENSURE STABILITY. EROSION CONTROL DEVICES (SILT FENCE, BIOROLL, ETC.) SHALL BE PLACED AROUND THE PERIMETER OF THE STOCKPILE TO ENSURE NO SOIL LOSS. THIS STOCKPILING SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. LOT 8 78,944 SF PROPOSED BUILDING 18,000 SQ. FT. FFE = 955.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04'NOPARKINGG R=956.43 SAN MH I=919.18 FO BISCAYNE AVEI=955.36 EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 95 5954 956 955 950 951 952 953 954 953 955953 954 956957953-2.8%-3.1%-2.0%-4.1%955.25955.25955.75955.75955.75955.65955.65955.75955.75955.65955.65955.75955.65955.75955.65955.75955.65955.65955.75955.75955.75955.25955.75955.75952.25955.25953.12952.06953.109 5 4 . 0 0 LP954.32LP9 5 4 . 0 1 LP954.37954.69954.37954.01HP954.63HP954.30HP955.35954.99954.68955.65955.65955.65955.569 5 5 . 5 6 955.56953.71954.23955.20HP955.20HP955.09954.91954.40954.90954.86954.83954.76954.68954.74954.43954.47954.58954.20954.74954.69954.669 5 4 . 6 5954.58954.20954.35954.52 954.43954.56954.44953.64954.04953.649 5 4 . 0 0 954.36954.47954.47-1 .5%-2.4%- 2 . 4%-2.0%-2.0%-2.1% -1.7% -4.0%-0.7%-2.1% -25.0% -10.3% -8. 3 %953.93954.74955.35952.15952.25948949947SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04'NOPARKING955.56955.562" CURB955.562" CURB955.56BIT955.37955.37954.90954.86955.19955.19955.56FULL CURB9 5 5 . 5 6 F U L L C U R B955.560" CURB955.560" CURB955.38BIT955.06BIT955.56BIT955.38BIT955.06BIT06/07/19 CITY COMMENTS TTK 22185 C4-GRADE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C4-20 DETAILED GRADING PLAN C4-20 DETAILED GRADING PLAN 300 22185 C4-20 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 UTILITY EASEMENT, TYP. PROPERTY LINE, TYP.LOT LINE, TYP.GRADING LEGEND EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) PROPOSED SPOT ELEVATION PROPOSED TOP BACK OF CURB SPOT ELEVATION SURFACE GRADE / DIRECTION GENERAL GRADING NOTES PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. REFER TO GEOTECHNICAL REPORT FOR SOIL INFORMATION. 101 100 101 100 XXX.XXXXX.XX-X.X% TOPSOIL NOTE: CONTRACTOR TO ENSURE NO MORE THAN 6" OF TOPSOIL IS PLACED IN THE FUTURE BUILDING PADS. CONTRACTOR TO ENSURE NO MORE THAN 12" OF TOPSOIL IS PLACED IN THE FUTURE PAVEMENT AREAS. FUTURE PAVEMENT, TYP. 0 SCALE IN FEET 5 10 15 INSET A SEE INSET A 157TH STREET LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 06/07/19 CITY COMMENTS TTK 22185 C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - PRO PRO RAS 18-22185 06/10/2019 C5-10 SITE RESTORATION PLAN C5-10 SITE RESTORATION PLAN 300 22185 C5-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP. LOT LINE, TYP. ROAD EASEMENT, TYP. 0 SCALE IN FEET 50 100 150 RIGHT-OF-WAY, TYP.TURF RESTORATION LEGEND SYMBOL ITEM NO.DESCRIPTION UNITS QUANTITY 2575.505 SEED, MIXTURE 25-151 AC 10.64 2575.505 SEED, MIXTURE 33-261 AC 2.29 2575.509 MULCH MATERIAL, TYPE 6 CY 47 THE QUANTITIES SHOWN ARE TOTAL FOR THE ENTIRE PROJECT NOT SPECIFIC TO THIS SHEET. *SHALL MEET MNDOT SPECIFICATION 3876. SEED SHALL BE PLACED IN ACCORDANCE WITH MNDOT 2575. TEMPORARY EROSION CONTROL MEASURES, INCLUDING PERIMETER CONTROL AND INLET PROTECTION MUST BE MAINTAINED UNTIL FINAL STABILIZATION MEASURES ARE IN PLACE AND APPROVED BY THE OWNERS REPRESENTATIVE. REFER TO THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR ADDITIONAL INFORMATION. 157TH STREET PROPOSED BUILDING 18,000 SQ. FT. FFE = 955.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04'BISCAYNE AVEI=955.36 EX 12" WATERMAINCK - (3) TO - (1) GT - (1) HL - (5) SM - (2) BF - (5) GT - (2) (1) - GT (1) - AA (3) - TR (3) - PG (1) - AA (1) - GT (3) - AM (3) - PG SG - (9) (6) - CK (2) - TO (3) - TB (2) - TO (6) - CK (2) - TB (5) - HL (1) - TO (3) - CK (1) - SM (2) - BN (1) - TO (3) - CK AA - (1) DL - (4) SG - (5) SM - (6) DL - (8) EVERGREEN TREE QTY COMMON / BOTANICAL NAME SIZE ROOT PG 9 Black Hills Spruce Picea glauca `Densata` 2" CAL B & B OVERSTORY TREE QTY COMMON / BOTANICAL NAME SIZE ROOT AA 5 Autumn Blaze Maple Acer x freemanii `Jeffsred` 2" CAL B & B AM 3 Green Mountain Sugar Maple Acer saccharum `Green Mountain` TM 2" CAL B & B BF 5 Dakota Pinnacle Asian White Birch Betula platyphylla `Fargo` TM 2" CAL B & B BN 2 River Birch Multi-Trunk Betula nigra 2" CAL B & B GT 6 Skyline Honeylocust Gleditsia triacanthos `Skycole` 2" CAL B & B TR 6 Redmond American Linden Tilia americana `Redmond` 2" CAL B & B SHRUBS QTY COMMON / BOTANICAL NAME SIZE ROOT CK 21 Feather Reed Grass Calamagrostis x acutiflora `Karl Foerster` 3 GAL CONT DL 12 Dwarf Bush Honeysuckle Diervilla lonicera 5 GAL CONT HL 10 Little Lime Hydrangea Hydrangea paniculata `Little Lime` 5 GAL CONT SG 14 Goldflame Spirea Spiraea x bumalda `Goldflame` 5 GAL CONT SM 9 Dwarf Korean Lilac Syringa meyeri `Palibin` 5 GAL CONT TB 5 Mr. Bowling Ball Arborvitae Thuja occidentalis `Bobazam` 5 GAL CONT TO 7 Technito Arborvitae Thuja occidentalis `Bailjohn` 5 GAL CONT PLANT SCHEDULE (1) - GT (1) - AA (1) - AA (3) - TR (3) - PG 06/07/19 CITY COMMENTS MW 22185 C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - PRO PRO RAS 18-22185 06/10/2019 C5-20 LANDSCAPING PLAN C5-20 LANDSCAPING PLAN 300 22185 C5-20 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60LOT LINE, TYP.CITY PLANTING REQUIREMENTS 1.A MINIMUM OF 5% OF THE PARKING AREA SHALL BE LANDSCAPED. THE LANDSCAPING SHALL BE LOCATED ON ISLANDS, PENINSULAS OR THE LIKE WITHIN THE PERIMETER OF THE PARKING AREA. 1.1.15,666 SQ FT x .05% = 783 SQ FT LANDSCAPED AREA REQUIRED. 1036 SQ FT LANDSCAPED AREA SHOWN. TREE REQUIREMENTS: 1.8 TREES OR 1 PER 3,000 SQUARE FEET LAND AREA 1.1.79,527 SQ FT/3,000 = 27 TREES REQUIRED 2.75% OF OVERSTORY TREES MUST BE DECIDUOUS 2.1.27 x .75 = 20 DECIDUOUS OVERSTORY TREES REQUIRED FOUNDATION PLANTING REQUIREMENTS: 1.1 FOUNDATION PLANTING PER 10 LINEAR FEET OF BUILDING PERIMETER 1.1.552 LINEAR FEET/10 = 55 FOUNDATION PLANTINGS REQUIRED MATCHLINE- SEE THIS SHEET MATCHLINE- SEE THIS SHEET 22185 C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - PRO PRO RAS 18-22185 06/10/2019 C5-30 LANDSCAPING DETAILS AND NOTES C5-30 LANDSCAPING DETAILS AND NOTES 300 22185 C5-30 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 1.COORDINATE LOCATION OF ALL UTILITIES (LINES, DUCTS, CONDUITS, SLEEVES, FOOTINGS, ETC.) WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS (FENCE, FOOTINGS, TREE ROOTBALLS, ETC.). CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO OWNER'S REPRESENTATIVE PRIOR TO CONTINUING WORK. 2.REMOVE ALL CONSTRUCTION DEBRIS AND MATERIALS INJURIOUS TO PLANT GROWTH FROM PLANTING PITS AND BEDS PRIOR TO BACKFILLING WITH PLANTING MIX. 3.LAWN AREAS SHALL HAVE 6" MINIMUM DEPTH OF TOPSOIL. TOPSOIL SHALL BE COMPACTED TO 85% MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT. 4.REFER TO PLANTING DETAILS PLAN FOR AMENDED SOIL DEPTH IN PLANTING BEDS AND SURROUNDING TREES. REFER TO SPECIFICATIONS FOR MIX TYPE. 5.OWNER'S REPRESENTATIVE SHALL APPROVE ALL PLANT LOCATIONS PRIOR TO INSTALLATION. OWNER RESERVES THE RIGHT TO REVISE PLANTING LAYOUT AT TIME OF INSTALLATION. 6.ALL PLANT MATERIALS SHALL BE TRUE TO THEIR SCIENTIFIC NAME AND SIZE AS INDICATED IN THE PLANT SCHEDULE. 7.IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE PLANTING PLAN AND THE NUMBER OF PLANTS IN THE SCHEDULE, THE PLANTING PLAN SHALL GOVERN. 8.OWNER RESERVES THE RIGHT TO REVISE QUANTITIES TO SUIT BUDGET LIMITATIONS. CONTRACTOR'S UNIT BID PRICES SHALL PREVAIL FOR ANY CHANGES IN QUANTITIES. 9.ANY PROPOSED SUBSTITUTIONS OF PLANT SPECIES SHALL BE MADE WITH PLANTS OF EQUIVALENT OVERALL FORM, HEIGHT, BRANCHING HABIT, FLOWER, LEAF, COLOR, FRUIT AND CULTURE, AND ONLY AFTER WRITTEN APPROVAL OF THE OWNER'S REPRESENTATIVE AND OWNER. 10.ALL PLANT MATERIALS MUST CONFORM TO AMERICAN STANDARDS FOR NURSERY STOCK (A.N.S.I.), LATEST EDITION PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, WASHINGTON D.C. LARGER SIZED PLANT MATERIALS OF THE SPECIES LISTED MAY BE USED IF THE STOCK CONFORMS TO A.N.S.I. 11.ALL PLANT MATERIAL SHALL BE GUARANTEED TO BE IN A LIVE AND HEALTHY GROWING CONDITION FOR ONE FULL GROWING SEASON (ONE YEAR) AFTER FINAL PROJECT ACCEPTANCE OR SHALL BE REPLACED FREE OF CHARGE WITH THE SAME GRADE AND SPECIES. ALL TREES SHALL HAVE A STRONG CENTRAL LEADER. 12.CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE DUE TO OPERATIONS. ANY AREAS THAT ARE DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER. 14.PLANTING BED EDGING - USE 3/4" x 6" PROFESSIONAL GRADE POLY EDGING IN ALL AREAS WHERE PLANTING BED MEETS LAWN AREAS OR WHERE INDICATED. USE 12" METAL SPIKES AS INSTRUCTED BY MANUFACTURER. 14.PROVIDE SHREDDED HARDWOOD MULCH, NATURAL COLOR, SURROUNDING ALL PROPOSED TREES(5' Ø) AND WITHIN PLANTING BEDS TO A 3-INCH MINIMUM DEPTH AS SHOWN IN TREE PLANTING DETAIL. DO NOT USE AN UNDERLAYMENT SUCH AS PLASTIC SHEET OR LANDSCAPE FABRIC. APPLY PRE-EMERGENT TO ALL PLANTING BEDS PRIOR TO MULCHING. REFER TO PLANS FOR ADDITIONAL DETAILS. REFER TO STORMWATER DETAILS FOR BASIN CONSTRUCTION AND MULCH APPLICATION. 15.ALL GROUND AREAS NOT WITHIN PLANT BEDS OR HAVE A DIFFERENT GROUNDCOVER INDICATED SHALL BE SODDED. TURF AREAS DISTURBED BY CONSTRUCTION SHALL BE SODDED. SOD SECTIONS SHALL BE NO SMALLER THAN 24" X 36" STAKED IN PLACE WITH BIODEGRADABLE SOD STAKES WHEN SLOPE IS STEEPER THAN 5:1 OR WHEN CONDITIONS REQUIRE. 16.FOR SHRUB LOCATIONS: CONTRACTOR IS PERMITTED TO USE DISCRETION AS NECESSARY TO AVOID DRIVEWAYS, UTILITIES, OR OTHER CONFLICTS. THE TOTAL NUMBER OF PLANTS, INCLUDING SHRUBS AND TREES SHALL MEET CITY CODE. 21.INDICATED QUANTITIES ARE ESTIMATES AND SHOULD BE CONFIRMED BY THE CONTRACTOR/BIDDER. GENERAL PLANTING NOTES CONIFER / EVERGREEN TREE PLANTING DETAIL SCALE: 1" = 1'-0" TIE NYLON STRAP AROUND TRUNK AS SHOWN CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE AND REMOVE FROM THE PLANTING PIT. AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEAN AT 90 DEGREES BACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL 3" LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGE TO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH DIRECTLY ON TREE TRUNK, LEAVE A MIN. 3" RING AROUND CROWN ROOTBALL DIA 1.5 X ROOTBALL DIA DEPTH OF ROOTBALL NEVER CUT PRIMARY LEADER PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTS CLEAN AT 90 DEGREES TREES 8'+TREES 6'-8' TOP OF ROOTBALL TO BE SET ABOVE GRADE 3" 1/2" WIDE NYLON STRAPPING - COLOR TO BE APPROVED BY LANDSCAPE ARCHITECT *NOTE: DO NOT STAKE TREES UNLESS INDICATED. STAKING DIAGRAM, NO STAKING TREES UNDER 6' REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP, TWINE - REMOVE THESE AND ALL NON-BIODEGRADIBLE MATURIALS FROM THE PLANTING PIT. AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEAN AT 90 DEGREES BACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL. DO NOT TAMP SOIL, BUT SATURATE WITH WATER THROUGHOUT BACKFILL PROCESS. EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL 3" LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGE TO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH WITHIN 3" OF TRUCK. WHEN IN PLANT BED, SUBSTITUTE WITH PLANT BED MULCH. ROOTBALL DIA 2X ROOTBALL DIA DEPTH OF ROOTBALL NEVER CUT PRIMARY LEADER PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTS CLEAN AT 90 DEGREES TREES 8'+TREES 6'-8' SET ROOT FLAIR ABOVE GRADE 3" WHEN STAKED, ATTACH 1/2" WIDE NYLON STRAPPING SNUGLY AROUND TRUCK AND, WITH SOME LOOSENESS, TO STAKES AS SHOWN NOTE: * AVOID STAKING UNLESS NECESSARY. * NO STAKING TREES UNDER 6'. STAKING DIAGRAM MUST MAINTAIN TRUNK IN VERTICAL ORIENTATION TREE PLANTING DETAIL NO SCALE UNDISTURBED SOIL MULCH, PER PLANS AND NOTES BACKFILL PLANTING PIT PER SHRUB PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL / CONTAINER MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL / CONTAINER - TILL ALL PLANTING BEDS TO A MINIMUM DEPTH OF 6" THROUGHT PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE PLANT IS PLUMB ALL PLANTS TO BE INSTALLED SO THAT THE TOP OF THE CROWN OF THE PLANT IS SLIGHTLY ABOVE FINISH GRADE 3" ROOTBALL DIA 2 TIMES ROOTBALL DIA DEPTH OF ROOTBALL CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE, OR ENTIRE CONTAINER, AND REMOVE FROM THE PLANTING PIT, SCARIFY ROOTS FOR ALL CONTAINERIZED PLANTS 5 GALLONS OR SMALLER CONTAINER DIA 2 TIMES CONTAINER DIA SHRUB PLANTING DETAIL NO SCALE LOT 8 78,944 SF NOPARKINGG R=956.43 SAN MH I=919.18 FO BISCAYNE AVEEX 12" WATERMAINREGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 Z1 LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SFZ1 06/07/19 CITY COMMENTS TTK 22185 C6-LIGHT DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C6-10 SITE LIGHTING PLAN C6-10 SITE LIGHTING PLAN 300 22185 C6-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. UTILITY EASEMENT, TYP. 0 SCALE IN FEET 20 40 60 MANUFACTURER/MODEL NUMBER LIGHT FIXTURE SCHEDULE STYLETYPE LAMPS REMARKS Provide light fixtures as shown on Fixture Schedule. Substitutions shall have prior approval by the Project Engineer before bid date. Being listed as an acceptable Manufacturer in no way relieves the Contractors obligation to provide all equipment and features in accordance with these specifications. LIGHT POLE BASE DETAIL N.T.S. 157TH STREET UTILITY EASEMENT, TYP. 157TH STREET LOT 8 78,944 SF NOPARKINGG R=956.43 SAN MH I=919.18 FO BISCAYNE AVEEX 12" WATERMAINREGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.4 0.4 0.4 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 0.9 0.9 0.9 0.7 0.6 0.4 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.5 0.7 1.0 1.4 1.8 2.0 2.1 1.9 1.5 1.2 0.8 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.2 0.3 0.5 0.7 1.1 1.5 2.2 3.0 3.8 4.1 3.5 2.6 1.8 1.3 0.9 0.6 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.1 0.1 0.2 0.4 0.6 1.0 1.5 2.0 2.7 3.7 5.8 6.7 4.5 3.0 2.3 1.7 1.2 0.8 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.1 0.1 0.2 0.4 0.6 0.9 1.4 2.0 2.6 4.0 4.8 5.8 4.2 3.3 2.3 1.6 1.1 0.7 0.5 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.4 0.6 0.8 1.1 1.3 1.5 2.8 4.1 1.9 1.4 1.2 0.9 0.7 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.5 1.1 1.2 0.8 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Z1 LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SFZ1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.4 0.4 0.4 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 0.9 0.9 0.9 0.7 0.6 0.4 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.5 0.7 1.0 1.4 1.8 2.0 2.1 1.9 1.5 1.2 0.8 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.5 0.7 1.1 1.5 2.2 3.0 3.8 4.1 3.5 2.6 1.8 1.3 0.9 0.6 0.4 0.3 0.2 0.1 0.1 0.0 0.1 0.1 0.2 0.4 0.6 1.0 1.5 2.0 2.7 3.7 5.8 6.7 4.5 3.0 2.3 1.7 1.2 0.8 0.5 0.3 0.2 0.1 0.1 0.0 0.1 0.1 0.2 0.4 0.6 0.9 1.4 2.0 2.6 4.0 4.8 5.8 4.2 3.3 2.3 1.6 1.1 0.7 0.5 0.3 0.2 0.1 0.0 0.0 0.0 0.1 0.1 0.3 0.4 0.6 0.8 1.1 1.3 1.5 2.8 4.1 1.9 1.4 1.2 0.9 0.7 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.5 1.1 1.2 0.8 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 06/07/19 CITY COMMENTS TTK 22185 C6-LIGHT DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C6-11 PHOTOMETRICS PLAN C6-11 PHOTOMETRICS PLAN 300 22185 C6-11 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 157TH STREET 157TH STREET MEMORANDUM To: Kyle Klatt, Planner CC: Kim Lindquist, Community Development Director Brian Erickson, Director of Public Works/City Engineer From: Stephanie Smith, Assistant City Engineer Date: June 25, 2019 Subject: Biscayne Business Park Final Plat - Engineering Review SUBMITTAL: The plans for Biscayne Business Park have been prepared by I & S Group (ISG), dated June 7th, 2019. Engineering review comments were generated from the following documents included in the submittal: ▫ Final Plat ▫ Existing Survey and Removal Plan ▫ Site Plan ▫ Road and Utility Plan ▫ Grading Plan ▫ SWPPP ▫ Restoration and Landscaping Plans ▫ Lighting Plan ▫ Stormwater Management Report GENERAL COMMENTS: The applicant has applied for both a final plat of the entire site and a site plan for Lot 1, Block 1. Additional site plans will be submitted for the remaining lots as the applicant is ready to development them. Note: all site plans must meet the requirements for the overall development plat. 1. Development fees are required based on the current Schedule of Rates and Fees. For 2018, the estimated development fees are listed below:  GIS Fee: $10 / parcel  Storm Sewer Trunk Charge: $ 6,865 / acre  Sanitary Sewer Trunk Charge: $ 1,075 / acre  Watermain Trunk Charge: $ 6,500 / acre 2. The developer shall be responsible for a pro-rated share of the future cost associated with the improvement of Biscayne Avenue. The front-foot rate is $110/FF. 3. Plans must be signed by an engineer registered in the state of Minnesota prior to grading on site. RIGHT OF WAY AND EASEMENTS: 4. Permits are required for work in Right-of-Way (ROW). 5. The width of Drainage and Utility (D&U) easements over all public utilities shall be verified during final design. 6. Easements are required over all ponding and infiltration areas, and shall encompass at minimum the HWL and all naturally vegetated areas. Signage for easements shall be provided by the developer and an extended maintenance warranty shall be required to ensure establishment of the naturally vegetated areas. STREETS & PARKING LOTS 1. To maintain the integrity of the pavement, 157th Street shall have 24” ribbon curb. 2. Truck turning movements shall be shown on the plans for the driveway entrances. 3. The plans shall show the proposed radius for the cul-de-sac bubble. 4. The plan shall include an intersection detail for 157th Street and Biscayne Avenue. 5. The applicant shall submit a signage plan for review. 6. The street lighting plan shall be revised to comply with City standards. WATERMAIN AND SANITARY SEWER Biscayne Avenue does not have City sanitary main at this time. The applicant has proposed temporarily connecting to a Metropolitan Council sanitary manhole on Biscayne Avenue. 7. When City-owned sanitary main is installed on Biscayne Avenue (anticipated in 2020), the applicant shall permanently connect to City-sanitary. At the time of final plat, the applicant shall deposit a security with the City to cover the cost of the removal of the MCES connection, new connection to City sewer and restoration of the street. Plans and a cost estimate for this connection shall be submitted to the City prior to construction. 8. The water and sanitary main lines shall be owned and maintained by the City. 9. The proposed water service lines are 8” diameter. The applicant shall verify with City staff whether this is an appropriate service size for these properties. 10. The water and sanitary sewer construction plans shall be designed consistent with City of Rosemount Engineering Guidelines and Standard Specifications and Detail Plates. 11. Watermain and Sanitary Sewer will be revised during final design. Typical revisions will include number and placement of hydrants, gate valves and manholes. STORMWATER The stormwater management plan for this development proposes six infiltration basins with a total of 8 cells, three on the northern property line and three on the southern property line. 12. City Engineering Guideline’s direct the construction of regional basins to promote efficiencies in treatment and maintenance. As this development will continue to come to the City with additional site plans, staff recommends developing a temporary stormwater condition. As the applicant comes to staff with site plans, working towards consolidation of the number of basins to produce efficiencies in the treatment and maintenance of the stormwater system. 13. Stormwater facilities shall be owned and maintained by the business park’s HOA. The applicant shall enter into a Stormwater Management Agreement with the City to be recorded against the property. The agreement shall detail the applicant’s inspection and maintenance responsibilities for their stormwater BMPs. 14. Upon completion of the infiltration basins, the applicant’s engineer shall submit infiltrometer testing to certify the functionality of the basins as modeled. WSB Engineering reviewed the Biscayne Business Park plans on behalf of the City. The full memorandum, dated June 20, 2019, is included as an attachment. The recommendations are summarized below: 15. Preference to provide stormwater management through the use of a regional system versus site-by-site systems remains. Applicant will need to provide evidence for why a regional basin is not feasible if current stormwater management system is to be approved. Additionally, if a regional system is not feasible it is preferred that the stormwater system only be constructed to handle Lot 1 development at this time and that interim conditions stormwater modeling and plans be submitted. As the plans for the reconstruction of Biscayne Avenue are being developed, additional conversations between the City and the developer over possible collaboration for stormwater treatment for the Biscayne Business Park and the road reconstruction are recommended. 16. Based on the equalizer pipe elevation, it appears the maintained water level for the southwest basin will be set at 949.75. Similarly, it appears the maintained water level for the northwest basin will be set at 951.0. Applicant should update the pipe elevations or update the HydroCAD modeling as applicable. 17. Emergency overflow elevations and locations should be called out for all basins (SW, south, SE, NW, north and NE) to ensure water will not flood proposed and future buildings if pipes are not functioning as designed. 18. Grading between the 949 and 951 contours shown in the southeast pond have a slope of 2:1. Applicant should update grading to meet requirements listed above. Additionally, maintenance benches should be graded extending upwards from the NWL rather than below the water level surface as currently shown. 19. It is recommended that additional consideration be given to the design of the storm sewer northeast of the cul-de-sac. Applicant should consider providing additional separation between FES 5 and FES 6 by changing the ditch grading in the area. 20. It appears there is still HDPE proposed under driving surfaces. Pipes P2 and P3 are both called out as HDPE and are shown under a proposed driving surface. Applicant should update the plans so RCP pipes are being used under proposed driving surfaces, including future proposed driving surfaces. 21. Pipe P-2 should be upsized to a 15” pipe per the City Engineering Guidelines. 22. Applicant should add proposed roof drain locations to the plans. 23. It is unclear what area is being counted towards the ‘provided infiltration area’ in Table 3.1 of the stormwater management report. Applicant should include calculations for the provided infiltration area. 24. Dead pool calculations were not found in Appendix E. The contours below the surface water for the stormwater ponds should be included in the HydroCAD model to confirm required dead pool storage is being provided. 25. The area below the NWL of the ponds will need to be lined to ensure they hold water on a permanent basis as designed. SITE PLAN The following conditions of approval are for the site plan proposed at Lot 1, Block 1 of the Biscayne Business Park. 26. The site plan must meet the applicable conditions of approval for the overall development plat as listed above. 27. A 10-foot turnaround at the end of the parking lot shall be added to the plan. 28. Additional flow arrows shall be labeled on the grading plan. 29. Label the contour line northwest of the building corner to determine if that area is a rise or a depression. Should you have any questions or comments regarding the items listed above, please contact me at 651-322-2015. Attachment: WSB Memorandum Re: Biscayne Business Park Plan Review, dated 4/16/2019 MEMORANDUM To: Kim Lindquist, Community Development Director Kyle Klatt, Senior Planner Anthony Nemcek, Planner Brian Erickson, City Engineer/Public Works Director Stephanie Smith, Assistant City Engineer From: Dan Schultz, Parks and Recreation Director Date: June 18, 2019 Subject: Biscayne Business Park Final Plat The Parks and Recreation Department recently reviewed the plans for the Biscayne Business Park Final Plat. After reviewing the plans, the Parks and Recreation Department staff has the following comments: PARKS DEDICATION The parks dedication requirement for business park development is 10% of the land area or the cash in lieu of land at $8,500 per acre. The total cash in lieu of land dedication for the entire development is $112,880 ($8,500 per acre x 13.28 acres, which does not include road ROW). Staff is recommending that the City collect cash in lieu of land for the Biscayne Business Park and that the cash payment should be paid for each lot being created at the time of issuance of the building permit for each lot in the plat. The price per lot is $14,110. Please let me know if you have any questions about this memo.