Loading...
HomeMy WebLinkAbout6.h. Request by Appro Development for Final Plat Approval for Biscayne Business Park EXECUTIVE SUMMARY City Council Regular Meeting: July 16, 2019 AGENDA ITEM: 19-37-FP: Request by Appro Development for Final Plat Approval for Biscayne Business Park AGENDA SECTION: Consent PREPARED BY: Kyle Klatt, Senior Planner AGENDA NO. 6.h. ATTACHMENTS: Final Plat Resolution; Subdivision Agreement; Site Location Map; Final Plat; Updated Project Development Plans: Site Data, Overall SWPP, Existing Site and Removals, Utility Plan, Road and Utility Plans, Site Plan, Hydrant Coverage, Overall Grading, Detailed Grading, Site Restoration, Landscaping, Lighting and Photometric Plan; City Engineer Review Memo; Parks and Recreation Review Memo APPROVED BY: LJM RECOMMENDED ACTION: The Planning Commission and Staff recommend the City Council adopt the following motions: 1) Motion to adopt a Resolution Approving the final plat for Biscayne Business Park subject to conditions. 2) Motion to approve the Subdivision Agreement for Biscayne Business Park and Authorizing the Mayor and Clerk to enter into this Agreement. SUMMARY Applicant: Jim Connelly, Appro Development, 21476 Grenada Avenue, Lakeville, MN Property Owner: Tom Stordahl, 1001 Main Street East, Wabasha, MN Comp. Guide Plan Designation: BP – Business Park Current Zoning: BP/PUD – Business Park/Planned Unit Development Gross Area: 15.32 Acres Net Area: 14.55 Acres Lots/Units: 8 Lots The City Council is being asked to consider a Final Plat request from Jim Connelly of Appro Development for Biscayne Business Park to create eight lots associated with the City’s recent approval of a planned unit development (PUD) on the site. The applicant intends to build an 18,000 square foot building on Lot 1, Block 1 shortly after final plat approval, and then will market the remaining lots to individuals or companies looking for office, manufacturing, and warehousing space. The final plat is necessary to facilitate subdivision of the property into individual lots along with the required street dedication over Biscayne Avenue. Staff finds the application consistent with the Biscayne Business Park Preliminary Plat and recommends approval of this application subject to the conditions listed above. PLANNING COMMISSION REPORT The Planning Commission reviewed the final plat for Biscayne Business Park at its June 25, 2019 meeting and voted unanimously to approve the request as part of the consent agenda. BACKGROUND The Planning Commission reviewed a preliminary plat and planned unit development (PUD) master development plan for Biscayne Business Park at its April 23, 2019 meeting. The City Council approved the preliminary plat and PUD plans at its May 21, 2019 meeting based on the recommendation of the Planning Commission. The applicant has subsequently submitted a final plat for the entire project area, which will create eight individual lots as described within the overall master PUD development plan. The final plat will cover the entire PUD area, which will allow the applicant to complete mass grading for the entire site and install the private road to serve each of the individual lots. Future lot buyers will then be able to construct buildings consistent with the master PUD development plan without needing to further subdivide the property or perform additional mass grading on their lot. Because the property is zoned BP – Business Park/PUD, permit review for building construction will be conducted administratively consistent with the BP ordinance. The applicant has previously provided preliminary building details for Lot 1, Block 1, and these plans will serve as the template for future lot development within the business park. The approved PUD agreement allows for variation in the materials and colors of individual buildings as long as they remain consistent with the general design proposed for Lot 1. Additionally, all future buildings will need to conform to the City’s architectural review requirements listed in the BP district development standards. The first building is being constructed as a spec building, and the applicant has not identified a specific user for the site in advance of the Planning Commission meeting. Since the proposed final plat incorporates all of the Biscayne Business Park PUD area, the applicant will not need to come forward with another final plat before building any future structures within the PUD development area. ISSUE ANALYSIS Legal Authority. The final plat application is Quasi-Judicial because the City has a set of standards and requirements for reviewing this type of application that is described in detail below. Generally, if the final plat meets the ordinance requirements it must be approved. Land Use and Zoning . The proposed eight lot business park development is consistent with the land use and zoning classifications for the project area. The subject property is guided BP – Business Park and zoned BP/PUD Business Park with the Biscayne Business Park Planned Unit Development (PUD). As a result, the property is subject to all the standards of the BP – Business Park zoning district as well as the specific development standards for the project area described in the PUD. The Biscayne Business Park PUD included deviations from the base BP zoning; the including the following: 1. Section 11-5-2.C.6.d. Driveways in Commercial, Business Park, and Industrial, and Residential Developments: Shared driveways will be allowed with zero (0) setback to the adjoining property. 2. Section 11-2-7 Street Access Required: Lots will be allowed to be platted without access to a public street; all access to individual lots will occur from a private street. Overall, the final plat conforms to the BP district standards and Biscayne Business Park PUD requirements, with the smallest lot within the final plat at 1.41 acres (one acre required) and the width of the narrowest lot at 214 feet (120 feet required). Many of the other standards will be addressed at the building permit stage when an individual site survey is reviewed by the City. 2 Final Plat. Standards for reviewing subdivision requests are detailed in Title 12 of the Rosemount City Code. This section of the Code outlines the two-step Preliminary and Final Plat process for land subdivision. In this case, the preliminary plat was approved on May 21st consisting of eight lots. The current application proposes to plat all eight of these lots for Biscayne Business Park and to dedicate the easements necessary to construct the storm water retention areas within the overall project area. The developer has been working to address the City’s preliminary plat review comments and the updated site and development plans reflect some of this work. The majority of the staff review comments concerning the project were incorporated into the PUD/preliminary plat review memorandum and supporting documentation. Some of the updates to the previous review are noted as follows: Parks and Open Space. The City’s Parks and Recreation Department had previously recommended that the City accept a fee in lieu of land dedication for the entire subdivision because there are no planned municipal parks in the area. Based on the amount of land within the subdivision and City’s current fee schedule, the applicant will need to pay a fee of $112,880 for the entire plat area. The City is willing to either accept this payment with the final plat, or to allocate the fee throughout the subdivision with each individual building permit. If the applicant elects to pay the fee at the time of each building permit, the fee per lot will be calculated on a pro-rated basis consistent with the adopted fee schedule in time at the time of each permit. Storm Water Management. The City’s previous review identified two major areas of concern with the overall storm water management plan for the subdivision. First, the City wanted to see some consolidation of the storm water retention basins planned on each individual lot. After further reviewing these comments, the developer has made minor modifications to the overall system, but still is planning for a series of small interconnected ponds within each lot. Staff believes the system will function properly overall, but is concerned about the long-term ownership and maintenance of each pond, especially since the City is ultimately responsible for the basins under its city-wide MS4 (Municipal Separate Storm Sewer System) permit. To address the long-term maintenance issue, staff is recommending that an overall master association for the business park assume responsibility for maintenance of the entire storm water ponding system. This will help ensure that eight individual lot owners will not be directly responsible for eight smaller pond systems on their lots. Landscaping . The developer has updated the landscape plan to include nine additional plantings along Biscayne Avenue that will be installed in conjunction with the overall site grading and construction of the proposed building on Lot 1, Block 1. A site-specific landscape plan must be submitted with each individual building permit and final site development plan associated with all of the other lots within the subdivision. Engineering . All public improvements depicted on the preliminary development plans are included on the attached submission materials. The City Engineer has provided a review memorandum for the proposed final plat, and all issues identified by the City Engineer must be addressed prior to the release of the final plat for recording. RECOMMENDATION Staff and the Planning Commission are recommending approval of the final plat, subject to conditions, based on the information provided by the applicant and reviewed within this report. 3 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019- A RESOLUTION APPROVING THE FINAL PLAT FOR BISCAYNE BUSINESS PARK WHEREAS, Appro Development, 21476 Grenada Avenue, Lakeville, MN, (Applicant) has submitted an application to the City of Rosemount for a Plat concerning property legally described as follows: The South Half of the Southeast Quarter of Section 32, Township 115, Range 19, except the West 1645.05 feet and except the South 656.14 feet, Dakota County, Minnesota. WHEREAS, on June 25, 2019, the Planning Commission of the City of Rosemount reviewed the Final Plat for Biscayne Business Park; and WHEREAS, on June 25, 2019, the Planning Commission recommended approval of the Final Plat for Biscayne Business Park, subject to conditions; and WHEREAS, on July 16, 2019, the City Council of the City of Rosemount reviewed the Planning Commission’s recommendations and the Final Plat for Biscayne Business Park. NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Rosemount hereby approves the Final Plat for Biscayne Business Park, subject to the following conditions: 1. Execution of a Subdivision Agreement. 2. Provision of $112,880 for Fee-in-Lieu of Park Dedication for the entire subdivision. This fee may also be paid prior to the issuance of a building permit for each lot in the amount consistent with the City’s most recent fee schedule or any updates. 3. The applicant shall create a master association that will assume maintenance responsibility for all shared roads, driveways, and stormwater infiltration and retention basins in accordance with approved Stormwater management Mainenance Plan for Biscayne Business Park. 4. Compliance with the conditions and standards within the City Engineer’s Memorandum dated June 19, 2019. ADOPTED this 16th day of July 2019, by the City Council of the City of Rosemount. __________________________________________ William H. Droste, Mayor ATTEST: ___________________________________ Erin Fasbender, City Clerk Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx SUBDIVISION AGREEMENT Biscayne Business Park AGREEMENT dated this ________ day of ________________________, 2019, by and between the CITY OF ROSEMOUNT, a Minnesota municipal corporation, (the "City"), and STORDAHL PARTNERSHIP, L.L.L.P., a Minnesota limited liability limited partnership (the "Developer"). 1. Request for Plat Approval. The Developer has asked the City to approve the subdivision of land and a plat of land to be known as Biscayne Business Park, which land is legally described on ATTACHMENT ONE, attached hereto and hereby made a part hereof (hereinafter referred to as the “Subject Property”). 2. Conditions of Plat Approval. The City has approved the subdivision and the plat on the following conditions: a. Incorporation of recommendations of the City Engineer concerning design and installation of public infrastructure and including grading, erosion control, streets and utilities. b. Execution of a Subdivision or Development Agreement to secure the public and private improvements. c. Payment of all applicable fees including GIS, Park Dedication and other fees identified in the current fee schedule. d. Incorporation of any easements necessary to accommodate drainage, ponding, trails, underpasses, conservation areas, streets and utilities. e. Payment of $73,937 for the Developer’s share of Biscayne Avenue improvements, as indicated on Exhibit B (Development Fees Paragraph, number 5). f. Payment of $3,630 for the future removal of the sanitary sewer connection, as indicated on Exhibit B (Development Fees Paragraph, number 6). 3. Phased Development. The City may refuse to approve final plats of subsequent additions of the plat if the Developer has breached this Agreement and the breach has not been remedied. Development of subsequent phases may not proceed until Subdivision Agreements for such phases are approved by the City. 4. Effect of Subdivision Approval. For two (2) years from the date of this Agreement, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Agreement to the contrary, to the full extent permitted by state law, the City may require compliance with any amendments to the City's Comprehensive Guide Plan, official controls, platting or dedication requirements enacted after the date of this Agreement. 5. Development Plans. The Subject Property shall be developed in accordance with the following plans, specifications and contract documents, original copies of which are on file with the City Engineer. The plans and contract documents may be prepared, subject to City approval, after entering this Agreement, but before commencement of any work on the Subject Property. If the plans vary from the written terms of this Agreement, the written terms shall control. The plans are: Plan A - Plat Plan B - Soil Erosion Control Plan and Schedule Plan C - Drainage and Storm Water Runoff Plan Plan D - Plans and Specifications for Public and Private Improvements Plan E - Grading Plan and House Pad Elevations Plan F - Street Lights Plan G - Landscape Improvements All Improvements, including Developer Improvements and City-Installed Public Infrastructure Improvements (if any) that lie within the public right-of-way or easements and are improvements listed in Minnesota Statutes, Section 429.021 (hereinafter Public Improvements) will be designed by the Developer and must be approved by the City Engineer. The Developer will prepare plans and specifications for Public Improvements which shall be approved by the City Engineer. Such approvals shall not be unreasonably withheld and the City shall approve or provide Developer with necessary revision comments within 30 calendar days of Developer submittal of Public Improvement plans and specifications. The City will perform all construction inspection for the Public Improvements, at the Developer’s expense. Construction inspection includes but is not limited to inspection, documentation, and monitoring. 6. Installation by Developer. The Developer shall install or cause to be installed and pay for the following, hereinafter referred to as the “Developer Improvements”: A. Surveying and staking B. Surface improvements (paved streets, sidewalks, trails, etc.) C. Water main improvements D. Sanitary sewer improvements E. Storm sewer improvements F. Setting of lot and block monuments G. Gas, electric, telephone, and cable lines H. Site grading I. Landscaping Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx J. Streetlights K. Other items as necessary to complete the development as stipulated herein or in other agreements 7. Time of Performance. The Developer shall install all required improvements, excepting the wear course of pavement, enumerated in Paragraph 6 that will serve the Subject Property by December 31, 2019, subject to delays due to inclement weather, casualty, labor strikes, material shortages, or other force majeure not within the Developer’s reasonable control. The pavement wear course shall be completed by December 31, 2020. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 8. City-Installed Public Infrastructure. The following improvements, hereinafter referred to as “City- Installed Public Infrastructure Improvements” (known as City Project 2019-11), shall be designed, inspected, surveyed and administered by the City, and installed in the Subject Property at Developer expense by a Contractor selected by the City through the public bidding process: A. None 9. [This Section Intentionally Left Blank] 10. Security for Developer Improvements. To guarantee compliance with the terms of this Agreement, payment of the costs of all Developer Improvements, and construction of all Developer Improvements (as noted in Paragraph 6), the Developer shall furnish the City with a cash deposit or irrevocable letter of credit from a local bank (“security”) in the amount of Nine Hundred Sixty-One Thousand, Five Hundred Eighty-Two Dollars ($961,582). The amount of the security was calculated as follows: Private Improvements Cost 110% Grading & Erosion Control $53,620 $58,982 Pond Restoration and Erosion Control Removal $25,000 $27,500 Survey Monumentation $4,000 $4,400 Landscaping (35 trees) $10,500 $11,550 Street Lighting (2 lights) $8,000 $8,800 Surface Improvements $523,374 $575,712 Storm Sewer Improvements $38,107 $41,918 Public Improvements Cost 125% Water Main Improvements $104,736 $130,919 Sanitary Sewer Improvements $81,441 $101,801 Total $848,778 $961,582 Refer to Exhibit A and Exhibit B for an explanation of each item. The bank and form of the letter of credit or other security shall be subject to the approval of the City Administrator. The letter of credit shall be automatically renewable until the City releases the Developer from responsibility. The letter of credit shall secure compliance with all terms of this Agreement and all obligations of the Developer under it. The City may draw down on the letter of credit without notice if the obligations of the Developer have not been completed as required by this Agreement. In the event of a default under this Subdivision Agreement by the Developer, the City shall furnish the Developer with written notice by certified mail of Developer’s default(s) under the terms of this Subdivision Agreement. If the Developer does not remove said default(s) within two (2) Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx weeks of receiving notice, the City may draw on the letter of credit and take such steps as it deems necessary to remedy the default. With City approval, the letter of credit may be reduced from time to time as financial obligations are paid and Developer Improvements and other Developer obligations are completed to the City’s requirements. 11. Grading Plan/Site Grading. Site grading shall be completed by the Developer at its cost and approved by the City Engineer. The completion of grading activities will need to be coordinated by the City in conjunction with the installation of utilities. Developer shall furnish the City Engineer satisfactory proof of payment for the site grading work and shall submit a certificate of survey of the development to the City as the site grading is completed by phase, with street and lot grades. If the installation of utilities by the City is occurring simultaneously with the grading, the utility contractor shall have preference over the grading activities. No substantial grading activities can be completed over installed utilities unless otherwise protected. All improvements to the lots and the final grading shall comply with the grading plan as submitted and shall be the responsibility of the Developer. 12. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the Subject Property to perform all work and inspections deemed appropriate by the City. Such license shall terminate as to all lots within the Subject Property upon acceptance by the City of the public infrastructure improvements. 13. Erosion Control. Prior to site grading, and before any utility construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be implemented, inspected and approved by the City. All areas disturbed by the excavation and backfilling operations shall be reseeded within 72 hours after the completion of the work in that area. Except as otherwise provided in the erosion control plan, seed shall be rye grass or other fast-growing seed suitable to the existing soil to provide a temporary ground cover as rapidly as possible. All seeded areas shall be mulched and disc-anchored as necessary for seed retention. All basement and/or foundation excavation spoil piles shall be kept completely off City right-of-way and shall be completely surrounded with an approved erosion control silt fence. Approved erosion control shall be installed around the perimeter of each lot or at City-approved locations at the time of building permit issuance and remain in place until the lot is seeded or sodded. A 20-foot opening will be allowed on each lot for construction deliveries. The parties recognize that time is critical in controlling erosion. If development does not comply with the erosion control plan and schedule, or supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion. This right also applies to the required erosion control for basement and/or foundation excavation spoil piles. The City will attempt to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer’s or City’s rights or obligations hereunder. If the Developer does not reimburse the City for any cost the City incurred for such work within thirty (30) days, the City may draw down the letter of credit to pay any costs. No development will be allowed, and no building permits will be issued unless the Subject Property is in full compliance with the erosion control requirements. 14. Planting and Seeding. Landscaping shall be in accordance with Landscape Plans approved by the City Planner. 15. Clean up. The Developer shall clean streets of dirt and debris that has resulted from construction work by the Developer, its agents or assignees. The City will inspect the site on a weekly basis and determine whether it is necessary to take additional measures to clean dirt and debris from the streets. After a 24-hour verbal notice to the Developer, the City will complete or contract to complete the clean-up at the Developer’s expense in accordance with the procedures specified in Paragraph 13. The Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx Developer shall inspect and, if necessary, clean all catch basins, sumps, and ponding areas of erosion/siltation and restore to the original condition at the end of construction within this development. All silt fence and other erosion control should be removed following the establishment of turf. These items are to be secured through the letter of credit as is noted in Exhibit A. 16. Ownership of Improvements. Upon completion and City acceptance of the work and construction required by this Agreement, the Public Improvements lying within public rights-of-way and easements shall become City property without further notice or action unless the improvements are specifically identified herein as private infrastructure. Sanitary sewer and water main are Public Improvements. All other improvements are Private Improvements. 17. Warranty. The Developer warrants all work required to be performed by it against poor material and faulty workmanship for a period of two (2) years after its completion and acceptance by the City or such longer period as is specified in plans and specifications for Public Improvements. All trees, grass and sod shall be warranted to be alive, of good quality and disease free for twenty-four (24) months after planting. Vegetation surrounding ponds and/or wetlands shall be warranted to be alive, of good quality and weed free for three (3) years after planting. For each pond/wetland in the development, the Developer [or, after the formation of the association of owners of the various lots comprising the Subject Property (the “Association”), the Association] shall provide to the City Engineer an inspection report by July 31 each year which includes the following: A. Date of inspection B. Name of person responsible for inspection C. Photos of the pond/wetland area confirming the vegetation is established as intended D. Maintenance plan describing the required maintenance activities and tentative schedule. 18. Responsibility for Costs. A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in conjunction with the development of the Subject Property including, but not limited to, Soil and Water Conservation District charges, legal, planning, engineering and inspection expenses incurred in connection with approval and acceptance of the subdivision and the plat, the preparation of this Agreement and any amendments hereto, and all costs and expenses incurred by the City in monitoring and inspecting the development of the Subject Property. B. The Developer shall reimburse the City for costs incurred in the preparation and enforcement of this Agreement, including engineering and attorney’s fees. Upon request, the City shall provide invoices, in reasonable detail, as to any such fees. The estimated City fees of $153,752 shall be deposited with the City at the time this Agreement is signed, and represent the following amounts: $112,149 Engineering Fees (15% of construction estimate) $2,000 Attorney Fees $37,383 5% City Fees (based on construction estimate of $747,658) $1,440 Streetlight Energy Cost $300 6 wetland buffer signs purchased from the City $480 GIS Fees $153,752 Total Amount Due Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx If the actual City fees exceed this estimate, the Developer shall pay the additional costs to the City within ten (10) days of the request. If actual City fees are lower than this estimate, any surplus funds will be returned to the Developer when the project fund is reconciled and closed. C. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Agreement within thirty (30) days after receipt. If the bills are not paid on time, the City may halt development work and construction including, but not limited to, the issuance of building permits for lots that the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of nine percent (9%) per year. E. The Developer shall pay all energy costs for street lights installed within the Subject Property incurred prior to the recording of a declaration against the Subject Property in the Office of the Dakota County Recorder or Registrar of Titles, whereby the Association shall agree to pay such energy costs. 19. Indemnification. The Developer shall hold the City and its officers, agents and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat or subdivision approval and development of the Subject Property, except for any costs or expenses arising from the intentional acts or gross negligence of the City, it’s agents, employees or contractors. The Developer shall indemnify the City and its officers, agents and employees for all costs, damages or expenses that the City may pay or incur in consequence of such claims, including attorney’s fees. 20. Insurance. The Developer agrees to take out and maintain or cause to be taken out and maintained until six months after the City has accepted the Subdivision Improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer’s work or the work of its contractors or subcontractors. Liability limits shall not be less than $500,000 when the claim is one for death by wrongful act or omission or for any other claim and $2,000,000 for any number of claims arising out of a single occurrence, and twice said limits when the claim arises out of the release or threatened release of a hazardous substance. The City shall be named as an additional insured on the policy. The certificate of insurance shall provide that the City must be given the same advance written notice of the cancellation of the insurance as is afforded to the Developer. 21. Utility Fees. The Developer agrees to pay fees, charges and assessments set forth in this Paragraph prior to, or at the time of execution of any plat by the City: A. Storm Sewer Trunk Area Charges in the amount of $83,684 B. Sanitary Sewer Trunk Area Charges in the amount of $16,469 C. Watermain Trunk Area Charges in the amount of $99,580 D. Developer share of Biscayne Avenue improvements in the amount of $73,937 E. Deposit for removal of sewer connection in the amount of $3,630 Or other amounts for such fees as in effect at the time of plat approval. 22. Park Dedication and Service Charges. The Developer understands that builders will be required to pay for the Subject Property fees, charges and assessments in effect at the time of issuance of building permits. The rates for each of these items will be set according to the current rate structure at the time Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx the building permit is received. The fees, charges, and assessments in effect as of the date of this agreement are: A. Park dedication fees in the amount of $112,880 ($14,110 to be collected with each building permit application) B. Metropolitan Council Environmental Services Availability Charges per SAC unit; SAC rate determined by Metropolitan Council (current rate is $2,485) C. Storm Sewer Connection Charges (STAAC) (currently $2,270 per acre for business park, public, institutional, commercial, and industrial) D. Sanitary Sewer Availability Charges per SAC unit (currently at $1,200/SAC unit) E. Water Availability Charge is dependent upon water meter size. Current fee schedule is as follows: Meter Size Charge 1” $9,850 1.5” $14,700 2” $19,600 3” $29,450 4” $34,350 6” $39,250 8” $44,150 23. Building Permits. No occupancy permits shall be issued until: A. The site grading is completed and approved by the City. B. All utilities are tested, approved by the City Engineer, and in service. C. All curbing is installed and backfilled. D. The first lift of bituminous is in place and approved by the City. E. All building permit fees are paid in full. F. No early building permits will be issued without prior authorization from the City Building Official. The Developer, in executing this Agreement, assumes all liability and costs for damage or delays incurred by the City in the construction of the Improvements caused by the Developer, its employees, contractors, subcontractors, material men or agents. No occupancy permits shall be issued until the streets and utilities referred to in Paragraph 6 are installed and approved by the City (excluding the final wear course of bituminous), unless otherwise authorized in writing by the City Engineer. 24. Record Drawings. At project completion, Developer shall submit record drawings of all public and private infrastructure improvements in accordance with the City’s Engineering Guidelines. No securities will be fully released until all record drawings have been submitted and accepted by the City Engineer. 25. Developer’s Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than 48 hours in advance. This Agreement is a license for the City to act, and it shall not be necessary for the City to seek a court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, draw on Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx the letter of credit or other security described in Paragraph 10, or levy the cost in whole or in part as a special assessment against the Subject Property. Developer waives its rights to notice of hearing and hearing on such assessments and its right to appeal such assessments pursuant to Minnesota Statutes, Section 429.081. 26. Miscellaneous. A. The Developer represents to the City that the development of the Subject Property, the subdivision and the plat comply with all city, county, metropolitan, state and federal laws and regulations including, but not limited to: subdivision ordinances, zoning ordinances and environmental regulations. If the City determines that the subdivision, or the plat, or the development of the Subject Property does not comply, the City may, at its option, refuse to allow construction or development work on the Subject Property until the Developer does comply. Upon the City’s demand, the Developer shall cease work until there is compliance. B. Third parties shall have no recourse against the City under this Agreement. C. Breach of the terms of this Agreement by the Developer shall be grounds for denial of building permits, including lots sold to third parties. D. If any portion, section, subsection, sentence, clause, paragraph or phase of this Agreement is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Agreement. E. If building permits are issued prior to the completion and acceptance of the Public Improvements, the Developer assumes all liability and costs resulting from delays in completion of the Public Improvements and damage to the Public Improvements caused by the City, the Developer, its contractors, subcontractors, material men, employees, agents or third parties. F. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City’s failure to promptly take legal action to enforce this Agreement shall not be a waiver or release. G. This Agreement shall run with the land and may be recorded against the title to the Subject Property. The Developer shall take such steps, including execution of amendments to this Agreement, as are necessary to effect the recording hereof. After the Developer has completed the work required of it under this Agreement, at the Developer’s request, the City will execute and deliver to the Developer a recordable release of the Subject Property from this Agreement. H. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, express or implied, now or hereafter arising, available to the City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. I The Developer may not assign this Agreement without the written permission of the City Council. Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx J. The Developer acknowledges that the City may issue additional requirements outside of the 2015 General Specifications and Standard Detail Plates for Street and Utility Construction or the 2008 Engineering Guidelines as the City is in the process of updating these documents. The review process may require additional time and expense due to this process, which shall be the Developer’s responsibility. The Developer shall not be billed for the time required for the City to update and approve their revisions to the 2015 General Specifications and Standard Details Plates for Street and Utility Construction or the 2008 Engineering Guidelines. 27. Notices. Required notices to the Developer shall be in writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: Stordahl Partnership, L.L.L.P. Attn: Thomas J. Stordahl 1001 E. Main Street Wabasha, MN 55024 With a copy to: Jim Connelly Appro Development 21476 Grenada Avenue Lakeville, MN 55044 952-469-2171 jimc@approdevelopment.com Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or mailed to the City by registered mail in care of the City Administrator at the following address: City Administrator Rosemount City Hall 2875 145th Street West Rosemount, Minnesota 55068 Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx IN WITNESS WHEREOF, the parties have hereunto set their hands the day and year first above written. CITY OF ROSEMOUNT BY: William H. Droste, Mayor BY: Erin Fasbender, City Clerk STATE OF MINNESOTA ) ) SS COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me this day of _____________________, 2019, by William H. Droste, Mayor, and Erin Fasbender, City Clerk, of the City of Rosemount, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. Notary Public STORDAHL PARTNERSHIP, L.L.L.P. BY: Its STATE OF MINNESOTA ) ) SS COUNTY OF _____________) The foregoing instrument was acknowledged before me this _______ day of _______________________, 2019 by , the _______________________________ of Stordahl Partnership, L.L.L.P., a Minnesota limited liability limited partnership, on behalf of said limited liability limited partnership. Notary Public Drafted By: City of Rosemount 2875 145th Street West Rosemount, MN 55068 Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx EXHIBIT A The following clarifies the various portions of the letter of credit for Developer Improvements that are outlined in the Subdivision Agreement: Grading & Erosion Control – A restoration and erosion control bond to ensure re-vegetation and erosion control ($3,500/acre). Note: The minimum surety amount is set at $25,000. Pond Restoration/Erosion Control Removal – A security to allow for cleaning of sedimentation ponds prior to City acceptance, and removal of any installed erosion control measures such as silt fence and wood fiber blanket following development of 75 percent of adjoining lots (estimated lump sum). Survey Monumentation – An amount equal to 110% of the cost to monument all lots within the development. Landscaping – An amount equal to 110% of the cost to complete the minimum required landscaping. If additional landscaping is planned, a surety for that cost is not required. Street Lighting – An amount equal to 110% of the cost to complete the minimum required lighting. If additional lighting is planned, a surety for that cost is not required ($4,000 per light has been used to calculate this cost). Buffer Monumentation – An amount equal to 110% of the cost to manufacture and install the necessary buffer monumentation signs around all ponds and wetlands ($50 per sign has been used to calculate this cost). Wetland Monitoring – An amount equal to 110% of the cost to hire a wetland specialist to monitor the mitigation areas for 5 years to ensure their proper creation. This wetland specialist will be hired by the City. Wetland Restoration/Mitigation – An amount equal to 110% of the cost to develop new wetlands should the mitigation not be effective ($20,000 per acre of mitigation). Biscayne Business Park EXHIBIT B (Page 1 of 2) No.Item Cost 110%Calculation 1 Grading and Erosion Control 53,620$ 58,982$ $3500/ac x 15.32ac Minimum $25,000 2 Pond Restoration and Erosion Control Removal 25,000$ 27,500$ Minimum $25,000 3 Survey Monumentation 4,000$ 4,400$ $500/lot x 8 lots 4 Landscaping 10,500$ 11,550$ Per City Planner, 35 trees x $300 5 Street Lights 8,000$ 8,800$ 2 lights x $4000/light 6 Surface Improvements 523,374$ 575,712$ 110% 7 Storm Sewer Improvements 38,107$ 41,918$ 110% 8 Water Main Improvements 104,736$ 130,919$ 125% 9 Sanitary Sewer Improvements 81,441$ 101,801$ 125% Total 848,778$ 961,582$ No.Item Cost Estimated Construction Cost 747,658$ 1 Engineering Fees 112,149$ 2 Deposit -$ 3 Attorney Fees 2,000$ 4 5% City Administrative Fees 37,383$ 5 Street Light Energy Cost 1,440$ 6 Buffer Monumentation 300$ 7 GIS Fees 480$ 8 Trail Fog Seal -$ 9 Seal Coating -$ Total 153,752$ No.Item Cost 1 Storm Sewer Trunk Charge 83,684$ 2 Sanitary Sewer Trunk Charge 16,469$ 3 Water Trunk Charge 99,580$ 5 Biscayne Avenue Improvements 73,937$ 6 Deposit for Removal of Sewer Connection 3,630$ Total 277,300$ No.Item Cost 1 Park Dedication 112,880$ Total 112,880$ $8,500 per acre x 13.28 acres (not including ROW). $14,110 due with each building permit application). Calculation $6500/acre x 15.32 acres N/A - Private Streets Development Fees (due with signed agreement) Calculation $6865/net developable acre 12.19 acres $1075/acre x 15.32 acres $110/front foot x 672.15 feet Development Fees (due with building permits) See Attachment Two N/A Letter of Credit for Developer Improvements (due with signed agreement) City Fees (due with signed agreement) Calculation Engineer Estimation 15% of Estimated Construction Cost Estimate 5% of Estimated Construction Cost 2 lights x 24 months x $30/month $60/unit x 8 units N/A 6 signs x $50/sign Block Lots Units Block Lot Units SQ FT Acres 1 8 8 1 1 1 79,082.000 1.815 1 2 1 65,194.000 1.497 1 3 1 63,248.000 1.452 1 4 1 84,759.000 1.946 1 5 1 81,344.000 1.867 1 6 1 61,594.000 1.414 1 7 1 64,130.000 1.472 Total 8 8 1 8 1 78,944.000 1.812 Right-of-Way 88,941.000 2.042 Total Plat Area =15.32 acres Total Boundary 667,236.000 15.318 Total Park Area 0.00 acres Future Plat Area =0.00 acres Developable Area =15.32 acres * Ponding to HWL = 3.13 acres Net Developable Area =12.19 acres * Excludes future plat and park areas Biscayne Business Park EXHIBIT B (Page 2 of 2) Totals Biscayne Business Park July / 2019 G:\ENGPROJ\2019-11 Biscayne Business Park\Subdivisionagreement 2019-11.docx ATTACHMENT ONE Biscayne Business Park Final Plat BISCAYNE BUSINESS PARK SHEET 1 OF 2 SHEETS KNOW ALL PERSONS BY THESE PRESENTS: That Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, owner of the following described property: The South Half of the Southeast Quarter of Section 32, Township 115, Range 19, except the West 1645.05 feet and except the South 656.14 feet, Dakota County, Minnesota.. Has caused the same to be surveyed and platted as BISCAYNE BUSINESS PARK and does hereby dedicate to the public for public use the public way and drainage and utility easements as created by this plat. In witness whereof said Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, has caused these presents to be signed by its proper partner this _______ day of ___________________, 20_____. Signed: Stordahl Partnership, L.L.L.P. By _____________________________________________ Tom Stordahl, Gerneral Partner State of ____________________________ County of ____________________________ This instrument was acknowledged before me on _______________________, 20_____ by Tom Stordahl, General Partner of Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, on behalf of the partnership. _______________________________________________________ Signature _______________________________________________________ Printed Notary Public ____________________________________________ My Commission Expires ___________________________________ SURVEYORS CERTIFICATE I, Mark A. Schwanz, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this _______ day of _______________________, 20_____. _____________________________________________ Mark A. Schwanz, Licensed Land Surveyor Minnesota License No. 45817 State of Minnesota County of Rice This instrument was acknowledged before me on _______________________, 20_____ by Mark A. Schwanz. _____________________________________________ Jennifer R. Canedo Notary Public, Minnesota My Commission Expires January 31, 2020 CITY PLANNING COMMISSION, CITY OF ROSEMOUNT, MINNESOTA Approved by the Planning Commission of the City of Rosemount, Minnesota this _______ day of _______________________, 20_____. By: _____________________________________________, Chair CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of the City of Apple Valley, Minnesota at a regular meeting thereof held this _______ day of _______________________, 20_____, and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. By: _____________________________________________, Mayor By: _____________________________________________, Chair COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _______ day of _______________________, 20_____. By: _____________________________________________ Todd B. Tollefson Dakota County Surveyor DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA, STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20_____ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes Section 272.12, there are no delinquent taxes and transfer entered this _______ day of ___________________, 20_____. By: _____________________________________________ Amy A. Koethe Director, Department of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of BISCAYNE BUSINESS PARK was filed in the office of the County Recorder for public record on this _______ day of ___________________, 20_____, at _______ o'clock _______.M. and was duly filed in Book _________ of Plats, Page _________, as Document Number. ______________________. By: _____________________________________________ Amy A. Koethe Dakota County Recorder N89°41'05"E 995.03N00°20'03"E 670.24N89°34'26"E 993.29 N00°11'04"E 672.15259.79 50.00303.1366.00107.3950.00 NORTH 304.56EAST 672.40 N61° 5 2' 2 3" E 70.00 70. 0 0 S6 1 ° 5 2 ' 2 3 " E L=371.10R=70.00Δ=303°44'44"260.77 70.58128.02BLOCK 1 1 N00°11'04"E 672.05OUTLOT A BISCAYNE AVENUEEAST LINE OF S 1/2 SE 1/4 SEC. 32 - T115 - R19 N89°34'26"E 254.78 NORTH 21.41 N89°34'26"E 82.15 NORTH63.26N45°59'01"E17.87N89°34'26"E 233.85 S5 0 ° 2 1 ' 4 0 "E 1 9 . 1 4 SOUTH66.50N89°34'26"E 172.78 NORTH43.57N53°2 3' 5 4 " E 15.55 N89°34'26"E 86.81S56°37'35"E16.50SOUTH41.11N89°34'26"E 59.46 N89°41'05"E 260.86NORTH45.58NORTH34.4382.10 N89°41'05"E SOUTH70.3368.82NORTHN89°41'05"E 84.33 181.1174.35 N89°41'05"E S00°11'04"W73.2921 . 4 0 S4 5 ° 3 9 ' 3 4 " E 170.48 N89°41'05"E 35.12DRAINAGE AND UTILITY EASEMENTNORTH 305.74NORTH 271.69341.34EAST 201.60328.91254.04 213.65 213.65 261.95 302.92213.65213.65257.94 136.26 213.64 EAST 610.67 EAST 610.88NORTH 299.38NORTH 300.97136.26 213.64 260.98 234 8765 L =91.38 Δ=74°4 7'2 9 "L=94.17Δ=77°04'5 3 "L=94.17Δ=77 °0 4'53" L =9 1.3 8 Δ =7 4 °4 7'29"NORTH 262.56N18°44'25 "W 108 .58 S 4 9 ° 4 0 ' 1 6 " E 1 0 3 . 2 1 2 9 . 4 3 7 3 . 7 8 N89°41'05"E 150.30 N89°41'05"E 107.23 1010 S00°11'04"W 1328.31NE CORNER S1/2 SE 1/4 SEC. 32 - T115- R19 FOUND CAST IRON MONUMENT EAST LINE OF S 1/2 OF SE 1/4 DRAINAGE AND UTILITY EASEMENT BISCAYNE BUSINESS PARK Denotes Found Iron Monument Indicates 1/2" Dia. x 18" Long Solid Iron Pipe Set With Plastic Cap Marked By ISG, License No. 45817 LEGEND BEARING NOTE: The east line of the South Half of the Southeast Quarter of Section 32, Township 115, Range 19 is assumed to bear N00°11'04"E. SEC. 32, TWP. 115, RGE. 19 VICINITY MAP (NOT TO SCALE) Dakota County, MNNW 1/4NE 1/4SE 1/4SW 1/4Biscayne AvenueC.S.A.H. No. 46 (160th Street West) SITE 0 SCALE IN FEET 50 100 SHEET 2 OF 2 SHEETS Drainage And Utility Easements Are Shown Thus:10101010 10 Drainage And Utility Easement Lines Lot Lines Right-of-Way Line Being 10 feet in width and adjoining lot lines, right - of - way lines and rear lot lines, unless otherwise indicated on the plat. Location: Rosemount, MN ISG Project #: 18-22185 Date: 06/24/2019 ITEM NO.CONSTRUCTION ITEM UNIT QUANTITY UNIT PRICE TOTAL AMOUNT 1 MOBILIZATION (5%)LS 1 1,000.00$ 1,000.00$ 2 ABANDON SANITARY SEWER PIPE LF 123 10.00$ 1,230.00$ 3 PLUG SP-1 OUTLET IN S-2 EA 1 250.00$ 250.00$ 4 REMOVE AND PATCH INSIDE DROP CONNECTION AT EX S-1 EA 1 800.00$ 800.00$ 5 TURF ESTABLISHMENT LS 1 350.00$ 350.00$ 3,630.00$ BISCAYNE BUSINESS PARK APPRO DEVELOPMENT TOTAL CONSTRUCTION COST ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ISG www.is-grp.com Project No. 18-22185 Page 1 NOPARKINGG R=956.43 SAN MH I=919.18 FO BISCAYNE AVEEX 12" WATERMAINREGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 9101111S-2 EX S-1 SP-2 (8") SP - 1 ( 8 " ) SP-1A (8") 06/07/19 CITY COMMENTS TTK 22185 SANITARY REMOVAL DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 1 SANITARY SEWER REMOVAL C3-10 OVERALL SITE & UTILITY PLAN 300 22185 C3-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 40 80 120 FILL ABANDONED SANITARY SEWER SP-1 WITH FLOWABLE FILL CAP AND ABANDON SP-1 REMOVE AND PLUG 8" INSIDE DROP STRUCTURE AT EX S-1 REMOVE PLUG FROM SP-1A AND PLUG SP-1 CONNECT TO CITY SANITARY SEWER Location Map—Biscayne Business Park BISCAYNE BUSINESS PARK SHEET 1 OF 2 SHEETS KNOW ALL PERSONS BY THESE PRESENTS: That Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, owner of the following described property: The South Half of the Southeast Quarter of Section 32, Township 115, Range 19, except the West 1645.05 feet and except the South 656.14 feet, Dakota County, Minnesota.. Has caused the same to be surveyed and platted as BISCAYNE BUSINESS PARK and does hereby dedicate to the public for public use the public way and drainage and utility easements as created by this plat. In witness whereof said Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, has caused these presents to be signed by its proper partner this _______ day of ___________________, 20_____. Signed: Stordahl Partnership, L.L.L.P. By _____________________________________________ Tom Stordahl, Gerneral Partner State of ____________________________ County of ____________________________ This instrument was acknowledged before me on _______________________, 20_____ by Tom Stordahl, General Partner of Stordahl Partnership, L.L.L.P., a Minnesota limited liability partnership, on behalf of the partnership. _______________________________________________________ Signature _______________________________________________________ Printed Notary Public ____________________________________________ My Commission Expires ___________________________________ SURVEYORS CERTIFICATE I, Mark A. Schwanz, do hereby certify that this plat was prepared by me or under my direct supervision; that I am a duly Licensed Land Surveyor in the State of Minnesota; that this plat is a correct representation of the boundary survey; that all mathematical data and labels are correctly designated on this plat; that all monuments depicted on this plat have been, or will be correctly set within one year; that all water boundaries and wet lands, as defined in Minnesota Statutes, Section 505.01, Subd. 3, as of the date of this certificate are shown and labeled on this plat; and all public ways are shown and labeled on this plat. Dated this _______ day of _______________________, 20_____. _____________________________________________ Mark A. Schwanz, Licensed Land Surveyor Minnesota License No. 45817 State of Minnesota County of Rice This instrument was acknowledged before me on _______________________, 20_____ by Mark A. Schwanz. _____________________________________________ Jennifer R. Canedo Notary Public, Minnesota My Commission Expires January 31, 2020 CITY PLANNING COMMISSION, CITY OF ROSEMOUNT, MINNESOTA Approved by the Planning Commission of the City of Rosemount, Minnesota this _______ day of _______________________, 20_____. By: _____________________________________________, Chair CITY COUNCIL, CITY OF ROSEMOUNT, MINNESOTA This plat was approved by the City Council of the City of Apple Valley, Minnesota at a regular meeting thereof held this _______ day of _______________________, 20_____, and said plat is in compliance with the provisions of Minnesota Statutes, Section 505.03, Subd. 2. By: _____________________________________________, Mayor By: _____________________________________________, Chair COUNTY SURVEYOR, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that in accordance with Minnesota Statutes, Section 505.021, Subd. 11, this plat has been reviewed and approved this _______ day of _______________________, 20_____. By: _____________________________________________ Todd B. Tollefson Dakota County Surveyor DEPARTMENT OF PROPERTY TAXATION AND RECORDS, COUNTY OF DAKOTA, STATE OF MINNESOTA Pursuant to Minnesota Statutes, Section 505.021, Subd. 9, taxes payable in the year 20_____ on the land hereinbefore described have been paid. Also, pursuant to Minnesota Statutes Section 272.12, there are no delinquent taxes and transfer entered this _______ day of ___________________, 20_____. By: _____________________________________________ Amy A. Koethe Director, Department of Property Taxation and Records COUNTY RECORDER, COUNTY OF DAKOTA, STATE OF MINNESOTA I hereby certify that this plat of BISCAYNE BUSINESS PARK was filed in the office of the County Recorder for public record on this _______ day of ___________________, 20_____, at _______ o'clock _______.M. and was duly filed in Book _________ of Plats, Page _________, as Document Number. ______________________. By: _____________________________________________ Amy A. Koethe Dakota County Recorder N89°41'05"E 995.03N00°20'03"E 670.24N89°34'26"E 993.29 N00°11'04"E 672.15259.79 50.00303.1366.00107.3950.00 NORTH 304.56EAST 672.40 N61° 5 2' 2 3" E 70.00 70. 0 0 S6 1 ° 5 2 ' 2 3 " E L=371.10R=70.00Δ=303°44'44"260.77 70.58128.02BLOCK 1 1 N00°11'04"E 672.05OUTLOT A BISCAYNE AVENUEEAST LINE OF S 1/2 SE 1/4 SEC. 32 - T115 - R19 N89°34'26"E 254.78 NORTH 21.41 N89°34'26"E 82.15 NORTH63.26N45°59'01"E17.87N89°34'26"E 233.85 S5 0 ° 2 1 ' 4 0 "E 1 9 . 1 4 SOUTH66.50N89°34'26"E 172.78 NORTH43.57N53°2 3' 5 4 " E 15.55 N89°34'26"E 86.81S56°37'35"E16.50SOUTH41.11N89°34'26"E 59.46 N89°41'05"E 260.86NORTH45.58NORTH34.4382.10 N89°41'05"E SOUTH70.3368.82NORTHN89°41'05"E 84.33 181.1174.35 N89°41'05"E S00°11'04"W73.2921 . 4 0 S4 5 ° 3 9 ' 3 4 " E 170.48 N89°41'05"E 35.12DRAINAGE AND UTILITY EASEMENTNORTH 305.74NORTH 271.69341.34EAST 201.60328.91254.04 213.65 213.65 261.95 302.92213.65213.65257.94 136.26 213.64 EAST 610.67 EAST 610.88NORTH 299.38NORTH 300.97136.26 213.64 260.98 234 8765 L =91.38 Δ=74°4 7'2 9 "L=94.17Δ=77°04'5 3 "L=94.17Δ=77 °0 4'53" L =9 1.3 8 Δ =7 4 °4 7'29"NORTH 262.56N18°44'25 "W 108 .58 S 4 9 ° 4 0 ' 1 6 " E 1 0 3 . 2 1 2 9 . 4 3 7 3 . 7 8 N89°41'05"E 150.30 N89°41'05"E 107.23 1010 S00°11'04"W 1328.31NE CORNER S1/2 SE 1/4 SEC. 32 - T115- R19 FOUND CAST IRON MONUMENT EAST LINE OF S 1/2 OF SE 1/4 DRAINAGE AND UTILITY EASEMENT 79,082 SQ. FEET - 1.82 ACRES65,194 SQ. FEET - 1.50 ACRES63,248 SQ. FEET - 1.45 ACRES84,759 SQ. FEET - 1.95 ACRES 81,344 SQ. FEET - 1.87 ACRES 61,594 SQ. FEET - 1.41 ACRES 64,130 SQ. FEET - 1.47 ACRES 78,944 SQ. FEET - 1.81 ACRES BISCAYNE BUSINESS PARK Denotes Found Iron Monument Indicates 1/2" Dia. x 18" Long Solid Iron Pipe Set With Plastic Cap Marked By ISG, License No. 45817 LEGEND BEARING NOTE: The east line of the South Half of the Southeast Quarter of Section 32, Township 115, Range 19 is assumed to bear N00°11'04"E. SEC. 32, TWP. 115, RGE. 19 VICINITY MAP (NOT TO SCALE) Dakota County, MNNW 1/4NE 1/4SE 1/4SW 1/4Biscayne AvenueC.S.A.H. No. 46 (160th Street West) SITE 0 SCALE IN FEET 50 100 SHEET 2 OF 2 SHEETS Drainage And Utility Easements Are Shown Thus:10101010 10 Drainage And Utility Easement Lines Lot Lines Right-of-Way Line Being 10 feet in width and adjoining lot lines, right - of - way lines and rear lot lines, unless otherwise indicated on the plat. AREA TABLE: Existing: Total Area = 667,236 sq. ft. = 15.32 acres Proposed: Biscayne R/W = 33,605 sq. ft. = .77 acres Street R/W = 55,336 sq. ft. = 1.27 acres Lot 1, Block 1 = 79,082 sq. ft. = 1.82 acres Lot 2, Block 1 = 65,194 sq. ft. = 1.50 acres Lot 3, Block 1 = 63,248 sq. ft. = 1.45 acres Lot 4, Block 1 =84,759 sq. ft. = 1.95 acres Lot 5, Block 1 =81,344 sq. ft. = 1.87 acres Lot 6, Block 1 = 61,594 sq. ft. = 1.41 acres Lot 7, Block 1 = 64,130 sq. ft. = 1.47 acres Lot 8, Block 1 = 78,944 sq. ft. = 1.81 acres Total Area = 667,236 sq. ft. = 15.32 acres 06/07/19 CITY COMMENTS TTK 22185 C0-DATA DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C0-10 SITE DATA SHEET PROJECT LOCATION N S W E LOCATION MAP 0 SCALE IN FEET 2000 4000 SITE SUMMARY ZONING:BP - BUSINESS PARK SITE/LOT AREA:SITE = 667,236 SF / 15.32 AC LOT 1 = 79,082 SF / 1.82 AC IMPERVIOUS AREA:SITE = 80,720 SF / 1.85 AC LOT 1 = 45,558 SF / 1.05 AC GREENSPACE PROVIDED:SITE = 586,516 SF / 13.46 AC LOT 1 = 33,524 SF / 0.77 AC PARKING REQUIREMENTS (PER CITY CODE) TYPE UNIT / AREA STALLS REQUIRED STALLS PROVIDED OFFICE - 1 PER 200 SF GFA 3,456 SF 17 17 MANUFACTURING - 1 PER 300 SF GFA 3,456 SF 12 14 WAREHOUSE - 1 PER 2,000 SF GFA 10,368 SF 5 5 TOTAL:34 36 SETBACKS PARKING BUILDING FRONT YARD 20'-0"30'-0" SIDE YARD 10'-0"10'-0" REAR YARD 10'-0"10'-0" PROJECT LOCATION: MN05 T115M R19W SEC 32 THE NORTHERN HALF OF THE SW QUARTER OF THE SW QUARTER OF SEC 32 ROSEMOUNT TWP ROSEMOUNT, MINNESOTA B.M. ELEVATION=957.80 TIE IN NW SIDE OF PP LOCATED AT THE SOUTHEAST PROPERTY CORNER APPROX. 650' NORTH OF CR 46 1.ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO, THE OWNER - CONTRACTOR AGREEMENT, THE PROJECT MANUAL (WHICH INCLUDES GENERAL SUPPLEMENTARY CONDITIONS AND SPECIFICATIONS), DRAWINGS OF ALL DISCIPLINES AND ALL ADDENDA, MODIFICATIONS AND CLARIFICATIONS ISSUED BY THE ARCHITECT/ENGINEER. 2.CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE GENERAL CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND COMPLETE COORDINATION OF ALL WORK. 3.WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 4.FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES OR CONDITIONS REQUIRING INFORMATION OR CLARIFICATION BEFORE PROCEEDING WITH THE WORK. 5.DETAILS SHOWN ARE INTENDED TO BE INDICATIVE OF THE PROFILES AND TYPE OF DETAILING REQUIRED THROUGHOUT THE WORK. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO DETAILS SHOWN. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 6.ALL MANUFACTURED ARTICLES, MATERIALS AND EQUIPMENT SHALL BE APPLIED, INSTALLED, CONNECTED, ERECTED, CLEANED AND CONDITIONED ACCORDING TO MANUFACTURERS' INSTRUCTIONS. IN CASE OF DISCREPANCIES BETWEEN MANUFACTURERS' INSTRUCTIONS AND THE CONTRACT DOCUMENTS, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK. 7.ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION. 8.THE LOCATION AND TYPE OF ALL INPLACE UTILITIES SHOWN ON THE PLANS ARE FOR GENERAL INFORMATION ONLY AND ARE ACCURATE AND COMPLETE TO THE BEST OF THE KNOWLEDGE OF I & S GROUP, INC. (ISG). NO WARRANTY OR GUARANTEE IS IMPLIED. THE CONTRACTOR SHALL VERIFY THE SIZES, LOCATIONS AND ELEVATIONS OF ALL INPLACE UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR SHALL IMMEDIATELY NOTIFY ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM PLAN. 9.THE CONTRACTOR IS TO CONTACT "GOPHER STATE ONE CALL" FOR UTILITY LOCATIONS, MINIMUM 2 BUSINESS DAYS PRIOR TO ANY EXCAVATION / CONSTRUCTION (1-800-252-1166). PROJECT GENERAL NOTES ALL CONSTRUCTION SHALL COMPLY WITH THE CITY OF ROSEMOUNT REQUIREMENTS AND MnDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION, 2018 EDITION, THE STANDARD SPECIFICATIONS FOR SANITARY SEWER, STORM DRAIN AND WATERMAIN AS PROPOSED BY THE CITY ENGINEERS ASSOCIATION OF MINNESOTA 2013, AND CURRENT VERSION OF THE MINNESOTA STATE PLUMBING CODE UNLESS DIRECTED OTHERWISE. HORIZONTAL COORDINATES HAVE BEEN REFERENCED TO THE NORTH AMERICAN DATUM OF 1983 (NAD83), 1996 ADJUSTMENT (NAD83(1996)) ON THE DAKOTA COUNTY COORDINATE SYSTEM, IN U.S. SURVEY FEET. ELEVATIONS HAVE BEEN REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). RTK GPS METHODS WERE USED TO ESTABLISH HORIZONTAL AND VERTICAL COORDINATES FOR THIS PROJECT. THIS PROJECT'S TOPOGRAPHIC SURVEY CONSISTS OF DATA COLLECTED IN SEPTEMBER 2018 BY I&S GROUP. SPECIFICATIONS REFERENCE PROJECT DATUM TOPOGRAPHIC SURVEY LEGEND EXISTING CITY LIMITS ACCESS CONTROL SECTION LINE QUARTER SECTION LINE RIGHT OF WAY LINE PROPERTY / LOTLINE EASEMENT LINE CULVERT WATER EDGE WETLAND BOUNDARY WETLAND / MARSH WATER FENCE LINE STORM SEWER SANITARY SEWER SANITARY SEWER FORCEMAIN CONTOUR (MAJOR) UNDERGROUND TELEPHONE OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TV GAS UNDERGROUND FIBER OPTIC CONTOUR (MINOR) DECIDUOUS TREE CONIFEROUS TREE TREE LINE MANHOLE/STRUCTURE CATCH BASIN HYDRANT CURB STOP VALVE UTILITY PEDESTAL / CABINET POWER POLE 990 989 PROPOSED CULVERT STORM SEWER SANITARY SEWER SERVICE WATER SERVICE OVERHEAD ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND TV GAS CONTOUR STORM SEWER MANHOLE SANITARY SEWER MANHOLE HYDRANT VALVE EASEMENT RIGHT OF WAY 1015 LOT LINE OVERHEAD UTILITY UNDERGROUND UTILITY CITY OF ROSEMOUNT C0-10 SITE DATA SHEET 300 22185 C0-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. CIVIL SHEET INDEX Sheet Number Sheet Title C0-10 SITE DATA SHEET C0-20 CITY OF ROSEMOUNT STANDARD DETAILS C0-21 CITY OF ROSEMOUNT STANDARD DETAILS C0-22 SITE DETAILS C0-23 SITE DETAILS C0-24 SITE DETAILS C0-25 SITE DETAILS C0-26 SITE DETAILS C1-10 OVERALL SWPPP C1-20 SWPPP NOTES C1-21 SWPPP NOTES C1-22 SWPPP NOTES C1-23 SWPPP NOTES C1-24 SWPPP DETAILS C2-10 EXISTING SITE & REMOVALS PLAN C3-10 OVERALL SITE & UTILITY PLAN C3-20 PLANNED ROAD & UTILITY CONSTRUCTION C3-21 PLANNED ROAD & UTILITY CONSTRUCTION C3-22 DETAILED SITE PLAN C3-30 UTILITY SCHEDULES C3-40 HYDRANT COVERAGE PLAN C4-10 OVERALL GRADING PLAN C4-20 DETAILED GRADING PLAN C5-10 SITE RESTORATION PLAN C5-20 LANDSCAPING PLAN C5-30 LANDSCAPING DETAILS AND NOTES C6-10 SITE LIGHTING PLAN C6-11 PHOTOMETRICS PLAN CR RD 46CR RD 3BISCAYNE AVE145TH ST W BONNIE PATH W AKRON AVEPILOT KNOB RD170TH ST W 160TH ST WDIAMOND PATHCHIPPENDALE AVE W150TH ST W 145TH ST W SANITARY SEWER WATER DEVELOPER: JIM CONNELLY APPRO DEVELOPMENT 21476 GRENADA AVE LAKEVILLE, MN 55044 PROJECT MANAGER: REESE SUDTELGTE EMAIL: REESE.SUDTELGTE@IS-GRP.COM MANAGING OFFICE: 7900 INTERNATIONAL DRIVE INTERNATIONAL PLAZA SUITE 550 MINNEAPOLIS, MN 55425 PHONE: 952.426.0699 MINNEAPOLIS / ST. PAUL OFFICE R=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKING95 5954 955 953 954 950950 951 951 952 952 953 953 954 954 950 950 949949 951 951 951 952 952 952 953 953 953 953 954 940 945 939 941 942 943 944 950 948 949 951 952 953953 951951 952 952 953 953 954 954 950 950 948 948 949 949 951 951 952 952 952 953 953 953 954 953 954 950 955955955947948949951 952 953 953 953954954954 9 5 0 955955 946 9 4 7 948 949 9519519 5 1 95295295 2 9 5 3 953 953954 95 4 9 5 4 955955 955952953954954 954956 95606/07/19 CITY COMMENTS TTK 22185 C1-SWPPP DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C1-10 OVERALL SWPPP C1-10 OVERALL SWPPP 300 22185 C1-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 50 100 150 PROPERTY LINE, TYP. EROSION CONTROL LEGEND SYMBOL ITEM NO.DESCRIPTION UNITS QUANTITY 2511.507 RANDOM RIPRAP, CLASS III CY 162 2511.504 GEOTEXTILE FILTER, TYPE IV SY 100 PERIMETER CONTROL LF 9,341 2573.502 EXISTING STORM DRAIN INLET PROTECTION EACH 2 2573.502 PROPOSED STORM DRAIN INLET PROTECTION EACH 14 2573.501 STABILIZED CONSTRUCTION EXIT EACH 1 2575.504 EROSION CONTROL BLANKET, CATEGORY 3N SY 17,534 CONCRETE WASHOUT AREA EA 1 EXISTING DRAINAGE ARROW PROPOSED DRAINAGE ARROW PERIMETER CONTROL CAN BE SILT FENCE OR SEDIMENT CONTROL LOG. QUANTITIES ARE FOR INFORMATIONAL PURPOSES TO MEET THE REQUIREMENTS OF THE CONSTRUCTION STORMWATER PERMIT. NO GUARANTEE IS MADE TO THE ACTUAL QUANTITIES REQUIRED. THE QUANTITIES SHOWN ARE TOTAL FOR THE ENTIRE PROJECT NOT SPECIFIC TO THIS SHEET. SEE SITE RESTORATION PLAN FOR FINAL TURF ESTABLISHMENT NOTE: SWPPP COVERAGE INCLUDES ELECTRIC, GAS, TELEPHONE, AND CABLE INSTALLATION. EACH COMPANY OR THEIR SUBCONTRACTOR IS RESPONSIBLE TO FOLLOW THE REQUIREMENTS OF THIS SWPPP INCLUDING PROVIDING THEIR OWN RESTORATION IF INSTALLATION OCCURS AFTER PRIMARY INSTALLATION OF SEEDING/SODDING/MULCHING DURING CONSTRUCTION OF EACH UTILITY. LOT LINE, TYP. UTILITY EASEMENT, TYP. PERIMETER CONTROL, TYP.EROSION CONTROL BLANKET, TYP.INLET PROTECTION, TYP. PROPOSED SURFACE DRAINAGE ARROW, TYP. EXISTING SURFACE DRAINAGE ARROW, TYP. CONSTRUCTION ENTRANCE CONCRETE WASHOUT AREARIGHT-OF-WAY, TYP.157TH STREET R=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 9459 5 0 955 9559559449469479489499519519 5 1 95295295 2 95 3 95395395495495 4 946947947948948 955952953954956 955951952953954956 950955951952953954956955 956 06/07/19 CITY COMMENTS TTK 22185 C2-EXIST DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C2-10 EXISTING SITE & REMOVALS PLAN C2-10 EXISTING SITE & REMOVALS PLAN 300 22185 C2-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 50 100 150 PROPERTY LINE, TYP. PROTECT POWER POLE PROTECT POWER POLE EXISTING SURFACE CONTOUR, TYP. EXITING FIELD EDGE, TYP. EXISTING OVERHEAD LINE EXISTING UNDERGROUND FIBER OPTIC LINE EXISTING GRAVEL, TYP.670.24'960.3' REMOVAL LEGEND SYMBOL DESCRIPTION REMOVE GRAVEL SURFACE CONTRACTOR SHALL VERIFY EXISTING PAVEMENT SECTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PAVEMENT REMOVALS SHALL INCLUDE FULL DEPTH SAWCUT & SECTION REMOVAL. REMOVE GRAVEL SURFACING NOTE: CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH THE MNDOT TEMPORARY TRAFFIC CONTROL MANUAL AND THE CITY OF OWATONNA REQUIREMENTS. SALVAGE SIGN FOR REINSTALLMENT REMOVE 7 LF OF WATERMAIN CONTRACTOR TO FIELD VERIFY SIZE, DEPTH AND LOCATION OF EXISTING UTILITIES 962.03' LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 012345678910A-7 FES-1A FES-2 FES-1 A-10 FES-3AFES-4 FES-3 FES-7 FES-4A FES-8A FES-8 FES-9A FES-9 FES-5A FES-5 FES-6 A-2 P-1 (15") P-3 (24")P-4 (24") P-8 (24")P-9 (24") P-10 (15")P-5 (24")P-6 (24")P- 7 ( 2 4 " )P-2 (12")S-2 S-3 EX S-1 S-5 S-4 8" PLUG SP-4 (8")SP-3 (8")SP-2 (8") SP - 1 ( 8 " ) SP-1A (8") 12''x6'' TEE 12''x6'' TEE 12''x12'' TEE 12''x6'' REDUCER 6'' GV & BOX 6'' GV & BOX 6'' GV & BOX 12" WATERMAIN (C900) 6" WATERMAIN (C900) 8'' GV & BOX 8''x45° BEND 12''x8'' TEE 12''x8'' TEE 8''x45° BEND 8'' GV & BOX 8" WATERMAIN (C900) 8" WATERMAIN (C900) 8" WATERMAIN (C900) 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 12''x8'' TEE 6" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 8" WATERMAIN (C900) 5''x 7'-6'' HYDRANT 5''x 7'-6'' HYDRANT 5''x 7'-6'' HYDRANT 12'' GV & BOX 12'' GV & BOX 8'' CAP8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP 06/07/19 CITY COMMENTS TTK 22185 C3-SITE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-10 OVERALL SITE & UTILITY PLAN C3-10 OVERALL SITE & UTILITY PLAN 300 22185 C3-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP.LOT LINE, TYP.OUTLOT A 0 SCALE IN FEET 40 80 120 FUTURE BUILDING PADS, TYP. STUB 6" SANITARY SERVICE TO ROAD EASEMENT, TYP. STUB WATER SERVICE TO ROAD EASEMENT, TYP. CONNECT TO MET COUNCIL SANITARY SEWER (SEE NOTES)RIGHT-OF-WAY, TYP.DRAINAGE AND UTILITY EASEMENT, TYP. 157TH STREET STUB P-10 TO PROPERTY LINE FOR CONNECTION TO BISCAYNE AVE FUTURE STORM CONSERVATION EASEMENT SIGN (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) MCES CONNECTION NOTES: THE CONTRACTOR IS REQUIRED TO CONTACT MIKE OLERICH AT 651-602-8908 BETWEEN 7:30 AM AND 3:30 PM AT LEAST 48 HOUTS IN ADVANCE TO ARRANGE TO HAVE AN INSPECTOR ON SITE AT THE TIME THE CONNECTION IS BEING MADE. INSPECTIONS PERFORMED OUTSIDE NORMAL HOURS, MONDAY THROUGH FRIDAY 7:00 AM - 3:30 PM, MAY REQUIRE REIMBURSEMENT TO MCES FOR OVERTIME. SHOULD THE CONTRACTOR ELECT TO PERFORM THE CONNECTION OUTSIDE OF NORMAL BUSINESS HOURS, THE CONTRACTOR SHALL PAY FOR ANY ADDITIONAL FEES. BACKUP CONTACTS ARE AS FOLLOWS: MATT AMUNDSON AT 651-262-8053 AND DAVE ELZINGA AT 651-602-8924. THE CONTRACTOR SHALL TAKE MEASUREMENTS BEFORE BEGINNING CONSTRUCTION TO ENSURE THAT SERVICE CONNECTIONS SHALL NOT BE CUT INTO MAINTENANCE ACCESS STRUCTURE JOINTS OR PIPE BARREL JOINTS. CUTTING INTO JOINTS WILL NOT BE ALLOWED. LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 012345FES-5A FES-5 FES-6 P-5 (24")P-6 (24")S-5 S-4 SP-4 (8")SP-3 (8")12''x6'' TEE 12''x6'' REDUCER 6'' GV & BOX 6'' GV & BOX 12" WATERMAIN 6" WATERMAIN 6" WATERMAIN6" WATERMAIN 8'' GV & BOX 8" WATERMAIN (C900) 8''x45° BEND 12''x8'' TEE 12''x8'' TEE 8''x45° BEND 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8" WATERMAIN (C900) 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 8" WATERMAIN (C900) 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 5''x 7'-6'' HYDRANT BREAK=953.98 5''x 7'-6'' HYDRANT BREAK=953.47 8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP 8'' CAP MATCH LINE: 4+90STA. 5+52 S = 946.38 STA. 5+57 S = 946.36 STA. 3+99 S = 947.25 STA. 2+39 S = 948.22 STA. 2+32 S = 948.13 STA. 4+04 S = 947.22 0+00952.90+25953.2953.780+50953.6953.920+75954.0954.171+00954.4954.321+25954.6954.181+50954.9954.041+75955.1953.882+00955.3951.772+25955.5954.812+50955.6954.692+75955.7954.563+00955.8954.313+25955.8954.073+50955.8953.953+75955.6953.944+00955.3953.944+25954.4953.944+50953.6953.944+75952.8953.945+00952.1953.945+25951.4953.9440.3' @ -1.00%363.1' @ 0.00%3+11.90954.19953.943+61.90L = 50.0' K = 50.00 A.D. = 1.00% S-5 R=954.80 I=947.11 (8") SP-4 SP-4 300'x8" @0.50% S-4 R=953.94 I=945.61 (8") SP-4 I=945.51 (8") SP-3 6" WATERMAIN (C900) 6" WATERMAIN (C900) 6'' GV & BOX 12''x6'' REDUCER 12" WATERMAIN (C900) 12''x6'' TEE P-5 C C NOTE: XXX.X - EXISTING GROUND L XXX.XX - PROPOSED GRADE L 12''x8'' TEE 12''x8'' TEE 12" WATERMAIN (C900) 12''x8'' TEE12''x8'' TEE 12" WATERMAIN (C900) 12''x8'' TEE 12''x8'' TEE 930 935 940 945 950 955 960 965 970 975 930 935 940 945 950 955 960 965 970 975 06/07/19 CITY COMMENTS TTK 22185 C3-PROFILES DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-20 PLANNED ROAD & UTILITY CONSTRUCTION C3-20 PLANNED ROAD & UTILITY CONSTRUCTION 300 22185 C3-20 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 PROPOSED DITCH GRADE, 31' RIGHT OF CENTERLINE PROPOSED CENTERLINE GRADE, TYP.EXISTING GRADE, TYP. STUB WATER SERVICE TO ROAD EASEMENT, TYP. STUB 6" SANITARY SERVICE TO ROAD EASEMENT, TYP. UTILITY EASEMENT, TYP.LOT LINE, TYP.PROPERTY LINE, TYP.STA. 0+00 TO 5+50PROPOSED 66' ROAD EASEMENT30'R30' R30' R55' R70'7.5' MIN BURY DEPTH18" MIN. SEPARATION5"x7'-6" HYDRANT PROPOSED DITCH GRADE, 31' LEFT OF CENTERLINE 10' MIN. SEPARATION 10' MIN. SEPARATION 157TH STREET 0 V E R T. 5 10 NOTE: STA: 00+00 SANITARY WYE STATION S = 0.0 SANITARY STUB INVERT ELEVATION INSULATE SANITARY SERVICE UNDER DITCH CROSSING INSULATE SANITARY SERVICE UNDER DITCH CROSSING LOT 7 64,130 SF LOT 8 78,944 SF LOT 2 65,194 SF 17 19 PARKINGR=956.43 SAN MH I=919.18 FO BISCAYNE AVEEX 12" WATERMAINREGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 5678910FES-1AFES-1 A-2 P-1 (15") S-2 S-3 EX S-1 S-4 8" PLUG SP-2 (8") SP - 1 ( 8 " ) SP-1A (8")SP-3 (8")12''x6'' TEE 12''x12'' TEE 6'' GV & BOX 6" WATERMAIN12" WATERMAIN 8'' GV & BOX 12''x8'' TEE 8" WATERMAIN (C900) 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900) 8'' GV & BOX 12''x8'' TEE 12''x8'' TEE 8'' GV & BOX 8" WATERMAIN (C900)8" WATERMAIN (C900)5''x 7'-6'' HYDRANT BREAK=954.04 12'' GV & BOX 8'' CAP 8'' CAP 8'' CAP MATCH LINE: 4+90STA. 8+60 S = 944.74STA. 5+52 S = 946.38 STA. 5+57 S = 946.36 12'' GV & BOX 5+25951.4953.945+50951.0953.945+75950.8953.946+00950.8953.946+25951.1953.946+50951.3953.946+75951.7953.947+00952.2953.947+25952.9953.947+50953.5954.027+75954.0954.278+00954.5954.608+25954.6954.938+50954.7955.268+75954.8955.609+00954.7955.939+25954.5956.149+50954.7956.089+75955.7955.8310+00956.310+25955.410+50955.125.0' @ -1.00% 363.1' @ 0.00% 128.1' @ 1.33%7+25.00953.94954.277+75.00L = 50.0' K = 21.48 A.D. = 2.33% L = 50.0' K = 37.66 A.D. = 1.33%956.169+31.649+03.12955.97956.059+53.12SP-3 300'x8" @0.50% S-4 R=953.94 I=945.61 (8") SP-4 I=945.51 (8") SP-3 S-3 R=954.95 I=944.01 (8") SP-3 I=943.91 (8") SP-2 SP-2 114'x8" @0.50% S-2 R=956.14 I=943.34 (8") SP-2 I=943.24 (8") SP-1 I=943.24 (8") SP-1A SP-1 123'x8" @0.50% EX S-1 R=955.13 I=942.63 (8") SP-1 951.769 5 2 . 1 2 P-1 90'x15" @0.40% 12''x12'' TEE12''x6'' TEE 12" WATERMAIN (C900) 930 935 940 945 950 955 960 965 970 975 930 935 940 945 950 955 960 965 970 975 C C NOTE: XXX.X - EXISTING GROUND L XXX.XX - PROPOSED GRADE L 12''x8'' TEE 12''x8'' TEE 12''x8'' TEE 12''x8'' TEE 12" WATERMAIN (C900) 12'' GV & BOXBISCAYNE AVE06/07/19 CITY COMMENTS TTK 22185 C3-PROFILES DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-21 PLANNED ROAD & UTILITY CONSTRUCTION C3-21 PLANNED ROAD & UTILITY CONSTRUCTION 300 22185 C3-21 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 PROPOSED DITCH GRADE, 31' LEFT OF CENTERLINE PROPOSED CENTERLINE GRADE, TYP.EXISTING GRADE, TYP. STUB WATER SERVICE TO ROAD EASEMENT, TYP.STUB 6" SANITARY SERVICE TO ROAD EASEMENT, TYP.UTILITY EASEMENT, TYP.LOT LINE, TYP.PROPERTY LINE, TYP.STA. 5+00 TO 10+75 CONSTRUCT WATER SERVICE AND 6" SANITARY SERVICE TO WITHIN 5' FROM THE BUILDING. CONNECTION INTO BUILDING BY MECHANICAL CONTRACTOR. (VERIFY LOCATIONS WITH MECHANICAL PLANS)RIGHT-OF-WAY, TYP.CONTRACTOR TO DAM SP-1A UNTIL CONNECTION TO FUTURE CITY SANITARY IS ESTABLISHED NOTE: CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH THE MNDOT TEMPORARY TRAFFIC CONTROL MANUAL AND THE CITY OF ROSEMOUNT REQUIREMENTS.7.5' MIN. BURY DEPTHPROPOSED DITCH GRADE, 31' RIGHT OF CENTERLINE 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION 10' MIN. SEPARATION PROVIDE TEMPORARY INSIDE DROP CONNECTION TO SANITARY MANHOLE ASSUMED DEPTH OF 947.2 CONTRACTOR TO FIELD VERIFY SIZE, DEPTH AND LOCATION. CONTRACTOR TO FIELD VERIFY SIZE, DEPTH AND LOCATION OF EXISTING UTILITIES 157TH STREET 0 V E R T. 5 10 FUTURE TRAIL (BY OTHERS) SANITARY WYE = 8+55 NOTE: STA: 00+00 SANITARY WYE STATION S = 0.0 SANITARY STUB INVERT ELEVATION PROPOSED 66' ROAD EASEMENT30'R35' R35' LOT 7 64,130 SF LOT 8 78,944 SF LOT 2 65,194 SF 17 19 PROPOSED BUILDING 18,000 SQ. FT. FFE = 955.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGG R=956.43 SAN MH I=919.18 FO BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=955.36 EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 06/07/19 CITY COMMENTS TTK 22185 C3-SITE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-22 DETAILED SITE PLAN C3-22 DETAILED SITE PLAN 300 22185 C3-22 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 PAVEMENT LEGEND SYMBOL DESCRIPTION BITUMINOUS PAVEMENT HEAVY DUTY BITUMINOUS PAVEMENT CONCRETE PAVEMENT HEAVY DUTY CONCRETE PAVEMENT CONCRETE SIDEWALK ROAD EASEMENT, TYP. PROPERTY LINE, TYP.LOT LINE, TYP.32'19'24'19'24'9'9' CONSTRUCT TURN DOWN WALK (SEE DETAIL)6'6' CONSTRUCT CONCRETE WALK (SEE DETAIL) CONSTRUCT TURN DOWN WALK (SEE DETAIL)5'20'20'5' FUTURE BUILDING PAD CONSTRUCT B618 CURB & GUTTER (SEE DETAIL) 3' CURB TAPER 3' CURB TAPER R50' R15' R15' R30'R30' R15' R39' CONSTRUCT WATER SERVICE AND 6" SANITARY SERVICE TO WITHIN 5' FROM THE BUILDING. CONNECTION INTO BUILDING BY MECHANICAL CONTRACTOR. (VERIFY LOCATIONS WITH MECHANICAL PLANS) SANITARY CLEANOUT R = 955.65 I =944.01 10'F&I: ACCESSIBLE PARKING SIGNS SOUTHEAST BASIN SOUTH BASIN 17' R50' R3', TYP.RIGHT-OF-WAYF&I: 4" WHITE STRIPING, TYP. CONSTRUCT ACCESSIBLE PARKING AREA (SEE DETAIL) CONNECT TO MET COUNCIL SANITARY SEWER PATCH GRAVEL SURFACING TO MATCH EXISTING (SEE DETAIL) SALVAGE & REINSTALL SIGNAGE AS NEEDED NOTE: CONTRACTOR TO PROVIDE TRAFFIC CONTROL IN ACCORDANCE WITH THE MNDOT TEMPORARY TRAFFIC CONTROL MANUAL AND THE CITY OF ROSEMOUNT REQUIREMENTS. CONTRACTOR TO PROTECT AND FIELD VERIFY SIZE, DEPTH AND LOCATION OF EXISTING UTILITIES DRAINAGE AND UTILITY EASEMENT, TYP. 157TH STREET CONSTRUCT 2' GRAVEL SHOULDER 18'18'FUTURE TRAIL (BY OTHERS) R1-1 (30x30) CONSTRUCT 12" RIBBON CURB (SEE DETAIL) CONSERVATION EASEMENT SIGN (SEE DETAIL) LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BENCHMARK TIE IN PP ELEV = 957.80 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 22185 C3-SITE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C3-40 HYDRANT COVERAGE PLAN C3-40 HYDRANT COVERAGE PLAN 300 22185 C3-40 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP. LOT LINE, TYP. ROAD EASEMENT, TYP. 0 SCALE IN FEET 50 100 150 HYDRANT COVERAGE LEGEND EXISTING HYDRANT PROPOSED HYDRANT R250' R250'RIGHT-OF-WAY, TYP. LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 95 5954 956 955 950 951 952 953 954 953 955953 954 956957951 950 951 952 953 954 951 952 953 954 950 947 948 949 951 952 953953 955 952 953 954 955 951952953 954 950 9 4 9 951 952 95 3 9539539 5 4 95 4 955951 951952952953954 950 951 952 953 953 940 945 939 941 942 943 944 952 953 954 952 953 954 -1.9%-2.3%-1.2%- 2 . 1%-2.0%-1.7%-0.6%- 3 . 3%-2.8%-3.1%-2.9%-2.9%- 3 . 6% -3.1%-2.0%954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.87954.87954.87954.87954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47954.47956-0.7%-0.7%-0.6% -0.6% -1.7%-0.7%-1.2%-1 .5%-2.4%- 2 . 4%-2.0%-2.0%950 948949948949947948949950947948949950NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' 06/07/19 CITY COMMENTS TTK 22185 C4-GRADE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C4-10 OVERALL GRADING PLAN C4-10 OVERALL GRADING PLAN 300 22185 C4-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP. LOT LINE, TYP. UTILITY EASEMENT, TYP. 0 SCALE IN FEET 50 100 150 GRADING LEGEND EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) PROPOSED SPOT ELEVATION PROPOSED TOP BACK OF CURB SPOT ELEVATION SURFACE GRADE / DIRECTION GENERAL GRADING NOTES PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. REFER TO GEOTECHNICAL REPORT FOR SOIL INFORMATION. 101 100 101 100 XXX.XXXXX.XX-X.X%RIGHT-OF-WAY, TYP.APPROXIMATE FFE = 955.3APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.3 APPROXIMATE FFE = 955.7 FUTURE PAVEMENT, TYP. GRADING NOTES: A SHRINKAGE FACTOR OF 1.15 (EMBANKMENT) & 1.20 (TOPSOIL) WERE APPLIED TO ALL EXCAVATION MATERIAL WHEN DETERMINING SITE BALANCE. NO WARRANTY IS MADE OR IMPLIED AS TO THE ACCURACY, SUFFICIENCY, OR RELIABILITY OF SHRINKAGE FACTORS. 18" OF TOPSOIL WAS CALCULATED IN ALL TOPSOIL STRIP AREAS. GREEN SPACE AREAS SHALL BE DRESSED WITH A MINIMUM OF 6" OF TOPSOIL AND A MAXIMUM OF 18" OF TOPSOIL. SEE TOPSOIL NOTES FOR FUTURE AREAS. THE SITE BALANCE PROVIDED ABOVE IS FOR INFORMATIONAL PURPOSES. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY ALL QUANTITIES PRIOR TO SUBMITTING A BID FOR THE PROJECT. 157TH STREET EMERGENCY OVERFLOW @ 953.00 (SEE DETAIL) EMERGENCY OVERFLOW STRUCTURE (SEE DETAIL) TO BE CONNECTED TO FUTURE BISCAYNE STORM SEWER MAINTENANCE ACCESS ROUTEMAINTENANCE ACCESS ROUTE MAINTENANCE ACCESS NOTE: UNTIL LOTS 3-8 HAVE BEEN DEVELOPED TO A POINT WHERE THE MAINTENANCE ACCESS ROUTE SHOWN ON THE PLAN IS VIABLE, MAINTENANCE VEHICLES SHALL USE THE SHARED ACCESS DRIVE FOR LOTS 1 & 2 TO ACCESS THE STORMWATER BASINS. EMERGENCY OVERFLOW @ 953.50 (SEE DETAIL) TOPSOIL NOTES: CONTRACTOR TO ENSURE NO MORE THAN 6" OF TOPSOIL IS PLACED IN THE INFILTRATION BASIN AREAS. CONTRACTOR TO ENSURE NO MORE THAN 6" OF TOPSOIL IS PLACED IN THE FUTURE BUILDING PADS. CONTRACTOR TO ENSURE NO MORE THAN 12" OF TOPSOIL IS PLACED IN THE FUTURE PAVEMENT AREAS. CONTRACTOR SHALL STOCKPILE EXCESS TOPSOIL IN A LOCATION DETERMINED BY THE OWNER. THE STOCKPILE SHALL BE NO MORE THAN 8' HIGH AND SHALL BE TEMPORARILY SEEDED TO ENSURE STABILITY. EROSION CONTROL DEVICES (SILT FENCE, BIOROLL, ETC.) SHALL BE PLACED AROUND THE PERIMETER OF THE STOCKPILE TO ENSURE NO SOIL LOSS. THIS STOCKPILING SHALL BE CONSIDERED INCIDENTAL TO THE PROJECT. LOT 8 78,944 SF PROPOSED BUILDING 18,000 SQ. FT. FFE = 955.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04'NOPARKINGG R=956.43 SAN MH I=919.18 FO BISCAYNE AVEI=955.36 EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 95 5954 956 955 950 951 952 953 954 953 955953 954 956957953-2.8%-3.1%-2.0%-4.1%955.25955.25955.75955.75955.75955.65955.65955.75955.75955.65955.65955.75955.65955.75955.65955.75955.65955.65955.75955.75955.75955.25955.75955.75952.25955.25953.12952.06953.109 5 4 . 0 0 LP954.32LP9 5 4 . 0 1 LP954.37954.69954.37954.01HP954.63HP954.30HP955.35954.99954.68955.65955.65955.65955.569 5 5 . 5 6 955.56953.71954.23955.20HP955.20HP955.09954.91954.40954.90954.86954.83954.76954.68954.74954.43954.47954.58954.20954.74954.69954.669 5 4 . 6 5954.58954.20954.35954.52 954.43954.56954.44953.64954.04953.649 5 4 . 0 0 954.36954.47954.47-1 .5%-2.4%- 2 . 4%-2.0%-2.0%-2.1% -1.7% -4.0%-0.7%-2.1% -25.0% -10.3% -8. 3 %953.93954.74955.35952.15952.25948949947SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04'NOPARKING955.56955.562" CURB955.562" CURB955.56BIT955.37955.37954.90954.86955.19955.19955.56FULL CURB9 5 5 . 5 6 F U L L C U R B955.560" CURB955.560" CURB955.38BIT955.06BIT955.56BIT955.38BIT955.06BIT06/07/19 CITY COMMENTS TTK 22185 C4-GRADE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C4-20 DETAILED GRADING PLAN C4-20 DETAILED GRADING PLAN 300 22185 C4-20 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 UTILITY EASEMENT, TYP. PROPERTY LINE, TYP.LOT LINE, TYP.GRADING LEGEND EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) PROPOSED SPOT ELEVATION PROPOSED TOP BACK OF CURB SPOT ELEVATION SURFACE GRADE / DIRECTION GENERAL GRADING NOTES PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. REFER TO GEOTECHNICAL REPORT FOR SOIL INFORMATION. 101 100 101 100 XXX.XXXXX.XX-X.X% TOPSOIL NOTE: CONTRACTOR TO ENSURE NO MORE THAN 6" OF TOPSOIL IS PLACED IN THE FUTURE BUILDING PADS. CONTRACTOR TO ENSURE NO MORE THAN 12" OF TOPSOIL IS PLACED IN THE FUTURE PAVEMENT AREAS. FUTURE PAVEMENT, TYP. 0 SCALE IN FEET 5 10 15 INSET A SEE INSET A 157TH STREET LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 8 78,944 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SF PROPOSED BUILDING18,000 SQ. FT.FFE = 955.75SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' SOUTHWEST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 951.00 NORTHWEST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 945.75 NORTH POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' NWL = 951.00 NORTHEAST POND 100-YR EVENT HWL = 953.21' 100-YR SNOWMELT HWL = 953.40' SOUTH POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04' NWL = 949.75 NOPARKINGR=954.59 SAN MH I= G R=956.43 SAN MH I=919.18FO I=948.22 BISCAYNE AVEI=954.77 I=955.36EX 12" WATERMAINDAKO T A U N L I M I T E D PID: 3 4 0 3 2 1 0 8 5 0 5 1 SPOW D D E V E L O P M E N T L L C PID: 3 4 0 3 2 1 0 8 5 0 4 0 METR O M O S Q U I T O C O N T R O L PID: 3 4 0 3 2 1 0 8 5 0 1 9 PAHL F A M I L Y L I M I T E D P A R T N E R S H I P PID: 3 4 0 3 2 1 0 7 5 0 1 5 DONA L D R . W A C H T E R & S A N D R A M . R A H N PID: 3 4 0 3 2 1 0 7 5 0 1 2 REGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 06/07/19 CITY COMMENTS TTK 22185 C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - PRO PRO RAS 18-22185 06/10/2019 C5-10 SITE RESTORATION PLAN C5-10 SITE RESTORATION PLAN 300 22185 C5-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. PROPERTY LINE, TYP. LOT LINE, TYP. ROAD EASEMENT, TYP. 0 SCALE IN FEET 50 100 150 RIGHT-OF-WAY, TYP.TURF RESTORATION LEGEND SYMBOL ITEM NO.DESCRIPTION UNITS QUANTITY 2575.505 SEED, MIXTURE 25-151 AC 10.64 2575.505 SEED, MIXTURE 33-261 AC 2.29 2575.509 MULCH MATERIAL, TYPE 6 CY 47 THE QUANTITIES SHOWN ARE TOTAL FOR THE ENTIRE PROJECT NOT SPECIFIC TO THIS SHEET. *SHALL MEET MNDOT SPECIFICATION 3876. SEED SHALL BE PLACED IN ACCORDANCE WITH MNDOT 2575. TEMPORARY EROSION CONTROL MEASURES, INCLUDING PERIMETER CONTROL AND INLET PROTECTION MUST BE MAINTAINED UNTIL FINAL STABILIZATION MEASURES ARE IN PLACE AND APPROVED BY THE OWNERS REPRESENTATIVE. REFER TO THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR ADDITIONAL INFORMATION. 157TH STREET PROPOSED BUILDING 18,000 SQ. FT. FFE = 955.75 SOUTHEAST POND 100-YR EVENT HWL = 952.88' 100-YR SNOWMELT HWL = 953.04'BISCAYNE AVEI=955.36 EX 12" WATERMAINCK - (3) TO - (1) GT - (1) HL - (5) SM - (2) BF - (5) GT - (2) (1) - GT (1) - AA (3) - TR (3) - PG (1) - AA (1) - GT (3) - AM (3) - PG SG - (9) (6) - CK (2) - TO (3) - TB (2) - TO (6) - CK (2) - TB (5) - HL (1) - TO (3) - CK (1) - SM (2) - BN (1) - TO (3) - CK AA - (1) DL - (4) SG - (5) SM - (6) DL - (8) EVERGREEN TREE QTY COMMON / BOTANICAL NAME SIZE ROOT PG 9 Black Hills Spruce Picea glauca `Densata` 2" CAL B & B OVERSTORY TREE QTY COMMON / BOTANICAL NAME SIZE ROOT AA 5 Autumn Blaze Maple Acer x freemanii `Jeffsred` 2" CAL B & B AM 3 Green Mountain Sugar Maple Acer saccharum `Green Mountain` TM 2" CAL B & B BF 5 Dakota Pinnacle Asian White Birch Betula platyphylla `Fargo` TM 2" CAL B & B BN 2 River Birch Multi-Trunk Betula nigra 2" CAL B & B GT 6 Skyline Honeylocust Gleditsia triacanthos `Skycole` 2" CAL B & B TR 6 Redmond American Linden Tilia americana `Redmond` 2" CAL B & B SHRUBS QTY COMMON / BOTANICAL NAME SIZE ROOT CK 21 Feather Reed Grass Calamagrostis x acutiflora `Karl Foerster` 3 GAL CONT DL 12 Dwarf Bush Honeysuckle Diervilla lonicera 5 GAL CONT HL 10 Little Lime Hydrangea Hydrangea paniculata `Little Lime` 5 GAL CONT SG 14 Goldflame Spirea Spiraea x bumalda `Goldflame` 5 GAL CONT SM 9 Dwarf Korean Lilac Syringa meyeri `Palibin` 5 GAL CONT TB 5 Mr. Bowling Ball Arborvitae Thuja occidentalis `Bobazam` 5 GAL CONT TO 7 Technito Arborvitae Thuja occidentalis `Bailjohn` 5 GAL CONT PLANT SCHEDULE (1) - GT (1) - AA (1) - AA (3) - TR (3) - PG 06/07/19 CITY COMMENTS MW 22185 C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - PRO PRO RAS 18-22185 06/10/2019 C5-20 LANDSCAPING PLAN C5-20 LANDSCAPING PLAN 300 22185 C5-20 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60LOT LINE, TYP.CITY PLANTING REQUIREMENTS 1.A MINIMUM OF 5% OF THE PARKING AREA SHALL BE LANDSCAPED. THE LANDSCAPING SHALL BE LOCATED ON ISLANDS, PENINSULAS OR THE LIKE WITHIN THE PERIMETER OF THE PARKING AREA. 1.1.15,666 SQ FT x .05% = 783 SQ FT LANDSCAPED AREA REQUIRED. 1036 SQ FT LANDSCAPED AREA SHOWN. TREE REQUIREMENTS: 1.8 TREES OR 1 PER 3,000 SQUARE FEET LAND AREA 1.1.79,527 SQ FT/3,000 = 27 TREES REQUIRED 2.75% OF OVERSTORY TREES MUST BE DECIDUOUS 2.1.27 x .75 = 20 DECIDUOUS OVERSTORY TREES REQUIRED FOUNDATION PLANTING REQUIREMENTS: 1.1 FOUNDATION PLANTING PER 10 LINEAR FEET OF BUILDING PERIMETER 1.1.552 LINEAR FEET/10 = 55 FOUNDATION PLANTINGS REQUIRED MATCHLINE- SEE THIS SHEET MATCHLINE- SEE THIS SHEET 22185 C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - PRO PRO RAS 18-22185 06/10/2019 C5-30 LANDSCAPING DETAILS AND NOTES C5-30 LANDSCAPING DETAILS AND NOTES 300 22185 C5-30 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 1.COORDINATE LOCATION OF ALL UTILITIES (LINES, DUCTS, CONDUITS, SLEEVES, FOOTINGS, ETC.) WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS (FENCE, FOOTINGS, TREE ROOTBALLS, ETC.). CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO OWNER'S REPRESENTATIVE PRIOR TO CONTINUING WORK. 2.REMOVE ALL CONSTRUCTION DEBRIS AND MATERIALS INJURIOUS TO PLANT GROWTH FROM PLANTING PITS AND BEDS PRIOR TO BACKFILLING WITH PLANTING MIX. 3.LAWN AREAS SHALL HAVE 6" MINIMUM DEPTH OF TOPSOIL. TOPSOIL SHALL BE COMPACTED TO 85% MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT. 4.REFER TO PLANTING DETAILS PLAN FOR AMENDED SOIL DEPTH IN PLANTING BEDS AND SURROUNDING TREES. REFER TO SPECIFICATIONS FOR MIX TYPE. 5.OWNER'S REPRESENTATIVE SHALL APPROVE ALL PLANT LOCATIONS PRIOR TO INSTALLATION. OWNER RESERVES THE RIGHT TO REVISE PLANTING LAYOUT AT TIME OF INSTALLATION. 6.ALL PLANT MATERIALS SHALL BE TRUE TO THEIR SCIENTIFIC NAME AND SIZE AS INDICATED IN THE PLANT SCHEDULE. 7.IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE PLANTING PLAN AND THE NUMBER OF PLANTS IN THE SCHEDULE, THE PLANTING PLAN SHALL GOVERN. 8.OWNER RESERVES THE RIGHT TO REVISE QUANTITIES TO SUIT BUDGET LIMITATIONS. CONTRACTOR'S UNIT BID PRICES SHALL PREVAIL FOR ANY CHANGES IN QUANTITIES. 9.ANY PROPOSED SUBSTITUTIONS OF PLANT SPECIES SHALL BE MADE WITH PLANTS OF EQUIVALENT OVERALL FORM, HEIGHT, BRANCHING HABIT, FLOWER, LEAF, COLOR, FRUIT AND CULTURE, AND ONLY AFTER WRITTEN APPROVAL OF THE OWNER'S REPRESENTATIVE AND OWNER. 10.ALL PLANT MATERIALS MUST CONFORM TO AMERICAN STANDARDS FOR NURSERY STOCK (A.N.S.I.), LATEST EDITION PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, WASHINGTON D.C. LARGER SIZED PLANT MATERIALS OF THE SPECIES LISTED MAY BE USED IF THE STOCK CONFORMS TO A.N.S.I. 11.ALL PLANT MATERIAL SHALL BE GUARANTEED TO BE IN A LIVE AND HEALTHY GROWING CONDITION FOR ONE FULL GROWING SEASON (ONE YEAR) AFTER FINAL PROJECT ACCEPTANCE OR SHALL BE REPLACED FREE OF CHARGE WITH THE SAME GRADE AND SPECIES. ALL TREES SHALL HAVE A STRONG CENTRAL LEADER. 12.CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE DUE TO OPERATIONS. ANY AREAS THAT ARE DISTURBED SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER. 14.PLANTING BED EDGING - USE 3/4" x 6" PROFESSIONAL GRADE POLY EDGING IN ALL AREAS WHERE PLANTING BED MEETS LAWN AREAS OR WHERE INDICATED. USE 12" METAL SPIKES AS INSTRUCTED BY MANUFACTURER. 14.PROVIDE SHREDDED HARDWOOD MULCH, NATURAL COLOR, SURROUNDING ALL PROPOSED TREES(5' Ø) AND WITHIN PLANTING BEDS TO A 3-INCH MINIMUM DEPTH AS SHOWN IN TREE PLANTING DETAIL. DO NOT USE AN UNDERLAYMENT SUCH AS PLASTIC SHEET OR LANDSCAPE FABRIC. APPLY PRE-EMERGENT TO ALL PLANTING BEDS PRIOR TO MULCHING. REFER TO PLANS FOR ADDITIONAL DETAILS. REFER TO STORMWATER DETAILS FOR BASIN CONSTRUCTION AND MULCH APPLICATION. 15.ALL GROUND AREAS NOT WITHIN PLANT BEDS OR HAVE A DIFFERENT GROUNDCOVER INDICATED SHALL BE SODDED. TURF AREAS DISTURBED BY CONSTRUCTION SHALL BE SODDED. SOD SECTIONS SHALL BE NO SMALLER THAN 24" X 36" STAKED IN PLACE WITH BIODEGRADABLE SOD STAKES WHEN SLOPE IS STEEPER THAN 5:1 OR WHEN CONDITIONS REQUIRE. 16.FOR SHRUB LOCATIONS: CONTRACTOR IS PERMITTED TO USE DISCRETION AS NECESSARY TO AVOID DRIVEWAYS, UTILITIES, OR OTHER CONFLICTS. THE TOTAL NUMBER OF PLANTS, INCLUDING SHRUBS AND TREES SHALL MEET CITY CODE. 21.INDICATED QUANTITIES ARE ESTIMATES AND SHOULD BE CONFIRMED BY THE CONTRACTOR/BIDDER. GENERAL PLANTING NOTES CONIFER / EVERGREEN TREE PLANTING DETAIL SCALE: 1" = 1'-0" TIE NYLON STRAP AROUND TRUNK AS SHOWN CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE AND REMOVE FROM THE PLANTING PIT. AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEAN AT 90 DEGREES BACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL 3" LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGE TO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH DIRECTLY ON TREE TRUNK, LEAVE A MIN. 3" RING AROUND CROWN ROOTBALL DIA 1.5 X ROOTBALL DIA DEPTH OF ROOTBALL NEVER CUT PRIMARY LEADER PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTS CLEAN AT 90 DEGREES TREES 8'+TREES 6'-8' TOP OF ROOTBALL TO BE SET ABOVE GRADE 3" 1/2" WIDE NYLON STRAPPING - COLOR TO BE APPROVED BY LANDSCAPE ARCHITECT *NOTE: DO NOT STAKE TREES UNLESS INDICATED. STAKING DIAGRAM, NO STAKING TREES UNDER 6' REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP, TWINE - REMOVE THESE AND ALL NON-BIODEGRADIBLE MATURIALS FROM THE PLANTING PIT. AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARE SCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEAN AT 90 DEGREES BACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL. DO NOT TAMP SOIL, BUT SATURATE WITH WATER THROUGHOUT BACKFILL PROCESS. EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL 3" LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGE TO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH WITHIN 3" OF TRUCK. WHEN IN PLANT BED, SUBSTITUTE WITH PLANT BED MULCH. ROOTBALL DIA 2X ROOTBALL DIA DEPTH OF ROOTBALL NEVER CUT PRIMARY LEADER PRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS AND BRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTS CLEAN AT 90 DEGREES TREES 8'+TREES 6'-8' SET ROOT FLAIR ABOVE GRADE 3" WHEN STAKED, ATTACH 1/2" WIDE NYLON STRAPPING SNUGLY AROUND TRUCK AND, WITH SOME LOOSENESS, TO STAKES AS SHOWN NOTE: * AVOID STAKING UNLESS NECESSARY. * NO STAKING TREES UNDER 6'. STAKING DIAGRAM MUST MAINTAIN TRUNK IN VERTICAL ORIENTATION TREE PLANTING DETAIL NO SCALE UNDISTURBED SOIL MULCH, PER PLANS AND NOTES BACKFILL PLANTING PIT PER SHRUB PLANTING SPECIFICATIONS WHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL EXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL / CONTAINER MINUS 3" AND A MINIMUM TWICE THE DIAMETER OF THE ROOTBALL / CONTAINER - TILL ALL PLANTING BEDS TO A MINIMUM DEPTH OF 6" THROUGHT PLACE ROOTBALL ON UNDISTURBED SOIL AND ENSURE PLANT IS PLUMB ALL PLANTS TO BE INSTALLED SO THAT THE TOP OF THE CROWN OF THE PLANT IS SLIGHTLY ABOVE FINISH GRADE 3" ROOTBALL DIA 2 TIMES ROOTBALL DIA DEPTH OF ROOTBALL CUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS, BURLAP AND/OR TWINE, OR ENTIRE CONTAINER, AND REMOVE FROM THE PLANTING PIT, SCARIFY ROOTS FOR ALL CONTAINERIZED PLANTS 5 GALLONS OR SMALLER CONTAINER DIA 2 TIMES CONTAINER DIA SHRUB PLANTING DETAIL NO SCALE LOT 8 78,944 SF NOPARKINGG R=956.43 SAN MH I=919.18 FO BISCAYNE AVEEX 12" WATERMAINREGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 Z1 LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SFZ1 06/07/19 CITY COMMENTS TTK 22185 C6-LIGHT DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C6-10 SITE LIGHTING PLAN C6-10 SITE LIGHTING PLAN 300 22185 C6-10 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. UTILITY EASEMENT, TYP. 0 SCALE IN FEET 20 40 60 MANUFACTURER/MODEL NUMBER LIGHT FIXTURE SCHEDULE STYLETYPE LAMPS REMARKS Provide light fixtures as shown on Fixture Schedule. Substitutions shall have prior approval by the Project Engineer before bid date. Being listed as an acceptable Manufacturer in no way relieves the Contractors obligation to provide all equipment and features in accordance with these specifications. LIGHT POLE BASE DETAIL N.T.S. 157TH STREET UTILITY EASEMENT, TYP. 157TH STREET LOT 8 78,944 SF NOPARKINGG R=956.43 SAN MH I=919.18 FO BISCAYNE AVEEX 12" WATERMAINREGE N T S O F U O F M PID: 3 4 0 3 3 1 0 0 1 0 1 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.4 0.4 0.4 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 0.9 0.9 0.9 0.7 0.6 0.4 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.5 0.7 1.0 1.4 1.8 2.0 2.1 1.9 1.5 1.2 0.8 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.2 0.3 0.5 0.7 1.1 1.5 2.2 3.0 3.8 4.1 3.5 2.6 1.8 1.3 0.9 0.6 0.4 0.3 0.2 0.1 0.1 0.0 0.0 0.1 0.1 0.2 0.4 0.6 1.0 1.5 2.0 2.7 3.7 5.8 6.7 4.5 3.0 2.3 1.7 1.2 0.8 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.1 0.1 0.2 0.4 0.6 0.9 1.4 2.0 2.6 4.0 4.8 5.8 4.2 3.3 2.3 1.6 1.1 0.7 0.5 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.4 0.6 0.8 1.1 1.3 1.5 2.8 4.1 1.9 1.4 1.2 0.9 0.7 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.5 1.1 1.2 0.8 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Z1 LOT 5 81,344 SF LOT 6 61,594 SF LOT 7 64,130 SF LOT 4 84,759 SF LOT 3 63,248 SF LOT 2 65,194 SFZ1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.4 0.4 0.4 0.5 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.5 0.7 0.8 0.9 0.9 0.9 0.7 0.6 0.4 0.3 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.3 0.5 0.7 1.0 1.4 1.8 2.0 2.1 1.9 1.5 1.2 0.8 0.6 0.4 0.3 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.3 0.5 0.7 1.1 1.5 2.2 3.0 3.8 4.1 3.5 2.6 1.8 1.3 0.9 0.6 0.4 0.3 0.2 0.1 0.1 0.0 0.1 0.1 0.2 0.4 0.6 1.0 1.5 2.0 2.7 3.7 5.8 6.7 4.5 3.0 2.3 1.7 1.2 0.8 0.5 0.3 0.2 0.1 0.1 0.0 0.1 0.1 0.2 0.4 0.6 0.9 1.4 2.0 2.6 4.0 4.8 5.8 4.2 3.3 2.3 1.6 1.1 0.7 0.5 0.3 0.2 0.1 0.0 0.0 0.0 0.1 0.1 0.3 0.4 0.6 0.8 1.1 1.3 1.5 2.8 4.1 1.9 1.4 1.2 0.9 0.7 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.5 1.1 1.2 0.8 0.4 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 06/07/19 CITY COMMENTS TTK 22185 C6-LIGHT DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP, - TTK TTK RAS 18-22185 06/10/2019 C6-11 PHOTOMETRICS PLAN C6-11 PHOTOMETRICS PLAN 300 22185 C6-11 APPRO DEVELOPMENT BISCAYNE BUSINESS PARK MINNESOTAROSEMOUNT LIC. NO.DATE LIC. NO.DATE PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONREESE SUDTELGTE XX/XX/XXXX 54243 NOTE: THE CLARITY OF THESE PLANS DEPEND UPON COLOR COPIES. IF THIS TEXT DOES NOT APPEAR IN COLOR, THIS IS NOT AN ORIGINAL PLAN SET AND MAY RESULT IN MISINTERPRETATION. 0 SCALE IN FEET 20 40 60 157TH STREET 157TH STREET MEMORANDUM To: Kyle Klatt, Planner CC: Kim Lindquist, Community Development Director Brian Erickson, Director of Public Works/City Engineer From: Stephanie Smith, Assistant City Engineer Date: June 25, 2019 Subject: Biscayne Business Park Final Plat - Engineering Review SUBMITTAL: The plans for Biscayne Business Park have been prepared by I & S Group (ISG), dated June 7th, 2019. Engineering review comments were generated from the following documents included in the submittal: ▫ Final Plat ▫ Existing Survey and Removal Plan ▫ Site Plan ▫ Road and Utility Plan ▫ Grading Plan ▫ SWPPP ▫ Restoration and Landscaping Plans ▫ Lighting Plan ▫ Stormwater Management Report GENERAL COMMENTS: The applicant has applied for both a final plat of the entire site and a site plan for Lot 1, Block 1. Additional site plans will be submitted for the remaining lots as the applicant is ready to development them. Note: all site plans must meet the requirements for the overall development plat. 1. Development fees are required based on the current Schedule of Rates and Fees. For 2018, the estimated development fees are listed below:  GIS Fee: $10 / parcel  Storm Sewer Trunk Charge: $ 6,865 / acre  Sanitary Sewer Trunk Charge: $ 1,075 / acre  Watermain Trunk Charge: $ 6,500 / acre 2. The developer shall be responsible for a pro-rated share of the future cost associated with the improvement of Biscayne Avenue. The front-foot rate is $110/FF. 3. Plans must be signed by an engineer registered in the state of Minnesota prior to grading on site. RIGHT OF WAY AND EASEMENTS: 4. Permits are required for work in Right-of-Way (ROW). 5. The width of Drainage and Utility (D&U) easements over all public utilities shall be verified during final design. 6. Easements are required over all ponding and infiltration areas, and shall encompass at minimum the HWL and all naturally vegetated areas. Signage for easements shall be provided by the developer and an extended maintenance warranty shall be required to ensure establishment of the naturally vegetated areas. STREETS & PARKING LOTS 1. To maintain the integrity of the pavement, 157th Street shall have 24” ribbon curb. 2. Truck turning movements shall be shown on the plans for the driveway entrances. 3. The plans shall show the proposed radius for the cul-de-sac bubble. 4. The plan shall include an intersection detail for 157th Street and Biscayne Avenue. 5. The applicant shall submit a signage plan for review. 6. The street lighting plan shall be revised to comply with City standards. WATERMAIN AND SANITARY SEWER Biscayne Avenue does not have City sanitary main at this time. The applicant has proposed temporarily connecting to a Metropolitan Council sanitary manhole on Biscayne Avenue. 7. When City-owned sanitary main is installed on Biscayne Avenue (anticipated in 2020), the applicant shall permanently connect to City-sanitary. At the time of final plat, the applicant shall deposit a security with the City to cover the cost of the removal of the MCES connection, new connection to City sewer and restoration of the street. Plans and a cost estimate for this connection shall be submitted to the City prior to construction. 8. The water and sanitary main lines shall be owned and maintained by the City. 9. The proposed water service lines are 8” diameter. The applicant shall verify with City staff whether this is an appropriate service size for these properties. 10. The water and sanitary sewer construction plans shall be designed consistent with City of Rosemount Engineering Guidelines and Standard Specifications and Detail Plates. 11. Watermain and Sanitary Sewer will be revised during final design. Typical revisions will include number and placement of hydrants, gate valves and manholes. STORMWATER The stormwater management plan for this development proposes six infiltration basins with a total of 8 cells, three on the northern property line and three on the southern property line. 12. City Engineering Guideline’s direct the construction of regional basins to promote efficiencies in treatment and maintenance. As this development will continue to come to the City with additional site plans, staff recommends developing a temporary stormwater condition. As the applicant comes to staff with site plans, working towards consolidation of the number of basins to produce efficiencies in the treatment and maintenance of the stormwater system. 13. Stormwater facilities shall be owned and maintained by the business park’s HOA. The applicant shall enter into a Stormwater Management Agreement with the City to be recorded against the property. The agreement shall detail the applicant’s inspection and maintenance responsibilities for their stormwater BMPs. 14. Upon completion of the infiltration basins, the applicant’s engineer shall submit infiltrometer testing to certify the functionality of the basins as modeled. WSB Engineering reviewed the Biscayne Business Park plans on behalf of the City. The full memorandum, dated June 20, 2019, is included as an attachment. The recommendations are summarized below: 15. Preference to provide stormwater management through the use of a regional system versus site-by-site systems remains. Applicant will need to provide evidence for why a regional basin is not feasible if current stormwater management system is to be approved. Additionally, if a regional system is not feasible it is preferred that the stormwater system only be constructed to handle Lot 1 development at this time and that interim conditions stormwater modeling and plans be submitted. As the plans for the reconstruction of Biscayne Avenue are being developed, additional conversations between the City and the developer over possible collaboration for stormwater treatment for the Biscayne Business Park and the road reconstruction are recommended. 16. Based on the equalizer pipe elevation, it appears the maintained water level for the southwest basin will be set at 949.75. Similarly, it appears the maintained water level for the northwest basin will be set at 951.0. Applicant should update the pipe elevations or update the HydroCAD modeling as applicable. 17. Emergency overflow elevations and locations should be called out for all basins (SW, south, SE, NW, north and NE) to ensure water will not flood proposed and future buildings if pipes are not functioning as designed. 18. Grading between the 949 and 951 contours shown in the southeast pond have a slope of 2:1. Applicant should update grading to meet requirements listed above. Additionally, maintenance benches should be graded extending upwards from the NWL rather than below the water level surface as currently shown. 19. It is recommended that additional consideration be given to the design of the storm sewer northeast of the cul-de-sac. Applicant should consider providing additional separation between FES 5 and FES 6 by changing the ditch grading in the area. 20. It appears there is still HDPE proposed under driving surfaces. Pipes P2 and P3 are both called out as HDPE and are shown under a proposed driving surface. Applicant should update the plans so RCP pipes are being used under proposed driving surfaces, including future proposed driving surfaces. 21. Pipe P-2 should be upsized to a 15” pipe per the City Engineering Guidelines. 22. Applicant should add proposed roof drain locations to the plans. 23. It is unclear what area is being counted towards the ‘provided infiltration area’ in Table 3.1 of the stormwater management report. Applicant should include calculations for the provided infiltration area. 24. Dead pool calculations were not found in Appendix E. The contours below the surface water for the stormwater ponds should be included in the HydroCAD model to confirm required dead pool storage is being provided. 25. The area below the NWL of the ponds will need to be lined to ensure they hold water on a permanent basis as designed. SITE PLAN The following conditions of approval are for the site plan proposed at Lot 1, Block 1 of the Biscayne Business Park. 26. The site plan must meet the applicable conditions of approval for the overall development plat as listed above. 27. A 10-foot turnaround at the end of the parking lot shall be added to the plan. 28. Additional flow arrows shall be labeled on the grading plan. 29. Label the contour line northwest of the building corner to determine if that area is a rise or a depression. Should you have any questions or comments regarding the items listed above, please contact me at 651-322-2015. Attachment: WSB Memorandum Re: Biscayne Business Park Plan Review, dated 4/16/2019 MEMORANDUM To: Kim Lindquist, Community Development Director Kyle Klatt, Senior Planner Anthony Nemcek, Planner Brian Erickson, City Engineer/Public Works Director Stephanie Smith, Assistant City Engineer From: Dan Schultz, Parks and Recreation Director Date: June 18, 2019 Subject: Biscayne Business Park Final Plat The Parks and Recreation Department recently reviewed the plans for the Biscayne Business Park Final Plat. After reviewing the plans, the Parks and Recreation Department staff has the following comments: PARKS DEDICATION The parks dedication requirement for business park development is 10% of the land area or the cash in lieu of land at $8,500 per acre. The total cash in lieu of land dedication for the entire development is $112,880 ($8,500 per acre x 13.28 acres, which does not include road ROW). Staff is recommending that the City collect cash in lieu of land for the Biscayne Business Park and that the cash payment should be paid for each lot being created at the time of issuance of the building permit for each lot in the plat. The price per lot is $14,110. Please let me know if you have any questions about this memo.