Loading...
HomeMy WebLinkAbout7.a. 124th Court West and 121st Street West, City Project 2018-05 Public Improvement Hearing, Order Improvement and Preparation of Plans EXECUTIVE SUMMARY City Council Regular Meeting: July 16, 2019 AGENDA ITEM: 124th Court West and 121st Street West, City Project 2018-05: Public Improvement Hearing, Order Improvement and Preparation of Plans AGENDA SECTION: Public Hearing PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 7.a. ATTACHMENTS: Resolution; Affidavit of Mailing Public Hearing Notice APPROVED BY: LJM RECOMMENDED ACTION: Adopt a Resolution Ordering the Improvement and the Preparation of Plans and Specifications for 124th Court West and 121st Street West, City Project 2018-05 BACKGROUND On April 3, 2018, City Council approved a Joint Powers Agreement (JPA) with Dakota County for the reconstruction of Akron Ave (County Road 73). Then on February 5, 2019, City Council approved the first amendment to the JPA which adjusted the cost share for this project. Finally in February 19, 2019, City Council approved a proposal for engineering services from Kimley-Horn and Associates (KHA) for design of street and utilities. Currently, this project is in design and right of way acquisition. Construction will occur in 2020. Additionally, staff has reviewed the pavement condition in this area and has noted that there were local streets programmed in the Capital Improvement Plan for 2022. As a result, 121st Street and 124th Court were brought forward for construction in 2020 in order to take advantage of the large amount of paving involved in the Akron Avenue reconstruction. On May 30, City staff held an open house for the project. KHA was available to answer questions about the project. Comments were largely positive, as residents are aware of the distressed condition of their roadways. Comments received were summarized in the Feasibility Report. On June 18, 2019 the City Council received a Feasibility Report prepared by KHA. That report noted that a mill and overlay of the pavement was not appropriate due to the poor condition and has recommended that the streets receive a pavement reclamation and overlay. Overall, the report found this project to be feasible, cost effective and necessary. PROPOSED IMPROVEMENTS The existing roadways are proposed to be reclaimed, with the pavement and top inches of gravel base ground-up in place. Some of the grounds will be removed so new bituminous pavement can be installed at the existing elevation. This process will improve the upper level of the base course and allow entirely new asphalt pavement to be installed with minimal impact to driveways. I:\City Clerk\Agenda Items\Approved Items\7.x. 124th Court West and 121st Street West, City Project 2018-05 Public Improvement Hearing, Order Improvement and Preparation of Plans.docx The roadway section will continue to be rural, using ditches and driveway culverts to facilitate stormwater in this neighborhood. The project will include a small quantity of culvert replacement and ditch regrading where identified in the preliminary field inspections. COSTS AND FUNDING The Feasibility Report estimated the project cost at $406,000 which includes an estimated $33,000 for stormwater improvements. The costs and funding are shown in the following tables. Per the Rosemount Special Assessment Policy, the assessments are proposed to be divided among the 21 properties that have driveway access to either 121st Street or 124th Court. The assessment is estimated at: $130,550 / 21 properties = $6,216.67 per property Please note: this is an estimate. The final assessment amount will be determined at a future assessment hearing and will be based on the actual bids received for the project. SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Items marked “CC” will require City Council approval in order to move forward. CC Improvement Hearing, Order Improvement and July 16, 2019 Authorize Preparation of Plans & Specs CC Approve Plans & Specs and Order Advertisement for Bid November 5, 2019 Bid Opening February 5, 2020 CC Set Assessment Hearing and Award Contract March 5, 2020 Neighborhood Meeting March 18, 2020 CC Assessment Hearing April 7, 2020 Construction Summer 2020 2 RECOMMENDATION Staff recommends Council hold the public improvement hearing to receive comment on the proposed improvements and adopt the attached resolution ordering the proposed improvements, and the preparation of plans and specifications for 124th Court West and 121st Street West, City Project 2018-05. 3 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 - 60 A RESOLUTION ORDERING THE IMPROVEMENTS AND PREPARATION OF PLANS FOR 121ST STREET AND 124TH COURT IMPROVEMENTS, CITY PROJECT 2018-05 WHEREAS, a resolution of the city council adopted the 18th day of June, 2019, fixed a date for a council hearing on City Project 2018-05 for the improvement of 121st Street and 124th Court; WHEREAS, ten days’ mailed notice and two weeks’ published notice of the hearing was given, and the hearing was held thereon on the 16th day of July, 2019, at which all persons desiring to be heard were given an opportunity to be heard thereon; NOW THEREFORE BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROSEMOUNT MINNESOTA: 1. Such improvement is necessary, cost-effective, and feasible as detailed in the feasibility report. 2. Such improvement is hereby ordered as proposed in the council resolution adopted 16th day of July, 2019. 3. Such improvement has no relationship to the comprehensive municipal plan. 4. Kimley-Horn and Associates is hereby designated as the engineer for this improvement. The engineer shall prepare plans and specifications for the making of such improvement. 5. The city council declares its official intent to reimburse itself for the costs of the improvement from the proceeds of tax exempt bonds. ADOPTED this 16th day of July, 2019. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk