EXECUTIVE SUMMARY
Planning Commission Meeting: July 23, 2019
AGENDA ITEM: 19-38-SP: Request by Novel Energy
Solutions for a Site Plan Review of a
Solar Installation.
AGENDA SECTION:
Public Hearing
PREPARED BY: Anthony Nemcek, Planner AGENDA NO. 6.b.
ATTACHMENTS: Site Location; Site Plan; Grading Plan,
Erosion Control Plan; Details; Landscape
Plan; Images; Engineer’s Memo Dated
July 23, 2019
APPROVED BY: KL
RECOMMENDED ACTION:
Motion to Approve the Site Plan submitted by Novel Energy Solutions, subject to the
following conditions:
1. Applicant shall provide a landscaping surety in the amount of $15,180.
2. The execution of an encroachment agreement for the electrical wiring that will cross
the drainage and utility easement.
3. The applicant shall register the location of the electrical wires within the drainage
and utility easement with Gopher State One Call.
4. The applicant shall receive a grading permit prior to any excavation on the site.
5. Compliance with all the conditions contained within the Engineer’s Memo dated July,
23, 2019
SUMMARY
The Planning Commission is being asked to review a request for site plan review for a ground-mounted
solar installation on property owned by St. Joseph’s Catholic Church. The site is located within the R1-
Low Density Residential zoning district, and solar energy systems are a permitted accessory use in that
zoning district. The solar system is considered an accessory use because less than half of the site is
dedicated to the solar array with the remaining lands, approximately 17 acres being dedicated to church
use. However, the total area of the proposed solar installation is greater than 50% of the area of the
principal structure, in this case the church building. The ordinance exempts site plan review if the
accessory use is less than 50% of the principal structure, which in this case, a site plan is required. The
proposed installation meets or exceeds the standards contained within the City’s Alternative Energy
Systems ordinance, as well as the standards for accessory structures in the R1-Low Density Residential
zoning district. Staff is recommending approval of the site plan review.
BACKGROUND
Applicant: Paula Fitzgerald, Novel Energy Solutions
Property Owner: Church of St. Joseph of Rosemount
Location: 13900 Biscayne Avenue West
Area in Acres: 29.59 Acres total, 9.5 Acres project area
Comp. Guide Plan Designation: LDR – Low Density Residential
Current Zoning: R1-Low Density Residential
2
The subject site is located on the eastern portion of a parcel located in the southeast quadrant of the
intersection of Biscayne Avenue and Connemara Trail. The principal structure on the site, the church, was
constructed in 2002 when the Church of St. Joseph’s congregation moved from its former location along
South Robert Trail in downtown Rosemount. In 2014, The City Council amended the City zoning
ordinance to allow for alternative energy systems, which in this case the alternative energy system is a
ground mounted solar array. The proposed solar installation is “behind the meter” meaning any power
produced by the system will be used by the church. This differs from Community Solar Gardens (CSGs)
where the power generated is immediately purchased by a utility.
While the proposed solar array is not a CSG, due to its size and site plan requirement, staff recommended
the applicant submit a landscape plan that provides screening similar to that which is required in an interim
use permit for the CSG on the east end of Rosemount. Typically, Solar Energy Systems are approved by
staff administratively through the normal building permit process. Because the size of the array being
proposed is greater in area than 50% of the principal structure on the site, a site plan review is required by
City Code. The proposed array meets all the other standards required by the City Code for Alternative
Energy Systems, therefore staff is recommending the planning commission approve the site plan to allow
Novel Energy Solutions to install a solar array on property owned by the Church of St. Joseph.
SITE PLAN REVIEW
Site plan applications are approved by the Planning Commission and considered a Quasi-Judicial action.
As such, the City has a set of standards and requirements for review. Generally, if a site plan application
meets the ordinance requirements it must be approved. These standards are outlined in Section 11-2-12
(Alternative Energy Systems) and 11-10-3 (Site and Building Plan Review).
Land Use & Zoning .
The site is located within the R1-Low Density Residential zoning district. The church is a conditional use
in the R1-zoning district, and ground-mounted solar energy systems are an accessory use within that
zoning district. In addition to specific standards relating to Alternative Energy Systems found in 11-2-12
of the City Code, the proposed project must adhere to the setback requirements for accessory structures of
the zoning district in which the site is located. The proposed array meets all the lot standards of the R1-
Low Density Residential zoning district.
Standards for Accessory Structures in the R1-Low Density Residential Zoning District
Standard Required Proposed
Front (North) 30 ft. 153.5 ft.
Side (East) 10 ft. 100 ft.
Rear (South) 10 ft. 69 ft.
Maximum Lot Coverage 30% of entire parcel 23.25% of entire parcel
Alternative Energy Systems
In addition to the lot standards for the R1-Low Density Residential zoning district, the proposed solar
system must meet the standards set forth in Section 11-2-12: Alternative Energy Systems.
Height. The maximum height permitted for ground mounted solar systems is fifteen feet (15’). The plans
submitted by the applicant indicate the highest point from grade the proposed solar panels will reach is
8’9” as indicated in the attached details.
Landscaping and Screening. The Alternative Energy Systems ordinance requires that ground mounted solar
3
energy systems shall be screened from view of the public right of way to the extent possible without
reducing their efficiency by setback, berming, landscaping, walls or a combination thereof. No specific
requirements for screening from neighboring properties are listed in the City Code. Because of the size of
the project, staff recommended that the applicant enhance the existing landscaping by planting trees in
between the existing trees to better screen the installation from adjacent properties.
The landscaping plan provided by the applicant indicates that a total of 46 coniferous trees will be added
to the existing landscaping along the eastern and southern boundaries of the site which will provide
screening to 90% opacity. Because the northern site boundary features stormwater management
infrastructure, staff feels the screening requirement for a portion of that side of the solar array is met by
the existing landscaping along Connemara Trail as well as the increased setback created by the stormwater
ponding.
A low growing native grass mix will be seeded beneath the array while a pollinator mix is shown along the
perimeter of the array. A condition of approval is the provision of a landscaping surety in the amount of
$15,180 (46 trees @ $300 per tree, plus 10%) in conformance with the City’s landscaping ordinance.
While not required by the City Code, the plans submitted by the applicant show a security fence to be
installed around the array, between the buffer trees and the array and also along the drainage and utility
easement that bisects the project area. The final design of the fence will be reviewed for compliance with
the City Code during the permit review process.
Engineering
The Assistant City Engineer has reviewed the proposed solar array and provided comments in the
Engineer’s Memo dated July 23, 2019. The project site is bisected by a drainage and utility easement. The
project itself will be located outside all easements on the property, with a small exception being electrical
wiring connecting the two sections of the solar array. Staff is recommending as a condition of approval
entering into an encroachment agreement for the wiring. Additionally, the location of the wiring should be
registered with Gopher State One Call to ensure the lines can easily be located if work needs to take place
within the easement. A grading permit is required due to the volume of earth being excavated for this
project. The applicant shall apply for a grading permit and submit the necessary financial guarantee as
required by the City Code.
RECOMMENDATION
Based on the information provided by the applicant and reviewed in this memorandum, staff finds that the
proposed solar installation meets or exceeds the requirements for accessory structures in the R1-Low
Density Residential zoning district as well those contained in section 11-2-12: Alternative Energy Systems.
Staff is recommending approval of the site plan to allow Novel Energy Systems to construct a solar energy
system on the property owned by the Church of St. Joseph.
Dakota County, MN
Property Information
Ju ly 10 , 2019
0 875 1,750437.5 ft
0 270 540135 m
1:9,600
Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification.
Jun 24, 2019 - 3:26pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-C1-TITLE.dwg
C1.01
TITLE SHEET
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
06/24/201921770
Kathryn M. Melody P.E.
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
CIVIL ENGINEER
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT: MICHELE CARON
LANDSCAPE ARCHITECT
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT:
SURVEYOR
SAMBATEK
12800 WHITEWATER DRIVE, SUITE 300
MINNETONKA, MN 55343
TEL 763-476-6010
FAX 763-476-8532
CONTACT:
for
Preliminary Civil Site Plans
Novel Church of St. Joseph Solar LLC
Novel Energy Solutions
Dakota, Minnesota
Presented by:
NO SCALE
VICINITY MAP
SITE
CONSULTANT CONTACT LIST:
N.T.S.
CITY ENGINEER'S ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS (2013)
MNDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION (2016 EDITION)
GOVERNING SPECIFICATIONS
GEOTECHNICAL
TBD
TBD
TBD
TEL TBD
CONTACT: xxx
DEVELOPER
NOVEL ENERGY SOLUTIONS
1633 SOUTH ROBERT ST, SUITE A
WEST ST. PAUL, MN 55118
TEL 651-492-0462
CONTACT: TOBIAS BROWN
ELECTRICAL ENGINEER
CONSULTING ENGINEERS GROUP, INC.
21875 GRENADA AVE
LAKEVILLE, MN 55044
TEL 651-463-1183
CONTACT: STEPHEN KATZ
SHEET INDEX
SHEET DESCRIPTION
C1.01 TITLE SHEET
C3.01 PRELIMINARY SITE PLAN
C4.01 GRADING PLAN
C5.01 PHASE I EROSION CONTROL PLAN
C5.02 PHASE II EROSION CONTROL PLAN
C5.03 EROSION CONTROL NOTES AND DETAILS
C9.01 DETAILS
L1.01 LANDSCAPE PLAN
L1.02 LANDSCAPE NOTES-DETAILS
30' SETBA
C
K
30' SETBACK30' SETBACK
CONN
E
M
A
R
A
T
R
AI
L
-22.0%-23.5%-20
.3%
-
3
.
1%-20.3%-1.2%
-1.0%
-1.0%
-1.3%-1.2%
-1.3%-2.3%
-2.4%
-2.2%
-20.2%
-19.6%
-20.2%-20.4%
-24.1%
15' PANELS
TO FENCE 32'32' PANELSTO FENCE69' PANELSTO PROP LINE100' PANELS
TO PROP LINE
15' PANELS
TO FENCE
90' PANELS
TO PROP LINE
-1.2%-1.2%
-17.
8
%-9.3%-
3
.
0%
-
2
.
0%-4.7% Jun 24, 2019 - 3:26pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-C3-SITE REVEG.dwg
C3.01
PRELIMINARY
SITE PLAN
EQUIPMENT PAD
PROJECT SUMMARY
PROJECT NAME CHURCH OF ST. JOSEPH
SOLAR GARDEN
GARDEN OPERATOR NAME NOVEL SOLAR
APPLICATION POINT OF
CONTACT - PHONE (612) 345-7188
APPLICATION POINT OF
CONTACT - EMAIL
PAULA.FITZGERALD@
NOVELENERGY.BIZ
SOLAR GARDEN ADDRESS 13900 BISCAYNE AVE W
ROSEMOUNT, MN 55068
SYSTEM SIZE (AC)1 MW
AREA
GROSS SITE AREA
ARRAY AREA
ZONING
EXISTING ZONING
EXISTING USE
INTENDED USE
ARRAY AREA IMPERVIOUS
EXISTING
PROPOSED
29.6 AC
±9.5 AC
R1-LOW DENSITY RESDIDENTIAL
VACANT
SOLAR
0.00 AC
1.63 AC
PROPERTY LIMIT
ARRAY LIMITS
ACCESS ROAD
EQUIPMENT PAD
WETLAND
FENCE
EXISTING DRAINAGE PATTERN
SETBACKS
FRONT
SIDE
REAR
30 FEET
30 FEET
30 FEET
1.THIS CONCEPT PLAN IS INTENDED TO IDENTIFY THE APPROXIMATE
AREA REQUIRED FOR THE SOLAR GARDEN, LEASE AREA LIMITS,
ACCESS AND PROPOSED POINT OF CONNECTION LOCATION.
2.A PERIMETER SECURITY FENCE WILL BE INSTALLED AROUND THE
SYSTEM.
3.PROPERTY LINES ARE PROVIDED FROM PUBLICLY AVAILABLE COUNTY
GIS INFORMATION.
4.CONTOURS WITHIN PROJECT AREA SHOWN ARE BASED ON SURVEY
INFORMATION. CONTOURS OUTSIDE OF PROJECT AREA ARE BASED
ON LIDAR.
5.EASEMENTS WILL BE PROVIDED FOR ACCESS AND THE ELECTRICAL
UTILITY SYSTEM.
6.APPROXIMATE WETLAND LIMITS ARE TAKEN FROM NATIONAL
WETLAND INVENTORY (NWI) MAPPING.
7.PROPOSED ELECTRICAL LINES OUTSIDE OF FENCED PERIMETER WILL
BE UNDERGROUND.
8.TREE AND SHRUB SCREENING FOR RESIDENTIAL & PUBLIC R.O.W.
WILL BE PROVIDED AS DETERMINED IN CONJUNCTION WITH THE
PERMITTING AGENCY AT THE TIME OF DESIGN. (TYPES, SIZES &
SPACING OF PLANTS)
9.REFER TO SHEET C1.01 FOR LANDSCAPE PLAN.
10.REFER TO SHEET C9.01 FOR DETAILS.
TREE/SHRUB SCREENING
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
06/24/201921770
Kathryn M. Melody P.E.
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
NOTES
DEVELOPMENT SUMMARY LEGEND
SCALE IN FEET
0
NORTH
10050
CONNECT TO
EXISTING DRIVEWAY
BUFFER YARD: A BUFFER YARD EQUAL TO THIRTY FEET (30') OR TWO (2)
TIMES THE HEIGHT OF THE BUILDING, WHICHEVER IS GREATER, SHALL BE
REQUIRED ALONG ANY SIDE OR REAR PROPERTY LINE ABUTTING ANY
RESIDENTIAL USE. THIS AREA SHALL CONTAIN LANDSCAPING AND BERMING TO
PROVIDE A NINETY PERCENT (90%) OPACITY SCREEN TO A HEIGHT OF AT LEAST
SIX FEET (6') AND SHALL NOT CONTAIN ANY STRUCTURES, PARKING, OFF
STREET LOADING OR STORAGE. SHOULD LANDSCAPING AND BERMING BE
FOUND INEFFECTIVE BY THE CITY, THE CITY MAY APPROVE SCREENING WALLS
AND/OR DECORATIVE FENCING AS AN ALTERNATIVE. SCREENING WALLS SHALL
BE CONSTRUCTED OF THE SAME MATERIALS AS THE PRINCIPAL BUILDING AND
SHALL NOT EXTEND MORE THAN TWENTY FIVE FEET (25') WITHOUT A CHANGE
IN ARCHITECTURE TO REDUCE THEIR MASS AND APPEARANCE.
1.0%
PROPOSED
±3600 SF
GRAVEL DRIVE
CONNECT TO
EXISTING DRIVEWAY
PROPOSED
±3000 SF
GRAVEL DRIVE
10' ELECTRICAL
EQUIPMENT
TRENCH
STORMWATER
BASIN
STORMWATER
BASIN
STORMWATER BASIN
CONN
E
M
A
R
A
T
R
AI
L
30' SETBA
C
K
30' SETBACK30' SETBACK
965.91
965.57
965.28
965.00
964.79
964.62
963.70
963.50964.05
965.16
965.25
965.81
966.08
965.05
965.40 964.83
964.46
964.80
964.73
964.30
963.76 962.98
963.10
964.24965963964962963964
96596496096096096196
1
96196
2
963 960960960961961960961961
FES 01
IE=962.50
FES 02
IE=962.00
NOTE:
SEE TYPICAL ACCESS
ROAD SECTION
DETAIL 03, SHEET
C9.01
50 LF - 15" CMP @ 1.00%
SCALE IN FEET
0 10050
NORTH
Jun 24, 2019 - 3:26pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-C4 GRADING.dwg
C4.01
GRADING PLAN
LEGEND
EASEMENT
PIPE BOLLARD
GRAVEL DRIVE
PROPERTY LIMIT
EXISTINGPROPOSED
WETLAND LIMITS
TREELINE
SETBACK
CHAIN LINK FENCE
SOLAR PANELS
LAYDOWN AREA
LEASE AREA
902.5
X
902
SPOT ELEVATION
CONTOUR
RIP RAP
STORM SEWER
LIMITS OF DISTURBANCE
1.PROPOSED CONTOURS ARE TO FINISHED SURFACE ELEVATION. SPOT ELEVATIONS ALONG PROPOSED CURB DENOTE GUTTER GRADE.
2.CONTRACTOR SHALL REVIEW PAVEMENT GRADIENT AND CONSTRUCT “GUTTER OUT” WHERE WATER DRAINS AWAY FROM
CURB. ALL OTHER AREAS SHALL BE CONSTRUCTED AS “GUTTER IN” CURB.
3.ALL GRADIENT ON SIDEWALKS ALONG THE ADA ROUTE SHALL HAVE A MAXIMUM LONGITUDINAL SLOPE OF 5% (1:20), EXCEPT AT
CURB RAMPS (1:12), AND A MAXIMUM CROSS SLOPE OF 1.50%. MAXIMUM SLOPE IN ANY DIRECTION ON AN ADA PARKING STALL OR
ACCESS AISLE SHALL BE IN 1.50%. CONTRACTOR SHALL REVIEW AND VERIFY THE GRADIENT IN THE FIELD ALONG THE ADA ROUTES
PRIOR TO PLACING CONCRETE OR BITUMINOUS. CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY IF THERE IS A
DISCREPANCY BETWEEN THE GRADIENT IN THE FIELD VERSUS THE DESIGN GRADIENT. COORDINATE ALL WORK WITH PAVING
CONTRACTOR.
4.CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO ADJACENT PROPERTIES DURING THE
CONSTRUCTION PHASES OF THIS PROJECT. CONTRACTOR WILL BE HELD SOLELY RESPONSIBLE FOR ANY DAMAGES TO THE ADJACENT
PROPERTIES OCCURRING DURING THE CONSTRUCTION PHASES OF THIS PROJECT.
5.SAFETY NOTICE TO CONTRACTORS: IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR WILL BE
SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY
DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE CONTRACTOR'S
PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY MEASURES IN, ON OR
NEAR THE CONSTRUCTION SITE.
6.CONTRACTOR SHALL COMPLETE THE SITE GRADING CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE OWNER'S
SOILS ENGINEER. ALL SOIL TESTING SHALL BE COMPLETED BY THE OWNER'S SOILS ENGINEER. CONTRACTOR SHALL BE RESPONSIBLE
FOR COORDINATING ALL REQUIRED SOIL TESTS AND INSPECTIONS WITH THE SOILS ENGINEER.
A GEOTECHNICAL ENGINEERING SOILS REPORT HAS BEEN COMPLETED BY:
COMPANY: TBD
ADDRESS: TBD
PHONE: TBD
DATED: TBD
CONTRACTOR SHALL OBTAIN A COPY OF THE SOILS REPORT.
7.CONTRACTOR SHALL COMPLETE DEWATERING AS REQUIRED TO COMPLETE THE SITE GRADING CONSTRUCTION.
8.PRIOR TO PLACEMENT OF THE AGGREGATE BASE, A TEST ROLL SHALL BE PERFORMED ON THE STREET AND PARKING AREA SUBGRADE.
CONTRACTOR SHALL PROVIDE A LOADED TANDEM AXLE TRUCK WITH A GROSS WEIGHT OF 25 TONS. THE TEST ROLLING SHALL BE AT
THE DIRECTION OF THE SOILS ENGINEER AND SHALL BE COMPLETED IN AREAS AS DIRECTED BY THE SOILS ENGINEER. CORRECTION OF
THE SUBGRADE SOILS SHALL BE COMPLETED IN ACCORDANCE WITH THE REQUIREMENTS OF THE SOILS ENGINEER.
9.REPLACE ALL SUBGRADE SOIL DISTURBED DURING THE CONSTRUCTION THAT HAVE BECOME UNSUITABLE AND WILL NOT PASS A TEST
ROLL. REMOVE UNSUITABLE SOIL FROM THE SITE AND IMPORT SUITABLE SOIL AT NO ADDITIONAL COST TO THE OWNER.
10.CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING VEHICULAR AND PEDESTRIAN TRAFFIC CONTROL DEVICES
SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, FLAGMEN AND LIGHTS TO CONTROL THE MOVEMENT OF TRAFFIC
WHERE NECESSARY. TRAFFIC CONTROL DEVICES SHALL CONFORM TO APPROPRIATE MINNESOTA DEPARTMENT OF TRANSPORTATION
STANDARDS.
11.EXISTING TREES AND OTHER NATURAL VEGETATION WITHIN THE PROJECT AND/OR ADJACENT TO THE PROJECT ARE OF PRIME
CONCERN TO THE CONTRACTOR'S OPERATIONS AND SHALL BE A RESTRICTED AREA. CONTRACTOR SHALL PROTECT TREES TO REMAIN
AT ALL TIMES. EQUIPMENT SHALL NOT NEEDLESSLY BE OPERATED UNDER NEARBY TREES AND EXTREME CAUTION SHALL BE
EXERCISED WHEN WORKING ADJACENT TO TREES. SHOULD ANY PORTION OF THE TREE BRANCHES REQUIRE REMOVAL TO PERMIT
OPERATION OF THE CONTRACTOR'S EQUIPMENT, CONTRACTOR SHALL OBTAIN THE SERVICES OF A PROFESSIONAL TREE TRIMMING
SERVICE TO TRIM THE TREES PRIOR TO THE BEGINNING OF OPERATION. SHOULD CONTRACTOR'S OPERATIONS RESULT IN THE
BREAKING OF ANY LIMBS, THE BROKEN LIMBS SHOULD BE REMOVED IMMEDIATELY AND CUTS SHALL BE PROPERLY PROTECTED TO
MINIMIZE ANY LASTING DAMAGE TO THE TREE. NO TREES SHALL BE REMOVED WITHOUT AUTHORIZATION BY THE ENGINEER. COSTS
FOR TRIMMING SERVICES SHALL BE CONSIDERED INCIDENTAL TO THE GRADING CONSTRUCTION AND NO SPECIAL PAYMENT WILL BE
MADE.
12.EXCAVATE TOPSOIL FROM AREAS TO BE FURTHER EXCAVATED OR REGRADED AND STOCKPILE IN AREAS DESIGNATED ON THE SITE.
CONTRACTOR SHALL SALVAGE ENOUGH TOPSOIL FOR RESPREADING ON THE SITE AS SPECIFIED. EXCESS TOPSOIL SHALL BE PLACED IN
EMBANKMENT AREAS, OUTSIDE OF BUILDING PADS, ROADWAYS AND PARKING AREAS. CONTRACTOR SHALL SUBCUT CUT AREAS,
WHERE TURF IS TO BE ESTABLISHED, TO A DEPTH OF 6 INCHES. RESPREAD TOPSOIL IN AREAS WHERE TURF IS TO BE ESTABLISHED TO
A MINIMUM DEPTH OF 6 INCHES.
13.FINISHED GRADING SHALL BE COMPLETED, CONTRACTOR SHALL UNIFORMLY GRADE AREAS WITHIN LIMITS OF GRADING, INCLUDING
ADJACENT TRANSITION AREAS. PROVIDE A SMOOTH FINISHED SURFACE WITHIN SPECIFIED TOLERANCES, WITH UNIFORM LEVELS OR
SLOPES BETWEEN POINTS WHERE ELEVATIONS ARE SHOWN, OR BETWEEN SUCH POINTS AND EXISTING GRADES. AREAS THAT HAVE
BEEN FINISHED GRADED SHALL BE PROTECTED FROM SUBSEQUENT CONSTRUCTION OPERATIONS, TRAFFIC AND EROSION. REPAIR
ALL AREAS THAT HAVE BECOME RUTTED, ERODED OR HAS SETTLED BELOW THE CORRECT GRADE. ALL AREAS DISTURBED BY THE
CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO EQUAL OR BETTER THAN ORIGINAL CONDITION OR TO THE REQUIREMENTS OF
THE NEW WORK.
14.TOLERANCES
14.a.THE STREET OR PARKING AREA SUBGRADE FINISHED SURFACE ELEVATION SHALL NOT VARY BY MORE THAN 0.05 FOOT
ABOVE, OR 0.10 FOOT BELOW, THE PRESCRIBED ELEVATION OF ANY POINT WHERE MEASUREMENT IS MADE.
14.b.AREAS WHICH ARE TO RECEIVE TOPSOIL SHALL BE GRADED TO WITHIN 0.30 FOOT ABOVE OR BELOW THE REQUIRED
ELEVATION, UNLESS DIRECTED OTHERWISE BY THE ENGINEER.
14.c.TOPSOIL SHALL BE GRADED TO PLUS OR MINUS 1/2 INCH OF THE SPECIFIED THICKNESS.
15.AFTER THE SITE GRADING IS COMPLETED, IF EXCESS OR SHORTAGE OF SOIL MATERIAL EXISTS, CONTRACTOR SHALL TRANSPORT ALL
EXCESS SOIL MATERIAL OFF THE SITE TO AN AREA SELECTED BY THE CONTRACTOR, OR IMPORT SUITABLE MATERIAL TO THE SITE.
16.CONTRACTOR SHALL DETERMINE THE LOCATION OF ANY HAUL ROADS THAT MAY BE REQUIRED TO COMPLETE THE SITE GRADING
CONSTRUCTION AND SHALL INDICATE HAUL ROADS ON EROSION AND SEDIMENT CONTROL “SITE MAP”. CONTRACTOR SHALL
COMPLY WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY OF EACH ROADWAY. CONTRACTOR SHALL POST WHATEVER
SECURITY, AND COMPLY WITH ALL CONDITIONS WHICH ARE REQUIRED BY EACH GOVERNING AUTHORITY OF EACH ROADWAY.
GRADING NOTES Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
06/24/201921770
Kathryn M. Melody P.E.
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
CONN
E
M
A
R
A
T
R
AI
L
E-1
0.52 AC
E-2
1.44 AC
E-3
6.05 AC
SCALE IN FEET
0 10050
NORTH
Jun 24, 2019 - 3:27pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-C5 EROS.dwg
C5.01
PHASE I
EROSION
CONTROL PLAN
TEMPORARY STABILIZATION MEASURES
(SEED, MULCH, MATS OR BLANKETS AS
OUTLINED IN THE SWPPP)
TEMPORARY STORAGE AND PARKING AREA
DIRECTION OF
OVERLAND FLOW
TEMPORARY DIVERSION
DITCH
LIMITS OF DRAINAGE
SUB-BASIN
INLET PROTECTION DEVICE 1
INLET PROTECTION DEVICE 2
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
LIMITS OF DISTURBANCE
CONTOUR
RIP RAP
CHECK DAM
SILT FENCE
EXISTINGPROPOSED
STORM SEWER
SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
TEMPORARY CONTROL MEASURES
STRIP & STOCKPILE TOPSOIL
ROUGH GRADE / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDING CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING / SEED / FINAL STABILIZATION
STORM FACILITIES
NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL
THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP,
INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS,
SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE
NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL
REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE
RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE.
TSM
TS
SB
EROSION CONTROL MATERIALS
QUANTITIES
ITEM UNIT QUANTITY
SILT FENCE LINEAR FEET 2,058
SILT DIKE LINEAR FEET 0
BIO-ROLL LINEAR FEET 0
INLET PROTECTION UNIT 0
CONSTRUCTION ENTRANCE UNIT 2
SILT DIKE
BIO-ROLL
LEGEND
NOTE TO CONTRACTOR
IP-1
902
* REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE
NOTES, LOCATION MAPS, AND STANDARD DETAILS
LEASE AREA
PROPERTY LIMIT
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL C. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
06/24/201921770
Kathryn M. Melody P.E.
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
CONN
E
M
A
R
A
T
R
AI
L
30' SETBA
C
K
30' SETBACK30' SETBACK
P-1
0.52 AC
P-2
4.54 AC
P-3
2.95 AC
SCALE IN FEET
0 ######
NORTH
Jun 24, 2019 - 3:27pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-C5 EROS.dwg
C5.02
PHASE II
EROSION
CONTROL PLAN
SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
THE EROSION CONTROL PLAN SHEETS ALONG WITH THE REST OF THE SWPPP MUST BE KEPT ONSITE UNTIL
THE NOTICE OF TERMINATION IS FILED WITH THE MPCA, THE CONTRACTOR MUST UPDATE THE SWPPP,
INCLUDING THE EROSION CONTROL PLAN SHEETS AS NECESSARY TO INCLUDE ADDITIONAL REQUIREMENTS,
SUCH AS ADDITIONAL OR MODIFIED BMPS DESIGNED TO CORRECT PROBLEMS IDENTIFIED. AFTER FILING THE
NOTICE OF TERMINATION, THE SWPPP, INCLUDING THE EROSION CONTROL PLAN SHEETS, AND ALL
REVISIONS TO IT MUST BE SUBMITTED TO THE OWNER, TO BE KEPT ON FILE IN ACCORDANCE WITH THE
RECORD RETENTION REQUIREMENTS DESCRIBED IN THE SWPPP NARRATIVE.
EROSION CONTROL MATERIALS
QUANTITIES
ITEM UNIT QUANTITY
SILT FENCE LINEAR FEET 2,058
SILT DIKE LINEAR FEET 0
BIO-ROLL LINEAR FEET 0
INLET PROTECTION UNIT 0
CONSTRUCTION ENTRANCE UNIT 2
NOTE TO CONTRACTOR
* REFER TO SHEET C5.03 FOR GENERAL NOTES, MAINTENANCE
NOTES, LOCATION MAPS, AND STANDARD DETAILS
TEMPORARY STABILIZATION MEASURES
(SEED, MULCH, MATS OR BLANKETS AS
OUTLINED IN THE SWPPP)
TEMPORARY STORAGE AND PARKING AREA
DIRECTION OF
OVERLAND FLOW
TEMPORARY DIVERSION
DITCH
LIMITS OF DRAINAGE
SUB-BASIN
INLET PROTECTION DEVICE 1
INLET PROTECTION DEVICE 2
TEMPORARY STONE
CONSTRUCTION ENTRANCE
TEMPORARY SEDIMENT BASIN
LIMITS OF DISTURBANCE
CONTOUR
RIP RAP
CHECK DAM
SILT FENCE
EXISTINGPROPOSED
STORM SEWER
TSM
TS
SB
SILT DIKE
BIO-ROLL
LEGEND
IP-1
902
LEASE AREA
PROPERTY LIMIT
THE SUBSURFACE UTILITY INFORMATION SHOWN ON THESE PLANS IS A UTILITY QUALITY LEVEL C. THIS QUALITY LEVEL WAS DETERMINED
ACCORDING TO THE GUIDELINES OF ASCE/CI 38-02, TITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING
SUBSURFACE UTILITY DATA." THE CONTRACTOR AND/OR SUBCONTRACTORS SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING
UTILITIES BEFORE COMMENCING WORK, BY CONTACTING THE NOTIFICATION CENTER (GOPHER STATE ONE FOR MINNESOTA). THE
CONTRACTOR AND/OR SUBCONTRACTOR AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES, WHICH MIGHT BE OCCASIONED BY
HIS OR HER FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UTILITIES (UNDERGROUND AND OVERHEAD).
IF THE CONTRACTOR ENCOUNTERS ANY DRAIN TILE WITHIN THE SITE, HE OR SHE SHALL NOTIFY THE ENGINEER WITH THE LOCATION, SIZE,
INVERT AND IF THE TILE LINE IS ACTIVE. NO DRAIN TILE SHALL BE BACKFILLED WITHOUT APPROVAL FROM THE PROJECT ENGINEER.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED
IMPROVEMENTS SHOWN ON THE PLANS.
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
06/24/201921770
Kathryn M. Melody P.E.
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
SOIL EROSION / SEDIMENTATION CONTROL OPERATION TIME SCHEDULE
CONSTRUCTION SEQUENCE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUN
TEMPORARY CONTROL MEASURES
STRIP & STOCKPILE TOPSOIL
ROUGH GRADE / SEDIMENT CONTROL
TEMPORARY CONSTRUCTION ROADS
FOUNDATION / BUILDING CONSTRUCTION
SITE CONSTRUCTION
PERMANENT CONTROL STRUCTURES
FINISH GRADING
LANDSCAPING / SEED / FINAL STABILIZATION
STORM FACILITIES
NOTE: CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE
Jun 24, 2019 - 3:27pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-C5 EROS.dwg
C5.03
EROSION
CONTROL
NOTES AND
DETAILS
ALL MEASURES STATED ON THIS EROSION AND SEDIMENT CONTROL PLAN, AND IN THE STORM WATER POLLUTION PREVENTION PLAN SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL NO
LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABILIZATION OF THE SITE. THE DESIGNATED CONTACT PERSON NOTED ON THIS PLAN MUST ROUTINELY INSPECT THE CONSTRUCTION
ON SITE ONCE EVERY SEVEN DAYS DURING ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER THAN 0.5 INCHES IN 24 HOURS. ALL EROSION AND SEDIMENTATION
CONTROL MEASURES SHALL BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING:
1.ALL SILT FENCES MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WHEN THEY BECOME NONFUNCTIONAL OR THE SEDIMENT REACHES 1/3 OF THE HEIGHT OF THE FENCE. THESE REPAIRS MUST BE
MADE WITHIN 24 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS.
2.TEMPORARY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND THE SEDIMENT REMOVED WHEN THE DEPTH OF SEDIMENT COLLECTED IN THE BASIN REACHES 1/2 THE STORAGE
VOLUME. DRAINAGE AND REMOVAL MUST BE COMPLETED WITHIN 72 HOURS OF DISCOVERY, OR AS SOON AS FIELD CONDITIONS ALLOW ACCESS (SEE PART IV.D. OF THE GENERAL PERMIT).
3.SURFACE WATERS, INCLUDING DRAINAGE DITCHES AND CONVEYANCE SYSTEMS, MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT BEING DEPOSITED BY EROSION. CONTRACTOR MUST REMOVE ALL
DELTAS AND SEDIMENT DEPOSITED IN SURFACE WATERS, INCLUDING DRAINAGE WAYS, CATCH BASINS, AND OTHER DRAINAGE SYSTEMS, AND RESTABILIZE THE AREAS WHERE SEDIMENT REMOVAL
RESULTS IN EXPOSED SOIL. THE REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) DAYS OF DISCOVERY UNLESS PRECLUDED BY LEGAL, REGULATORY, OR PHYSICAL ACCESS
CONSTRAINTS. CONTRACTOR SHALL USE ALL REASONABLE EFFORTS TO OBTAIN ACCESS. IF PRECLUDED, REMOVAL AND STABILIZATION MUST TAKE PLACE WITHIN SEVEN (7) CALENDAR DAYS OF
OBTAINING ACCESS. CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL LOCAL, REGIONAL, STATE AND FEDERAL AUTHORITIES AND RECEIVING ANY APPLICABLE PERMITS, PRIOR TO CONDUCTING
ANY WORK.
4.CONSTRUCTION SITE VEHICLE EXIT LOCATIONS MUST BE INSPECTED FOR EVIDENCE OF OFF-SITE SEDIMENT TRACKING ONTO PAVED SURFACES. TRACKED SEDIMENT MUST BE REMOVED FROM ALL
OFF-SITE PAVED SURFACES, WITHIN 24 HOURS OF DISCOVERY, OR IF APPLICABLE, WITHIN A SHORTER TIME TO COMPLY WITH PART IV.C.6 OF THE GENERAL PERMIT.
5.CONTRACTOR IS RESPONSIBLE FOR THE OPERATION AND MAINTENANCE OF TEMPORARY AND PERMANENT WATER QUALITY MANAGEMENT BMPS, AS WELL AS ALL EROSION PREVENTION AND
SEDIMENT CONTROL BMPS, FOR THE DURATION OF THE CONSTRUCTION WORK AT THE SITE. THE PERMITTEE(S) ARE RESPONSIBLE UNTIL ANOTHER PERMITTEE HAS ASSUMED CONTROL (ACCORDING
TO PART II.B.5 OF THE MPCA GENERAL PERMIT) OVER ALL AREAS OF THE SITE THAT HAVE NOT BEEN FINALLY STABILIZED OR THE SITE HAS UNDERGONE FINAL STABILIZATION, AND A (N.O.T.) HAS
BEEN SUBMITTED TO THE MPCA.
6.IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE ACCUMULATIONS OF SEDIMENT MUST BE REMOVED IN A MANNER AND AT A FREQUENCY SUFFICIENT TO MINIMIZE OFF-SITE IMPACTS
(E.G., FUGITIVE SEDIMENT IN STREETS COULD BE WASHED INTO STORM SEWERS BY THE NEXT RAIN AND/OR POSE A SAFETY HAZARD TO USERS OF PUBLIC STREETS).
7.ALL INFILTRATION AREAS MUST BE INSPECTED TO ENSURE THAT NO SEDIMENT FROM ONGOING CONSTRUCTION ACTIVITIES IS REACHING THE INFILTRATION AREA AND THESE AREAS ARE PROTECTED
FROM COMPACTION DUE TO CONSTRUCTION EQUIPMENT DRIVING ACROSS THE INFILTRATION AREA.
1.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. WHERE A CONFLICT EXISTS BETWEEN LOCAL JURISDICTIONAL STANDARD SPECIFICATIONS
AND SAMBATEK STANDARD SPECIFICATIONS, THE MORE STRINGENT SPECIFICATION SHALL APPLY.
2.THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IS COMPRISED OF THIS DRAWING (EROSION & SEDIMENTATION CONTROL PLAN-ESC PLAN), THE STANDARD DETAILS, THE PLAN
NARRATIVE, AND ITS APPENDICES, PLUS THE PERMIT AND ALL SUBSEQUENT REPORTS AND RELATED DOCUMENTS.
3.CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETING & SUBMITTING THE APPLICATION FOR THE MPCA GENERAL STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY. ALL CONTRACTORS AND
SUBCONTRACTORS INVOLVED WITH STORM WATER POLLUTION PREVENTION SHALL OBTAIN A COPY OF THE SWPPP AND THE STATE OF MINNESOTA NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM GENERAL PERMIT (NPDES PERMIT) AND BECOME FAMILIAR WITH THE CONTENTS. THE SWPPP AND ALL OTHER RELATED DOCUMENTS MUST BE KEPT AT THE SITE DURING CONSTRUCTION.
(NOTE TO THE PREPARER: EDIT APPLICATION PROCESS PER PROJECT REQUIREMENTS)
4.CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES (BMP'S) AS REQUIRED BY THE SWPPP & PERMITS. CONTRACTOR SHALL OVERSEE THE INSPECTION & MAINTENANCE OF THE BMP'S
AND EROSION PREVENTION FROM BEGINNING OF CONSTRUCTION AND UNTIL CONSTRUCTION IS COMPLETED, IS APPROVED BY ALL AUTHORITIES, AND THE NOTICE OF TERMINATION (NOT) HAS BEEN
FILED WITH THE MPCA BY EITHER THE OWNER OR OPERATOR AS APPROVED ON PERMIT. ADDITIONAL BMP'S SHALL BE IMPLEMENTED AS DICTATED BY CONDITIONS AT NO ADDITIONAL COST TO
OWNER THROUGHOUT ALL PHASES OF CONSTRUCTION. (NOTE TO THE PREPARER: REVISE INSPECTION RESPONSIBILITY PER OPTIONS IN SWPPP NARRATIVE (SECTION 02370))
5.CONTRACTOR SHALL COMPLY WITH TRAINING REQUIREMENTS IN PART III.A.2 OF THE GENERAL PERMIT.
6.BMP'S AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS
DIRECTED BY PERMITTING AGENCY OR OWNER.
7.ESC PLAN MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL
TIMES.
8.CONTRACTOR SHALL MINIMIZE CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED BY THE GENERAL PERMIT. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THE ESC PLANS
SHALL BE CLEARLY DELINEATED (E.G. WITH FLAGS, STAKES, SIGNS, SILT FENCE, ETC.) ON THE DEVELOPMENT SITE BEFORE WORK BEGINS. GROUND DISTURBING ACTIVITIES MUST NOT OCCUR OUTSIDE
THE LIMITS OF DISTURBANCE.
9.GENERAL CONTRACTOR SHALL DENOTE ON PLAN THE TEMPORARY PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE
PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, OFFICE TRAILERS, AND TOILET FACILITIES.
10.ALL WASH WATER (CONCRETE TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND SHALL BE CONTAINED AND PROPERLY TREATED OR
DISPOSED. NO ENGINE DEGREASING IS ALLOWED ON SITE.
11.ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. A COMPACTED CLAY
LINER IS NOT ACCEPTABLE. THE LIQUID AND SOLID WASTES MUST NOT CONTACT THE GROUND, AND THERE MUST NOT BE RUNOFF FROM THE CONCRETE WASHOUT OPERATIONS OR AREAS. LIQUID
AND SOLID WASTES MUST BE DISPOSED OF PROPERLY AND IN COMPLIANCE WITH MPCA REGULATIONS. A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE
EQUIPMENT OPERATORS TO UTILIZE THE PROPER FACILITIES. SELF-CONTAINED CONCRETE WASHOUTS ON CONCRETE DELIVERY TRUCKS ARE ALLOWED.
12.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS AND
LEAKS.
13.DUST ON THE SITE SHALL BE CONTROLLED. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED.
14.SOLID WASTE: COLLECTED SEDIMENT, ASPHALT & CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, FABRIC, CONSTRUCTION & DEMOLITION DEBRIS & OTHER WASTES MUST BE DISPOSED OF
PROPERLY & MUST COMPLY WITH MPCA DISPOSAL REQUIREMENTS.
15.HAZARDOUS MATERIALS: OIL, GASOLINE, PAINT & ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILLS, LEAKS OR OTHER
DISCHARGE. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE & DISPOSAL OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA
REGULATIONS.
16.ALL STORM WATER POLLUTION PREVENTION MEASURES PRESENTED ON THIS PLAN, AND IN THE SWPPP, SHALL BE INITIATED AS SOON AS PRACTICABLE AND PRIOR TO SOIL DISTURBING ACTIVITIES
UPSLOPE.
17.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS STOPPED SHALL BE TEMPORARILY SEEDED, WITHIN 14 DAYS OF INACTIVITY. SEEDING SHALL BE IN ACCORDANCE WITH
MN/DOT SEED MIXTURE NUMBER 21-111 OR 21-112 DEPENDING ON THE SEASON OF PLANTING ( SEE MN/DOT SPECIFICATION SECTION 2575.3) SEEDING METHOD AND APPLICATION RATE SHALL
CONFORM TO MN/DOT SPECIFICATION SECTION 2575.3. TEMPORARY MULCH SHALL BE APPLIED IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3F1 AND 2575.3G. ALTERNATIVELY,
HYDRAULIC SOIL STABILIZER IN ACCORDANCE WITH MN/DOT SPECIFICATION SECTION 2575.3H MAY BE USED IN PLACE OF TEMPORARY MULCH.
18.DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY STOPPED SHALL BE PERMANENTLY STABILIZED. THESE AREAS SHALL BE STABILIZED IN ACCORDANCE WITH
THE TIME TABLE DESCRIBED ABOVE. REFER TO THE GRADING PLAN AND/OR LANDSCAPE PLAN FOR VEGETATIVE COVER.
19.CONTRACTORS OR SUBCONTRACTORS WILL BE RESPONSIBLE FOR REMOVING SEDIMENT FROM CONVEYANCES & FROM TEMPORARY SEDIMENTATION BASINS THAT ARE TO BE USED AS PERMANENT
WATER QUALITY MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING WASHED BACK INTO THE BASIN, CONVEYANCES, OR DRAINAGEWAYS DISCHARGING OFF-SITE OR
TO SURFACE WATERS. THE CLEANOUT OF PERMANENT BASINS MUST BE SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY.
20.ON-SITE & OFF-SITE SOIL STOCKPILE AND BORROW AREAS SHALL BE PROTECTED FROM EROSION AND SEDIMENTATION THROUGH IMPLEMENTATION OF BMP'S. STOCKPILE AND BORROW AREA
LOCATIONS SHALL BE NOTED ON THE SITE MAP AND PERMITTED IN ACCORDANCE WITH GENERAL PERMIT REQUIREMENTS.
21.TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCE OR OTHER EFFECTIVE SEDIMENT CONTROLS & CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORMWATER CONVEYANCES SUCH AS
CURB & GUTTER SYSTEMS OR CONDUITS & DITCHES.
22.SLOPES SHALL BE LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION.
23.DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES (SILT FENCES, CHECK DAMS,
INLET PROTECTION DEVICES, ETC.) TO PREVENT EROSION.
24.ALL CONSTRUCTION SHALL BE STABILIZED AT THE END OF EACH WORKING DAY, THIS INCLUDES BACKFILLING OF TRENCHES FOR UTILITY CONSTRUCTION AND PLACEMENT OF GRAVEL OR BITUMINOUS
PAVING FOR ROAD CONSTRUCTION.
DEVELOPER/OWNER:
XXXXXXX
XXXXXXX
XXXXXXXX
XXX-XXX-XXXX
SITE OPERATOR / GENERAL CONTRACTOR
SUPERINTENDENT:
NOT TO SCALE
5
0
'
M
I
N
.
ROAD
6" MIN.CONSTRUCT 2' HIGH BERM WITH
MAXIMUM SIDE SLOPE OF 4:1
2" TO 3" GRAVEL
NOTE: ROCK EXITS SHALL BE INSTALLED PRIOR TO THE
START OF ANY SITE WORK. ROCK EXITS SHALL BE
INSPECTED FOLLOWING EACH RAINFALL.
MAINTENANCE OF ROCK EXITS SHALL INCLUDE A TOP
DRESSING OF NEW GRAVEL, OR REMOVAL AND
REPLACEMENT OF THE GRAVEL AS NEEDED, TO KEEP
THE EXITS FREE FROM COLLECTED MUD.
AS
REQUI
R
E
D
M
I
N
0
.
5
%
G
R
A
D
E
8' X 8' MIN OR AS
REQUIRED TO
CONTAIN WASTE
CONCRETE
SIGN TO INDICATE THE LOCATION OF
THE CONCRETE WASHOUT AREA
2'-0" MIN
BERM AROUND PERIMETER
GROUND SURFACE
12" MIN
12" MIN
COMPACTED EMBANKMENT
MATERIAL (TYP.)3:1 OR FLATTER
SIDE SLOPES
NOTES:
1.CONCRETE WASHOUT AREA SHALL BE INSTALLED PRIOR TO ANY CONCRETE PLACEMENT
ON SITE.
2.CONCRETE WASHOUT AREA SHALL BE LINED WITH MINIMUM 10 MIL THICK PLASTIC
LINER.
3.VEHICLE TRACKING CONTROL IS REQUIRED IF ACCESS TO CONCRETE WASHOUT AREA IS
OFF PAVEMENT.
4.SIGNS SHALL BE PLACED AT THE CONSTRUCTION ENTRANCE, AT THE WASHOUT AREA,
AND ELSEWHERE AS NECESSARY TO CLEARLY INDICATE THE LOCATION OF THE
CONCRETE WASHOUT AREA TO OPERATORS OF CONCRETE TRUCKS AND PUMP RIGS.
5.THE CONCRETE WASHOUT AREA SHALL BE REPAIRED AND ENLARGED OR CLEANED OUT
AS NECESSARY TO MAINTAIN CAPACITY FOR WASTED CONCRETE.
6.AT THE END OF CONSTRUCTION, ALL CONCRETE SHALL BE REMOVED FROM THE SITE
AND DISPOSED OF AT AN ACCEPTED WASTE SITE.
7.WHEN THE CONCRETE WASHOUT AREA IS REMOVED, THE DISTURBED AREA SHALL BE
SEEDED AND MULCHED OR OTHERWISE STABILIZED IN A MANNER ACCEPTED BY THE
CITY.
EROSION & SEDIMENTATION CONTROL NOTES & DETAILS / "SITE MAP"
SITE LOCATION MAP
NOT TO SCALE
USGS MAP
GENERAL EROSION NOTES:
NOT TO SCALE
ROCK EXIT DRIVE
NOT TO SCALE
CONCRETE WASHOUT AREA
AREA SUMMARY IN ACRES
PAVEMENT AREA 0.15 AC±
BUILDING AREA 0.00 AC±
SEEDED AREA 0.00 AC±
TOTAL DISTURBED 9.27 AC±
PRE - CONSTRUCTION IMPERVIOUS 0.00 AC±
POST - CONSTRUCTION IMPERVIOUS 1.63 AC±
SEQUENCE OF CONSTRUCTION
MAINTENANCE NOTES:
PHASE I:
1.INSTALL STABILIZED CONSTRUCTION ENTRANCES.
2.CONSTRUCT THE SILT FENCES ON THE SITE.
3.CONSTRUCT ALL DIVERSIONS.
4.HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT TO PERFORM INSPECTION OF BMPs. GENERAL CONTRACTOR SHALL SCHEDULE
AND CONDUCT STORM WATER PRE-CONSTRUCTION MEETING WITH ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE PROCEEDING WITH
CONSTRUCTION.
PHASE II:
1.INSTALL INLET PROTECTION.
2.PREPARE SITE FOR ROAD GRADING AND COVER.
3.COVER ACCESS ROAD WITH GRAVEL.
4.PILE DRIVING FOR SOLAR FEATURES, AND TRENCHING FOR UNDERGROUND UTILITIES WILL COMMENCE, AND CONCRETE PADS WILL BE POURED.
5.RACKING AND SOLAR MODULES WILL BE INSTALLED ON PILES.
6.RESTABILIZE DISTURBED AREAS.
7.REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES AFTER SITE HAS BEEN STABILIZED, IF REQUIRED BY CONTRACT.
UNDISTURBED SOIL
BACKFILL 6"x 6" TRENCH
FILTER FABRIC
(MIRAFI-ENVIRO FENCE
OR APPROVED EQUAL)
MIN 30" - MAX 36"
ABOVE GRADE
MINIMUM POST
LENGTH IS 5 FEET
2"x 2" WOOD
POSTS 6'-0" O.C.
DIRECTION
OF DRAINAGE
18" MINNOTES:
1.MAXIMUM SPACING BETWEEN POSTS (CENTER TO
CENTER) SHALL NOT EXCEED 6 FEET IN SPACING.
2.A MINIMUM OF 5 FASTENERS PER POST
N.T.S.
PREASSEMBLED SILT FENCE-
WOOD POSTS (MNDOT 3886)
SF
SITE
SITE
42
38
3
BISCAYNE AVEBRAZIL AVEBO
N
A
I
R
E
P
A
T
H
W
CONNEMARA TRAIL W
145TH ST W
150TH ST WBIRCHWOOD AVEROSEMOUNT
ROAD DRAIN CASTING APPLICABILTY
·NEENAH R-3067
·NEENAH R-3512
N.T.S.
DEFLECTOR PLATE
OVERFLOW 1 - CENTER
OF FILTER ASSEMBLY
OVERFLOW 2 - TOP OF CURB BOX
10" FILTER ASSEMBLY
CURB
CG 3067
HIGH-FLOW FABRIC
MIRAFI FF101
IP-2 INLET PROTECTIONIP
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
06/24/201921770
Kathryn M. Melody P.E.
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
Jun 24, 2019 - 3:27pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-C1-TITLE.dwg
C9.01
DETAILS
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
Registration No.Date:
I hereby certify that this plan, specification or
report was prepared by me or under my direct
supervision and that I am a duly licensed
professional ENGINEER under the laws of the state
of Minnesota.
If applicable, contact us for a wet signed copy of this
plan which is available upon request at Sambatek's,
Minnetonka, MN office.
06/24/201921770
Kathryn M. Melody P.E.
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
LV SWITCHGEAR
MAIN
UTILITY
ACCESSIBLE
AC DISCO
AUX
PANEL
AND
RELAY
CABINET
SECONDARY
PRODUCTION
METER
FEEDER
BREAKERS
& DISCOMEDIUM
VOLTAGE
XFMR
GND
XFMR
4'
9'7.5'16'23'
NOT TO SCALE
EQUIPMENT PAD PLAN
RECOMMENDED LAYOUT - 20 MODULE BLOCK
OPTIONAL LAYOUT
(REQUIRES 2 RAILS TO BECUT IN HALF)
4 MODULE BLOCK
4' TYP.
13'-3"27'-7"8 1/4" MIN.16 1/2" MAX.(TYP.)5'-6"13'-3"11'33'-1"
PV MODULE
2 RAIL
QUICK MOUNT COMP
L-BRACKET
PANEL
RACKING
GROUND30°30"6'-4"8'-9"12'-8"
±11'
TYPICAL FIXED PANEL SYSTEM
PER PLAN PER PLAN
EDGE OF GRAVEL6" AGGREGATE BASE CLASS 5
COMPACTED SUBGRADE
SLOPE 2.0%
NOTES:
1.REMOVE ALL VEGETATION, TOPSOIL, AND UNSUITABLE
SOILS FROM BENEATH ROADWAY AND OVERSIZE AREA.
2.FOR OVERSIZE EXCAVATIONS, FILL WITH ACCEPTABLE
NON-ORGANIC SOIL PER GEOTECHNICAL REPORT.
3.COMPACT SUBGRADE PER GEOTECHNICAL REPORT.
ROAD CENTERLINE
SLOPE 2.0%EDGE OF GRAVELN.T.S.
TYPICAL ACCESS ROAD SECTION
WITH CROWN
N.T.S.
TYPICAL PANEL
CONN
E
M
A
R
A
T
R
AI
L
30' SETBA
C
K
30' SETBACK30' SETBACK
NEW TREES TO BE PLACED IN GAP
BETWEEN EXISTING TREES IN
A STAGGERED ROW WHERE SPACE PERMITS
NEW TREES TO BE PLACED IN GAP
BETWEEN EXISTING TREES IN
A STAGGERED ROW WHERE SPACE PERMITS
PROTECT EXISTING TREES 10' OUT FROM DRIPLINE
WITH CONSTRUCTION FENCE
Jun 24, 2019 - 3:27pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-L1-LAND.dwg
L1.01
LANDSCAPE
PLAN
POINT OF
INTERCONNECTION
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
SCALE IN FEET
0
NORTH
10050
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
06/24/201940252
William L. Delaney
CONIFERS CODE BOTANICAL / COMMON NAME CONT SIZE QTY
BF Abies balsamea / Balsam Fir B & B 6`24
BS Picea glauca densata / Black Hills Spruce B & B 6`6
WP Pinus strobus / White Pine B & B 6`16
GROUND COVERS CODE BOTANICAL / COMMON NAME CONT QTY
SN Seed Mix NATIVE GRASS MIX / UNDER ARRAY Seed 480,584 sf
SP2 Seed Mix POLLINATOR MIX / PERIMETER OF ARRAY Seed 124,860 sf
PLANT SCHEDULE
Jun 24, 2019 - 3:27pm - User:areinisch L:\PROJECTS\21134.36\CAD\Civil\Sheets\21134.36-L1-LAND.dwg
L1.02
LANDSCAPE
NOTES-DETAILS
Project
Location
Date Submittal / RevisionNo.
Certification
Sheet Title
Summary
Revision History
Sheet No.Revision
Project No.
By
Designed:Drawn:
Approved:Book / Page:
Phase:Initial Issue:
Client
NOVEL ENERGY
SOLUTIONS
1633 S ROBERT ST., SUITE A
WEST ST. PAUL, MN 55118
NOVEL CHURCH
OF ST. JOSEPH
SOLAR LLC
ROSEMOUNT,
MN
13900 BISCAYNE AVENUE WEST
AJR JMW
KMM
PRELIMINARY 06/24/2019
21134.36
mm/dd/yy ###30% Issue
mm/dd/yy ###60% Issue
mm/dd/yy ###90% Issue
SCALE IN FEET
0
NORTH
10050
Registration No.Date:
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision
and that I am a duly Licensed LANDSCAPE
ARCHITECT under the laws of the State of
Minnesota.
This certification is not valid unless wet signed in blue
ink. If applicable, contact us for a wet signed copy of
this survey which is available upon request at
Sambatek, Minnetonka, MN office.
06/24/201940252
William L. Delaney
PROVIDE & INSTALL RODENT PROTECTION
1/2" HARDWIRE CLOTH, MESH CYLINDER, 8" DIA OR
GREATER X 24" HT.. STAKE IN PLACE
INSTALL TREE WITH ROOT FLARE VISIBLE AT TOP OF
THE ROOT BALL. REMOVE SOIL IN LEVEL MANNER FROM
TOP OF ROOT BALL TO EXPOSE 1ST 1/2" OR LARGER MAIN
ORDER ROOT IF NEEDED. SET ROOT BALL WITH MAIN
ORDER ROOT 1" ABOVE ADJACENT GRADE. DO NOT
COVER TOP OF ROOT BALL WITH SOIL.
INSTALL 3" LAYER OF SHREDDED HARDWOOD MULCH.
PLACE NO MULCH IN CONTACT WITH TREE TRUNK
REMOVE BURLAP, TWINE, ROPE AND WIRE FROM
TOP HALF OF ROOT BALL
BUILD 4" HIGH EARTH SAUCER BEYOND EDGE OF
ROOT BALL
EDGE CONDITION VARIES
PLACE ROOT BALL ON UNDISTURBED OR
COMPACTED SOIL
SCARIFY SIDES OF TREE PIT WITH SPADE BY HAND
TO BIND WITH PREPARED SOIL
PLANTING SOIL, REFER TO SPECIFICATIONS, COMPACT TO 85%
OF MAX. DRY UNIT WEIGHT ACCORDING TO ASTM D 698
TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT
PRESSURE SO THAT ROOT BALL DOES NOT SHIFT
DIG PLANTING PIT 4" TO 6"
DEEPER THAN ROOT BALL
UNDISTURBED
SUBGRADE
NOTE:
CONTRACTOR SHALL MAINTAIN TREES IN A PLUMB
POSITION THROUGHOUT THE WARRANTY PERIOD. IF
STAKING IS REQUIRED BY SITE CONDITIONS,
CONTRACTOR TO USE 2 OR 3 STAKE METHOD WITH 1"
WEBBING AROUND TRUNK OF TREE (NO WIRE OR
CABLING TO BE USED)
WRAP TREE TRUNKS PER NOTES.
1
1
TREE PLANTING DETAIL
N.T.S.
L1.01 P-01
1
LANDSCAPE NOTES
GENERAL NOTES:
1.THE CONTRACTOR SHALL INSPECT THE SITE AND BECOME FAMILIAR WITH THE EXISTING
CONDITIONS RELATING TO THE NATURE AND SCOPE OF THE WORK.
2.THE CONTRACTOR SHALL VERIFY PLAN LAYOUT AND BRING TO THE ATTENTION OF THE LANDSCAPE
ARCHITECT DISCREPANCIES WHICH MAY COMPROMISE THE DESIGN OR INTENT OF THE LAYOUT.
3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CODES,
REGULATIONS, AND PERMITS GOVERNING THE WORK.
4.THE CONTRACTOR SHALL PROTECT EXISTING ROADS, CURBS/GUTTERS, TRAILS, TREES, LAWNS AND
SITE ELEMENTS DURING CONSTRUCTION. DAMAGE TO SAME SHALL BE REPAIRED AND/OR
REPLACED AT NO ADDITIONAL COST TO THE OWNER.
5.LOCATE AND VERIFY ALL UTILITIES, INCLUDING IRRIGATION LINES, WITH THE OWNER FOR
PROPRIETARY UTILITIES AND GOPHER STATE ONE CALL 48 HOURS BEFORE DIGGING. CONTRACTOR
SHALL BE RESPONSIBLE FOR THE PROTECTION AND REPAIR OF ANY DAMAGES TO SAME. NOTIFY
THE LANDSCAPE ARCHITECT OF ANY CONFLICTS TO FACILITATE PLANT RELOCATION.
6.THE LANDSCAPE CONTRACTOR SHALL COORDINATE THE PHASES OF CONSTRUCTION AND
PLANTING INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
7.THE CONTRACTOR SHALL REVIEW THE SITE FOR DEFICIENCIES IN SITE CONDITIONS WHICH MIGHT
NEGATIVELY AFFECT PLANT ESTABLISHMENT, SURVIVAL OR WARRANTY. UNDESIRABLE SITE
CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO
BEGINNING OF WORK.
8.THE PLAN TAKES PRECEDENCE OVER THE LANDSCAPE LEGEND IF DISCREPANCIES EXIST.
QUANTITIES SHOWN IN THE PLANTING SCHEDULE ARE FOR THE CONTRACTOR'S CONVENIENCE.
CONTRACTOR TO VERIFY QUANTITIES SHOWN ON THE PLAN.
9.THE SPECIFICATIONS TAKE PRECEDENCE OVER THE PLANTING NOTES AND GENERAL NOTES.
10.EXISTING TREES AND SHRUBS TO REMAIN SHALL BE PROTECTED TO THE DRIP LINE FROM ALL
CONSTRUCTION TRAFFIC, STORAGE OF MATERIALS ETC. WITH 4' HT. ORANGE PLASTIC SAFETY
FENCING ADEQUATELY SUPPORTED BY STEEL FENCE POSTS 6' O.C. MAXIMUM SPACING.
11.LONG-TERM STORAGE OF MATERIALS OR SUPPLIES ON-SITE WILL NOT BE ALLOWED.
12.CONTRACTOR SHALL REQUEST IN WRITING, A FINAL ACCEPTANCE INSPECTION.
PLANTING NOTES:
1.NO PLANTS SHALL BE INSTALLED UNTIL FINAL GRADING AND CONSTRUCTION HAS BEEN
COMPLETED IN THE IMMEDIATE AREA.
2.A GRANULAR PRE-EMERGENT HERBICIDE SHALL BE APPLIED TO ALL PLANT BEDS AT THE
MANUFACTURERS RECOMMENDED RATE PRIOR TO PLANT INSTALLATION.
3.ALL PLANTING STOCK SHALL CONFORM TO THE "AMERICAN STANDARD FOR NURSERY STOCK,"
ANSI-Z60, LATEST EDITION, OF THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. AND SHALL
CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIALS.
4.ALL PLANTS MUST BE HEALTHY, VIGOROUS MATERIAL, FREE OF PESTS AND DISEASE AND BE
CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE LANDSCAPE LEGEND.
5.PLANT MATERIALS TO BE INSTALLED PER PLANTING DETAILS.
6.ALL TREES MUST BE STRAIGHT TRUNKED AND FULL HEADED AND MEET ALL REQUIREMENTS
SPECIFIED.
7.THE LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY PLANTS WHICH ARE DEEMED
UNSATISFACTORY BEFORE, DURING, OR AFTER INSTALLATION.
8.NO SUBSTITUTIONS OF PLANT MATERIAL SHALL BE ACCEPTED UNLESS APPROVED IN WRITING BY
THE LANDSCAPE ARCHITECT.
9.ALL PLANT MATERIAL QUANTITIES, SHAPES OF BEDS AND LOCATIONS SHOWN ARE APPROXIMATE.
CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT
SPACING SHOWN AND ADJUSTED TO CONFORM TO THE EXACT CONDITIONS OF THE SITE. THE
LANDSCAPE ARCHITECT SHALL APPROVE THE STAKING LOCATION OF ALL PLANT MATERIALS PRIOR
TO INSTALLATION.
10.ALL PLANTING AREAS MUST BE COMPLETELY MULCHED AS SPECIFIED.
11.MULCH: SHREDDED HARDWOOD MULCH, CLEAN AND FREE OF NOXIOUS WEEDS OR OTHER
DELETERIOUS MATERIAL, IN ALL MASS PLANTING BEDS AND FOR TREES, UNLESS INDICATED AS
ROCK MULCH ON DRAWINGS. SUBMIT SAMPLE TO LANDSCAPE ARCHITECT PRIOR TO DELIVERY
ON-SITE FOR APPROVAL. DELIVER MULCH ON DAY OF INSTALLATION. USE 3" FOR SHRUB BEDS,
TREE RINGS, AND 3" FOR PERENNIAL/GROUND COVER BEDS, UNLESS OTHERWISE DIRECTED.
12.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MULCHES AND PLANTING SOIL QUANTITIES TO
COMPLETE THE WORK SHOWN ON THE PLAN.
13.USE ANTI-DESICCANT (WILTPRUF OR APPROVED EQUAL) ON DECIDUOUS PLANTS MOVED IN LEAF
AND FOR EVERGREENS MOVED ANYTIME. APPLY AS PER MANUFACTURER'S INSTRUCTION. ALL
EVERGREENS SHALL BE SPRAYED IN THE LATE FALL FOR WINTER PROTECTION DURING WARRANTY
PERIOD.
14. WRAP ALL SMOOTH-BARKED DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO DECEMBER 1 AND
REMOVE WRAPPING AFTER MAY 1. TREE WRAPPING MATERIAL SHALL BE WHITE TWO-WALLED
PLASTIC SHEETING APPLIED FROM TRUNK FLARE TO THE FIRST BRANCH.
15.ALL DECIDUOUS, PINE, AND LARCH PLANTINGS SHALL RECEIVE RODENT PROTECTION PER MNDOT
2571.31.2
16.PLANTING SOIL FOR TREES, SHRUBS AND GROUND COVERS: FERTILE FRIABLE LOAM
CONTAINING A LIBERAL AMOUNT (4% MIN.) OF HUMUS AND CAPABLE OF SUSTAINING
VIGOROUS PLANT GROWTH. IT SHALL COMPLY WITH MNDOT SPECIFICATION 3877 TYPE B
SELECT TOPSOIL. MIXTURE SHALL BE FREE FROM HARDPACK SUBSOIL, STONES,
CHEMICALS, NOXIOUS WEEDS, ETC. SOIL MIXTURE SHALL HAVE A PH BETWEEN 6.1 AND 7.5
AND 10-0-10 FERTILIZER AT THE RATE OF 3 POUNDS PER CUBIC YARD. IN PLANTING BEDS
INCORPORATE THIS MIXTURE THROUGHOUT THE ENTIRE BED IN A 6" LAYER AND
ROTO-TILLING IT INTO THE TOP 12" OF SOIL AT A 1:1 RATIO.ANY PLANT STOCK NOT PLANTED
ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED UNTIL INSTALLATION. PLANTS NOT
MAINTAINED IN THIS MANNER WILL BE REJECTED.
17.CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THAT EACH EXCAVATED TREE AND SHRUB PIT
WILL PERCOLATE PRIOR TO INSTALLING PLANTING MEDIUM AND PLANTS. THE CONTRACTOR
SHALL FILL THE BOTTOM OF SELECTED HOLES WITH SIX INCHES OF WATER AND CONFIRM THAT
THIS WATER WILL PERCOLATE WITHIN A 24-HOUR PERIOD. IF THE SOIL AT A GIVEN AREA DOES
NOT DRAIN PROPERLY, A PVC DRAIN OR GRAVEL SUMP SHALL BE INSTALLED OR THE PLANTING
SHALL BE RELOCATED IF DIRECTED BY THE LANDSCAPE ARCHITECT.
18.ALL PLANTS SHALL BE GUARANTEED FOR TWO COMPLETE GROWING SEASONS (APRIL 1 -
NOVEMBER 1), UNLESS OTHERWISE SPECIFIED. THE GUARANTEE SHALL COVER THE FULL COST OF
REPLACEMENT INCLUDING LABOR AND PLANTS.
19.CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 3 DAYS PRIOR TO PLANNED
DELIVERY. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AT LEAST 24 HOURS IN
ADVANCE OF BEGINNING PLANT INSTALLATION.
20.SEASONS/TIME OF PLANTING AND SEEDING: NOTE: THE CONTRACTOR MAY ELECT TO PLANT IN
OFF-SEASONS ENTIRELY AT HIS/HER RISK.
20.1.DECIDUOUS /B&B: 4/1 - 6/1; 9/21 - 11/1
20.2.EVERGREEN B&B: 4/1 - 5/1; 9/21 - 11/1
20.3.NATIVE MIX SEEDING: 4/15 - 7/20; 9/20-10/20
21.MAINTENANCE SHALL BEGIN IMMEDIATELY AFTER EACH PORTION OF THE WORK IS IN PLACE.
PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF THE
PLANTS IS COMPLETE, INSPECTION HAS BEEN MADE, AND PLANTINGS ARE ACCEPTED EXCLUSIVE
OF THE GUARANTEE. MAINTENANCE SHALL INCLUDE WATERING, CULTIVATING, MULCHING,
REMOVAL OF DEAD MATERIALS, RE-SETTING PLANTS TO PROPER GRADE AND KEEPING PLANTS IN
A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME MAINTENANCE
RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE RESPONSIBLE FOR
KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD.
.
GENERAL TREE SPECIFICATIONS:
1.ALL TREES SHALL HAVE SYMMETRICAL OR BALANCED BRANCHING ON ALL SIDES OF THE TREE.
2.TREES SHALL NOT BE TIPPED PRUNED.
3.TREES SHALL BE FREE OF PHYSICAL DAMAGE FROM SHIPPING AND HANDLING. DAMAGED TREES
SHALL BE REJECTED.
4.SUMMER DUG TREES SHALL HAVE ROOTBALL SIZE INCREASED BY 20%
NATIVE SEEDING NOTES:
1.SEE PRAIRIE PLANTING /SOLAR NOTES THIS SHEET
PRAIRIE PLANTING / SOLAR NOTES:
SPECIFICATIONS FOR THE ESTABLISHMENT OF NATIVE VEGETATION AS PART OF HABITAT FRIENDLY SOLAR PROJECTS
4-24-19 DEVELOPED BY THE MINNESOTA BOARD OF WATER AND SOIL RESOURCES
NOTE: THESE SPECIFICATIONS ARE GENERIC IN NATURE AND SHOULD BE ADAPTED FOR SPECIFIC SITE CONDITIONS. IF SITE
CONDITIONS REQUIRE CHANGES TO SEEDING OR METHODS, REVIEW FOR APPROVAL WITH LOCAL JURISDICTIONAL AGENCY.
CONTRACTOR QUALIFICATIONS
1.SEEDING CONTRACTORS MUST HAVE AT LEAST THREE YEARS OF EXPERIENCE INSTALLING NATIVE SEED AND SIMILAR TYPES OF
PROJECTS.
SEED SPECIFICATIONS
1.SUBSTITUTION OF SPECIES IN THE SPECIFIED SEED MIXES/SPECIES LISTS MUST BE APPROVED BY THE LOCAL GOVERNMENT
ORGANIZATION THAT IS REVIEWING THE HABIT FRIENDLY SOLAR STANDARDS.
2.ALL SEED THAT IS SUPPLIED FOR PROJECTS MUST BE LABELED ACCORDING TO THE REQUIREMENTS OF THE MINNESOTA SEED
LAW, SECTION 21.82, INCLUDING LIMITS ON NOXIOUS WEED SEED.
3.THE ORIGIN OF SEED IS REQUIRED TO BE LISTED ON THE SEED TAG FOR ALL SPECIES IN A MIX TO PROVIDE VERIFICATION OF
ORIGINAL (GENERATION 0) SEED SOURCE. THE SMALLEST KNOWN GEOGRAPHIC AREA (TOWNSHIP, COUNTY, ECOTYPE REGION,
ETC.) SHALL BE LISTED.
O INFORMATION PERTAINING TO PURE SEED, GERMINATION, AND HARD (DORMANT) SEED OF INDIVIDUAL COMPONENTS IN
A MIX IS REQUIRED ON SEED TAGS.
O WHEN SUBMITTING SEED BIDS, SEED VENDORS MUST LIST ANY AMARANTH SEEDS THAT WERE FOUND IN OFFICIAL SEED
TESTS. IF AMARANTH SPECIES ARE FOUND IN THE TEST RESULTS, THE MINNESOTA DEPARTMENT OF AGRICULTURE (MDA)
REQUIRES THAT THE VENDOR PAY FOR GENETIC TESTING TO DETERMINE IF THE AMARANTH SEEDS PRESENT ARE PALMER
AMARANTH.
4.SEED MUST BE CLEANED TO AN EXTENT SUFFICIENT TO ALLOW ITS PASSAGE THROUGH APPROPRIATE SEEDING EQUIPMENT.
5.SEED MUST ORIGINATE FROM WITHIN 175 MILES OF THE PROJECT SITE. FOLLOW THE MINNESOTA BOARD OF WATER AND SOIL
RESOURCED (BWSR) SEED ZONE MAP AND SOURCE SEQUENCE ON PAGE 8 OF BWSR'S NATIVE VEGETATION ESTABLISHMENT
AND ENHANCEMENT GUIDELINES FOR OBTAINING SEED.
6.ALL SEED DELIVERED TO SITES MUST HAVE A COMPLETE LABEL AND INCLUDE INFORMATION ABOUT INDIVIDUAL COMPONENT
SEED LOTS. INSTALLERS MUST ALLOW MDA STAFF TO TAKE SEED SAMPLES WHEN THEY ARRIVE FOR A RANDOM INSPECTION.
SITE PREPARATION SPECIFICATIONS
1.SEEDING CAN ONLY BE CONDUCTED AFTER ALL GRADING, CONSTRUCTION ACTIVITIES AND SITE PREPARATION ARE
COMPLETED.
2.TREAT ANY WEEDS LOCATED WITHIN THE AREA TO BE SEEDED WITH GLYPHOSATE HERBICIDE. CONDUCT A SECOND HERBICIDE
TREATMENT IF WEEDS CONTINUE GROWING AFTER TEN DAYS. AN HERBICIDE THAT KILLS LEGUMES MAY ALSO BE USED IF NEED
BUT SHOULD ONLY BE APPLIED WHERE NEEDED AS THESE CHEMICALS CAN OFTEN INHIBIT GERMINATION. WAIT AT LEAST 14
DAYS AFTER HERBICIDE APPLICATION TO CONDUCT TILLING.
3.PRIOR TO SEEDING, PREPARE THE SOIL SURFACE TO PROVIDE A SMOOTH, MOIST, AND EVENLY TEXTURED FOUNDATION. USE
CULTIVATING EQUIPMENT SUCH AS DISKS, HARROWS, FIELD DIGGERS, OR TILLERS CAPABLE OF LOOSENING THE SOIL TO A
DEPTH OF AT LEAST 4 IN. ON ALL AREAS. TILL THE SOIL SURFACE TO REMOVE TRACK IMPRINTS FROM WHEELED OR TRACKED
EQUIPMENT. OPERATE CULTIVATING EQUIPMENT ON SLOPES AT RIGHT ANGLES TO THE DIRECTION OF SURFACE DRAINAGE.
SOIL CLODS, LUMPS, AND TILLAGE RIDGES 3 IN. HIGH OR LESS MAY REMAIN IN PLACE FOR SEEDING OPERATIONS. MULTIPLE
PASSES OF THE EQUIPMENT MAY BE NEEDED TO MEET THESE REQUIREMENTS.
4.SEEDING SHOULD BE CONDUCTED AS SOON AFTER TILLING AS POSSIBLE. A SECOND TILLING MAY BE NEEDED IF THERE IS MORE
THAN TWO WEEKS BETWEEN TILLING AND SEEDING AND WEEDS ARE STARTING TO GROW.
SEEDING SPECIFICATIONS
5.SEEDING DATES INCLUDE MAY 15TH - JUNE 30TH IN THE SPRING, OR OCTOBER 15TH - FROZEN GROUND IN THE FALL. PROJECT
PLANNING AND DESIGN STAFF MUST PROVIDE WRITTEN APPROVAL TO CONDUCT SEEDING OUTSIDE OF THE RECOMMEND
TIME PERIODS.
6.SEEDING CONTRACTOR IS RESPONSIBLE FOR DISTRIBUTING SEED ACROSS THE ENTIRE PROJECT AREA AS SPECIFIED IN THE
PROJECT PLAN AND SPECIFICATIONS.
7.WHERE ACCESSIBLE WITHIN THE PROJECT SITE A NATIVE SEED DRILL WITH BOXES FOR DIFFERENT SIZE SEED (SUCH AS A TRUAX
OR TRILLION TYPE SEEDER) WILL BE USED FOR SEED INSTALLATION. WHERE A SEEDER CANNOT ACCESS THE SITE BROADCAST
SEEDING THAT IS CONDUCTED IN A WAY THAT ENSURES AN EVEN DISTRIBUTION OF SEED MUST BE CONDUCTED FOLLOWED BY
RAKING, ROLLING OR OTHER METHODS TO ENSURE THAT THERE IS SUFFICIENT SEED TO SOIL CONTACT.
8.IF HYDROSEEDING WILL BE CONDUCTED WHERE BROADCAST SEEDING IS REQUIRED CONDUCT SEEDING BY APPLYING SEED
WITH ONLY WATER FIRST BEFORE PLACING HYDRAULIC EROSION CONTROL PRODUCTS (HYDRO-MULCHING). THE SOLAR
ARRAYS MUST BE PROTECTED USING METHODS INCLUDING APPROPRIATE SHIELDS, COVERS AND AVOIDANCE MEASURES.
ACCIDENTAL OVERSPRAY MUST BE CLEANED UP AT THE TIME OF INSTALLATION.
9.APPLY CERTIFIED WEED FREE STRAW MULCH (TYPE 3) OVER THE SEEDED AREAS AND DISC ANCHOR WHERE POSSIBLE EXCEPT
WHERE EROSION CONTROL BLANKET OR OTHER EROSION CONTROL DEVICES ARE USED AS DEFINED IN THE EROSION CONTROL
SPECIFICATIONS.
10.USE TEMPORARY EROSION CONTROL DEVICES (SEDIMENT LOGS, SILT FENCE) AS NEEDED TO PREVENT EROSION PRIOR TO AND
DURING SEED ESTABLISHMENT.
11.IF A COVER CROP IS NOT INCLUDED WITH SPECIFIED SEED MIXES FOR THE PROJECT INCLUDE A COVER CROP OF OATS AT A
RATE OF 25LB. PER ACRE IF SEEDING BETWEEN MAY 15TH AND AUGUST 1ST AND WINTER WHEAT AT 25LB PER ACRE IF
SEEDING BETWEEN AUGUST 1 AND OCTOBER 15TH. NO COVER CROPS SHOULD BE INCLUDED IF SEEDING BETWEEN OCTOBER
15TH AND FREEZING OF THE SOIL AS COVER CROPS DO NOT MAINTAIN GERMINATION WELL OVER WINTER.
MANAGEMENT NOTES
1.MONITORING OF THE SITE'S VEGETATION IS REQUIRED THREE TIMES A YEAR DURING THE FIRST THREE YEARS OF THE PROJECT
AS VEGETATION ESTABLISHES AND THEN TWICE A YEAR (JUNE AND SEPTEMBER) EACH YEAR IN FOLLOWING YEARS TO
DETERMINE MAINTENANCE NEEDS.
2.YEAR 1 MAINTENANCE - DURING THE FIRST GROWING SEASON VEGETATION OVER THE ENTIRE SEEDED AREAS MUST BE
MOWED APPROXIMATELY EVERY 30 DAYS AS VEGETATION REACHES ONE FOOT TALL UNTIL SEPTEMBER 30TH TO A HEIGHT OF
5-8 INCHES WITH A FLAIL TYPE MOWER OR STALK CHOPPER THAT WILL HELP PREVENT THE SMOTHERING OF NATIVE PLANT
SEEDLINGS. HAND HELD TRIMMING EQUIPMENT MAY BE NEEDED FOR AREAS UNDER SOLAR ARRAYS. HERBICIDE SHOULD BE
USED MINIMALLY DURING THE FIRST YEAR AS NATIVE PLANT SEEDLINGS WILL BE SUSCEPTIBLE TO OVERSPRAY.
3.YEAR 2 MAINTENANCE - DURING THE SECOND GROWING SEASON VEGETATION OVER THE ENTIRE SEEDED AREAS MUST BE
MOWED APPROXIMATELY EVERY 30 DAYS AS VEGETATION REACHES ONE FOOT TALL UNTIL SEPTEMBER 30TH TO A HEIGHT OF
5-8 INCHES WITH A FLAIL TYPE MOWER OR STALK CHOPPER THAT WILL HELP PREVENT THE SMOTHERING OF NATIVE PLANT
SEEDLINGS. HAND HELD TRIMMING EQUIPMENT MAY BE NEEDED FOR AREAS UNDER SOLAR ARRAYS. SPOT TREAT OR HAND
PULL ANY INVASIVE SPECIES OR NOXIOUS WEEDS THAT ARE STARTING TO ESTABLISH.
4.YEAR 3+ MAINTENANCE - SPOT TREAT OR HAND PULL ANY INVASIVE SPECIES OR NOXIOUS WEEDS THAT ARE STARTING TO
ESTABLISH. IN SOME CASES IT MAY BE BENEFICIAL TO SPOT MOW WEEDS TO PREVENT THEM FROM DEVELOPING SEED AND
THEN TREATING THEM WITH HERBICIDE A COUPLE WEEKS LATER AFTER THEY HAVE A CHANCE TO RE-GROW. AFTER TWO
GROWING SEASONS FLAIL MOW (OR BY USING HAND HELD EQUIPMENT AS NEEDED) NATIVE VEGETATION IN MAY EACH
SEASON.
5.AVOID THE USE OF HERBICIDE DURING TIMES WHEN TARGET SPECIES AND ADJACENT SPECIES ARE IN BLOOM.
6.ANY AREAS OVER 100 SQUARE FEET WITH SPARSE ESTABLISHMENT (LESS THAN ONE NATIVE PLANT EVERY 1.5 FEET ON
AVERAGE) AFTER THE FIRST FULL GROWING SEASON WILL REQUIRE RE-SEEDING. WITH THE ORIGINAL SEED MIXES SPECIFIED
FOR THE PROJECT.
7.THE SEEDING WILL BE SUCCESSFULLY ESTABLISHED WHEN THE AREA HAS A 90% AREAL COVERAGE OF NATIVE PLANT SPECIES.
8.IF FLOWER DIVERSITY DECREASES OVER TIME INTER-SEED FLOWERS INTO THE PLANTING IN LATE FALL WITH SPECIES SUCH AS
BERGAMOT, PRAIRIE CLOVERS, YELLOW CONEFLOWER, ASTERS, COREOPSIS AND WILD MINTS. PRESCRIBED BURNING
FOLLOWING A BURN PLAN CAN ALSO BE USED OUTSIDE OF THE ARRAY AREAS AS A WAY TO MAINTAIN FLOWER DIVERSITY.
MEMORANDUM
To: Anthony Nemcek, Planner
CC: Kim Lindquist, Community Development Director
Brian Erickson, Director of Public Works/City Engineer
Stacy Bodsberg, Planning & Personnel Secretary
From: Stephanie Smith, Assistant City Engineer
Date: July 23, 2019
Subject: St. Joseph’s Church Site Plan – Engineering Review
SUBMITTAL:
The following review comments were generated from plans dated 6/24/2019 and prepared by
Sambatek:
▫ Site Plan
▫ Grading Plan
▫ Erosion Control Plan
▫ Landscaping Plan
GENERAL COMMENTS:
1. The applicant shall submit civil plans signed by a professional engineer, licensed with the
State of Minnesota.
2. The applicant shall include an existing conditions survey of the project area in their plan set.
UTILITIES:
An 80-foot, Drainage & Utility (D&U) Easement bisects the property. The City owns a 30” sanitary
sewer pipe and a 30” storm sewer pipe within the easement, both approximately 35 feet deep. The
proposed plan will place solar panels on both sides of the easement, connected by buried electrical
cables. An 8” watermain runs through the property to serve the existing building and hydrants
onsite.
3. The applicant shall enter into an encroachment agreement for the electrical cables buried
within the D&U easement, prior to construction.
4. The applicant shall register buried cables with Gopher State One Call for locating.
5. The existing conditions survey shall show the location of water utilities within the project
area.
6. The applicant shall not place solar panels above the 8” waterline.
GRADING & STORMWATER COMMENTS:
The applicant plans to seed the area underneath the solar panels with a native mix rather than paved
or gravel surface.
7. The applicant shall provide a drainage map and stormwater management information to
confirm that the runoff from this proposal can be accommodated in the existing pond
#1637 and adjacent infiltration basin #1671.
8. The applicant is required to obtain a NPDES Construction Stormwater Permit and provide a
copy of the approved SWPPP to the City prior to the start of any construction activity.
9. A grading permit is required prior to starting grading on site.
Should you have any questions or comments regarding the items listed above, please contact me at
651-322-2015.