HomeMy WebLinkAbout6.l. Adalyn Avenue, City Project 2019-10 Receive Bids, Award Contract and Approve Proposal for Construction Services EXECUTIVE SUMMARY City Council Meeting: August 5, 2019 AGENDA ITEM: Adalyn Avenue, City Project 2019-10: Receive Bids, Award Contract and Approve Proposal for Construction Services AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 6.l. ATTACHMENTS: Resolution, Letter of Recommendation, Proposal for Construction Services APPROVED BY: LJM RECOMMENDED ACTION: Motion to 1. Adopt a Resolution Receiving Bids and Awarding the Contract for Adalyn Avenue, City Project 2019-10; and 2. Approve the Proposal for Construction Services for Adalyn Avenue, City Project 2019-10 BACKGROUND Adalyn Avenue, City Project 2019-10, will extend water and sanitary sewer south from Addison Avenue to the Connemara Trail – East Extension. Adalyn Avenue borders the County Development Authority (CDA) property and the Lennar property that was approved for preliminary plat this year and final plat as Prestwick Place 18th Addition. On July 2, 2019, the Council received plans and specifications and authorized advertisement for bids for Adalyn Avenue, City Project 2019-10. Construction is proposed to begin in August 2019 and is anticipated to be substantially complete, excluding wear bituminous course, by late October 2019. COSTS & FUNDING On July 30, 2019, seven bids were received for Adalyn Avenue, City Project 2019-10, and were read aloud publicly. The bids are listed in the table on the next page. The low bidder is Northern Lines Contracting, who submitted a bid in the amount of $531,019.00. The engineer’s estimated construction cost at $781,167.00 was approximately 147% of the low bid. Northern Lines’ project manager has completed acceptable work in the City previously, and this contractor has completed work in the metro area and is currently working on the Dunmore 2nd development, performing acceptable work. I:\City Clerk\Agenda Items\Approved Items\6.l. Adalyn Avenue, City Project 2019-10 Receive Bids, Award Contract and Approve Proposal for Construction Services.docx Bidder Total Bid Percentage of Low Bid Engineer’s Estimate $781,167.00 147% Northern Lines Contracting* $531,016.00 100% Ryan Contracting Company $611,872.00 115% A-1 Excavating Inc. $662,105.00 125% Douglass-Kerr Underground, LLC $716,526.10 135% Eureka Construction, Inc. $749,210.00 141% Kuechle Underground, Inc. $931,395.50 175% McNamara Contracting $1,056,624.25 199% * - Low Bidder The City requested a proposal from the design engineer, WSB, for construction services, including survey, inspection and materials testing. The proposed cost is $58,288.00 and is included as an attachment. This project is proposed to be developer-funded by the parties of the Prestwick Place Cost Share Agreement. A portion of the funding was collected with the final plat of Prestwick Place 18th Addition, and the remaining amount will be collected in development fees as nearby parcels under the agreement are developed and platted. RECOMMENDATION Staff recommends Council adopt the attached resolution receiving the bids and awarding the contract and approve the proposal for construction services for Adalyn Avenue, City Project 2019-10. 2 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 – 65 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR ADALYN AVENUE, CITY PROJECT 2019-10. BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of Adalyn Avenue, City Project 2019-10, are hereby received and tabulated. 2. Based on the Total Bid, the bid of Northern Lines Contracting in the amount of $531,016.00 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 5th day of August, 2019. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\013827-000\Admin\Construction Admin\013827-000 CST LOR_Northern Lines 07312019.docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM July 31, 2019 Honorable Mayor and City Council City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: Adalyn Avenue Improvement Project City Project No.2019-10 WSB Project No. 13827-000 Dear Mayor and Council Members: Bids were received for the above-referenced project on Tuesday July 30, 2019, and were opened and read aloud. A total of seven bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer’s Estimate was $781,167.00. The bid tabulation indicates the low bidder as Northern Lines Contracting, Inc., Bloomington, Minnesota, in the amount of $531,016.00. We recommend that the City consider these bids and award a contract to Northern Lines Contracting, Inc., based on the results of the bids received. Sincerely, WSB Mitch Hatcher, PE Project Manager Enclosure cc: Logan Martin, City of Rosemount Brian Erickson, City of Rosemount Erin Fasbender, City of Rosemount Monica Heil, WSB MH/tmw Task Description2 Construction2.1 Project Management 8 60 876$9,920.002.2 Construction Observation220220$18,040.002.3 Erosion Control Inspection4848$3,936.002.4 Office Survey88$1,168.002.5 2-Person Survey Crew6060$11,400.002.6 Record Drawings 24 832$3,824.002.7 Material TestingL S$10,000.00Task 2 Total Estimated Hours and Fee 8 84 228 8 60 8 48 444 $58,288.00Average Hourly Billing Rate176.00 132.00 82.00 74.00 190.00 146.00 82.00Total Fee by Labor Classification $1,408.00 $11,088.00 $18,696.00 $592.00 $11,400.00 $1,168.00 $3,936.00 $48,288.00Total Fee for Materials Testing $10,000.00TOTAL PROJECT COST $58,288.00Estimate of CostCity of Rosemount, MinnesotaProfessional Engineering ServicesAdalyn Avenue Improvement ProjectProject EngineerConstruction ObserverAdminSurvey CoordinatorEnvironmental ScientistTotal HoursSenior Project ManagerMonica HeilCostMitch Hatcher Payton Hill Tabitha Walsh Pete Helder Taylor EngstromTwo Person Survey Crew