EXECUTIVE SUMMARY
City Council Meeting: August 20, 2019
AGENDA ITEM: Accept Public Street and Utilities –
Prestwick Place 14th Addition, City Project
2017-07
AGENDA SECTION:
Consent
PREPARED BY: Stephanie Smith, PE (MN),
Assistant City Engineer AGENDA NO. 6.j.
ATTACHMENTS: Resolution, WSB Letter APPROVED BY: LJM
RECOMMENDED ACTION: Approve Resolution to Accept Prestwick Place 14th Addition,
City Project 2017-07, Public Improvements for Perpetual Maintenance.
BACKGROUND
Public improvements installed as part of Prestwick Place 14th Addition, City Project 2017-07, included
streets, sanitary sewer, watermain and storm sewer during the 2017/2018 construction season.
The developer requested final acceptance of the public improvements and has submitted documentation
required for public acceptance, including warranty deeds, lien waivers, as-builts and the final pay voucher.
WSB, the City’s designer/inspector for the project, submitted a letter February 14, 2019 that recommends
approval and acceptance of the public improvements.
RECOMMENDATION
Upon City acceptance of the work, the public improvements constructed in Prestwick Place 14th Addition,
City Project 2017-07, shall become City property per the subdivision agreement. Staff recommends that
City Council approve the resolution accepting the improvements for perpetual maintenance.
I:\City Clerk\Agenda Items\Approved Items\6.j. Accept Public Street and Utilities – Prestwick Place 14th Addition, City Project 2017-07.docx
K:\010175-000\Admin\Docs\20190214 Memo - Prestwick Place 14th Project Closeout.docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM Memorandum
To: Stephanie Smith, PE, Assistant City Engineer
City of Rosemount
From: Mitch Hatcher, PE, Project Engineer
Date: February 14, 2019
Re: Prestwick Place 14th Addition Street & Utility Construction
City Project No. 2017-07
WSB Project No. 10175-000
The City of Rosemount is in the process of closing out and accepting the street and utility
improvements within Prestwick Place 14th Addition.
The improvements, consisting of sanitary sewer, watermain, storm sewer, street, and sidewalk,
within Prestwick Place 14th Addition were designed and inspected by WSB & Associates in
accordance with the City’s Standard Specifications and Engineering Guidelines. The public
improvements were administered and constructed privately by the developer KRB Development
and Friedges Contracting. Improvements were constructed from September 2017 to October
2018.
WSB & Associates recommends approval and acceptance of the street and utility improvements.
Please contact me at mhatcher@wsbeng.com or 612-360-1315 with any comments or questions.
Sincerely,
WSB & Associates, Inc.
Mitch Hatcher, PE
Project Engineer
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2019 – 70
A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT
FOR PRESTWICK PLACE 14TH ADDITION,
CITY PROJECT 2017-07
WHEREAS, the developer has submitted documentation for City acceptance of the public
improvements;
WHEREAS, the City received a letter from WSB & Associates, Inc. confirming the public
improvements were installed in accordance with the approved plans and specifications and finds the
improvements acceptable;
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota. The work completed
under said agreement is hereby accepted for perpetual maintenance and ownership.
ADOPTED this 20th day of August, 2019.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk