Loading...
HomeMy WebLinkAbout6.e. Family Resource Center Project - Change Order #2 EXECUTIVE SUMMARY City Council Regular Meeting: October 15, 2019 AGENDA ITEM: Family Resource Center Project - Change Order #2 AGENDA SECTION: Consent PREPARED BY: Dan Schultz, Parks and Recreation Director AGENDA NO. 6.e. ATTACHMENTS: Change Order #2 APPROVED BY: LJM RECOMMENDED ACTION: Motion to approve Change Order #2 for the Family Resource Center Project. BACKGROUND In the summer of 2019, the City Council awarded a bid for the expansion of the Family Resource Center. The expansion plans will add 3,320 square feet to the facility. During the construction of the project a few changes have been needed that have resulted in staff requesting the City Council to consider approving change order #2. The changes that are incorporated in the attached Change Order #02 are the following: A. Building envelope upgrades: This item included additional flashing at grade to better protect the building base from moisture and a small increase in window sizes. B. Electrical changes: This change addressed adjustments in equipment wiring and outlet locations to best meet the current needs of 360 Communities. C. Grading and stormwater changes: This item further revised the stormwater system as requested by City’s Engineering department. D. Miscellaneous interior changes: This change involved increasing the ceiling tile attic stock and covering a prep area wall with FRP panels. The total of the three requests is $11,472.34. RECOMMENDATION Staff is recommending the City Council approve Change Order #2 for the Family Resource Center expansion project.