Loading...
HomeMy WebLinkAbout6.h. Autumn Path Improvement Project, City Project 2019-07 Accept Quotes and Authorize a Contract for Engineering Services and Order Feasibility Report UpdateI:\City Clerk\Agenda Items\Approved Items\6.h. Autumn Path Improvement Project, City Project 2019-07 Accept Quotes and Authorize a Contract for Engineering Services and Order Feasibility Report Update.docx EXECUTIVE SUMMARY City Council Regular Meeting: October 15, 2019 AGENDA ITEM: Autumn Path Improvement Project, City Project 2019-07: Accept Quotes and Authorize a Contract for Engineering Services and Order Feasibility Report Update AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 6.h. ATTACHMENTS: Resolution; Map; Proposal APPROVED BY: LJM RECOMMENDED ACTION: Motion to: 1. Accept Proposal for Engineering Services for the Autumn Path Improvement Project, City Project 2019-07; and 2. Adopt a Resolution Authorizing the Preparation of a Feasibility Report Update for the Autumn Path Improvement Project, City Project 2019-07 BACKGROUND On November 19, 2013, the City Council received the Feasibility Report for public improvements related to the Bella Vista development. One of the roads identified in the report was Autumn Path. Autumn Path’s alignment is proposed to weave between the Bella Vista property and the neighboring property (PID 34-02200-25-010). As the neighboring property has not dedicated needed right-of-way, Autumn Path has not yet been constructed. The developer does not have access to the future Bella Vista 7th Addition until Autumn Path is constructed. On June 4, 2019, the City Council approved the final plat for Caramore Crossing on the neighboring property (PID 34-02200-25-010). A condition of approval for this plat is the dedication of a roadway, drainage and utility easement to allow construction of Autumn Path to the northern property line. The Caramore Crossing developer, DR Horton, intends to plat and dedicate the easement in spring of 2020. In order to begin construction of Autumn Path early spring/summer of 2020, the design work would be scheduled for winter 2019. The Autumn Path Improvement Project, City Project 2019-07, would consist of construction of a 32-foot wide asphalt collector roadway with curb and gutter. Pedestrian facilities will include trail and sidewalk. Storm pipe will be constructed to ponds within the Bella Vista development. Watermain will be installed the full length of the road and some sanitary sewer will be installed for connection to the future Bella Vista 7th addition and trunk connections. 2 DISCUSSION The City Engineer requested a proposal from WSB, as a member of the previously selected engineering pool, to perform the design work on this project. WSB is familiar with this area and type of project as that firm prepared plans and specifications for many projects in the City. WSB’s proposal in the amount of $157,004 provides the necessary engineering services to complete design and bidding of the Autumn Path Improvement Project, City Project 2019-07. The resolution orders the preparation of an update to the original 2013 feasibility report which is a necessary step under the Minnesota Statutes Chapter 429. This chapter specifies the actions that must be taken in order to assess property owners for all or a portion of the cost of local improvements. It should be noted that Lennar, as the developer of Bella Vista, has agreed to their portion of funding for Autumn Path during development. The feasibility report will provide information regarding whether the proposed improvements are necessary, cost-effective and feasible. The following information will be included in the report: • Existing conditions with detailed information on the existing materials • Proposed improvements • Detailed cost estimates and proposed funding sources • Estimated assessments COSTS & FUNDING The design and construction costs for the Autumn Path Improvement Project, City Project 2019-07, are budgeted in the proposed 2020-2029 CIP in the amount of $1,510,000 for 2022. The street improvements will be funded by developer fees, assessment of abutting properties and the Street Improvement Project Fund. Utility work would be funded by the respective utility core funds. A detailed cost estimate will be prepared as part of the Feasibility Report. RECOMMENDATION Staff recommends Council accept the proposal for engineering services to WSB and adopt a resolution to authorize preparation of a feasibility report for the Autumn Path Improvement Project, City Project 2019-07. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 – 81 A RESOLUTION AUTHORIZING THE PREPARATION OF A FEASIBLITY REPORT FOR THE AUTUMN PATH IMPROVEMENT PROJECT CITY PROJECT 2019-07 WHEREAS, it is proposed to construct an extension of Autumn Path from Bonaire Path to approximately 2600 feet north, and; WHEREAS, it is proposed to assess the benefited properties for all or a portion of the cost of the improvement, pursuant to Minnesota Statues, Chapter 429. NOW THEREFORE BE IT RESOLVED, that the proposed improvement, called Autumn Path Improvement Project (City Project 2019-07), be referred to the City Engineer for study and that the City Engineer is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is necessary, cost effective and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for the affected parcels. ADOPTED this 15th day of October 2019. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk Autumn PathAutumn PathPhase 1 Phase 2 Phase 3 Phase 4N Phase 4S Phase 2Bacardi AveBonaire Path W Document Path: K:\01928-060\GIS\Maps\Figure1_ProjectLayout.mxd Date Saved: 11/13/2013 1:39:32 PMProje ct L oca tion 1 inch = 400 feet Bella VistaFigure 1 - Project Layout/PhasesCity of Rosemount MN