Loading...
HomeMy WebLinkAbout6.p. 124th Court West and 121st Street West, City Project 2018-05 Accept Plans and Specifications and Authorize Advertisement for BidsI:\City Clerk\Agenda Items\Approved Items\6.p. 124th Court West and 121st Street West, City Project 2018-05 Accept Plans and Specifications and Authorize Advertisement for Bids.docx EXECUTIVE SUMMARY City Council Regular Meeting: December 17, 2019 AGENDA ITEM: 124th Court West and 121st Street West, City Project 2018-05: Accept Plans and Specifications and Authorize Advertisement for Bids AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer AGENDA NO. 6.p. ATTACHMENTS: Resolution APPROVED BY: LJM RECOMMENDED ACTION: Adopt a Resolution Accepting Plans and Specifications and Authorizing Advertisement for Bids for 124th Court West and 121st Street West, City Project 2018-05 BACKGROUND On April 3, 2018, City Council approved a Joint Powers Agreement (JPA) with Dakota County for the reconstruction of Akron Ave (County Road 73). Then on February 5, 2019, City Council approved the first amendment to the JPA which adjusted the cost share for this project. Finally, on February 19, 2019, City Council approved a proposal for engineering services from Kimley-Horn and Associates (KHA) for design of street and utilities. Currently, design has been completed for this project and right of way acquisition is nearly complete. Construction will occur in 2020. Staff has reviewed the pavement condition in this area and has noted that there were local streets programmed in the Capital Improvement Plan for 2022. As a result, 121st Street and 124th Court were brought forward for construction in 2020 in order to take advantage of the large amount of paving involved in the Akron Avenue reconstruction. On May 30, 2019, City staff held an open house for the project. KHA was available to answer questions about the project. Comments were largely positive, as residents are aware of the distressed condition of their roadways. Comments received were summarized in the Feasibility Report. On June 18, 2019, the City Council received a Feasibility Report prepared by KHA. That report noted that a mill and overlay of the pavement was not appropriate due to the poor condition and has recommended that the streets receive a pavement reclamation and overlay. Overall, the report found this project to be feasible, cost effective and necessary. On July 16, 2019, the City Council held a public hearing regarding the improvement. After the hearing the City Council then ordered the improvement and authorized the preparations of plans and specifications. Approving plans and specifications and authorizing the advertisement for bids is the next step in the project process. Since the planned work is part of a larger Dakota County project, the bidding and contract administration will be performed by Dakota County. COSTS AND FUNDING The Feasibility Report estimated the project cost at $406,000 which includes an estimated $33,000 for 2 stormwater improvements. The costs and funding are shown in the following tables. Per the Rosemount Special Assessment Policy, the assessments are proposed to be divided among the 21 properties that have driveway access to either 121st Street or 124th Court. The assessment is estimated at: $130,550 / 21 properties = $6,216.67 per property Please note: this is an estimate. The final assessment amount will be determined at a future assessment hearing and will be based on the actual bids received for the project. SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Items marked “CC” will require City Council approval in order to move forward. CC Improvement Hearing, Order Improvement and July 16, 2019 Authorize Preparation of Plans & Specs CC Approve Plans & Specs and Order Advertisement for Bid December 17, 2019 Bid Opening February 5, 2020 CC Set Assessment Hearing and Award Contract March 5, 2020 Neighborhood Meeting March 18, 2020 CC Assessment Hearing April 7, 2020 Construction Summer 2020 RECOMMENDATION Staff recommends Council approve the plans and specifications and authorize Dakota County to advertise for bids for 121st Street and 124th Court Improvements as part of the Akron Ave reconstruction project. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 – 96 A RESOLUTION RECEIVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE ADVERTISEMENT FOR BIDS FOR 121ST STREET AND 124TH COURT IMPROVEMENT PROJECT, CITY PROJECT 2018-05 WHEREAS, the City Council of the City of Rosemount has ordered the preparation of plans and specifications for 121st Street and 124th Court Improvement Project, City Project 2018-05, and such plans and specifications have been presented to this Council for approval; and, WHEREAS, the 121st Street and 124th Court Improvements are to be constructed in conjunction with the Dakota County Akron Road Reconstruction project; and, WHEREAS, Dakota County will be administering the construction contract for both the city and county work. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota: 1. Such plans and specifications are hereby approved and ordered placed on file in the office of the City Clerk. 2. Dakota shall advertise this project in accordance with their policies for the making of such improvements according to such approved plans and specifications for City Project 2019-05. 3. The advertisement shall be published in accordance with Dakota County’s policies. Such date and time are to be determined by Dakota County. 4. Such advertisement for bids is hereby authorized by the Council. ADOPTED this 17th day of December, 2019. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk