Loading...
HomeMy WebLinkAbout6.t. Deepwoods Court Improvement Project, City Project 2020-03 Accept Feasibility Report and Call Improvement HearingI:\City Clerk\Agenda Items\Approved Items\6.t. Deepwoods Court Improvement Project, City Project 2020-03 Accept Feasibility Report and Call Improvement Hearing.docx EXECUTIVE SUMMARY City Council Regular Meeting: December 17, 2019 AGENDA ITEM: Deepwoods Court Improvement Project, City Project 2020-03: Accept Feasibility Report and Call Improvement Hearing AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 6.t. ATTACHMENTS: Resolution; Map APPROVED BY: LJM RECOMMENDED ACTION: Motion to Adopt a Resolution Accepting the Feasibility Report and Call the Improvement Hearing for the Deepwoods Court Improvement Project, City Project 2020-03 BACKGROUND This spring, staff received a petition from residents living on Deepwoods Court concerned about the condition of their road. Deepwoods Court is listed in the 2019 - 2028 Capital Improvement Plan for rehabilitation in 2022. As the pavement condition rapidly deteriorated during the 2018/2019 winter, staff discussed possible repair and maintenance options to the City Council and was directed to move the project forward to construction in 2020. On April 25, 2019, city staff hosted a neighborhood meeting for the residents of Deepwoods Court where 7 out of 8 property owners and families attended. The residents expressed their concerns about the road condition and were supportive of moving the project to 2020. On November 4, 2019, City Council ordered a Feasibility Report to examine the existing conditions, proposed improvements, costs and proposed assessments for the project. On December 5, 2019, city staff hosted an open house for the residents of Deepwoods Court. The residents expressed concerns about the road condition, drainage and a desire for curb and gutter installation. DISCUSSION Deepwoods Court is a rural residential cul-de-sac off McAndrews Road (CSAH 38) in the northwestern part of Rosemount. The pavement is experiencing significant distresses that indicate pavement failure. Staff recommends a reclaim of the existing pavement and paving four inches of new asphalt to provide a new pavement surface. Minor stormwater repairs are anticipated with this project, including ditch re-grading of areas that have filled in over time. This street is outside the Metropolitan Urban Service Area (MUSA), so water and sanitary sewer improvements are not included in the scope of work. The resolution calls the Public Improvement Hearing on January 21st, 2020, which is a necessary step under the Minnesota Statutes Chapter 429. A full presentation of the proposed improvements will be 2 made at the Hearing. COSTS & FUNDING The estimated cost for the project is $296,300. This amount includes a 10% contingency and 25% incidentals such as engineering, legal, financing and administrative costs. The cost by improvement type is shown in the table below: PROJECT COST ESTIMATE Surface Improvements $260,500 Storm Sewer Improvements $35,800 TOTAL $296,300 The project costs for the Deepwoods Court Improvement Project, City Projects 2020-03, are budgeted in the 2019-2028 CIP (as part of a larger project). The funding anticipated for the project is shown in the table below. The street improvements will be funded by the Street Improvement Fund and assessment of abutting properties. The storm utility work would be funded by the Storm Utility Fund. PROJECT FUNDING ESTIMATE Street Capital Improvement Fund $169,300 Special Assessment $91,200 Storm Utility Fund $35,800 TOTAL $296,300 SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Items marked “CC” will require City Council approval in order to move forward. CC Receive Feasibility Report and Set Improvement Hearing December 17, 2019 CC Improvement Hearing, Order Improvement and January 21, 2020 Authorize Preparation of Plans & Specs CC Approve Plans & Specs and Order Advertisement for Bid February 18, 2020 Bid Opening March 12, 2020 CC Award Contract & Set Assessment Hearing March 17, 2020 Public Open House April 2020 CC Assessment Hearing, Approve Assessment Roll May 19, 2020 Construction Start June 2020 Substantial Completion September 2020 3 RECOMMENDATION Staff recommends Council adoption of the attached resolution receiving the feasibility report and calling for the improvement public hearing for the Deepwoods Court Improvement Project, City Project 2020- 03. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2019 - 95 A RESOLUTION ACCEPTING THE FEASIBILITY REPORT AND CALLING A PUBLIC HEARING FOR IMPROVEMENT FOR THE DEEPWOODS COURT IMPROVEMENT PROJECT, CITY PROJECT 2020-03 WHEREAS, a report has been prepared by WSB with reference to proposed Improvement No. 2020-03 for the improvement of Deepwoods Court. WHEREAS, this report was received by the council on December 17, 2019, and WHEREAS, the report provides information regarding whether the proposed improvement is necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection with some other improvement; the estimated cost of the improvement as recommended; and a description of the methodology used to calculate individual assessments for affected parcels. NOW THEREFORE IT BE RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA: 1. The Council will consider the improvement of such street in accordance with the report and the assessment of abutting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvement of $296,300. 2. A public hearing shall be held on such proposed improvement on the 21st day of January, 2020, in the Council Chambers of the City Hall at 7:00 p.m. and the clerk shall give mailed and published notice of such hearing and improvement as required by law. ADOPTED this 17th day of December, 2019. William H. Droste, Mayor ATTEST: _______________________________ Erin Fasbender, City Clerk "#* ") ")#* ") #* GªWX 12775 12549 12670 12570 12575 12561 12557 12565 12569 12553 12675 12770 4851 12816 12724 12756 12674 12736 12788 12818 4655 12753 12819 12802 12870 12765 12737 12823 12745 12748 4433 12797 12875 12763 12774 12835 12816 12762 12771 12822 12840 4485 1281712826 12807 12827 12799 12735 12781 12789 12825 12545 12475 4245 DEE PWOODS CT MCANDREWS RD Proje ct L ocation "Storm Sewer City Bou ndary 0 225Feet¯Project Location Map Deepwoods Court Improvement Project Rosemount, MN Document Path: K:\015059-000\GIS\Maps\ProjectLocationMap.mxd Date Saved: 12/4/2019 12:52:09 PM1 inch = 225 f eet