Loading...
HomeMy WebLinkAbout6.k. Prestwick Place 15th Addition, City Project 2018-14 Accept Public Improvements EXECUTIVE SUMMARY I:\City Clerk\Agenda Items\Approved Items\6.k. Prestwick Place 15th Addition, City Project 2018-14 Accept Public Improvements.docx City Council Meeting: January 7, 2020 AGENDA ITEM: Prestwick Place 15th Addition, City Project 2018-14: Accept Public Improvements AGENDA SECTION: Consent PREPARED BY: Stephanie Smith, PE (MN), Assistant City Engineer AGENDA NO. 6.k. ATTACHMENTS: Resolution, WSB Letter, Map APPROVED BY: LJM RECOMMENDED ACTION: Approve Resolution to Accept Prestwick Place 15th Addition, City Project 2018-14, Public Improvements for Perpetual Maintenance. BACKGROUND Public improvements installed as part of Prestwick Place 15th Addition, City Project 2018-14, included streets, sanitary sewer, watermain and storm sewer during the 2018/2019 construction season. The developer requested final acceptance of the public improvements and has submitted documentation required for public acceptance, including lien waivers, as-builts and the final pay voucher. WSB, the City’s designer/inspector for the project, submitted a letter January 2nd, 2020 that recommends approval and acceptance of the public improvements. RECOMMENDATION Upon City acceptance of the work, the public improvements constructed in Prestwick Place 15th Addition, City Project 2018-14, shall become City property per the subdivision agreement. Staff recommends that City Council approve the resolution accepting the improvements for perpetual maintenance. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2020 – 02 A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR PRESTWICK PLACE 15TH ADDITION CITY PROJECT 2018-14 WHEREAS, the developer has submitted documentation for City acceptance of the public improvements; WHEREAS, the City received a letter from WSB & Associates, Inc. confirming the public improvements were installed in accordance with the approved plans and specifications and finds the improvements acceptable; BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota. The work completed under said agreement is hereby accepted for perpetual maintenance and ownership. ADOPTED this 7th day of January, 2020. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\011811-000\Admin\Docs\20200102 Memo - Prestwick Place 15th Project Closeout.docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM Memorandum To: Stephanie Smith, PE, Assistant City Engineer City of Rosemount From: Mitch Hatcher, PE, Project Engineer Date: January 2, 2020 Re: Prestwick Place 15th Addition Street & Utility Construction City Project No. 2018-14 WSB Project No. 11811-000 The City of Rosemount is in the process of closing out and accepting the street and utility improvements within Prestwick Place 15th Addition. The improvements, consisting of sanitary sewer, watermain, storm sewer, street, and sidewalk, within Prestwick Place 15th Addition were designed and inspected by WSB & Associates in accordance with the City’s Standard Specifications and Engineering Guidelines. The public improvements were administered and constructed privately by the developer KRB Development and Northwest Asphalt. Improvements were constructed from July 2018 to October 2019. WSB & Associates recommends approval and acceptance of the street and utility improvements. Please contact me at mhatcher@wsbeng.com or 612-360-1315 with any comments or questions. Sincerely, WSB & Associates, Inc. Mitch Hatcher, PE Project Engineer PRESTWICK PLACE 15TH ADDITION