Loading...
HomeMy WebLinkAbout6.o. Trunk Highway 3 Drainage Improvement Project, CP 2019-13 Approve Plans and Specifications and Authorize Advertisement for BidsI:\City Clerk\Agenda Items\Approved Items\6.o. Trunk Highway 3 Drainage Improvement Project, CP 2019-13 Approve Plans and Specifications and Authorize Advertisement for Bids.docx EXECUTIVE SUMMARY City Council Meeting: January 21, 2020 AGENDA ITEM: Trunk Highway 3 Drainage Improvement Project, CP 2019-13: Approve Plans and Specifications and Authorize Advertisement for Bids AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 6.o. ATTACHMENTS: None. APPROVED BY: LJM RECOMMENDED ACTION: Motion to Approve Plans and Specifications and Authorize Advertisement for Bids for Trunk Highway 3 Drainage Improvement Project, CP 2019-13. BACKGROUND The Trunk Highway 3 (TH 3) Drainage Improvement Project, CP 2019-13, is proposed to make the trunk stormwater connection from the Harmony development on the east side of TH 3 to the regional pond recently constructed within the Dunmore development west of TH 3. See the figure below: To make this connection, the City intends to use the existing MnDOT culvert under TH 3. Due to the culvert’s structural condition, MnDOT has required the City to line the culvert and make a piped connection to Rosemount’s stormwater system prior to crossing the MnDOT right-of-way. This project meets those requirements. MnDOT Culvert Regional Pond at Dunmore Temporary Pond at Harmony 2 Some of this construction was intended to be performed as part of the Dunmore 1st Addition development for a stormwater trunk fee credit. That anticipated work has changed as a result of MnDOT’s requirements, the City is likely to get better bids from contractors by having the whole improvement performed as one City contract. The stormwater credit will need to be reduced accordingly for the Dunmore 3rd Addition. COSTS & FUNDING MnDOT has acknowledged this project will include improvement of TH 3’s drainage infrastructure. Therefore, MnDOT has agreed to provide some of the materials for the stormwater pipe and manhole structures at no cost to the City. The table below shows the estimated total project cost of $264,000. All funding will be provided by the Stormwater Core Fund. Construction Cost Contingency (10%)Indirect Costs (25%)Total 192,000$ 19,200$ 52,800$ 264,000$ 264,000$ Project Cost Estimate Funding Estimate Stormwater Core Fund SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Items marked “CC” will require City Council approval in order to move forward. Bid Opening February 5, 2020 Construction Start April 2020 Substantial Completion July 2020 RECOMMENDATION City staff recommends Council approval of the plans and specifications and authorizing the advertisement for bids for the Trunk Highway 3 (TH 3) Drainage Improvement Project, CP 2020-02.