EXECUTIVE SUMMARY
Port Authority Meeting: February 4, 2020
AGENDA ITEM: The Morrison Downtown Redevelopment
Project Review
AGENDA SECTION:
Old Business
PREPARED BY: Anthony Nemcek, Planner AGENDA NO. 4.b.
ATTACHMENTS: Site Location, Site Plan, Architectural
Plans and Renderings APPROVED BY: LJM
RECOMMENDED ACTION: Information Item
SUMMARY
At its meeting on January 14, 2020, the Planning Commission reviewed a request from Ron Clark
Construction to redevelop the Rosemount Plaza and Shenanigan’s sites with the construction of a 124-unit
apartment building. The proposed redevelopment plans also include a commercial building to be
constructed when existing tenant leases in the outbuilding expire. The Planning Commission unanimously
voted to recommend approval of the project. The purpose of this memorandum is to provide a summary
of the project that is under consideration as a recipient of tax increment financing.
BACKGROUND
Most of the project site was developed as a shopping center in 1962, which represented a major boost in
retail space for a growing community at the far fringes of the Twin Cities metropolitan area. The concept
of multiple commercial tenants under one roof was a relatively new concept at the time, and the shopping
center proved to be a viable shopping venue serving primarily Rosemount residents over the next 20-25
years. As both the City of Rosemount and its neighboring communities experienced rapid growth through
the 1980’s and 1990’s, the retail landscape changed dramatically, rendering small, local shopping malls
obsolete in the face of competition from big-box retailers, megamalls, and lifestyle centers (many of which
were built within an easy commuting distance from Rosemount and along the Highway 42 corridor within
the City). Over the last couple of decades, there has been minimal economic investment in the shopping
center leaving the current building dilapidated and very difficult (and likely impossible) to bring up to
modern construction standards.
The redevelopment site was identified in the 2004 Development Framework for Downtown Rosemount as a key
area for redevelopment, and the concept for the site included a mix of high-density residential and
commercial. A number of key elements of the Framework’s redevelopment concept for Core Block West
are shown in the plans submitted by the applicant. These include coordinating access and shared parking,
alignment of the primary access point with 146th Street, providing a buffer between the residential uses
west of the site and commercial development along South Robert Trail, and finally enhancing the
streetscape through improved landscaping and pedestrian spaces.
At the time the Framework was updated, the City also solicited a market study to better understand the
housing needs that could be met by the redevelopment of parts of downtown. The market study
conducted by Maxfield Research projected that there would be demand for 139 market rate rental units
between 2016-2021, and that the strongest sources of demand for new rental housing will likely be young
2
singles and couples without children in their late-20s to mid-30s. Mid-age households who want to sell
their single-family homes and have more freedom for leisure pursuits could also account for a portion of
the demand for new rental housing.
In addition to a specific need for multi-family housing within the Downtown, the market study also
identified Downtown Rosemount as a viable location for locally-owned convenience- and neighborhood-
oriented retailers, restaurants, and specialty retail. The introduction of new residents into Downtown will
help drive demand to induce development of commercial uses, such as those listed above.
PROPOSED REDEVELOPMENT
The site of the proposed apartment building is located on the 2.66 acres that currently contain the
Rosemount Plaza shopping center and Shenanigan’s. The site is accessed from Highway 3 via a one-way
entrance and a two-way driveway. The site is also accessed from 145th Street West from a northern
extension of the property. The building is positioned so the entrance to the underground parking entrance
is at the northern face of the building, which allows residents easy access to 145th Street where Highway 3
can be accessed via a controlled intersection.
The site plan offers substantially improved pedestrian facilities both internal to the site and along Highway
3. A bituminous trail will be constructed along the rear and sides of the building, over which a public
access easement will be dedicated to allow anyone to utilize the trail. Lighting placed on 3’ bollards will
provide illumination along the trail while avoiding any impacts on adjacent residents. No wall mounted
lighting will be placed on the western façade facing the residences west of the site. Pedestrians walking
past the site along Highway 3 must currently walk between moving traffic and a surface parking lot.
Additional landscaping, including a number of trees, will be installed along the sidewalk facing Highway 3,
which will provide an improvement to the pedestrian experience.
Landscaping will be used extensively along the western property boundary to provide screening between
the residential properties and the redevelopment site. The City Code requires a minimum 10’ buffer yard
between the downtown and adjacent residential uses, and the applicant has provided a 20’ yard that
contains the bituminous trail and landscaping. The developer will work with individual property owners
regarding installation of a fence if desired.
The exterior of the building will feature a combination of stone, brick, cement fiber paneling, and lap
siding, with the most prominent use of the stone and brick on facades that are visible to public rights of
way. Consistent with other recent buildings constructed downtown, the developer’s plans increase the use
of lap siding where the building faces residential uses. The Planning Commission recommended a
condition of approval that the eastern elevation be updated to meeting the minimum 75% stone/brick
requirement of the code while allowing a deviation from the minimum requirements for the north, south,
and west elevations.
The 124-unit, market rate building will contain a number amenities including underground parking, a roof
deck and other common areas, and fitness facilities. A dog wash area will be located within the
underground parking garage. Additional exterior amenities include a swimming pool and patio area with
grills for cooking and a fenced in dog run. One parking space in the underground parking will be included
with the rent for each unit, and 75 stalls of surface parking are provided for residents and guests as well as
to accommodate the future commercial building.
A few issues raised during the staff and Commission review related to the height of the building, concern
about traffic on Hwy 3 and the on-site parking. The building is four stories and is higher, on average 1.5
feet higher and a maximum of three feet higher, than the ordinance requirement. As the developer noted
the site could be raised to reduce the building height to bring it into compliance. However; this would
negatively impact the surrounding properties as they would be negatively impacted by the raised site,
3
particularly due to drainage concerns. With redevelopment, matching into the adjoining property is critical.
As noted above the parking on site is generally consistent with the other residential developments
Downtown. There have been concerns expressed because the amount of readily available parking stalls will
be decreased on the site, but often they are parked with customers from surrounding establishments. The
developer conducted a traffic study which compared what a viable commercial establishment of the square
footage currently on the site would generate as compared to the new residential apartment and commercial
building. Traffic generation is significantly less. Staff and the Commission recognize that the existing
tenants do not generate the same amount of traffic as a high occupancy commercial mall but the point is
that residential development on the site should decrease the traffic demand on the site. Further, the site
design leads residents to use the 145th site access which may be preferable to directly accessing unto Hwy
3.
CONCLUSION
The Planning Commission acknowledges the need for more housing in Rosemount’s downtown in order
to provide a critical mass of customers that can support the growth of retail and commercial services in the
downtown. The Commission’s recommendation of approval includes a condition that the applicant
receive a building permit for the commercial building by 12/30/2024 in order to ensure the
redevelopment of the site is consistent with the mix of uses identified in the concept plan for Core Block
West in the Development Framework for Downtown Rosemount.
The City Council will be asked to take formal action on the planning applications for the Morrison project
at their meeting later tonight. Staff is bringing this item to the Port Authority so that members can address
the project. As in other Downtown redevelopment projects that received some city financing, the Port
Authority and City Council should be on record supporting the project or they would not provide financial
assistance.
145TH ST W
146TH ST W
0.9 Acres
1.8 Acres
Dakota County GIS
Downtown
Document Path: T:\Project\CommDev\Downtown\Downtown.mxd PDF: I:\GIS\Map_Library\CommDev\Downtown\Downtown10162017.pdf
0 70 14035 Feet 3/8/2018
kaas wilson architects
The Morrison - Rosemount MNArchitectural Site Plan
SD_100 12/16/19 19064
1/32" = 1'-0"1 Architectural Site Plan
Level 1
100'-0"
Level 2
110'-7 7/8"
Level -1
88'-8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
CEMENT FIBER PANEL
BRICK
MANUFACTURED
STONE VENEER
CEMENT FIBER
LAP SIDING
ROCKFACE CMU
ALUMINUM
BALCONY
43'-4 3/4"Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
CEMENT FIBER LAP SIDING
CEMENT FIBER
PANEL SIDING
MANUFACTURED
STONE VENEER
ALUMINUM BALCONY
BRICK
ROCKFACE CMU
Level 1
100'-0"
Level 2
110'-7 7/8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
CEMENT FIBER LAP SIDING
CEMENT FIBER
PANEL SIDING
MANUFACTURED
STONE VENEER
BRICK
ROCKFACE CMU
Level 1
100'-0"
Level 2
110'-7 7/8"
Level -1
88'-8"
Level 3
121'-3 3/4"
Level 4
131'-11 5/8"
Truss Brg.
141'-0 3/4"
MANUFACTURED
STONE VENEER
CEMENT FIBER LAP SIDING
CEMENT FIBER
PANEL SIDING
BRICK
ROCKFACE CMU
kaas wilson architects
The Morrison - Rosemount MNExterior Elevations
SD_500 12/16/19 19064
1/16" = 1'-0"1 East Elevation
1/16" = 1'-0"2 South Elevation
1/16" = 1'-0"3 West Elevation
1/16" = 1'-0"5 North Elevation
EAST ELEVATION MATERIALS %
BRICK/STONE: 75% *includes bay
returns
CFB: 25%
WEST ELEVATION MATERIALS %
BRICK/STONE/GLASS: 46%
CFB: 54%
SOUTH ELEVATION MATERIALS %
BRICK/STONE/GLASS: 69%
CFB: 31%
NORTH ELEVATION MATERIALS %
BRICK/STONE/GLASS: 64%
CFB: 36%
41,754 ft²
Garage
Garage Entrance
238 ft²
MechEXHAUST Person door
POOL ABOVE
EXHAUSTPLAZA
122 ft²
Pool Equipment
105 ft²
Pool Chemical
209 ft²
Stair
287 ft²
Trash
SD_500
1
SD_500 2
SD_500
3
SD_5005
222 ft²
Trash
209 ft²
Stair
329 ft²
Bike Storage
CHARGING
STATION
CHARGING
STATION
CHARGING
STATION
CHARGING
STATION
124 ft²
Dog Wash
327 ft²
Maintenance
CHARGING
STATION
LINE OF EXTERIOR
WALL ABOVE
58 Storage Units
54 Wall-Mounted Bike Racks
51
50
49 29
48
3047
46
45
44
43
42
41
52
53
54
55
56
57
58
27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 10 9
109 110 111 114 115 116 117 118 119 124 125
99 98 97 96 95 94 86
64 65 67 68
123
90
59
60
122
91
121
92
120
93
113112
100101102103
108107
6
2
3
4
5
1
31
32
33
66 82818079787776757473
11
126
8 7
35
36
37
40
38
127
878988 85 84
39
636261
28
34
69 70 71 72 83
104105106
kaas wilson architects
SCALE - 1/16" = 1'-0"
The Morrison - Rosemount MNGarage
SD_300 12/16/19 19064
1/16" = 1'-0"1 Level -1
Parking Schedule
Type Count
Level -1
127
Level 1
77
204
1,196 ft²
Unit C2
RETAIL
POOL
18'X40'
784 ft²
Unit A1 PLNTR.PLNTR.PLNTR.PLNTR.784 ft²
Unit A1
Stair
576 ft²
Unit S1
1,171 ft²
Unit C3
1,171 ft²
Unit C3
576 ft²
Unit S1
1,171 ft²
Unit C3
576 ft²
Unit S1
Stair
1,171 ft²
Unit C3
752 ft²
Unit A2
441 ft²
Storage
127 ft²
Rest.
111 ft²
Mech.
99 ft²
Janitor
127 ft²
Trash
963 ft²
Fitness
284 ft²
Group Fitness
SD_500
1
1,193 ft²
Unit C1
SD_500 2
SD_500
3
SD_5005
Guardrail @ 40"
Retaining Wall
Corridor1,047 ft²
Community
Room
226 ft²
Core
Outdoor
Fitness
SD_500 4
Dog Run
784 ft²
Unit A1
784 ft²
Unit A1
576 ft²
Unit S2
SD_5006
576 ft²
Unit S1
Stair
784 ft²
Unit A1
784 ft²
Unit A1
784 ft²
Unit A1
1,068 ft²
Unit C4 784 ft²
Unit A1
1,196 ft²
Unit C2
1,196 ft²
Unit C2
Corridor
659 ft²
Unit S3
709 ft²
Unit S4
659 ft²
Unit S3
965 ft²
Unit B1
112 ft²
Trash
780 ft²
Lobby
780 ft²
Offices
659 ft²
Unit S3
564 ft²
Unit S5
Bag
Toss
21'-11 5/16"24'-9 7/16"21'-11 5/16"
68'-8"122'-8"23'-5 3/8"12'-2 5/8"13'-9 3/8"12'-2 5/8"37'-11 3/8"23'-0 5/8"31'-5 3/8"25'-0"50'-8"12'-2 5/8"13'-9 3/8"12'-2 5/8"13'-9 3/8"12'-2 5/8"13'-9 3/8"12'-2 5/8"36'-7 3/8"
233'-11 3/8"23'-0 5/8"99'-7 3/8"122'-8"19'-6"29'-8"19'-6"
68'-8"23'-0 5/8"38'-11 3/8"62'-0"55'-7 15/16"23'-0 5/8"38'-11 3/8"62'-0"19'-6"29'-8"19'-6"
68'-8"23'-0 5/8"38'-11 3/8"62'-0"21'-11 5/16"99'-8 3/16"
121'-7 7/16"23'-0 5/8"51'-11 3/8"12'-2 5/8"13'-9 3/8"12'-2 5/8"51'-0 3/4"23'-0 5/8"187'-4"185'-9"
kaas wilson architects
SCALE - 1/16" = 1'-0"
The Morrison - Rosemount MNLevel 1
SD_310 12/16/19 19064
1/16" = 1'-0"1 Level 1
1,185 ft²
Unit C2
795 ft²
Mech/Elec
784 ft²
Unit A1
784 ft²
Unit A1
Stair
Stair
576 ft²
Unit S1
1,171 ft²
Unit C3
1,171 ft²
Unit C3
576 ft²
Unit S1
Schema 1 Legend
1 BR
1+Den
2 BR
3BR/2BA
Cirrculation
Common
Studio
1,171 ft²
Unit C3
576 ft²
Unit S1
1,171 ft²
Unit C3Stair
752 ft²
Unit A2
99 ft²
Janitor 112 ft²
Trash
441 ft²
Storage
127 ft²
Core
111 ft²
Mech.
226 ft²
Core
127 ft²
Trash
SD_500
1
1,193 ft²
Unit C1
SD_500 2
SD_500
3
SD_5005
784 ft²
Unit A1
784 ft²
Unit A1
576 ft²
Unit S2
1,435 ft²
Unit D1
965 ft²
Unit B1
659 ft²
Unit S3
784 ft²
Unit A1
784 ft²
Unit A1
1,003 ft²
Unit C4
1,185 ft²
Unit C2
1,185 ft²
Unit C2
784 ft²
Unit A1
784 ft²
Unit A1
876 ft²
Unit B2
659 ft²
Unit S3
965 ft²
Unit B1
659 ft²
Unit S3
784 ft²
Unit A1
784 ft²
Unit A1
564 ft²
Unit S5
kaas wilson architects
SCALE - 1/16" = 1'-0"
The Morrison - Rosemount MNLevel 2
SD_320 12/16/19 19064
1/16" = 1'-0"1 Level 2
1,185 ft²
Unit C2
795 ft²
Core
784 ft²
Unit A1
784 ft²
Unit A1
Stair
576 ft²
Unit S1
1,171 ft²
Unit C3
1,171 ft²
Unit C3
576 ft²
Unit S1
1,171 ft²
Unit C3
576 ft²
Unit S1
1,171 ft²
Unit C3Stair
752 ft²
Unit A2
441 ft²
Storage
127 ft²
Core
111 ft²
Mech.
99 ft²
Janitor 112 ft²
Trash
226 ft²
Core
127 ft²
Trash
SD_500
1
1,193 ft²
Unit C1
SD_500 2
SD_500
3
SD_5005
Schema 1 Legend
1 BR
1+Den
2 BR
3BR/2BA
Cirrculation
Common
Studio
784 ft²
Unit A1
784 ft²
Unit A1
576 ft²
Unit S2
1,435 ft²
Unit D1
965 ft²
Unit B1
Stair
659 ft²
Unit S3
784 ft²
Unit A1
784 ft²
Unit A1
1,003 ft²
Unit C4
1,185 ft²
Unit C2
1,185 ft²
Unit C2
784 ft²
Unit A1
784 ft²
Unit A1
876 ft²
Unit B2
659 ft²
Unit S3
965 ft²
Unit B1
659 ft²
Unit S3
784 ft²
Unit A1
784 ft²
Unit A1
564 ft²
Unit S5
kaas wilson architects
SCALE - 1/16" = 1'-0"
The Morrison - Rosemount MNLevel 3
SD_330 12/16/19 19064
1/16" = 1'-0"1 Level 3
1,185 ft²
Unit C2
784 ft²
Unit A1
784 ft²
Unit A1
Stair
576 ft²
Unit S1
1,171 ft²
Unit C3
1,171 ft²
Unit C3
576 ft²
Unit S1
1,171 ft²
Unit C3Stair
752 ft²
Unit A2
Schema 1 Legend
1 BR
1+Den
2 BR
3BR/2BA
Cirrculation
Common
Studio
441 ft²
Storage
127 ft²
Rest.
111 ft²
Mech.
99 ft²
Janitor 112 ft²
Trash
226 ft²
Core
127 ft²
Trash
SD_500
1
1,193 ft²
Unit C1
724 ft²
Sky Bar
540 ft²
Roof Deck
SD_500 2
SD_500
3
SD_5005
784 ft²
Unit A1
784 ft²
Unit A1
576 ft²
Unit S2
965 ft²
Unit B1
1,171 ft²
Unit C3
1,435 ft²
Unit D1
Stair
659 ft²
Unit S3
784 ft²
Unit A1
784 ft²
Unit A1
1,003 ft²
Unit C4
1,185 ft²
Unit C2
1,185 ft²
Unit C2
784 ft²
Unit A1
784 ft²
Unit A1
876 ft²
Unit B2
659 ft²
Unit S3
965 ft²
Unit B1
659 ft²
Unit S3
784 ft²
Unit A1
784 ft²
Unit A1
564 ft²
Unit S5
1/16" = 1'-0"1 Level 4
kaas wilson architects
SCALE - 1/16" = 1'-0"
The Morrison - Rosemount MNLevel 4
SD_340 12/16/19 19064
kaas wilson architects
The Morrison - Rosemount MNExterior Perspectives
SD_600 12/16/19 19064