Loading...
HomeMy WebLinkAbout6.i. Autumn Path Extension Project, City Project 2019 07 Receiving Plans and Authorize Ad for BidI:\City Clerk\Agenda Items\Approved Items\6.i. Autumn Path Extension Project, City Project 2019 07 Receiving Plans and Authorize Ad for Bid.docx EXECUTIVE SUMMARY City Council Regular Meeting: February 18, 2020 AGENDA ITEM: Autumn Path Extension Project, City Project 2019-07: Receiving Plans and Authorize Ad for Bid AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 6.i. ATTACHMENTS: Resolution; Map APPROVED BY: ELF RECOMMENDED ACTION: Adopt a Resolution Receiving Plans and Specifications and Authorizing the Advertisement for Bids for the Autumn Path Extension Project, City Project 2019-07. BACKGROUND On November 19, 2013, the City Council received the Feasibility Report for public improvements related to the Bella Vista development. One of the roads identified in the report was Autumn Path. Autumn Path’s alignment is proposed to weave between the Bella Vista property and the neighboring property (PID 34-02200-25-010). The neighboring property has not dedicated needed right-of-way therefore Autumn Path extension has not yet been constructed. As a result, the developer does not have access to the future Bella Vista 7th Addition until Autumn Path is constructed. On November 4, 2019 the Council received an update of the Feasibility Report for Autumn Path. The report found this project, as proposed, to be feasible, cost effective, and necessary. On December 3, 2019 the Council held a public hearing and ordered the improvement, plans and specifications. Several of the property owners of the property proposed for assessment attended the hearing with concerns. Staff has sent a Petition and Waiver to the property owners to execute if they would like to defer the assessed amount for 10 years, or until the subdivision of the property, whichever occurs first. The Autumn Path Improvement Project, City Project 2019-07, would consist of construction of a 42-foot wide asphalt collector roadway with curb and gutter. Pedestrian facilities will include trail and sidewalk on each side of the road. Storm pipe will be constructed to ponds within the Bella Vista development. Watermain will be installed along the road along with some sanitary sewer. 2 COSTS & FUNDING The estimated cost for the project is $1,738,000. This amount includes 5% for contingency and 25% for incidentals such as engineering, legal, financing and administrative costs. The cost by improvement type is shown in the table below: PROJECT COST ESTIMATE Surface Improvements $1,267,100 Sanitary Sewer Improvements $24,500 Watermain Improvements $345,100 Storm Sewer Improvements $101,300 TOTAL $1,738,000 The design and construction costs for the Autumn Path Improvement Project, City Project 2019-07, are budgeted in the proposed 2020-2029 CIP in the amount of $1,510,000 for 2022. The funding anticipated for the project is shown in the table below. The street improvements will be funded by developer fees and assessment of abutting property. The City is ordering a special benefit appraisal of the benefitting property to assist with determination of the assessment amount. The Street Improvement Project (SIP) fund would cover shortfall from assessments. Utility work would be funded by the respective utility core funds. PROJECT FUNDING ESTIMATE Developer Fees (collected with Bella Vista) $684,200 Special Assessment $684,200 Sanitary Core Fund $24,500 Water Core Fund $345,100 TOTAL $1,738,000 SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Items marked “CC” will require City Council approval in order to move forward. CC Approve Plans & Specs and Order Advertisement for Bid February 18, 2020 Bid Opening March 19, 2020 CC Award Contract April 7, 2019 CC Set Assessment Hearing April 21, 2020 Public Open House April 2020 CC Assessment Hearing, Approve Assessment Roll May 19, 2020 3 Construction Start May/June 2020 Substantial Completion September 2020 SUMMARY Staff recommends the Council adopt the attached resolution accepting plans and authorizing advertisement for bids for the Autumn Path Extension Project, City Project 2019-07. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2020 - 29 A RESOLUTION RECEIVING THE PLANS AND SPECIFICATIONS AND AUTHORIZING THE ADVERTISEMENT FOR BIDS FOR AUTUMN PATH EXTENSION PROJECT, CITY PROJECT 2019-07 WHEREAS, the City Council of the City of Rosemount has ordered the preparation of plans and specifications for Autumn Path Extension Project, City Project 2019-07, and such plans and specifications have been presented to this Council for approval: NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota: 1. Such plans and specifications are hereby approved and ordered to be placed on file in the office of the City Clerk. 2. The City Clerk shall prepare and cause to be inserted in the official City newspaper and the Quest CDN an advertisement for bids upon the making of such improvements under such approved plans and specifications for City Project 2019-07. 3. The advertisement shall be published in each of said publications at least once not less than three (3) weeks before the date set for opening bids, specifying the work to be done, stating the bids will be publicly opened on March 19, 2020 at 10:00 o’clock a.m. at the Rosemount City Hall in said City, and that no bids will be considered unless sealed and filed with the City Clerk and accompanied by a cash deposit, cashier’s check, bid bond or certified check payable to the City Clerk for five (5%) percent of the amount of such bid. 4. Such advertisement for bids is hereby authorized by the Council. ADOPTED this 18th day of February, 2020. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk Autumn PathAutumn PathPhase 1 Phase 2 Phase 3 Phase 4N Phase 4S Phase 2Bacardi AveBonaire Path W Document Path: K:\01928-060\GIS\Maps\Figure1_ProjectLayout.mxd Date Saved: 11/13/2013 1:39:32 PMProje ct L oca tion 1 inch = 400 feet Bella VistaFigure 1 - Project Layout/PhasesCity of Rosemount MN