EXECUTIVE SUMMARY
City Council Regular Meeting: February 18, 2020
AGENDA ITEM: Deepwoods Court Improvement Project,
City Project 2020-03: Receiving Plans
and Authorize Ad for Bid
AGENDA SECTION:
Consent
PREPARED BY: Brian Erickson, PE, Director of Public
Works/City Engineer
Stephanie Smith, PE, Assistant City
Engineer
AGENDA NO. 6.l.
ATTACHMENTS: Resolution; Map APPROVED BY: ELF
RECOMMENDED ACTION: Adopt a Resolution Receiving Plans and Specifications and
Authorizing the Advertisement for Bids for the Deepwoods Court Improvement Project, City
Project 2020-03
BACKGROUND
In the Spring of 2019, staff received a request from residents living on Deepwoods Court that the
condition of their road be addressed. Deepwoods Court is listed in the 2019 - 2028 Capital Improvement
Plan for rehabilitation in 2022. As the pavement condition rapidly deteriorated during the 2018/2019
winter, staff discussed possible repair and maintenance options with the City Council and was directed to
move the project forward to construction in 2020.
On December 5, 2019, city staff hosted an open house for the residents of Deepwoods Court. The
residents expressed concerns about the road condition, drainage and a desire for curb and gutter
installation.
On December 17, 2019, the Rosemount City Council received the Feasibility Report and called for the
Public Improvement Hearing. The hearing was held, and City Council ordered the improvements on
January 21, 2020, which is a necessary step under the Minnesota Statute Chapter 429.
DISCUSSION
The proposed project will reclaim the existing pavement and repave with four inches of asphalt to provide
a new pavement surface. At the January improvement hearing, residents requested curb and gutter
installation for the full length of Deepwoods. As part of the bid documents, staff has included a bid
alternate for installation of ribbon curb so that the cost for this improvement can be established. Staff will
meet with residents following the bid opening to discuss the amount for installing ribbon curb with this
project.
Staff has also contacted Independent School District 196 (ISD 196) regarding the cul-de-sac configuration.
ISD 196 stated their policy is to not travel down cul-de-sac roads less than 1 mile in length unless there’s a
special need. Because of the traffic and travel speeds staff has requested ISD 196 review this policy. Staff
will also provide this information to the neighborhood so they can discuss with ISD 196 as well..
2
Minor stormwater improvements will include culvert replacement and ditch re-grading of areas that have
filled in over time. This street is outside the Metropolitan Urban Service Area (MUSA), so water and
sanitary sewer improvements are not included in the scope of work.
COSTS & FUNDING
The estimated cost for the project is $296,300. This amount includes a 10% contingency and 25%
incidentals such as engineering, legal, financing and administrative costs. The cost by improvement type is
shown in the table below:
Construction
Cost
Contingency
(10%)
Indirect Costs
(25%)Total
Surface
Improvements $175,837.50 $19,537.50 $65,125.00 $260,500.00
Storm Sewer
Improvements $24,165.00 $2,685.00 $8,950.00 $35,800.00
Totals $200,002.50 $22,222.50 $74,075.00 $296,300.00
PROJECT COST ESTIMATE
The project funding for the Deepwoods Court Improvement Project, City Project 2020-03, are shown in
the table below. The street improvements will be funded by the Street Improvement Fund and assessment
of abutting properties. The storm utility work would be funded by the Storm Utility Fund.
PROJECT FUNDING ESTIMATE
Street Capital Improvement Fund $169,300
Special Assessment $91,200
Storm Utility Fund $35,800
TOTAL $296,300
Per the Rosemount Special Assessment Policy, the assessment total is 35% of the estimated surface
improvement cost:
$260,500 * 35% = $91,175 rounded to $91,200
The assessments are proposed to be divided among the 8 properties that have driveway access to
Deepwoods Court. The assessment is estimated at:
$91,200 / 8 properties = $11,400 per property
Please note, this is an estimate. The final assessment amount will be determined at a future assessment
hearing and will be based on the actual bids received for the project.
The added cost for the requested curb and gutter is estimated at $113,900. This would be a new
improvement that, per Rosemount Assessment Policy, would be assessed at 100% of the improvement
cost. The proposed assessment per home would increase $14,237.50 for the installation of new curb. Staff
recommends Council require all properties within the project area enter a petition and waiver of the 429
process, agreeing to full assessment of the curb and gutter.
3
SCHEDULE
Should the Council approve this resolution, the proposed project schedule is shown below. Items marked
“CC” will require City Council approval in order to move forward.
CC Approve Plans & Specs and Order Advertisement for Bid February 18, 2020
Bid Opening March 17, 2020
Neighborhood Meeting March 18, 2020
CC Award Contract & Set Assessment Hearing April 7, 2020
CC Assessment Hearing, Approve Assessment Roll May 19, 2020
Construction Start June 2020
Substantial Completion September 2020
SUMMARY
Staff recommends Council adopt the attached resolution accepting plans and authorizing advertisement
for bids for the Deepwoods Court Improvement Project, City Project 2020-03.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2020 - 27
A RESOLUTION RECEIVING THE PLANS AND SPECIFICATIONS
AND AUTHORIZING THE ADVERTISEMENT FOR BIDS FOR
DEEPWOODS COURT IMPROVEMENT PROJECT, CITY PROJECT 2020-03
WHEREAS, the City Council of the City of Rosemount has ordered the preparation of plans and
specifications for Deepwoods Court Improvement Project, City Project 2020-03, and such plans and
specifications have been presented to this Council for approval:
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Rosemount,
Minnesota:
1. Such plans and specifications are hereby approved and ordered to be placed on file in the
office of the City Clerk.
2. The City Clerk shall prepare and cause to be inserted in the official City newspaper and the
Quest CDN an advertisement for bids upon the making of such improvements under such
approved plans and specifications for City Project 2020-03.
3. The advertisement shall be published in each of said publications at least once not less than
three (3) weeks before the date set for opening bids, specifying the work to be done, stating
the bids will be publicly opened on March 17, 2020 at 10:00 o’clock a.m. at the Rosemount
City Hall in said City, and that no bids will be considered unless sealed and filed with the
City Clerk and accompanied by a cash deposit, cashier’s check, bid bond or certified check
payable to the City Clerk for five (5%) percent of the amount of such bid.
4. Such advertisement for bids is hereby authorized by the Council.
ADOPTED this 18th day of February, 2020.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
"#*
")
")#*
")
#*
GªWX
12775
12549
12670
12570
12575
12561
12557
12565
12569
12553
12675
12770
4851
12816
12724
12756
12674
12736
12788
12818
4655
12753
12819
12802
12870
12765
12737
12823
12745
12748
4433
12797 12875
12763
12774
12835
12816
12762 12771
12822
12840
4485
1281712826
12807
12827
12799
12735
12781
12789
12825
12545
12475 4245
DEE
PWOODS CT
MCANDREWS RD
Proje ct L ocation
"Storm Sewer
City Bou ndary
0 225Feet¯Project Location Map
Deepwoods Court Improvement Project
Rosemount, MN Document Path: K:\015059-000\GIS\Maps\ProjectLocationMap.mxd Date Saved: 12/4/2019 12:52:09 PM1 inch = 225 f eet