HomeMy WebLinkAbout6.h. Connemara Trail, City Project 2018-09 Receive Bids, Award ContractI:\City Clerk\Agenda Items\Approved Items\6.h. Connemara Trail, City Project 2018-09 Receive Bids, Award Contract.docx EXECUTIVE SUMMARY City Council Meeting: March 17, 2020 AGENDA ITEM: Connemara Trail, City Project 2018-09: Receive Bids, Award Contract AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works/City Engineer Stephanie Smith, PE, Assistant City Engineer AGENDA NO. 6.h. ATTACHMENTS: Resolution APPROVED BY: LJM RECOMMENDED ACTION: Motion to Adopt a Resolution Accepting Bids and, Awarding a Contract for Connemara Trail, City Project 2018-09. BACKGROUND Connemara Trail, City Project 2018-09, will extend the roadway, water and sanitary sewer to the east from Akron Ave. This project would extend the stormwater trunk main to the east was well. On February 4, 2020, the Council received plans and specifications and approved the advertisement for bids for this project. Bids were opened on February 28, 2020. Construction is proposed to begin in Spring 2020 and is anticipated to be substantially complete, excluding wear bituminous course, by late October 2020. COSTS AND FUNDING On February 28, 2020, nine bids were received and read aloud publicly. The bids are listed in the table below. The low bidder is A-1 Excavating with a bid amount of $1,557,463.00 which is approximately 15% below the engineer’s estimate of $1,839,494. Additional costs for construction administration, including observation, contractor coordination and materials testing, will be brought to the Council for approval as a separate item. Bidder Total Bid Percentage of Engineer's Engineer's Estimate 1,839,494.00$ 100% A-1 Excavating, Inc.1,557,463.00$ 85% Northwest Asphalt, Inc.1,639,225.57$ 89% Ryan Contracting Company 1,678,619.50$ 91% Northern Lines Contracting, Inc.1,688,546.00$ 92% McNamara Contracting, Inc.1,731,683.00$ 94% Geislinger and Sons, Inc.1,898,855.00$ 103% R. L. Larson Excavating, Inc.1,980,347.25$ 108% Meyer Contracting, Inc.2,283,260.00$ 124% Kuechle Underground 2,637,115.25$ 143% 2 This project is proposed to be developer-funded by the parties of the Prestwick Place Cost Share Agreement. The funds are collected in development fees as nearby parcels under the agreement are developed and platted. Utility core funds will be used for upsizing and trunk facilities. RECOMMENDATION Staff recommends Council adopt the attached resolution receiving the bids and awarding the contract for Connemara Trail, City Project 2018-09. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2020 – 34 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR CONNEMARA TRAIL, CITY PROJECT 2018-09. BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of Connemara Trail, City Project 2018-09, are hereby received and tabulated. 2. Based on the Total Bid, the bid of A-1 Excavating, Inc in the amount of $1,557,463.00 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 17th day of March, 2020. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk