HomeMy WebLinkAbout6.m. Deepwoods Court Improvement Project, City Project 2020-03, Accept Bids and Award ContractI:\City Clerk\Agenda Items\Approved Items\6.m. Deepwoods Court Improvement Project, City Project 2020-03, Accept Bids and Award Contract.docx
EXECUTIVE SUMMARY
City Council Regular Meeting: April 21, 2020
AGENDA ITEM: Deepwoods Court Improvement Project,
City Project 2020-03, Accept Bids and
Award Contract
AGENDA SECTION:
Consent
PREPARED BY: Brian Erickson, PE, Director of Public
Works/City Engineer
Stephanie Smith, PE, Assistant City
Engineer
AGENDA NO. 6.m.
ATTACHMENTS: Resolution; Property Owner E-mail; Bid
Tabulation Summary; Location Map APPROVED BY: LJM
RECOMMENDED ACTION: Adopt a Resolution Accepting Bids and Awarding a Contract
for the Deepwoods Court Improvement Project, City Project 2020-03
BACKGROUND
In the Spring of 2019, staff received a request from residents living on Deepwoods Court that the
condition of their road be addressed. Deepwoods Court is listed in the 2019 - 2028 Capital Improvement
Plan for rehabilitation in 2022. As the pavement condition rapidly deteriorated during the 2018/2019
winter, staff discussed possible repair and maintenance options with the City Council and was directed to
move the project forward to construction in 2020.
On December 5, 2019, city staff hosted an open house for the residents of Deepwoods Court. The
residents expressed concerns about the road condition, drainage and a desire for curb and gutter
installation.
On December 17, 2019, the Rosemount City Council received the Feasibility Report and called for the
Public Improvement Hearing. The hearing was held, and City Council ordered the improvements on
January 21, 2020, which is a necessary step under the Minnesota Statute Chapter 429. Bids were opened
on March 24, 2020 and there were 5 bidders.
DISCUSSION
As this project has progressed forward, staff and the property owners have discussed the potential for
adding ‘ribbon’ curb to the project. On April 16, 2020 during a City Council Special Work Session, the
possibility of adding this curb was further discussed. Ultimately, the Council directed staff to have one
final discussion regarding the curb and expressed a willingness to add the curb, but only if the property
owners were willing to pay for the total cost of this installation. On April 17, 2020 an e-mail was received
from the property owners stating their willingness to pay for the full cost of curbing.
As a result, staff is recommending a contract be awarded to McNamara Construction, Inc. in the amount
of $248, 666.67 for the Base Bid and Additive Alternate 1 (ribbon curb). The Base Bid will reclaim the
existing pavement and repave with four inches of asphalt to provide a new pavement surface as well as
performing minor stormwater improvements to include culvert replacement and ditch grading of areas
2
that have filled in over time. Alternate 1 will install ‘ribbon’ curb on the full corridor.
The five bids received for the project ranged from a low of $248,666.67 to a high of $301,403.00 and are
shown in the table below. The engineer’s estimate of probable cost is also shown.
COSTS & FUNDING
The following table shows the Total Project Cost and Total Project Funding for completing the work on
Deepwoods Court. An assessment hearing will be scheduled at a future date.
RECOMMENDATION
Staff recommends Council adopt the attached resolution receiving bids and awarding a contract for the
Deepwoods Court Improvement Project, City Project 2020-03.
Bidder Bid Percent of
Estimate
McNamara Construction, Inc.248,666.67$ 94.4%
Northwest Asphalt, Inc.257,378.92$ 97.7%
Engineer's Estimate 263,490.00$ 100.0%
Minnesota Paving and Materials, 281,654.95$ 106.9%
Bituminous Roadways, Inc.298,504.90$ 113.3%
S.M. Hentges and Sons, Inc.301,403.00$ 114.4%
DEEPWOODS COURT BID SUMMARY
Construction 263,490.00$ 248,666.67$
Surface Improvement 186,740.00$ $ 181,099.50
Stormwater Improvmeent 20,650.00$ $ 35,406.17
Alt 1 - Ribbon Curb 56,100.00$ $ 32,161.00
Contingency (5%)13,174.50$ 12,433.33$
Subtotal 276,664.50$ 261,100.00$
Overhead (25%)65,872.50$ 62,166.67$
TOTAL PROJECT COST 342,537.00$ 323,266.67$
Street Improvement (City Share)157,795.30$ 153,029.08$
Storm Sewer (Storm Fund)26,845.00$ 46,028.02$
Assessments 157,896.70$ 124,209.57$
TOTAL PROJECT FUNDING 342,537.00$ 323,266.67$
Estimate Low Bid
TOTAL PROJECT FUNDING
Estimate
TOTAL PROJECT COST
Low Bid
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2020 – 55
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR DEEPWOODS COURT IMPROVEMENT PROJECT,
CITY PROJECT 2020-03
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of Deepwoods Court Improvement Project, City Project 2020-03, are
hereby received and tabulated.
2. Based on the combination of Base Bid and Additive Alternate 1, the bid of McNamara
Contracting, Inc. in the amount of $248,666.67 for the construction of said improvements is in
accordance with the plans and specifications and advertisement for bids, and is the lowest
responsible bid and shall be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said
bidder for the construction of said improvements for and on behalf of the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposit of the successful bidder and the next two lowest
bidders shall be retained until a contract has been executed.
ADOPTED this 21st day of April, 2020.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
PROJECT:
OWNER:
City of Rosemount, MN Project No. 2020-03
WSB PROJECT NO.:
015059-000
Bids Opened: Tuesday, March 24, 2020 at 9:00 am
Contractor Bid Security (5%)Grand Total Bid
1 McNamara Contracting, Inc.X $248,666.67
2 Northwest Asphalt, Inc.X $257,378.92
3 Minnesota Paving and Materials X $281,654.95
4 Bituminous Roadways, Inc.X $298,504.90
5 S.M. Hentges & Sons, Inc X $301,403.00
Engineer's Opinion of Cost $263,490.00
Denotes corrected figure
Tim Hanson, PE Project Manager
BID TABULATION SUMMARY
I hereby certify that this is a true and correct tabulation of the bids as received on March 24, 2020.
Deepwoods Court Improvements
K:\015059-000\Admin\Bidding\015059-000 Bid Tab Summary 032420
"#*
")
")#*
")
#*
GªWX
12775
12549
12670
12570
12575
12561
12557
12565
12569
12553
12675
12770
4851
12816
12724
12756
12674
12736
12788
12818
4655
12753
12819
12802
12870
12765
12737
12823
12745
12748
4433
12797 12875
12763
12774
12835
12816
12762 12771
12822
12840
4485
1281712826
12807
12827
12799
12735
12781
12789
12825
12545
12475 4245
DEE
PWOODS CT
MCANDREWS RD
Proje ct L ocation
"Storm Sewer
City Bou ndary
0 225Feet¯Project Location Map
Deepwoods Court Improvement Project
Rosemount, MN Document Path: K:\015059-000\GIS\Maps\ProjectLocationMap.mxd Date Saved: 12/4/2019 12:52:09 PM1 inch = 225 f eet