EXECUTIVE SUMMARY
Utility Commission Meeting: June 22, 2020
AGENDA SECTION:
AGENDA ITEM: Water Treatment Plant Update
New Business
PREPARED BY: Brian Erickson, PE, Director of Public AGENDA NO.
Works/City Engineer 7.b.
ATTACHMENTS: None APPROVED BY: BLE
RECOMMENDED ACTION: None, discussion only.
BACKGROUND:
The City of Rosemount has been planning for the construction of a Water Treatment Plant for a number
of years. There is currently a site identified that has water mains installed for both raw (untreated) and
production (treated) water. Additionally, the water rates have been set such that the fund balance has
increased to cover a portion of the cost of the work.
With the discovery of elevated manganese levels in a portion of the city wells, there is a renewed emphasis
on the construction of a treatment plant. To that end, staff has received a proposal from one of the city’s
consultants to begin the early planning process for a treatment plant. Staff will be working to establish a
project timeline for the construction. This process will be coordinated with our consultant and provided
as a future update.
SUMMARY:
This is an information/discussion item for the Commission, no action is required.