EXECUTIVE SUMMARY
City Council Regular Meeting: July 21, 2020
AGENDA ITEM: Approve Development Agreement for
Rosemount Woods Expansion, CP 2020-
12
AGENDA SECTION:
Consent
PREPARED BY: Stephanie Smith, PE, Assistant City
Engineer AGENDA NO. 6.j.
ATTACHMENTS: Development Agreement APPROVED BY: LJM
RECOMMENDED ACTION: Motion to Approve Development Agreement for Rosemount
Woods Expansion.
BACKGROUND
On February 18, 2020 the Rosemount City Council approved a major amendment to the Rosemount
Woods Planned Unit Development. This amendment includes the condition of approval that the property
owner construct several public improvements including paving Brazil Avenue, installing associated
stormwater improvements and trail connections from the development to Erickson Park trail system.
The property owner must enter into a development agreement with the City to facilitate private installation
of these public improvements. The agreement has been reviewed by the City Attorney. It contains
language comparable to the standard subdivision agreement and is attached to this memo.
RECOMMENDATION
Staff recommends City Council approve the attached development agreement and authorize the Mayor
and City Clerk to enter into this agreement.
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
DEVELOPMENT AGREEMENT
Rosemount Woods Expansion
AGREEMENT dated this ________ day of ________________________, 2020, by and between the
CITY OF ROSEMOUNT, a Minnesota municipal corporation, (the "City"), and MHC ROSEMOUNT WOODS ,
LLC, a Delaware limited liability company (the "Developer").
1. Request for Approval. The Developer has asked the City to approve the plans for the expansion of
Rosemount Woods, which are attached hereto and hereby made a part hereof (hereinafter referred to
as the “subject property”).
2. Conditions of Approval. The City has approved the expansion on the following conditions:
a. Incorporation of recommendations of the City Engineer concerning design and installation of
public infrastructure.
b. Execution of a Development Agreement to secure the public and private improvements.
c. Payment of all applicable fees including GIS, Park Dedication and other fees identified in the
current fee schedule.
d. Incorporation of any easements necessary to accommodate drainage, ponding, trails, underpasses,
conservation areas, streets and utilities.
3. [This Section Intentionally Left Blank]
4. [This Section Intentionally Left Blank]
5. Development Plans. The subject property shall be developed in accordance with the following plans,
specifications and contract documents, original copies of which are on file with the City Engineer. The
plans and contract documents may be prepared, subject to City approval, after entering this Agreement,
but before commencement of any work on the Subject Property. If the plans vary from the written
terms of this Agreement, the written terms shall control. The Plans, included with this agreement as
Attachment One are:
Plan A - Site Plan
Plan B - Soil Erosion Control Plan and Schedule
Plan C - Drainage and Storm Water Runoff Plan
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
Plan D - Plans and Specifications for Public and Private Improvements
Plan E - Grading Plan and House Pad Elevations
Plan F - Street Lights
Plan G - Landscape Improvements
All Improvements, including Developer Improvements and City-Installed Public Infrastructure
Improvements (if any) that lie within the public right-of-way or easements and are improvements listed
in Minnesota Statutes, Section 429.021 (hereinafter Public Improvements) will be designed by the
Developer and must be approved by the City Engineer. The Developer will prepare plans and
specifications for Public Improvements which shall be approved by the City Engineer. Such approvals
shall not be unreasonably withheld and the City shall approve or provide Developer with necessary
revision comments within 30 calendar days of Developer submittal of Public Improvement plans and
specifications. The City will perform all construction inspection for the Public Improvements, at the
Developer’s expense. Construction inspection includes but is not limited to inspection,
documentation, and monitoring.
6. Installation by Developer. The Developer shall install or cause to be installed and pay for the
following, hereinafter referred to as the “Developer Improvements”:
A. Surveying and staking
B. Surface improvements (paved streets, sidewalks, trails, etc.)
C. Water main improvements
D. Sanitary sewer improvements
E. Storm sewer improvements
F. Setting of survey monuments
G. Gas, electric, telephone, and cable lines
H. Site grading
I. Landscaping
J. Streetlights
K. Other items as necessary to complete the development as stipulated herein or in other
agreements
7. Time of Performance. The Developer shall construct Brazil Avenue up to a drivable base course by
November 15, 2020, subject to delays due to inclement weather, casualty, labor strikes, material
shortages, quarantines, national emergency, disruption of labor force, epidemic, pandemic, government
orders, viral or communicable disease outbreak or other force majeure events that are not within the
Developer’s reasonable control and that prevent or prohibit work on the project.
The Developer shall install all required improvements, excepting the wear course of pavement,
enumerated in Paragraph 6 that will serve the subject property by December 31, 2021, subject to delays
due to inclement weather, casualty, labor strikes, material shortages, quarantines, national emergency,
disruption of labor force, epidemic, pandemic, government orders, viral or communicable disease
outbreak or other force majeure events that are not within the Developer’s reasonable control and that
prevent or prohibit work on the project. The pavement wear course shall be completed by December
31, 2022.
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
The Developer may, however, request an extension of time from the City. If an extension is granted,
it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and
the extended completion date.
8. City-Installed Public Infrastructure. The following improvements, hereinafter referred to as “City-
Installed Public Infrastructure Improvements” (known as City Project 2020-12), shall be designed,
inspected, surveyed and administered by the City, and installed in the Subject Property at Developer
expense by a Contractor selected by the City through the public bidding process:
A. None
9. COVID-19 Pandemic. Notwithstanding any other provision in this Agreement to the contrary,
Developer agrees that it will not be able to submit a claim for extra work or for monetary damages (for
delay or otherwise), or request an extension of time to complete the work, for any reason arising out of
or relating to: (1) the COVID-19 pandemic; or (2) any national, state, or local declaration, resolution, or
order relating to the COVID-19 pandemic, unless such declaration, resolution or order prohibits work
on the project. The contract completion date shall be extended for the period of the required stoppage
in work but without any claim for delay damages.
10. Security for Developer Improvements. To guarantee compliance with the terms of this Agreement,
payment of the costs of all Developer Improvements, and construction of all Developer Improvements
(as noted in Paragraph 6), the Developer shall furnish the City with a cash deposit or irrevocable letter
of credit from a local bank (“security”) in the amount of One Million, Thirty-One Thousand, Five
Hundred, Eighty-Nine Dollars ($1,031,589). The amount of the security was calculated as follows:
Cost 110%
Grading and Erosion Control $35,210 $38,731
Survey Monumentation $500 $550
Retaining Wall $19,793 $21,772
Landscaping $61,200 $67,320
Street Lights $32,000 $35,200
Cost 125%
Surface Improvements $305,222 $381,527
Water Main Improvements $202,850 $253,563
Sanitary Sewer Improvements $136,940 $171,175
Storm Sewer Improvements $49,401 $61,751
Total $843,115 $1,031,589
Refer to Exhibit A and Exhibit B for an explanation of each item.
At Developer's option, in order to obtain the grading permit and begin the grading and erosion control
work prior to the full execution and delivery of the Development Agreement and payment in full of the
required fees in the amount of $251,613.00, Developer may furnish the City with an irrevocable letter
of credit in the amount of $42,300 for the Grading and Erosion Control items. Upon receiving the
required fees and Developer's irrevocable letter of credit in the amount of $1,031,589 the City will
promptly release and return to Developer the original letter of credit in the amount of $42,300.
The bank and form of the letter of credit or other security shall be subject to the approval of the City
Administrator. The letter of credit shall be automatically renewable until the City releases the developer
from responsibility. The letter of credit shall secure compliance with all terms of this Agreement and
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
all obligations of the Developer under it. The City may draw down on the letter of credit without notice
if the obligations of the Developer have not been completed as required by this Agreement. In the
event of a default under this Development Agreement by the Developer, the City shall furnish the
Developer with written notice by certified mail of Developers default(s) under the terms of this
Development Agreement. If the Developer does not remove said default(s) within two (2) weeks of
receiving notice, the City may draw on the letter of credit and take such steps as it deems necessary to
remedy the default. With City approval, the letter of credit may be reduced from time to time as financial
obligations are paid and Developer Improvements and other Developer obligations are completed to
the City’s requirements.
11. Grading Plan/Site Grading. In accordance with Plan E, site grading shall be completed by the
Developer at its cost and approved by the City Engineer. The completion of grading activities will need
to be coordinated by the City in conjunction with the installation of utilities. Developer shall furnish
the City Engineer satisfactory proof of payment for the site grading work and shall submit a certificate
of survey of the development to the City as the site grading is completed by phase, with street and lot
grades. If the installation of utilities by the City is occurring simultaneously with the grading, the utility
contractor shall have preference over the grading activities. No substantial grading activities can be
completed over installed utilities unless otherwise protected. All improvements to the lots and the final
grading shall comply with the grading plan as submitted and shall be the responsibility of the Developer.
12. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license
to enter the Subject Property to perform all work and inspections deemed appropriate by the City. Such
license shall terminate as to all residential lots within the subject property upon acceptance by the City
of the public infrastructure improvements.
13. Erosion Control. Prior to site grading, and before any utility construction is commenced or building
permits are issued, the erosion control plan, Plan B, shall be implemented, inspected and approved by
the City. All areas disturbed by the excavation and backfilling operations shall be reseeded within 72
hours after the completion of the work in that area. Except as otherwise provided in the erosion control
plan, seed shall be rye grass or other fast-growing seed suitable to the existing soil to provide a temporary
ground cover as rapidly as possible. All seeded areas shall be mulched and disc-anchored as necessary
for seed retention.
All basement and/or foundation excavation spoil piles shall be kept completely off City right-of-way
and shall be completely surrounded with an approved erosion control silt fence. Approved erosion
control fencing shall be installed around the perimeter of each lot or at City-approved locations at the
time of building permit issuance and remain in place until the lot is seeded or sodded. A 20-foot opening
will be allowed on each lot for construction deliveries.
The parties recognize that time is critical in controlling erosion. If development does not comply with
the erosion control plan and schedule, or supplementary instructions received from the City, the City
may take such action as it deems appropriate to control erosion. This right also applies to the required
erosion control for basement and/or foundation excavation spoil piles. The City will attempt to notify
the Developer in advance of any proposed action, but failure of the City to do so will not affect the
Developer’s or City’s rights or obligations hereunder. If the Developer does not reimburse the City for
any cost the City incurred for such work within thirty (30) days, the City may draw down the letter of
credit to pay any costs. No development will be allowed, and no building permits will be issued unless
the Subject Property is in full compliance with the erosion control requirements.
14. Planting and Seeding. Landscaping shall be in accordance with Plan G, as approved by the City
Planner.
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
15. Clean up. The Developer shall clean streets of dirt and debris that has resulted from construction work
by the Developer, its agents or assignees. The City will inspect the site on a weekly basis and determine
whether it is necessary to take additional measures to clean dirt and debris from the streets. Costs for
City inspection of onsite erosion and sediment control shall be at the Developer’s expense. After a 24-
hour written notice to the Developer, the City will complete or contract to complete the clean-up at the
Developer’s expense in accordance with the procedures specified in Paragraph 13. The Developer shall
inspect and, if necessary, clean all catch basins, sumps, and ponding areas of erosion/siltation and restore
to the original condition at the end of home construction within this development. All silt fence and
other erosion control should be removed following the establishment of turf. These items are to be
secured through the letter of credit as is noted in Exhibit A.
16. Ownership of Improvements. Upon completion and City acceptance of the work and construction
required by this Agreement, the Public Improvements lying within public rights-of-way and easements
shall become City property without further notice or action unless the improvements are specifically
identified herein as private infrastructure. Storm sewer from Brazil Avenue and the Brazil Avenue
roadway are Public Improvements. All other improvements are Private Improvements.
17. Warranty. The Developer warrants all work required to be performed by it against poor material and
faulty workmanship for a period of two (2) years after its completion and acceptance by the City or such
longer period as is specified in plans and specifications for Public Improvements.
All trees, grass and sod shall be warranted to be alive, of good quality and disease free for twenty-four
(24) months after planting.
Vegetation surrounding ponds and/or wetlands shall be warranted to be alive, of good quality and weed
free for three (3) years after planting.
For each pond/wetland in the development, the developer shall provide to the City Engineer an
inspection report by July 31 each year which includes the following:
A. Date of inspection
B. Name of person responsible for inspection
C. Photos of the pond/wetland area confirming the vegetation is established as intended
D. Maintenance plan describing the required maintenance activities and tentative schedule
18. Responsibility for Costs.
A. Except as otherwise specified herein, the Developer shall pay all costs incurred by it or the City in
conjunction with the development of the Subject Property including, but not limited to, Soil and
Water Conservation District charges, legal, planning, engineering and inspection expenses
incurred in connection with this expansion project, the preparation of this Agreement and any
amendments hereto, and all costs and expenses incurred by the City in monitoring and inspecting
the development of the Subject Property.
B. The Developer shall reimburse the City for costs incurred in the preparation and enforcement of
this Agreement, including engineering and attorney’s fees. Upon request, the City shall provide
invoices, in reasonable detail, as to any such fees. The estimated City fees of $113,281, shall be
deposited with the City at the time this Agreement is signed, and represent the following amounts:
$69,441 Engineering Fees (10% of construction estimate)
$1,500 Attorney Fees
$34,721 5% City Fees (based on construction estimate of $694,413)
$2,160 Street Light Energy Cost – Brazil Lighting Only
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
$1,086 GIS Fees
$400 Buffer Monumentation
$170 Trail Fog Seal
$3,803 Seal Coating
$113,281 Total Amount Due
If the actual City fees exceed this estimate, the Developer shall pay the undisputed additional costs
to the City within thirty (30) days after receipt of a reasonably detailed invoice. If actual City fees
are lower than this estimate, any surplus funds will be returned to the developer within 15 days of
completion and City acceptance of the work in accordance with the Plans.
C. The Developer shall pay in full all undisputed bills submitted to it by the City for obligations
incurred under this Agreement within thirty (30) days after receipt of a reasonably detailed invoice.
If the bills are not paid on time, the City may halt development work and construction including,
but not limited to, the issuance of building permits for lots that the Developer may or may not
have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest
at the rate of nine percent (9%) per year.
D. The Developer shall pay all energy costs for street lights installed within the Subject Property for
24-months at a cost of $30/month/light. After that, the City will assume the energy costs.
E. The Developer will pay the cost of sealcoating the public streets within the development at a cost
of $1.70/SY. The sealcoating will be completed within three (3) years following wear course
placement.
F. The Developer will pay the cost of fog sealing the public trails within the development at a cost
of $0.20/SF. The fog sealing will be completed within three (3) years following trail installation.
19. Indemnification. The Developer shall hold the City and its officers, agents and employees harmless
from claims made by itself and third parties for damages sustained or costs incurred resulting from
development of the Subject Property, except for any costs or expenses arising from the intentional acts
or negligence of the City, it’s agents, employees or contractors. The City shall immediately notify
Developer of any claims received concerning the Subject Property. The Developer shall indemnify the
City and its officers, agents and employees for all costs, damages or expenses that the City may pay or
incur in consequence of such claims, including attorney’s fees.
20. Insurance. The Developer agrees to take out and maintain or cause to be taken out and maintained
until six months after the City has accepted the Development Improvements, public liability and
property damage insurance covering personal injury, including death, and claims for property damage
which may arise out of Developer’s work or the work of its contractors or subcontractors. Liability
limits shall not be less than $500,000 when the claim is one for death by wrongful act or omission or
for any other claim and $2,000,000 for any number of claims arising out of a single occurrence, and
twice said limits when the claim arises out of the release or threatened release of a hazardous substance.
The City shall be named as an additional insured on the policy. The certificate of insurance shall provide
that the City must be given the same advance written notice of the cancellation of the insurance as is
afforded to the Developer.
21. Park and Utility Fees.
The Developer agrees to pay fees, charges and assessments set forth in this Section prior to execution
of this agreement by the City:
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
A. Storm Sewer Trunk Area Charges in the amount of $62,127
B. Sanitary Sewer Trunk Area Charges in the amount of $10,815
C. Watermain Trunk Area Charges in the amount of $65,390
Or other amounts for such fees as in effect at the time of execution of this agreement.
22. Service Charges.
The Developer understands that builders will be required to pay for the Subject Property fees, charges
and assessments in effect at the time of issuance of building permits. The rates for each of these items
will be set according to the current rate structure at the time the building permit is received. The fees,
charges, and assessments in effect as of the date of this agreement are:
A. Metropolitan Council Environmental Services Availability Charges per SAC unit (current rate is
$2,485).
B. Storm Sewer Connection Charges per single family unit and per multiple family unit (single family
currently at $770; multi-family currently at $290 per housing unit).
C. Sanitary Sewer Availability Charges per SAC unit (currently at $1,200/SAC unit).
D. Water Availability Charges per SAC unit (currently at $2,425/SAC unit for single family residential
and multi-family residential).
23. Building Permits. No occupancy permits shall be issued until:
A. The site grading is completed and approved by the City.
B. All utilities are tested, approved by the City Engineer, and in service.
C. All curbing is installed and backfilled.
D. The first lift of bituminous is in place and approved by the City.
E. All building permit fees are paid in full.
F. No early building permits will be issued without prior authorization from the City Building
Official.
The Developer, in executing this Agreement, assumes all liability and costs for damage or delays incurred
by the City in the construction of the Improvements caused by the Developer, its employees,
contractors, subcontractors, material men or agents, except to the extent said liability and costs for
damage or delay were caused by the negligence or intentional acts of the City, its employees or agents
or quarantines, national emergence, disruption of labor force, epidemic, pandemic, government orders,
viral or communicable disease outbreak. No occupancy permits shall be issued until the streets and
utilities referred to in paragraph 6 are installed and approved by the City (excluding the final wear course
of bituminous), unless otherwise authorized in writing by the City Engineer.
24. Record Drawings. At project completion, Developer shall submit record drawings of all public and
private infrastructure improvements in accordance with the City’s Engineering Guidelines. No
securities will be fully released until all record drawings have been submitted and accepted by the City
Engineer.
25. Developer’s Default. In the event of default by the Developer as to any of the work to be performed
by it hereunder, the City may, at its option, perform the work and the Developer shall promptly
reimburse the City for any expense incurred by the City, provided the Developer is first given written
notice of the work in default, not less than 48 hours in advance. This Agreement is a license for the
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
City to act, and it shall not be necessary for the City to seek a court order for permission to enter the
land. When the City does any such work, the City may, in addition to its other remedies, draw on the
letter of credit or other security described in section 10, or levy the cost in whole or in part as a special
assessment against the Subject Property. Developer waives its rights to notice of hearing and hearing
on such assessments and its right to appeal such assessments pursuant to Minnesota Statutes, Section
429.081.
26. Miscellaneous.
A. The Developer represents to the City that the development of the Subject Property complies with
all city, county, metropolitan, state and federal laws and regulations including, but not limited to:
subdivision ordinances, zoning ordinances and environmental regulations. If the City determines
that the development of the Subject Property does not comply, the City may, at its option, refuse
to allow construction or development work on the Subject Property until the Developer does
comply. Upon the City’s demand, the Developer shall cease work until there is compliance.
B. Third parties shall have no recourse against the City under this Agreement.
C. Breach of the terms of this Agreement by the Developer shall be grounds for denial of building
permits, including lots sold to third parties.
D. If any portion, section, subsection, sentence, clause, paragraph or phase of this Agreement is for
any reason held invalid, such decision shall not affect the validity of the remaining portion of this
Agreement.
E. If building permits are issued prior to the completion and acceptance of the Public Improvements,
the Developer assumes all liability and costs resulting from delays in completion of the Public
Improvements and damage to the Public Improvements caused by, the Developer, its
contractors, subcontractors, material men, employees, agents or third parties.
F. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of
this Agreement. To be binding, amendments or waivers shall be in writing, signed by the parties
and approved by written resolution of the City Council. The City’s failure to promptly take legal
action to enforce this Agreement shall not be a waiver or release.
G. This Agreement shall run with the land and may be recorded against the title to the subject
property. The Developer shall take such steps, including execution of amendments to this
Agreement, as are necessary to effect the recording hereof. After the Developer has completed
the work required of it under this Agreement, at the Developer’s request, the City will execute and
deliver to the Developer a release.
H. Each right, power or remedy herein conferred upon the City is cumulative and in addition to every
other right, power or remedy, express or implied, now or hereafter arising, available to the City, at
law or in equity, or under any other agreement, and each and every right, power and remedy herein
set forth or otherwise so existing may be exercised from time to time as often and in such order
as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any
time thereafter any other right, power or remedy.
I. The Developer may not assign this Agreement without the written permission of the City Council
which shall not unreasonably withhold.
J. The Developer acknowledges that the City may issue additional requirements outside of the 2015
General Specifications and Standard Detail Plates for Street and Utility Construction or the 2008
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
Engineering Guidelines as the City is in the process of updating these documents. The review
process may require additional time and expense due to this process, which shall be the
Developer’s responsibility. The Developer shall not be billed for the time required for the City to
update and approve their revisions to the 2015 General Specifications and Standard Details Plates
for Street and Utility Construction or the 2008 Engineering Guidelines.
27. Notices. Required notices to the Developer shall be in writing, and shall be either hand delivered to
the Developer, its employees or agents, or mailed to the Developer by registered mail at the following
address:
MHC ROSEMOUNT WOODS, LLC
c/o Equity Lifestyle Properties, Inc.
Two North Riverside Plaza, Suite 800
Chicago, Illinois 60606
Attention: President
Telephone: (312) 279-1400
with a copy to:
Equity Lifestyle Properties, Inc.
Two North Riverside Plaza, Suite 800
Chicago, Illinois 60606
Attention: Legal Department
Telephone: (312) 279-1400
Notices to the City shall be in writing and shall be either hand delivered to the City Administrator, or
mailed to the City by registered mail in care of the City Administrator at the following address:
City Administrator
Rosemount City Hall
2875 145th Street West
Rosemount, Minnesota 55068
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
IN WITNESS WHEREOF, the parties have hereunto set their hands the day and year first above written.
CITY OF ROSEMOUNT
BY:
William H. Droste, Mayor
BY:
Erin Fasbender, City Clerk
STATE OF MINNESOTA )
) SS
COUNTY OF DAKOTA )
The foregoing instrument was acknowledged before me this day of _____________________, 2020,
by William H. Droste, Mayor, and Erin Fasbender, City Clerk, of the City of Rosemount, a Minnesota
municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council.
Notary Public
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
MHC ROSEMOUNT WOODS, LLC
BY:
Its
STATE OF MINNESOTA )
) SS
COUNTY OF _____________)
The foregoing instrument was acknowledged before me this ______ day of _______________________,
2020 by , the _______________________________ of MHC Rosemount
Woods, LLC, a Delaware limited liability corporation, on behalf of said corporation.
Notary Public
Drafted By:
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
EXHIBIT A
The following clarifies the various portions of the letter of credit for Developer Improvements that are
outlined in the Development Agreement:
Grading & Erosion Control – A restoration and erosion control bond to ensure re-vegetation and erosion
control ($3,500/acre). Note: The minimum surety amount is set at $25,000.
Pond Restoration/Erosion Control Removal – A security to allow for cleaning of sedimentation ponds prior
to City acceptance, and removal of any installed erosion control measures such as silt fence and wood fiber
blanket following development of 75 percent of adjoining lots (estimated lump sum).
Survey Monumentation – An amount equal to 110% of the cost to monument all lots within the development.
Landscaping – An amount equal to 110% of the cost to complete the minimum required landscaping. If
additional landscaping is planned, a surety for that cost is not required.
Retaining Walls – An amount equal to 110% of the cost to complete the retaining wall construction.
Street Lighting – An amount equal to 110% of the cost to complete the minimum required lighting. If
additional lighting is planned, a surety for that cost is not required ($4,000 per light has been used to calculate
this cost).
Buffer Monumentation – An amount equal to 110% of the cost to manufacture and install the necessary
buffer monumentation signs around all ponds and wetlands ($50 per sign has been used to calculate this cost).
Rosemount Woods Expansion
July 2020
\\rosemount9\Data\PWorks \ENGPROJ\2020-12 Rosemount Woods Expansion\Agreements\Development agreement 2020-12_MASTER.docx
ATTACHMENT ONE
Rosemount Woods Expansion Plan
PROPOSED LEGEND
CURB & GUTTER
REVERSE PITCH CURB & GUTTER
DEPRESSED CURB & GUTTER
PROPOSED BUILDING
PROPOSED ROADWAY
G
E
GAS SERVICE
ELECTRIC SERVICE
STORM SEWER
SANITARY SEWER
W WATER MAIN
STORM STRUCTURE
DOWNSPOUT CONNECTION
SANITARY MANHOLE
CLEANOUT
W WATER METER
VALVE VAULTW
VALVE BOX
HYDRANT
G
E
GAS METER
ELECTRIC METER
STREET LIGHT
FLOW ARROW
OVERLAND FLOOD ROUTE
TOP OF SIDEWALK GRADE100.00 TW
TOP OF CURB GRADE100.00 TC
PAVEMENT GRADE100.00 P
GROUND GRADE100.00 G
FENCEX
100
100
MAJOR CONTOUR
MINOR CONTOUR
D
S
G
E
W
TV
OH
T
FO
X
D
S
PROPOSED IMPROVEMENTS FOR
ROSEMOUNT WOODS EXPANSION
13925 BUNRATTY AVE, ROSEMOUNT, MN
SECTION 20, TOWNSHIP 115N, RANGE 19W
LOCATION MAP
INDEX OF SHEETS
C0.0 - SITE LOCATION MAP & CIVIL LEGEND
C0.1 - GENERAL NOTES & SPECIFICATIONS
C1.0 - EXISTING CONDITIONS & DEMOLITION PLAN
C1.1 - OVERALL SITE PLAN
C2.0 - SITE LIGHTING & SIGNAGE PLAN
C3.0 - OVERALL UTILITY PLAN
C4.0 - SANITARY PLAN & PROFILE - SAN LINE - A
C4.1 - SANITARY PLAN & PROFILE - SAN LINE - B
C4.2 - SANITARY PLAN & PROFILE - SAN LINE - C
C4.3 - SANITARY PLAN & PROFILE - SAN LINE - D
C5.0 - WATER PLAN & PROFILE - WATER LINE A
C5.1 - WATER PLAN & PROFILE - WATER LINE B
C5.2 - WATER PLAN & PROFILE - WATER LINE C
C6.0 - STORM AND PAVING PLAN & PROFILE - BURGUNDY AVE
C6.1 - STORM AND PAVING PLAN & PROFILE - BURGUNDY AVE
C6.2 - STORM AND PAVING PLAN & PROFILE - BRAZIL AVE
C7.0 - OVERALL GRADING PLAN
C7.1 - DETAILED GRADING PLAN
C7.2 - DETAILED GRADING PLAN
C7.3 - DETAILED GRADING PLAN
C8.0 - EROSION CONTROL PLAN
C8.1 - DETAILED EROSION CONTROL PLAN
C8.2 - DETAILED EROSION CONTROL PLAN
C8.3 - DETAILED EROSION CONTROL PLAN
C8.4 - EROSION CONTROL DETAILS
C9.0 - C9.4 - CONSTRUCTION DETAILS
PROJECT
SITE
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
CP 2020-12
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
1
SITE LOCATION
MAP & CIVIL
LEGEND
C0.0
OWNER: EQUITY LIFESTYLE PROPERTIES
CONTACT: MARISA KOLMAN
ADDRESS: TWO N. RIVERSIDE PLAZA CHICAGO, IL 60606
EMAIL: MARISA_KOLMAN@EQUITYLIFESTYLE.COM
ENGINEER: CAGE CIVIL ENGINEERING
CONTACT: GREG HOREJS
ADDRESS: 3110 WOODCREEK DRIVE DOWNERS GROVE, IL
EMAIL: GHOREJS@CAGECIVIL.COM
PHONE: 630.598.007
CITY OF ROSEMOUNT APPROVAL
CITY ENGINEER DATE
GENERAL REQUIREMENTS:
1.ALL WORK SHALL BE IN CONFORMANCE WITH THE APPLICABLE SECTIONS OF THE MINNESOTA DEPARTMENT OF
TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" (HEREIN AFTER REFERRED TO AS
STANDARD SPECIFICATIONS) ADOPTED IN 2018 AND SUPPLEMENTAL SPECIFICATIONS.
2.SCOPE OF WORK: THE PROPOSED IMPROVEMENTS CONSIST OF SUPPLYING ALL THE NECESSARY LABOR,
MATERIAL AND EQUIPMENT TO SATISFACTORILY CONSTRUCT AND INSTALL ALL IMPROVEMENTS ACCORDING TO
THE PLANS DESIGNATED HEREIN.
3.CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO LOCATE AND PROTECT ALL UNDERGROUND
FACILITIES/UTILITIES DURING CONSTRUCTION OPERATIONS AS OUTLINED IN THE STANDARD SPECIFICATIONS
AND CONTACT THE OWNER. ANY DAMAGE TO ANY UTILITIES SHALL BE PROMPTLY REPORTED TO THE OWNER.
REPAIRS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE UNDERGROUND UTILITIES SHOWN HEREIN
ARE APPROXIMATE AND BASED ON THE ACTUAL LOCATION OF SURFACE STRUCTURES AND PLANS PROVIDED BY
THE OWNER. THE IMPLIED PRESENCE OR ABSENCE OF UTILITIES IS NOT TO BE CONSTRUED BY THE OWNER,
ENGINEER, CONTRACTOR, OR SUBCONTRACTORS TO BE AN ACCURATE AND COMPLETE REPRESENTATION OF
UTILITIES THAT MAY OR MAY NOT EXIST ON THE CONSTRUCTION SITE. BURIED AND ABOVE GROUND UTILITY
LOCATION, IDENTIFICATION, AND MARKING IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. REROUTING,
DISCONNECTION, PROTECTION, ETC. OF ANY UTILITIES MUST BE COORDINATED BETWEEN THE CONTRACTOR,
UTILITY COMPANY, AND OWNER. SITE SAFETY, INCLUDING THE AVOIDANCE OF HAZARDS ASSOCIATED WITH
BURIED AND ABOVEGROUND UTILITIES REMAINS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING UTILITY PROPERTY FROM CONSTRUCTION
OPERATIONS.
4.THE CONTRACTOR SHALL FURNISH, ERECT, AND MAINTAIN MARKINGS AND ASSOCIATED HAZARD WARNING
LIGHTS, DELINEATOR FENCE, AND OTHER ASSOCIATED FACILITIES AS REQUIRED FOR OPEN TRENCHES,
EXCAVATIONS, TEMPORARY STOCK PILES, AND PARKED CONSTRUCTION EQUIPMENT THAT MAY POSE A
POTENTIAL HAZARD AS PART OF THE DAILY OPERATIONS AT THIS SITE. CONTRACTOR IS SOLELY RESPONSIBLE
FOR SITE SAFETY.
5.CONTRACTOR SHALL CONTINUOUSLY COMPARE ALL LINES, GRADES, AND OTHER INFORMATION APPEARING ON
THE PLANS WITH THE ACTUAL LINES, GRADES, AND SITE CONDITIONS. ANY DISCREPANCIES THAT MAY AFFECT
THE PERFORMANCE OF THE WORK IN ACCORDANCE WITH THE INTENT OF THE CONTRACT DOCUMENTS SHALL
BE IMMEDIATELY REPORTED TO THE OWNER AND ENGINEER IN WRITING FOR DISPOSITION BEFORE
CONTRACTOR PROCEEDS WITH THE WORK. CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR THE WORK
COMPLETED PRIOR TO THE REPORT TO THE OWNER AND ENGINEER, AND NO ADDITIONAL COMPENSATION WILL
BE ALLOWED FOR CORRECTION OF THE WORK PRIOR TO THE REPORT TO THE OWNER AND ENGINEER.
6.CONTRACTOR PARKING AND LAYDOWN AREAS SHALL BE COORDINATED WITH THE OWNER.
7.PRIOR TO PERFORMING ANY WORK IN OR ON THE RIGHT OF WAY OF ANY CITY OR STATE ROADWAY, THE
CONTRACTOR SHALL NOTIFY THE CITY / STATE TRAFFIC ENGINEER'S OFFICE. THE CONTRACTOR SHALL ERECT
WARNING SIGNS AND BARRICADES TO PROTECT THE TRAVELING PUBLIC AND HIS WORKERS. THE SIGNING AND
BARRICADING SHALL CONFORM TO THE APPROPRIATE APPLICATIONS OUTLINED IN THE MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES OR AS OTHERWISE DIRECTED BY THE CITY / STATE TRAFFIC ENGINEER. IF PERMITS
ARE REQUIRED TO CONDUCT THE WORK, THE CONTRACTOR SHALL SECURE THE PERMITS AND SUPPLY THEM
TO THE OWNER AT NO ADDITIONAL COST. ALL FULL WIDTH LANE CLOSURES, PARTIAL LANE CLOSURES, AND
CONSTRUCTION ADJACENT TO PAVEMENT SHALL BE IDENTIFIED, SIGNED, AND BARRICADES ERECTED IN
CONFORMANCE WITH THE APPLICABLE ARTICLES OF THE STANDARD SPECIFICATIONS AND THE MUNICIPALITY'S
REQUIREMENTS. ALL TRAFFIC PROTECTION, BOTH ONSITE AND OFFSITE, SHALL BE CONSIDERED INCIDENTAL
TO THE CONTRACT.
8.CONTRACTOR SHALL REMOVE EARTHEN MATERIALS, EXISTING SURFACES, AND STRUCTURES AS REQUIRED.
ALL WASTE MATERIAL SHALL BE PROPERLY DISPOSED OFF-SITE AND SHALL BE INCIDENTAL TO THE CONTRACT.
9.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS, UNLESS NOTED. THIS WILL
INCLUDE BUT NOT BE LIMITED TO MUNICIPAL BUILDING PERMIT. THE OWNER WILL SECURE THE N.P.D.E.S.
PERMIT. THE CONTRACTOR SHALL PROVIDE ANY FINANCIAL SURETIES REQUIRED AS PART OF ANY PERMIT.
10.WHEN CONCRETE IS PLACED ABUTTING STRUCTURES, FOUNDATIONS OR EXISTING SIDEWALKS, A BOND
BREAKER CONSISTING OF 1" P.J.F. AND ELASTOMERIC JOINT SEALANT SHALL BE USED FULL DEPTH UNLESS
OTHERWISE NOTED.
11.MAXIMUM CONTRACTION JOINT SPACING ON CONCRETE CURB AND GUTTER OR CONCRETE GUTTER SHALL NOT
EXCEED 25'.
12.SIDEWALK RAMPS FOR ADA SHALL BE IN ACCORDANCE WITH THE DETAILS SHOWN HEREIN. DETECTABLE
WARNINGS SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS.
13.HOT-MIX ASPHALT PAVEMENT PATCHING SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS.
14.CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARING AND SUBMITTING ELECTRONIC AS-BUILT DRAWINGS,
FOR UTILITIES AND DETENTION AREAS, TO THE OWNER AND ENGINEER FOR REVIEW AND APPROVAL PRIOR TO
PROJECT ACCEPTANCE.
15.CONSTRUCTION STAKING, LAYOUT, AND GRADING SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR USING
THE BASIC TOPOGRAPHIC SURVEY CONTROLS PROVIDED IN THE PLANS. CONTRACTOR SHALL VERIFY SURVEY
CONTROLS PRIOR TO BEGINNING CONSTRUCTION. ANY DISCREPANCIES IN THE SURVEY CONTROLS SHALL BE
REPORTED TO THE OWNER AND ENGINEER PRIOR TO CONSTRUCTION. ANY ADDITIONAL SURVEY CONTROLS
REQUIRED FOR CONSTRUCTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
16.CONTRACTOR SHALL COORDINATE ALL UTILITY LINE CROSSINGS TO ENSURE ALL PIPES MAINTAIN MINIMUM
COVER, MINIMUM CLEARANCES, AND PROPER SEPARATION. GRAVITY LINES SHALL HAVE PRECEDENCE OVER
PRESSURIZED LINES.
17.CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL ITEMS INCORPORATED INTO THE WORK FOR ENGINEER
REVIEW AND APPROVAL A MINIMUM OF 4 WEEKS PRIOR TO ORDERING.
18.REFERENCES TO "INSPECTION" OR "INSPECTOR" IN THE SPECIFICATIONS SHALL NOT CREATE, IMPOSE, OR GIVE
RISE TO ANY DUTY OWED BY THE OWNER OR ENGINEER TO THE CONTRACTOR, ANY SUBCONTRACTOR, OR ANY
SUPPLIER. ALL IMPROVEMENTS SHALL BE SUBJECT TO INSPECTION BY A DULY AUTHORIZED AND QUALIFIED
OWNER'S REPRESENTATIVE BOTH DURING THE COURSE OF CONSTRUCTION AND AFTER CONSTRUCTION IS
COMPLETE. THE INSPECTOR SHALL HAVE AUTHORITY OVER MATERIALS OF CONSTRUCTION, METHODS OF
CONSTRUCTION AND WORKSMANSHIP TO ENSURE COMPLIANCE WITH WORKING DRAWINGS AND
SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE FOR REASONABLE TESTS AND PROOF OF QUALITY OF
MATERIALS AS REQUESTED BY THE INSPECTOR. UPON DUE CAUSE, WHICH SHALL INCLUDE WEATHER
CONDITIONS, WORKMANSHIP OR NON-ADHEREANCE TO THE APPROVED PLANS AND SPECIFICATIONS, THE
INSPECTOR SHALL HAVE THE AUTHORITY TO STOP CONSTRUCTION.
19.WHERE SECTION, SUB-SECTION, SUBDIVISION, OR PROPERTY MONUMENTS ARE ENCOUNTERED, THE OWNER'S
REPRESENTATIVE SHALL BE NOTIFIED BEFORE SUCH MONUMENTS ARE REMOVED. THE CONTRACTOR SHALL
PROTECT AND PRESERVE ALL PROPERTY MARKERS UNTIL AN OWNER OR AUTHORIZED SURVEYOR HAS
WITNESSED OR REFERENCED THEIR LOCATION.
20.ALL TRENCH BACKFILL SHALL BE IMPORTED GRANULAR MATERIAL UNLESS EXISTING GRANULAR MATERIALS
ARE SPECIFICALLY APPROVED BY THE OWNER'S REPRESENTATIVE.
21.ALL AGGREGATE BASE COURSE SHALL BE COMPACTED TO 98% STANDARD PROCTOR DENSITY.
22.ALL AGGREGATE BASE AREAS TO BE PAVED (PAVEMENT, SIDEWALK, CURB, OR STRUCTURES) SHALL BE
PROOF-ROLLED WITH SEVERAL PASSES OF A FULLY LOADED DUMP TRUCK. CONTRACTOR SHALL NOTIFY THE
OWNER AND/OR ENGINEER 24 HOURS PRIOR TO PROOF ROLL AND SHALL MAKE ALL CORRECTIONS TO PROVIDE
A SATISFACTORY SUBGRADE.
23.ANY UNCONTROLLED CRACKING THAT OCCURS IN CONCRETE PAVEMENT, SIDEWALK, CURB, OR CURB AND
GUTTER PRIOR TO FINAL ACCEPTANCE SHALL BE ROUTED OR SAWED AND SEALED ACCORDING TO THE
STANDARD SPECIFICATIONS.
24.CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES PRIOR TO ANY WORK IN AND AROUND
UTILITY-OWNED INFRASTRUCTURE AND MAKE THEM AWARE OF WORK TO BE PERFORMED.
25.ALL SIDEWALKS SHALL BE 4 INCHES IN THICKNESS AND CONSTRUCTED TO THE WIDTH SHOWN ON THE PLANS.
ALL SIDEWALKS SHALL BE CONSTRUCTED WITH A MIN. CROSS SLOPE OF 1% AND A MAX. CROSS SLOPE OF 2%.
SIDEWALK THICKNESS SHALL BE INCREASED TO A MINIMUM 6" AT DRIVEWAYS OR AS REQUIRED BY THE
MUNICIPALITY.
26.ANY SIDEWALKS, FENCES, AND OTHER ITEMS NOT SHOWN TO BE REMOVED, BUT DAMAGED DURING
CONSTRUCTION, SHALL BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE OWNER.
27.CONTRACTOR SHALL NOTIFY THE APPROPRIATE AGENCY A MINIMUM OF 48 HOURS PRIOR TO CONNECTING TO
OR INSTALLING ANY PUBLIC SEWER OR WATER MAINS.
28.PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
CONDITIONS AFFECTING THEIR WORK WITH THE ACTUAL CONDITIONS AT THE PROJECT SITE. IN ADDITION, THE
CONTRACTOR MUST VERIFY THE ENGINEER'S LINE AND GRADE STAKES. IF THERE ARE ANY DISCREPANCIES
FROM WHAT IS SHOWN ON THE CONSTRUCTION PLANS, THE CONTRACTOR MUST IMMEDIATELY PROVIDE THE
INFORMATION TO THE ENGINEER BEFORE DOING ANY WORK. OTHERWISE, THE CONTRACTOR ASSUMES FULL
RESPONSIBILITY. IN THE EVENT OF DISAGREEMENT BETWEEN THE CONSTRUCTION PLANS, STANDARD
SPECIFICATIONS AND/OR DETAILS, THE CONTRACTOR SHALL SECURE WRITTEN INSTRUCTIONS FROM THE
ENGINEER PRIOR TO PROCEEDING WITH ANY PART OF THE WORK EFFECTED BY OMISSIONS OR
DISCREPANCIES. IF THE CONTRACTOR FAILS TO SECURE WRITTEN INSTRUCTIONS FROM THE ENGINEER, THE
CONTRACTOR WILL BE CONSIDERED TO HAVE PROCEEDED AT HIS OWN RISK AND EXPENSE. IN THE EVENT OF
ANY DOUBT OR QUESTION ARISING WITH RESPECT TO SPECIFICATIONS, THE DECISION OF THE ENGINEER SHALL
BE FINAL.
EXISTING TOPOGRAPHY:
1.ALL UTILITIES SHOWN ARE APPROXIMATE ONLY AND ARE DERIVED FROM EXISTING UTILITY MARKINGS, OLD SITE
PLANS, UTILITY COMPANY MAPS, PRIVATE LOCATOR AND OBSERVED EVIDENCE.
2.ALL PIPE SIZES REFERENCED HEREON ARE SHOWN ACCORDING TO UTILITY COMPANY MAPS, OLD SITE PLANS
AND OBSERVED EVIDENCE. ALL PIPE SIZES AND INVERTS SHOULD BE VERIFIED PRIOR TO ANY CONSTRUCTION.
3.PRIOR TO ANY EXCAVATION CONTRACTORS SHALL CALL THE TOLL FREE TELEPHONE NUMBER 1-800-252-1166.
ALLOW 48 HOURS FOR LOCATIONS OTHER THAN EMERGENCY ASSISTANCE.
SITE DEMOLITION:
1.EXISTING UTILITIES TO REMAIN, WHICH ARE DAMAGED BY THE CONTRACTOR DURING CONSTRUCTION, SHALL BE
REPAIRED AND/OR REPLACED WITHOUT ADDITIONAL COMPENSATION. CONFLICTS WITH PROPOSED
CONSTRUCTION AND UTILITIES TO REMAIN ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
CONSTRUCTION MANAGER FOR COORDINATION WITH THE OWNER'S REPRESENTATIVE, ENGINEER, AND UTILITY
COMPANY.
2.NO DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL TAKE PLACE WITHIN PUBLIC RIGHT-OF-WAY UNTIL ALL
PERMITS ARE SECURED.
3.ALL PAVEMENT TO BE REMOVED SHALL BE SAWCUT FULL DEPTH.
4.CONTRACTOR SHALL EMPLOY ALL MEASURES NECESSARY DURING DEMOLITION TO CONTROL EROSION AND
INSURE THAT SEDIMENT DOES NOT LEAVE THE SITE. TRACKING OF DIRT ONTO PUBLIC STREETS AND EXISTING
PARKING LOT SHALL BE CLEANED IMMEDIATELY, AND ALL SEDIMENT AND EROSION CONTROL ITEMS SHALL BE
INSTALLED PRIOR TO CLEARING AND DEMOLITION WORK.
5.CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING SITE CONDITIONS AND BECOMING FAMILIAR WITH ALL
CONSTRUCTION DOCUMENTS.
6.ITEMS INDICATED TO BE REMOVED SHALL BE COMPLETELY REMOVED UNLESS INDICATED OTHERWISE.
7.ALL TREES AND BRUSH INDICATED TO BE REMOVED SHALL BE REMOVED COMPLETELY, INCLUDING ROOT BALLS.
8.UNLESS OTHERWISE IDENTIFIED AND/OR NOTED ON THE DEMOLITION PLAN, CONTRACTOR SHALL FULLY
DEMOLISH, REMOVE, AND LAWFULLY DISPOSE OF ALL EXISTING BUILDINGS, IMPROVEMENTS, AND RELATED
APPURTENANCES AT THIS SITE AND PROPERTY. CONTRACTOR SHALL ALSO DEMOLISH, REMOVE, AND
LAWFULLY DISPOSE OF EXISTING IMPROVEMENTS AND CONSTRUCTIONS IN THE PUBLIC RIGHT-OF-WAY
NECESSARY TO ACCOMPLISH THE NEW PROJECT WORK DESCRIBED ELSEWHERE IN THESE BIDDING AND
CONSTRUCTION DOCUMENTS. CONTRACTOR SHALL PROCURE ALL NECESSARY PERMITS AND APPROVALS FOR
SUCH DEMOLITION WORK (BOTH INSIDE THE PROPERTY LINE AND IN THE PUBLIC RIGHT-OF-WAY) PRIOR TO
COMMENCING ANY DEMOLITION OPERATIONS.
9.CONTRACTOR SHALL FULLY PROTECT ALL SURROUNDING PROPERTIES FROM ANY AND ALL DAMAGE DURING
DEMOLITION OPERATIONS; AND SHALL BE FULLY RESPONSIBLE FOR REPAIRING (TO A CONDITION ACCEPTABLE
TO THE OWNER AND ARCHITECT) ANY AND ALL DAMAGE THAT DOES OCCUR.
10.CONTRACTOR SHALL PROVIDE ALL NECESSARY TRAFFIC CONTROLS AND RELATED APPURTENANCES THAT ARE
REQUIRED BY ANY APPLICABLE CODES AND ORDINANCES, DURING ALL DEMOLITION OPERATIONS.
11.CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE SAFETY AND SECURITY OF THE PROJECT SITE AND ITS
SURROUNDINGS DURING DEMOLITION OPERATIONS.
12.ALL DEMOLISHED EXISTING MATERIALS, SYSTEMS, AND CONSTRUCTIONS SHALL BE DISPOSED OF IN A LAWFUL
MANNER, AND WRITTEN RECORDS OF THE FINAL DESTINATION FOR THESE MATERIALS, SYSTEMS, AND
CONSTRUCTIONS SHALL BE PROVIDED TO THE OWNER AND ENGINEER.
13.EXISTING SITE SHALL BE CLEANED ON A DAILY BASIS THROUGHOUT THE DURATION OF DEMOLITIONS
OPERATIONS; AND NO DEBRIS OR PRODUCTS OF DEMOLITION SHALL BE ALLOWED TO ACCUMULATE OUTSIDE
THE BOUNDARIES OF THE SITE.
14.CONTRACTOR SHALL FULLY COORDINATE ALL PROJECT DEMOLITION OPERATIONS, INCLUDING THE REMOVAL
AND LAWFUL DISPOSAL OF MATERIALS AND SYSTEMS.
15.CONTRACTOR SHALL SUBMIT A COMPLETE WRITTEN PLAN AND SCHEDULE FOR ALL PROPOSED DEMOLITION
WORK TO OWNER AND ARCHITECT FOR REVIEW AND COMMENT, PRIOR TO BEGINNING ANY SUCH OPERATIONS.
DURING THE COURSE OF THIS DEMOLITION WORK, IF ANY ARTIFACTS OR OTHER UNUSUAL ITEMS ARE
DISCOVERED, CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER IMMEDIATELY, BEFORE PROCEEDING ANY
FURTHER. ANY EXPENSES RESULTING FROM THE FAILURE TO PROVIDE SUCH IMMEDIATE NOTIFICATION SHALL
BE BORNE BY THE CONTRACTOR.
SITE LAYOUT:
1.JOINTS IN SIDEWALK SHALL BE TOOLED AT 5' MAX. INTERVALS, UNLESS INDICATED OTHERWISE.
2.NORTHING-EASTING COORDINATES AND DIMENSIONS FOR CURB AND GUTTER ARE TO FACE OF CURB.
3.CONTRACTOR SHALL COORDINATE ALL WORK WITHIN PUBLIC RIGHT-OF-WAY WITH THE APPROPRIATE PUBLIC
AGENCY. NOTIFICATION SHALL OCCUR A MINIMUM OF 48 HOURS PRIOR TO COMMENCING WORK WITHIN PUBLIC
RIGHT-OF-WAY. ALL PERMITS ARE THE RESPONSIBILITY OF THE CONTRACTOR.
4.P.C. CONCRETE PAVEMENT AND SIDEWALKS SHALL BE CLASS PV AND CLASS SI, RESPECTIVELY, IN
ACCORDANCE WITH THE MNDOT STANDARD SPECIFICATIONS.
5.CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING SITE CONDITIONS AND BECOMING FAMILIAR WITH ALL
CONSTRUCTION DOCUMENTS.
6.SEE ARCHITECTURAL PLANS FOR EXACT BUILDING DIMENSIONS AND DOOR LOCATIONS.
7.CONTRACTOR SHALL COORDINATE EQUIPMENT PADS WITH EQUIPMENT MANUFACTURERS.
SITE GRADING AND EROSION CONTROL:
1.ALL SUBGRADE EXCAVATION AND COMPACTION SHALL BE COMPLETED IN ACCORDANCE WITH THE "SOILS
REPORT" PREPARED BY TERRACON, DATED NOVEMBER 26,2019.
2.ENGINEERED STRUCTURAL FILLS SHALL BE INCLUDED IN OVERALL SITE DEVELOPMENT TO PROVIDE ADEQUATE
STRUCTURAL SUPPORT FOR THE FLOOR SLABS ON GRADE AND ADJOINING PAVEMENT AREAS. REFER TO THE
GEOTECHNICAL REPORT FOR APPROVED FILL MATERIALS.
3.WHERE FIRM FOUNDATION MATERIAL IS NOT ENCOUNTERED AT THE GRADE ESTABLISHED, DUE TO UNSUITABLE
SOIL, ALL SUCH UNSUITABLE MATERIAL SHALL BE REMOVED AND REPLACED WITH APPROVED COMPACTED
GRANULAR MATERIAL.
4.TOPSOIL SHALL BE STRIPPED IN ALL STRUCTURAL FILL AREAS BEFORE PLACEMENT OF FILL MATERIAL AND
SHALL BE STOCKPILED IN AREAS DESIGNATED BY THE OWNER OR PER PLAN.
5.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM EARTHWORK CALCULATIONS BASED ON THE
PROVIDED PLANS AND TO LAWFULLY DISPOSE OF AND REMOVE ANY EXCESS MATERIAL FROM THE PROJECT
SITE, OR TO PROVIDE ANY NECESSARY FILL MATERIAL THAT MAY BE REQUIRED TO MEET THE FINAL PLAN
GRADES. THE DISPOSAL OR PROVIDING OF MATERIAL SHALL BE INCIDENTAL TO THE CONTRACT.
6.ALL VEGETATIVE AND STRUCTURAL EROSION CONTROL PRACTICES SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS
AND SPECIFICATIONS OF THE "EROSION CONTROL HANDBOOK II."
7.THE OWNER/ENGINEER SHALL PROVIDE THE SOIL EROSION AND SEDIMENT CONTROL PLANS INCLUDED HEREIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR DOCUMENTATION OF THE STORMWATER POLLUTION
PREVENTION PLAN BOOKLET AND ASSOCIATED DOCUMENTS
8.THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE INSTALLATION, ALL INSPECTIONS, AND
MAINTENANCE OF ALL EROSION CONTROL FACILITIES REQUIRED BY THE GENERAL NPDES PERMIT UNTIL FINAL
STABILIZATION OF ALL AREAS DISTURBED BY CONSTRUCTION OCCURS. MAINTENANCE AND REPLACEMENT OF
EROSION CONTROL ITEMS SHALL BE CONSIDERED AS INCIDENTAL TO THE CONTRACT.
9.ALL AREAS DISTURBED BY CONSTRUCTION ACTIVITY MUST BE SEEDED, SODDED, BLANKETED OR OTHERWISE
PROTECTED WITHIN 14 DAYS OF FINAL DISTURBANCE. ALL AREAS DISTURBED BY THE CONTRACTOR DURING
THE CONSTRUCTION OF THIS PROJECT WHICH ARE LOCATED OUTSIDE OF THE PROPOSED SEEDING LIMITS
SHALL BE GRADED TO DRAIN, FERTILIZED, SEEDED, MULCHED AND WATERED. THE COST ASSOCIATED WITH THE
PLACEMENT OF ADDITIONAL FERTILIZER, SEED, MULCH AND WATERING SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. A MINIMUM OF 70% VEGETATIVE COVERAGE IS REQUIRED PRIOR TO ACCEPTANCE. SEE
LANDSCAPE PLANS FOR ADDITIONAL REQUIREMENTS.
10.ALL EROSION CONTROL MEASURES SHOWN ON THE PLAN ARE THE MINIMUM MEASURES REQUIRED.
UNFORESEEN CHANGES IN SCOPE, SCHEDULE OR CONSTRUCTION METHODS MAY RESULT IN CHANGES OR
ADDITIONS TO THIS PLAN AND THE SWPPP. ANY CHANGES OR ADDITIONS NECESSARY TO MAINTAIN
COMPLIANCE WITH THE NPDES PERMIT SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE OWNER.
11.SHOULD PROJECT SCHEDULING PROHIBIT THE ABILITY TO SEED DISTURBED EARTH UPON COMPLETION OF
GRADING, CONTRACTOR SHALL EMPLOY ALTERNATE SOURCE CONTROLS IN ADDITION TO THOSE ON THIS PLAN,
INCIDENTAL TO THE CONTRACT.
12.DUST CONTROL MUST BE PROVIDED AS NEEDED, BY WATERING OR OTHER MEANS.
13.ALL AREAS WITH THE EXCEPTION OF PAVEMENT SHALL BE FINISHED IN ACCORDANCE WITH THE LANDSCAPE
PLANS INCLUDED IN THE PLAN SET.
14.CONTRACTOR SHALL INSTALL INLET FILTER PROTECTION BASKETS INSIDE ALL EXISTING AND PROPOSED
MANHOLES AND INLET FRAMES.
15.CONTRACTOR IS REQUIRED TO PROVIDE AND USE A CONCRETE WASHOUT AREA FOR RINSING CONCRETE
TRUCKS.
16.CONTRACTOR IS REQUIRED TO PROVIDE AND USE A TEMPORARY CONSTRUCTION ENTRANCE FOR ALL
CONSTRUCTION TRAFFIC PER PLAN.
17.CONTRACTOR SHALL PROVIDE AND USE A WHEEL WASH SYSTEM TO ENSURE THAT ALL CONSTRUCTION
TRAFFIC ENTERING AND EXITING THE SITE MAINTAIN CLEAN TIRES. ANY SEDIMENT TRACKED ONTO ADJACENT
ROADWAYS OR PAVED AREAS SHALL BE REMOVED BY THE CONTRACTOR BY THE END OF THE SAME WORK DAY.
18.ALL ELEVATIONS SHOWN ARE TO FINISHED PAVEMENT UNLESS SPECIFIED OTHERWISE.
19.ALL SLOPES GREATER THAN OR EQUAL TO 4:1 SHALL BE STABILIZED WITH NAG S75BN OR EQUIVALENT.
20.CONTRACTOR SHALL PROVIDE A MINIMUM OF 6" TOPSOIL IN ALL ISLANDS, LANDSCAPE AREAS, AND OPEN
SPACES.
SITE UTILITIES:
1.THIS CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS:
A."CITY ENGINEERS ASSOCIATION OF MINNESOTA STANDARD SPECIFICATIONS", CURRENT EDITION.
B.MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION"
C.CITY OF ROSEMOUNT OFFICE OF PUBLIC WORKS STANDARDS, SPECIFICATIONS, AND ENGINEERING
GUIDELINES
2.ALL UTILITY TRENCHES UNDER OR WITHIN 2' OF EXISTING OR PROPOSED PAVEMENT OR BUILDING SHALL BE
BACKFILLED WITH COMPACTED GRANULAR MATERIAL IN ACCORDANCE WITH ALL SPECIFICATIONS.
CONTROLLED LOW-STRENGTH MATERIAL (CLSM) SHALL BE USED TO BACKFILL TRENCHES WITHIN PUBLIC RIGHT
OF WAY. THE CLSM SHALL EXTEND 2 FT PAST THE PROPOSED PAVEMENT, CURB, OR SIDEWALK.
3.OPEN CUT TRENCHES SHALL BE SHEETED AND BRACED AS REQUIRED BY THE GOVERNING STATE, FEDERAL
LAWS AND MUNICIPAL ORDINANCES, AND AS MAY BE NECESSARY TO PROTECT LIFE, PROPERTY OR THE WORK.
4.CONTRACTOR SHALL AT ALL TIMES DURING CONSTRUCTION PROVIDE AND MAINTAIN SUFFICIENT MEANS AND
DEVICES TO REMOVE AND PROPERLY DISPOSE OF ALL WATER ENTERING THE EXCAVATIONS. WATER SHALL BE
FILTERED AND DISCHARGED IN ACCORDANCE WITH THE NPDES REQUIREMENTS.
5.ALL PIPE SHALL BE INSTALLED ON A BEDDING OF APPROVED, COMPACTED GRANULAR MATERIAL UNLESS
OTHERWISE APPROVED BY THE ENGINEER. THE BEDDING MATERIAL SHALL BE INSTALLED PER STANDARD
SPECIFICATIONS AND PROVIDED PLAN DETAILS.
6.A MINIMUM HORIZONTAL SEPARATION OF 10 FEET SHALL BE MAINTAINED BETWEEN ALL WATER MAINS AND
SEWERS. IF SEPARATION IS NOT POSSIBLE, WATER MAIN ENCASEMENT SHALL BE REQUIRED OR THE SEWER
SHALL BE CONSTRUCTED OF WATER MAIN QUALITY PIPE.
7.WATER MAINS SHALL CROSS ABOVE SEWERS WITH A MINIMUM VERTICAL SEPARATION OF 18 INCHES WHILE
STILL MAINTAINING THE REQUIRED DEPTH OF COVER. IF PROPER SEPARATION IS NOT POSSIBLE, OR IF THE
WATER MAIN MUST BE ROUTED UNDER THE SEWER, WATER MAIN ENCASEMENT SHALL BE REQUIRED OR THE
SEWER SHALL BE CONSTRUCTED OF WATER MAIN QUALITY PIPE.
8.ALL SANITARY SEWERS SHALL BE TESTED FOR EXFILTRATION OF AIR UNDER PRESSURE, INFILTRATION OF
WATER, AND/OR EXFILTRATION OF WATER AS PER STANDARD SPECIFICATIONS. ALL SANITARY SEWERS SHALL
BE DEFLECTION TESTED NO SOONER THAN 30 DAYS AFTER INSTALLATION. ALL MANHOLES SHALL BE TESTED
FOR WATERTIGHTNESS BY EITHER ASTM C 969 OR ASTM C 1244.
9.STORM SEWER SHALL BE IN CONFORMANCE WITH THE FOLLOWING:
A.REINFORCED CONCRETE PIPE (RCP), ASTM C76
a.GASKETS - ASTM C443
b.FITTINGS - ASTM C443
B.SMOOTH INTERIOR WALLED HIGH DENSITY POLYETHYLENE PIPE (HDPE), ASTM D3212, N-12 WT
a.WATER TIGHT JOINTS
b.JOINT SHALL BE SEALED SUFFICIENTLY TO PREVENT JETTING OR LEAKING AT THE JOINT
C.PVC STORM SEWER PIPING, ASTM D 3034, SDR 35
a.BELL-AND-SPIGOT ENDS
b.ASTM F 477, ELASTOMERIC SEALS FOR GASKETED JOINTS
D.FRAME AND GRATES
a.TYPE 1 CLOSED LID = NEENAH R-1713
b.TYPE 1 OPEN LID = NEENAH R-2504
c.TYPE 3 = NEENAH R-3501-R
d.DITCH GRATE = NEENAH R-4342
10.SANITARY SEWER SHALL BE IN CONFORMANCE WITH THE FOLLOWING:
A.PIPE AND FITTING MATERIAL - POLYVINYL CHLORIDE (PVC) SDR 26, ASTM D 3034, TYPE PSM
B.GASKETS - FLEXIBLE ELASTOMERIC, ASTM F 477, ASTM D 3139
C.JOINTS - ASTM D 3212
D.BEDDING - CLASS II, ASTM 2321
11.ALL CLEANOUT RIMS SHALL BE CONSTRUCTED FLUSH WITH THE FINISHED GROUND SURFACE.
12.CONTRACTOR SHALL COORDINATE CONSTRUCTION OF SANITARY SEWER SERVICES WITH THE DEPARTMENT OF
PUBLIC WORKS.
13.CONTRACTOR SHALL COORDINATE WATER MAIN, FIRE AND DOMESTIC WATER SERVICES WITH THE
DEPARTMENT OF PUBLIC WORKS.
14.GENERAL CONTRACTOR SHALL COORDINATE ALL UTILITY LINES THAT ENTER THE BUILDING. IN GENERAL,
PLUMBING PLANS SHOW ALL INTERIOR BUILDING PIPING AND PIPING UP TO 5-FEET OUTSIDE THE BUILDING.
CIVIL PLANS SHOW SITE PIPING BEGINNING FROM 5-FEET OUTSIDE THE BUILDING. GENERAL CONTRACTOR IS
RESPONSIBLE FOR ALL UTILITY CONNECTIONS.
15.CONTRACTOR SHALL COORDINATE ALL UTILITY LINE CROSSINGS TO ENSURE ALL PIPES MAINTAIN MINIMUM
COVER, MINIMUM CLEARANCES, AND PROPER SEPARATION. GRAVITY LINES SHALL HAVE PRECEDENCE OVER
PRESSURIZED LINES.
16.ALL TRENCH BACKFILL SHALL BE IMPORTED GRANULAR MATERIAL UNLESS EXISTING GRANULAR MATERIALS
ARE SPECIFICALLY APPROVED BY THE OWNER'S REPRESENTATIVE.
17.ALL MANHOLES AND INLET CASTINGS LOCATED WITHIN BITUMINOUS ASPHALT PAVEMENT SHALL BE
CONSTRUCTED WITH A CONCRETE APRON AT THE SURFACE.
18.FOR ALL WATERMAIN CONSTRUCTION:
A.WATER MAIN AND SERVICES TO BE INSTALLED WITH A MINIMUM OF 7'-6" OF COVER FROM FINISHED GRADE
TO TOP OF WATER PIPE.
B.TWO COMPLETE PIPE LENGTHS OF RESTRAINED JOINT PIPE SHALL BE CONSTRUCTED ON THE BRANCH
LEG OF ALL TEES AND BOTH SIDES OF ALL 90 DEGREE BENDS.
C.ONE COMPLETE PIPE LENGTH OF RESTRAINED JOINT PIPE SHALL BE CONSTRUCTED ON BOTH SIDES OF
ALL 11-1/4 AND 22-1/2 DEGREE BENDS.
D.ALL BENDS, TEES, PLUGS, VALVES AND HYDRANTS SHALL BE RESTRAINED JOINT.
E.ALL WATERMAIN PIPE 4" AND LARGER SHALL BE POLY WRAPPED DUCTILE IRON PIPE SPECIAL CLASS 52,
250 PSI RATING, WITH SINGLE GASKET JOINTS. CEMENT LINING SHALL BE PROVIDED FOR ALL PIPE.
F.ALL WATER SERVICE PIPE LESS THAN 4" SHALL BE COPPER PIPE, TYPE K OR PVC SDR 9 WITH A PRESSURE
RATING OF 200 PSI.
INDEMNIFICATION:
1.THE CONTRACTOR SHALL INDEMNIFY AND HOLD HARMLESS THE OWNER, THE CITY OF ROSEMOUNT, AND CAGE
ENGINEERING, INC. FROM AND AGAINST ALL CLAIMS, DAMAGES, LOSSES AND EXPENSES, INCLUDING
ATTORNEY'S FEES ARISING OUT OF OR RESULTING FROM THE PERFORMANCE OF THE CONTRACTOR'S WORK. IN
ANY AND ALL CLAIMS AGAINST THE OWNER OR CAGE ENGINEERING, INC. BY ANY EMPLOYEE OF THE
CONTRACTOR, OR ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY THE CONTRACTOR, OR ANYONE FOR
WHOSE ACTS THE CONTRACTOR MAY BE LIABLE, THE INDEMNIFICATION OBLIGATION SHALL NOT BE LIMITED IN
ANY WAY BY ANY LIMITATION ON THE AMOUNT OF DAMAGES, COMPENSATION OR BENEFITS PAYABLE BY OR FOR
THE CONTRACTOR UNDER WORKER'S COMPENSATIONS ACTS, DISABILITY BENEFIT ACTS OR OTHER EMPLOYEE
BENEFIT ACTS.
INSURANCE REQUIREMENTS
1.THE CONTRACTOR SHALL PURCHASE AND MAINTAIN COMPREHENSIVE GENERAL LIABILITY AND OTHER
INSURANCE SET FORTH BELOW WHICH WILL PROVIDE PROTECTION FROM CLAIMS WHICH MAY ARISE OUT OF OR
RESULTING FROM THE PERFORMANCE OF WORK BY ANYONE DIRECTLY OR INDIRECTLY EMPLOYED BY THE
CONTRACTOR OR BY ANYONE FOR WHOSE ACTS THE CONTRACTOR MAY BE LIABLE.
A.COMPREHENSIVE AUTOMOBILE LIABILITY INSURANCE COVERING ALL AUTOMOBILES, TRUCKS, TRAILERS
AND ANY OTHER MOTORIZED EQUIPMENT OWNED OR LEASED BY THE CONTRACTOR.
B.WORKER'S COMPENSATION AND EMPLOYER'S LIABILITY INSURANCE IN ANY AMOUNT NOT LESS THAN
STATUTORY LIMITS REQUIRED BY LAW.
C.COMPREHENSIVE GENERAL LIABILITY INSURANCE INCLUDING COVERAGE IN THE AMOUNT OF $500,000 PER
ACCIDENT FOR PROPERTY DAMAGE AND $1,000,000 PER PERSON AND $3,000,000 AGGREGATE PER
ACCIDENT FOR BODILY INJURY, SICKNESS OR DISEASE, OR DEATH OF ANY PERSON.
2.CERTIFICATE OF INSURANCE
A.THE CONTRACTOR SHALL NOT COMMENCE WORK UNTIL HE HAS FILED WITH THE MUNICIPALITY AND ITS
INSPECTOR A CERTIFICATE OF INSURANCE SHOWING COMPLETE COVERAGE OF ALL INSURANCE
REQUIRED, SIGNED BY THE INSURANCE COMPANIES OR THEIR AUTHORIZED AGENTS. EACH CERTIFICATE
SHALL PROVIDE THAT COVERAGE SHALL NOT BE TERMINATED OR REDUCED WITHOUT 30 DAYS ADVANCE
WRITTEN NOTICE TO THE MUNICIPALITY AND ITS INSPECTOR. THE CONTRACTOR SHALL NAME THE
OWNER, THE CITY OF ROSEMOUNT AND CAGE ENGINEERING, INC. AS ADDITIONAL INSUREDS ON THE
COMPREHENSIVE GENERAL LIABILITY AND AUTOMOBILE LIABILITY POLICIES.
CONSTRUCTION MEANS, METHODS, SAFETY
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLIANCE WITH ALL FEDERAL, STATE AND LOCAL LAWS,
INCLUDING OSHA STANDARDS AND WITH ANY OTHER APPLICABLE LAWS, ORDINANCES, RULES, REGULATIONS
AND ORDERS OF ANY PUBLIC BODY HAVING JURISDICTION FOR THE SAFETY OF PERSONS OR PROPERTY OR TO
PROTECT THEM FROM DAMAGE, INJURY OR LOSS. THE CONTRACTOR SHALL PROVIDE ALL SAFEGUARDS,
SAFETY DEVICES AND PROTECTIVE EQUIPMENT AND SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING,
AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS UTILIZED BY THE CONTRACTOR AND HIS
SUB-CONTRACTORS IN THE PERFORMANCE OF THEIR WORK AND SHALL TAKE ANY OTHER ACTIONS
NECESSARY TO PROTECT THE LIFE AN HEALTH OF EMPLOYEES ON THE JOB AND THE SAFETY OF THE PUBLIC
AND TO PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT.
2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES OR
PROCEDURES, EQUIPMENT, AND FOR SAFETY PRECAUTIONS OR PROGRAMS, UNLESS SUCH MEANS AND
EQUIPMENT ARE SPECIFIED IN THESE CONTRACT DOCUMENTS.
SOIL AMENDMENT PLAN
1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURE THAT INFILTRATION BASIN MEETS THE MINNESOTA
STORM WATER MANUALS REQUIRED INFILTRATION RATES. ITEM 16.11 STATES "FOR DESIGN PURPOSES,
PERMITTEES MUST DIVIDE FIELD MEASURED INFILTRATION RATES BY 2 AS A SAFETY FACTOR." TO AMEND THE
SOIL MIX IT IS RECOMMENDED THAT MNDOT GRADE 2 COMPOST IS USED. THE DESIRED DEPTH OF AMENDED
SOIL SHALL ACHIEVE AN INFILTRATION RATE OF NO MORE THAN 8.3 INCHES PER HOUR, IN ACCORDANCE WITH
NPDES REQUIREMENTS.
2.CONSTRUCTION PROCEDURES FROM MINNESOTA STORM WATER MANUAL
2.1.IMPLEMENTATION OF THE SOIL AMENDMENT CONSTRUCTION PROCEDURE NEEDS TO ENSURE THE
APPROPRIATE VOLUME OF AMENDMENT IS USED AND THAT THE MIXING PROCESS RESULTS IN A
CONSISTENT, HETEROGENEOUS MEDIA ACROSS THE ENTIRE SITE TO THE PROPER DEPTH (TYPICALLY 12 TO
18 INCHES). THE MIXING PROCESS CAN BE ACCOMPLISHED BY EITHER:
2.1.1.BLENDING THE NATIVE AND AMENDMENT MATERIALS IN PLACE WITH TILLING EQUIPMENT, OR
2.1.2.EXCAVATING THE NATIVE SOIL, MIXING WITH THE AMENDMENT MATERIAL, AND REAPPLYING THE
MIXTURE TO ACHIEVE THE DESIRED DEPTH AND GRADATION.
2.1.3.THE SPECIFIED CONSTRUCTION PROCEDURE MUST ALSO ENSURE THAT COMMON COMPLICATIONS ARE
PREVENTED, AND MAY INCLUDE THE FOLLOWING.
2.1.4.AVOID LAYERING – CREATING TWO OR MORE SOIL LAYERS THAT CAN (1) CREATE VOIDS IN THE SOIL
PROFILE WHICH WOULD NOT FILL WITH WATER UNLESS UNDER SATURATED CONDITIONS
(SHORT-CIRCUITING), OR (2) RESULT IN LEACHING OF FINE MEDIA MATERIALS BETWEEN LAYERS
CAUSING PLUGGING.
2.1.5.WHEN LEACHING OF NUTRIENTS COULD BE HARMFUL TO A RECEIVING WATER, TAKE THE COMPOST
SOURCE INTO CONSIDERATION
2.2.UPON COMPLETION OF INFILTRATION BASIN, THE INFILTRATION RATE SHALL BE TESTED. ALL INFILTRATION
AREAS THAT ARE PART OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM MUST BE TESTED FOR
INFILTRATION RATES AFTER THEY ARE COMPLETED IN ORDER TO SUBMIT THE NPDES NOTICE OF
TERMINATION. A MINIMUM OF 5 INFILTRATION TESTS SHALL BE CONDUCTED.
2.2.1.INFILTRATION TESTS SHALL RESULT IN A RATE OF NO MORE THAN 8.3 INCHES PER HOUR.
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
2
GENERAL
NOTES &
SPECIFICATIONS
C0.1
DSDDDGMEMACEMGMACEMGMTTTTEE
T T T SSSSSSSSDDDDDDDDDDSSSW W W W WWWWW W W WWWWWWWWWWWWDDSW
SOWSODDWDD EEEEEEEEEEEEETVTVTVTVEEEEE E E E
E ETVTVTVT139TH STREET W.BRIANBORU AVENUEUPPER 138TH STREET W.BUNRATTY AVENUE
BURGUNDY AVEBENCHMARK #1LOWER 138TH STREET W.CONNEMARA TRAILS. ROBERT TRAIL
XXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXBR
A
Z
I
L
A
V
E
N
U
ESAWCUT, FULLDEPTH(TBR)(TO REMAIN)(TBR)(TBR)(TBR)(TBR)(TBR)(TBR)(TBR)(TBR)(SEE NOTE 1)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TBR)N18°08'50" 418.6'N88° 57'47" 1168.6'S01°02'13" 49.5'S88°57'47" 477.5'S12°51'14"421.3'N2
3
°
0
1
'
4
8
"
3
9
8
.
2
'S88°57'47"72.3'N23
°
0
1
'
5
9
"
6
0
4
.
0
'N88°36'46" 1627.6N18°08'50" 69.3'S89°37'36" 58.5'N18°08'50" 162.2'N18°08'50" 805.3'S71°51'10" 208.7'(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)(TO REMAIN)DDEMOLITION LEGENDBUILDING DEMOLITIONPAVEMENT REMOVAL, FULLDEPTHGRAVEL REMOVALCURB & GUTTER REMOVALXXUTILITY REMOVALUTILITY STRUCTURE REMOVALSAWCUT PAVEMENT, FULL DEPTHTO BE REMOVED(TBR)XX1" = ' (HORIZONTAL)''80160800REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS3EXISTINGCONDITIONS &DEMOLITIONPLANC1.0SITE BENCHMARKS:REFERENCE BENCHMARK#1ELEVATION: 965.82TOPOGRAPHIC SURVEY PREPARED BY I & S GROUP,INC., DATED 08/05/19. THE ORIENTATION OF THISBEARING SYSTEMS IS BASED ON THE SOUTH LINE OFTHE SE 1/4 OF SECTION 20,TOWNSHIP 115, RANGE 19WHICH IS ASSUMED TO BEAR NORTH 88 DEGREES 36MINUTES 46 SECONDS EAST.NOTES:1.REFER TO LANDSCAPE PLANS FORTREE REMOVAL DETAILS.2.CONTRACTOR SHALL COORDINATEWITH UTILITY COMPANIES AND OWNERFOR OVERHEAD LINES AND POWERPOLE DEMOLITION.
XXGMEMACEMGMACEMGMTVTVTVTVTVTV TVPROPOSED STORMSHELTER34333936353738313212345678910111213142221201918171615232425262728293014'X23' CONCRETEPAD FOR MAILBOXES120.7'PLAYGROUNDEXPANSIONBR
A
Z
I
L
A
V
E
N
U
E139TH STREET W.UPPER 138TH STREET W.BUNRATTY AVENUE
BURGUNDY AVE LOWER 138TH STREET W.CONNEMARA TRAILS. ROBERT TRAIL 50.0'SETBACK50.0'SETBACK50.0'SETBACK5' SIDEWALK14.0'23.0'(3) 9'X19' PARKING STALLS(1) ADA STALLRETAINING WALLTO BE EXTENDEDBRIANBORU AVENUE
29.0'R=100.0'R=28.0'STOP SIGNSTOP SIGNFENCE28.0'30'X32' CONCRETE PADFOR MAINTENANCE SHEDCURB TURNOUTBURGUNDY AVERETAINING WALL5.0' SIDEWALK7.1'RETAINING WALLRETAINING WALL10' TRAIL CONNECTIONTO ERICKSON PARKR=25.0'R=128.0'28.0'R=20.0'R=
4
8.0'R.O.W66'TYPE S C&GR=100.0'R=128.0'R=28.0'28.0'(2) ADA STALLS26.0'140TH STREET W.139TH STREET W.UPPER 138TH STREET W.138TH STREET W.LOWER 138TH STREET W.BUNDORAN AVENUE
BROUGHSHANE AVENUE
BRIANBORU AVENUE
BUNRATTY AVENUE140TH CIR W10.0'1.5'X23' CRUSHED ROCK1.5'R=85.0'R=75.0'1" = ' (HORIZONTAL)''80160800REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS4OVERALL SITEPLANC1.1
XXTVTVTVTVTVTV TV STREET LIGHT #1N:200894.31E:550027.42STREET LIGHT #2N:200742.66E:550072.27STREET LIGHT #4N:200304.21E:549923.17STREET LIGHT #5N:200514.24E:550358.81STREET LIGHT #3N:200527.75E:549978.02BR
A
Z
I
L
A
V
E
N
U
E139TH STREET W.BRIANBORU AVENUEUPPER 138TH STREET W.BUNRATTY AVENUE
BURGUNDY AVE LOWER 138TH STREET W.CONNEMARA TRAILS. ROBERT TRAIL30" X 30" STOP SIGN30" X 30" STOP SIGN"NO PARKING" SIGN"NO PARKING" SIGN"NO PARKING" SIGN343339363537383132123456789101112131422212019181716152324252627282930TYPE-III BARRICADECONSERVATIONEASEMENT SIGNCONSERVATIONEASEMENT SIGNCONSERVATIONEASEMENT SIGNCONSERVATIONEASEMENT SIGNCONSERVATIONEASEMENT SIGNCONSERVATIONEASEMENT SIGNCONSERVATIONEASEMENT SIGNCONSERVATIONEASEMENT SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTRUCTUREMARKER SIGNSTREET LIGHT # 6N:200776.48E:551500.75STREET LIGHT #7N:200467.45E:551330.40STREET LIGHT #8N:200128.57E:551227.78ADA PARKING SIGN(2) ADA PARKING SIGNS140TH STREET W.STRUCTUREMARKER SIGNPROPOSEDSTORMWATEREASEMENTSTRUCTUREMARKER SIGNMNDOT W7-5 HILLWARNING SIGN1" = ' (HORIZONTAL)''80160.000380.00020REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS5SITE LIGHTING& SIGNAGEPLANC2.0
WWWW
W W W W W W W WSSSSWWWWWWWWWWWW
XXSSWSSSDDDDDDDDDSWWD
DDDSDDDGMEMACEMGMACEMGMTTTTEETTT SSSSSSSSDDDDDDDDSSSW W W W WWWWW W W WWWWWWWWWWWWDDSW
SOWSODDWDD EEEEEEEEEEEEETVTVTVTVEEEEE E E E
E ETVTVTVTCORE & CONNECT TO EX. SMH343339363537383132123456789101112131422212019181716152324252627282930SA- 5SA - 9SA - 8SA-4ST-1ST-2ST-3ST-5ST-6SA - 10SA - 6STORM LINE - BSTORM LINE - ASAN LINE - ESAN LINE - DWATER LINE - AWATER LINE - BSTORM LINE - CBR
A
Z
I
L
A
V
E
N
U
E139TH STREET W.BRIANBORU AVENUEUPPER 138TH STREET W.BUNRATTY AVENUE BURGUNDY AVE LOWER 138TH STREET W.CONNEMARA TRAILS. ROBERT TRAILSA - 2SA - 1SAN LINE - AWATER LINE - CST-4SA - 3SA- 7CORE & CONNECTTO EX. SMHSAN LINE - CSAN LINE - BWATER LINE - BST-10ST-11ST-9ST-8FES-56" DI WMINSERTA VALVEPROPOSEDSTORMWATEREASEMENTHYDHYDHYDFES-2FES-1FES-3FES-4INSTALL 54 LF 12" RCPCULVERT UNDER TRAILTO MAINTAIN EXISTINGDRAINAGE PATTERNS12" FES INV = 955.5012" FES INV = 956.00OUTLET CONTROLSTRUCTURE1" = ' (HORIZONTAL)''80160800REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS6OVERALLUTILITY PLANC3.076'
15'
SETBACK
BUILDING SETBACKPROPERTY LOT LINECURB & GUTTER50'15'
SETBACK
5' SETBACK20'6" SANITARYSERVICEWATER AND SANITARY MUSTMAINTAIN 36" HORIZONTALSEPARATION AND 18"VERTICAL SEPARATION5'B-BOX3'3/4" WATERSERVICE76'
15'
SETBACK
BUILDING SETBACKPROPERTY LOT LINECURB & GUTTER50'15'
SETBACK
5' SETBACK20'6" SANITARYSERVICE3/4" WATERSERVICEB-BOX10'3'WATER AND SANITARY MUST MAINTAIN36" HORIZONTAL SEPARATION AND 18"VERTICAL SEPARATIONTYPICAL LOT LAYOUT - FRONT UTILITIESTYPICAL LOT LAYOUT - REAR UTILITIES
WWWSSTTTTTTTTTEEEEESSSSDW W
WWWWWWWWEEEEEEEEEBURGUNDY AVENUECONNEMARA TRAIL W.1234560+00
1+00
2+003+003+76SAN LINE - AEX. SMHSTA: 0+008" PVC SDR 358" PVC SDR 35SA - 2STA: 1+01.68SA - 1STA: 3+76.22CONSTRUCT OUTSIDEDROP CONNECTIONTO EXISTINGSANITARY MANHOLEEX. 8" PVC SDR 2610'EX. 8" PVC SDR 26SAN STUBSTA:1+51.37LENGTH:4.14' RINV:951.70(3' RISER)SAN STUBSTA:1+71.37LENGTH:4.35' RINV:952.60(2' RISER)SAN STUBSTA:2+21.37LENGTH:4.57' RINV:954.85(2' RISER)SAN STUBSTA:2+71.37LENGTH:4.78' RINV:957.10(2' RISER)SAN STUBSTA:3+21.36LENGTH:5.00' RINV:959.35(2' RISER)SAN STUBSTA:3+71.22LENGTH:5.22' RINV:959.60935940945950955960965970975935940945950955960965970975-0+500+001+002+003+004+00PROPOSED GROUNDOVER PIPECONSTRUCT OUTSIDEDROP TO EX. SMHEX. SMH
STA. 0+00
RIM 955.07
INV IN 945.21 (W-8")
INV IN 937.83 (S-8")
INV OUT 937.83 (N-8")
SA - 2, 4' DIA MH
STA. 1+01.68
RIM 955.91
INV IN 947.25 (N-8")
INV OUT 947.25 (E-8")
SA - 1, 4' DIA MH
STA. 3+76.22
RIM 966.60
INV OUT 959.60 (S-8")275 LF
8"
PVC
SDR
35
@
4
.50%102 LF 8" PVC SDR 35 @ 2.00%1" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS7SANITARY PLAN& PROFILE -SAN LINE - AC4.0SAN LINE - A - PROFILE VIEWSAN LINE - A - PLAN VIEWNOTES:1.WATER SERVICES TO BE 1" TYPE "K" COPPERPLACE TO BUILDING LINE WITH CURB STOP PLACEDAT THE END LOCATIONS TO BE FIELD VERIFIED.2.SANITARY SEWER SERVICES TO BE 6" PVC, SDR 26.PLACE TO 10" DEEP AT THIS POINT. A 45° BENDAND A 5" RISER SHALL BE ADDED AT THIS POINT.SEE CITY SPEC. FOR SERVICES WHERE COVEROVER TOP OF SEWER IS GREATER THAN 12.'
WWWWWWWWWWWWWSSDDDDDDSSSSSDSA-4STA: 1+62.108" PVC SDR 35SA- 5SAN B - STA: 5+62.10SAN C - STA: 0+00.00BURGUNDY AVENUE7891011121314222120191817161523710'10'10'3'CONSTRUCT MHOVER EX. 8" SANSA - 3STA: 0+050+001+002+003+004+005+005+67SAN LINE - B3'3'7'4'3'5'PROPOSEDSTORMWATEREASEMENTSAN LINE - C8" PVC SDR 26EX. 8" PVC SDR 26SAN STUBSTA:1+73.10LENGTH:30.04' RINV:942.70SAN STUBSTA:2+21.80LENGTH:30.04' RINV:943.30SAN STUBSTA:1+67.10LENGTH:29.95' LINV:942.63SAN STUBSTA:2+64.77LENGTH:29.95' LINV:943.80SAN STUBSTA:2+71.80LENGTH:30.04' RINV:943.90SAN STUBSTA:3+14.77LENGTH:29.95' LINV:944.39SAN STUBSTA:3+21.80LENGTH:30.04' RINV:944.49SAN STUBSTA:3+71.80LENGTH:30.04' RINV:945.09SAN STUBSTA:4+21.80LENGTH:30.04' RINV:945.68SAN STUBSTA:4+71.80LENGTH:30.04' RINV:946.28SAN STUBSTA:3+64.77LENGTH:29.95' LINV:944.99SAN STUBSTA:4+14.77LENGTH:29.95' LINV:945.58SAN STUBSTA:4+64.77LENGTH:29.95' LINV:946.18SAN STUBSTA:5+14.77LENGTH:29.95' LINV:946.77SAN STUBSTA:5+21.80LENGTH:30.04' RINV:946.87SAN STUBSTA:2+14.77LENGTH:29.95' LINV:943.20935940945950955960965935940945950955960965-0+500+001+002+003+004+005+006+00PROPOSED GROUNDOVER PIPESA - 3, 4' DIA SMHSTA. 0+05RIM 956.83INV IN 941.17 (E-8")INV IN 941.17 (S-8")INV OUT 941.17 (N-8")157 LF 8" PVC SDR 26 @ 0.50%SA-4, 4' DIA SMH
STA. 1+62.10
RIM 947.47
INV IN 941.96 (N-8")
INV OUT 941.96 (W-8")400 LF 8" PVC SDR 35 @ 1.20%SA- 5, 4' DIA SMH
STA. 5+62.10
RIM 954.72
INV IN 946.74 (E-8")
INV OUT 946.74 (S-8")18" RCP15" RCP STCONSTRUCT MHOVER EX. 8" SAN1" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS8SANITARY PLAN& PROFILE -SAN LINE - BC4.1SAN LINE - B - PROFILE VIEWSAN LINE - B - PLAN VIEWNOTES:1.WATER SERVICES TO BE 1" TYPE "K" COPPERPLACE TO BUILDING LINE WITH CURB STOP PLACEDAT THE END LOCATIONS TO BE FIELD VERIFIED.2.SANITARY SEWER SERVICES TO BE 6" PVC, SDR 26.PLACE TO 10" DEEP AT THIS POINT. A 45° BENDAND A 5" RISER SHALL BE ADDED AT THIS POINT.SEE CITY SPEC. FOR SERVICES WHERE COVEROVER TOP OF SEWER IS GREATER THAN 12.'
W
W W W W W
SSSW W W W W WWWWWWWDDT T T T SDSA- 5SAN B - STA: 5+62.10SAN C - STA: 0+00.00SA - 6SAN - C STA: 1+97.32SAN - D STA: 4+15.54UPPER 138TH ST. W.5+184+005+008" PVC SDR 35723242526272829BUNRATTY AVENUE710'10'10'10'10'10'10'0+001+001+97SAN LINE - C3'SAN LINE - DEX.
8
"
P
V
C
S
D
R
2
6
SAN STUBSTA:0+81.95LENGTH:39.36' LINV:953.00SAN STUBSTA:1+31.95LENGTH:39.37' LINV:953.00SAN STUBSTA:1+81.95LENGTH:39.37' LINV:953.00935940945950955960965970935940945950955960965970-0+500+001+002+002+50PROPOSED GROUND OVER PIPESA- 5, 4' DIA SMH
STA. 0+00
RIM 954.72
INV IN 946.74 (E-8")
INV OUT 946.74 (S-8")
SA - 6, 4' DIA SMH
STA. 1+97.32
RIM 958.94
INV IN 950.60 (S-8")
INV IN 950.60 (N-8")
INV OUT 948.71 (W-8")197 LF 8" PVC SDR 35 @ 1.00%1.5'
MIN
6" WM1" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS9SANITARY PLAN& PROFILE -SAN LINE - CC4.2SAN LINE - C - PROFILE VIEWSAN LINE - C - PLAN VIEWNOTES:1.WATER SERVICES TO BE 1" TYPE "K" COPPERPLACE TO BUILDING LINE WITH CURB STOP PLACEDAT THE END LOCATIONS TO BE FIELD VERIFIED.2.SANITARY SEWER SERVICES TO BE 6" PVC, SDR 26.PLACE TO 10" DEEP AT THIS POINT. A 45° BENDAND A 5" RISER SHALL BE ADDED AT THIS POINT.SEE CITY SPEC. FOR SERVICES WHERE COVEROVER TOP OF SEWER IS GREATER THAN 12.'
SSSWWWWWWWWWWWWWWWWWWW W W W W W WSGMEMACEMGMACEMGMTTTTTTD
DDW
EEETVSA - 6SAN - C STA: 1+97.32SAN - D STA: 4+15.548" PVC SDR 358" PVC SDR 35UPPER 138TH ST. W.5+180+001+002+003+004+005+00SAN LINE - D343331322230BUNRATTY AVENUE2928272625242310'10'10'10'10'10'RETAINING WALLSA - 9STA: 5+17.87SA - 8STA: 0+00.04SA- 7STA: 3+12.90SAN LINE - C8" PVC SDR 35SAN STUBSTA:0+05.00LENGTH:8.96' RINV:956.80SAN STUBSTA:0+25.00LENGTH:8.94' RINV:956.60SAN STUBSTA:0+75.00LENGTH:9.00' RINV:956.10SAN STUBSTA:1+25.00LENGTH:8.94' RINV:955.60SAN STUBSTA:3+02.90LENGTH:9.42' RINV:953.00SAN STUBSTA:3+52.90LENGTH:9.49' RINV:952.90SAN STUBSTA:4+02.90LENGTH:9.61' RINV:951.80SAN STUBSTA:4+52.90LENGTH:9.71' RINV:953.00SAN STUBSTA:5+02.90LENGTH:9.63' RINV:954.40940945950955960965970975940945950955960965970975-0+500+001+002+003+004+005+005+50PROPOSEDGROUND OVER PIPESA - 9, 4' DIA SMH
STA. 5+17.87
RIM 959.93
INV OUT 954.81 (S-8")
SA - 6, 4' DIA SMH
STA. 4+12.54
RIM 958.94
INV IN 950.60 (S-8")
INV IN 950.60 (N-8")
INV OUT 948.71 (W-8")
SA - 8, 4' DIA SMHSTA. 0+00.04RIM 962.67INV OUT 955.90 (N-8")313 LF 8" PVC SDR 35 @ 1.00%105 LF
8"
PVC
SDR
35
@
4
.00%
SA- 7, 4' DIA SMH
STA. 3+12.90
RIM 960.15
INV IN 952.77 (S-8")
INV OUT 952.84 (N-8")100 LF 8" PVC SDR 35 @ 2.25%1" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS10SANITARY PLAN& PROFILE -SAN LINE - DC4.3SAN LINE - D - PROFILE VIEWSAN LINE - D - PLAN VIEWNOTES:1.WATER SERVICES TO BE 1" TYPE "K" COPPERPLACE TO BUILDING LINE WITH CURB STOP PLACEDAT THE END LOCATIONS TO BE FIELD VERIFIED.2.SANITARY SEWER SERVICES TO BE 6" PVC, SDR 26.PLACE TO 10" DEEP AT THIS POINT. A 45° BENDAND A 5" RISER SHALL BE ADDED AT THIS POINT.SEE CITY SPEC. FOR SERVICES WHERE COVEROVER TOP OF SEWER IS GREATER THAN 12.'
945950955960965945950955960965-0+500+001+002+003+00EX. SMH
STA. 0+00
RIM 955.56
INV IN 949.10 (E-8")
INV OUT 948.88 (N-18" )
SA - 10, 4' DIA SMH
STA. 2+63.77
RIM 957.89
INV OUT 953.06 (W-8")264 LF 8" PVC SDR 35 @ 1.50%PROPOSED GROUNDOVER PIPECORE DRILL CONNECTIONTO EX. SMH6" WM24" RCP ST1.5' MIN30" RCP STWWWWWWW W
SSSSWWWW
DDWW WTV
TVTVTVTVTVTVTVEEEEE
E E E EEBRIANBORU AVENUE0+001+002+002+648" PVC SDR 35EX. SMHSTA: 0+00SA - 10STA: 2+63.77139TH STREET W.BRIANBORU AVENUE
SAN LINE - E3936353738ROAD OPEN CUT EX. REPLACECURB & PAVEMENT. MATCHEX. SECTIONCORE-DRILLCONNECTIONTO EX. SMHSAN STUBSTA:0+58.77LENGTH:9.12' RINV:951.00SAN STUBSTA:1+08.77LENGTH:9.03' RINV:951.80SAN STUBSTA:1+58.77LENGTH:9.06' RINV:952.50SAN STUBSTA:2+08.77LENGTH:9.03' RINV:953.20SAN STUBSTA:2+58.77LENGTH:9.00' RINV:953.501" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS11SANITARY PLAN& PROFILE -SAN LINE - EC4.4SAN LINE - E - PROFILE VIEWSAN LINE - E - PROFILE VIEWNOTES:1.WATER SERVICES TO BE 1" TYPE "K" COPPERPLACE TO BUILDING LINE WITH CURB STOP PLACEDAT THE END LOCATIONS TO BE FIELD VERIFIED.2.SANITARY SEWER SERVICES TO BE 6" PVC, SDR 26.PLACE TO 10" DEEP AT THIS POINT. A 45° BENDAND A 5" RISER SHALL BE ADDED AT THIS POINT.SEE CITY SPEC. FOR SERVICES WHERE COVEROVER TOP OF SEWER IS GREATER THAN 12.'
EESSSSSWWWWWW
W
W
W
W
W
WWWWWWWEEEEEEEEEW W W W W W W W W W W
W
W
W
W
W
W
SWWWSSDDDDDDS0+00 1+00 2+00 3+00 4+00
5+00
6+00
7+00
8+00
9+00
10+0010+15
WATER LINE - A
1
2
3
4
5
6
891011121314
2221201918171615
7
23
BURGU
N
D
Y
A
V
E
N
U
E
BURGUNDY AVENUE
WET TAP TO
EXISTING
WATERMAIN
45° Bend
STA:6+22.76
45° Bend
STA:6+05.80
45° Bend
STA:4+44.05
OPEN CUT EXISTING
ROAD REPLACE
CURB & PAVEMENT
MATCH EX. SECTION
HYD-1
W/ GATE VALVE
STA:0+00.00
RING:946.9 G 8"X8"X6" TEE
STA:5+67.50
WATER LINE - B
8" GATE VALVE
STA:7+06.60
RIM:??? G
8" GATE VALVE
STA:5+62.50
RIM:961.1 G
WM STUB
STA:0+43.33
LENGTH:48.46'
WM STUB
STA:0+43.33
LENGTH:11.54'
WM STUB
STA:0+85.00
LENGTH:48.45'
WM STUB
STA:0+92.02
LENGTH:11.54'
WM STUB
STA:1+35.00
LENGTH:48.45'
WM STUB
STA:1+42.02
LENGTH:11.54'
WM STUB
STA:1+85.00
LENGTH:48.45'
WM STUB
STA:1+92.02
LENGTH:11.54'
WM STUB
STA:2+35.00
LENGTH:48.45'
WM STUB
STA:2+42.02
LENGTH:11.54'
WM STUB
STA:2+85.00
LENGTH:48.45'
WM STUB
STA:2+92.02
LENGTH:11.54'
WM STUB
STA:3+35.00
LENGTH:48.45'
WM STUB
STA:3+42.02
LENGTH:11.54'
WM STUB
STA:3+85.00
LENGTH:48.45'
WM STUB
STA:3+92.02
LENGTH:11.54'
WM ST
U
B
STA:7+
4
4
.
9
6
LENG
T
H
:
7
6
.
0
4'
WM ST
U
B
STA:7+
7
4
.
8
6
LENG
T
H
:
7
5
.
7
8'
WM ST
U
B
STA:8+
2
4
.
6
1
LENG
T
H
:
7
5
.
3
5'
WM ST
U
B
STA:8+
7
4
.
8
6
LENG
T
H
:
7
4
.
9
2'
WM ST
U
B
STA:9+
2
4
.
8
6
LENG
T
H
:
7
4
.
4
9'
WM ST
U
B
STA:9
+
7
4
.
8
6
LENG
T
H
:
7
4
.
0
6'
WATER LINE - A
930
935
940
945
950
955
960
965
930
935
940
945
950
955
960
965
-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 7+50
PROPOSED GROUND
OVER WATERMAIN
7.5' MINWET TAP INTO
EX. WATER MAIN
8" DI, CL 52
WATER MAINSTA = 0+00HYD-12.2'18" RCP
8" PVC SDR 35
7.5' MINSTA = 5+67.508"X8"X6" TEEREVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
CP 2020-12
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
1" = ' (HORIZONTAL)
1" = ' (VERTICAL)
''
40
80400
4 11
WATER PLAN &
PROFILE -
WATER LINE A
C5.0
WATER LINE - A - PROFILE VIEW
WATER LINE - A - PROFILE VIEW
NOTES:
1.WATER SERVICES TO BE 1" TYPE "K" COPPER PLACE
TO 9' BEYOND PROPERTY LINE WITH CURB STOP
PLACED AT THE END LOCATIONS TO BE FIELD
VERIFIED.
2.SANITARY SEWER SERVICES TO BE 4" PVC, SDR 26.
PLACE TO 10" DEEP AT THIS POINT. A 45° BEND AND
A 5" RISER SHALL BE ADDED AT THIS POINT. SEE
CITY SPEC. FOR SERVICES WHERE COVER OVER
TOP OF SEWER IS GREATER THAN 12.' LOCATIONS
TO BE FIELD VERIFIED.
GMEMACEMGMACEMGMT T T T T T
DDDWWW W W W W W W W WWWWWWWWWW
EEEEEEEEEEETVTVW
W
W W W W W
W W
SSSSW W W W W W W W
W W W
W W W W W W W WWWWWWWSD0+00 1+00 2+00 3+004+00
5+00 6+00 7+008+009+009+61WATER LINE - B
34 33 3132
22
21
20
19
30 29 28 27 26
25
24
23
UPPER 138TH ST. W.BUNRATTY AVENUE
45° Bend
STA:2+99.10
45° Bend
STA:3+24.10
45° Bend
STA:4+16.47
45° Bend
STA:4+40.83WATER LINE - B
10.0'10'10'
20'
10'10'10'10'
WET TAP TO EXISTING
WATERMAIN
HYD-2
W/ GATE VALVE
STA:9+40.64
RING:961.1 G
8" GATE VALVE
STA:0+05.00
RIM:964.9 G
8" GATE VALVE
STA:6+92.91
RIM:959.7 G8" GATE VALVE
STA:3+96.13
RIM:960.8 G
8" GATE VALVE
STA:4+01.13
RIM:960.8 G
8" GATE VALVE
STA:4+01.13
RIM:960.9 G
OPEN CUT EXISTING ROAD
REPLACE CURB & PAVEMENT.
MATCH EX. SECTION
8" GATE VALVE
STA:9+55.97
RIM:961.1 G
WM STUB
STA:8+94.12
LENGTH:9.93'
WM STUB
STA:8+44.12
LENGTH:9.90'
WM STUB
STA:7+94.12
LENGTH:9.87'
WM STUB
STA:6+70.77
LENGTH:15.03'
WM STUB
STA:6+30.83
LENGTH:16.42'
WM STUB
STA:5+80.83
LENGTH:16.43'
WM STUB
STA:5+30.84
LENGTH:16.44'
WM STUB
STA:4+80.83
LENGTH:16.45'
WM STUB
STA:2+89.09
LENGTH:9.31'
WM STUB
STA:2+39.09
LENGTH:16.17'
WM STUB
STA:1+89.09
LENGTH:16.10'
WM STUB
STA:1+39.09
LENGTH:16.04'
935
940
945
950
955
960
965
970
935
940
945
950
955
960
965
970
-0+50 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00
PROPOSED GROUND
OVER WATERMAIN
WET TAP INTO
LINE WATER-A7.5' MIN8" DI, CL 52
WATER MAIN7.5' MINWET TAP INTO
EXISTING
WATER MAIN STA = 9+40.64HYD - 21" = ' (HORIZONTAL)
1" = ' (VERTICAL)
''
40
80400
4 12
WATER PLAN &
PROFILE -
WATER LINE B
C5.1WATER LINE - B - PROFILE VIEW
WATER LINE - B - PROFILE VIEW
NOTES:
1.WATER SERVICES TO BE 1" TYPE "K" COPPER PLACE
TO 9' BEYOND PROPERTY LINE WITH CURB STOP
PLACED AT THE END LOCATIONS TO BE FIELD
VERIFIED.
2.SANITARY SEWER SERVICES TO BE 4" PVC, SDR 26.
PLACE TO 10" DEEP AT THIS POINT. A 45° BEND AND
A 5" RISER SHALL BE ADDED AT THIS POINT. SEE
CITY SPEC. FOR SERVICES WHERE COVER OVER
TOP OF SEWER IS GREATER THAN 12.' LOCATIONS
TO BE FIELD VERIFIED.
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
CP 2020-12
S
S S
WWWWWWD D
W WWTV TV TV TV TV TV TV TV TV
E E E E
EEEEEEEEW W W W W WWWS
D
D0+001+002+00 3+00 3+66
3936353738
BRAZIL AVENUEBRAZIL AVENUE139TH STREET W.BREMEN AVENUEWET TAP TO EXISTING WATER MAIN
W/ TAPPING SLEEVE & GATE VALVE
APPROXIMATE LOCATION OF
EXISTING WATER MAIN BASE
ON BEST AVAILABLE DATA
HYD-3
W/ GATE VALVE
STA:3+66.46
RING:960.5 G
45° Bend
STA:1+01.61
45° Bend
STA:0+91.61BRIANBORU AVENUEWM STUB
STA:1+16.17
LENGTH:5.00'
WM STUB
STA:1+66.17
LENGTH:5.05'
WM STUB
STA:2+16.17
LENGTH:4.98'
WM STUB
STA:2+66.17
LENGTH:4.97'
WM STUB
STA:3+16.17
LENGTH:4.96'
WATER LINE - C
940
945
950
955
960
965
970
940
945
950
955
960
965
970
-0+50 0+00 1+00 2+00 3+00 4+00
PROPOSED GROUND
OVER WATERMAIN
8" DI, CL 52
WATER MAIN
1.5' MIN STA = 3+66.46HYD - 3WET TAP INTO EXISTING
WATER MAIN
8" PVC SDR 35 7.5' MIN30" RCP
1.5'GTWWWWWWWWWSO
WSO W
E E E E EETVTVTTW
WW WW6" DI WM
PROP.
STORM
SHELTER
LIMITS OF EX. 6" WM TO BE
REMOVED AFTER INSTALLATION
OF PROPOSED 6" WM
INSTALL INSERTA VALVE
ON EXISTING 6" WM
45° BEND
90° BEND
90 DEGREE BEND, DRY
CONNECT TO EX. 6" WM
DRY CONNECT TO
EX. WM WITH 6" TEE45° BEND
45° BEND
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
CP 2020-12
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
1" = ' (HORIZONTAL)
1" = ' (VERTICAL)
''
40
80400
4 13
WATER PLAN &
PROFILE -
WATER LINE C
C5.2
WATER LINE - C - PROFILE VIEW
WATER LINE - C - PROFILE VIEW
NOTES:
1.WATER SERVICES TO BE 1" TYPE "K" COPPER PLACE
TO 9' BEYOND PROPERTY LINE WITH CURB STOP
PLACED AT THE END LOCATIONS TO BE FIELD
VERIFIED.
2.SANITARY SEWER SERVICES TO BE 4" PVC, SDR 26.
PLACE TO 10" DEEP AT THIS POINT. A 45° BEND AND
A 5" RISER SHALL BE ADDED AT THIS POINT. SEE
CITY SPEC. FOR SERVICES WHERE COVER OVER
TOP OF SEWER IS GREATER THAN 12.' LOCATIONS
TO BE FIELD VERIFIED.
STORM SHELTER
WWWWWWWWWWWWWWWSW
W
W
W
WS DDDDDDSDSSSSDD0+001+002+003+004+005+005+66BURGUNDY AVE7891011121314222120191817161523242528.0'961.31 TC961.28 TC948.74 TC948.22 TC946.83 TC947.79 TC947.79 TCSTORM LINE - ASTORM LINE - B947.56 TC952.80 TC952.80 TC959.69 TC959.69 TC946.53 TC948.41 TC948.41 TC949.66 TC950.92 TC950.92 TC949.66 TCSTORM LINE - CR=25.0'R=100.0'R=128.0'R=128.0'R=100.0'R=28.0'R=28.0'B6.18 C>RANSITION FROM TYPES C&G TO B6.18 C>RANSITION FROM TYPES C&G TO B6.18 C>YPE S C&GPROPOSEDSTORMWATEREASEMENTEMERGENCY OUTLETCONTROL STRUCTURE(SEE SKIMMER DETAIL)RIM = 942.0 G6" ORIFICE = 936.00WEIR WALL = 941.44INV OUT = 935.65PROPOSED INFILTRATION BASINREQ. VOLUME = 4.34 AC-FTPROV. VOLUME = 5.04 AC-FTNWL = 934.00HWL = 941.94SNOW HWL = 941.13BOTTOM ELEV = 935.00NURP BOTTOM ELEV = 924.00INV = 935.005 LF 18" RCP @ 2.00%10 LF 18" RCP @ 0.00%935940945950955960965970935940945950955960965970-0+500+001+002+003+004+005+006+00PVI STA=5+00.00PVI ELEV=960.14A.D.=-6.00K=10.8365.00' VCSTA: 4+67.50
PVC: 957.54
STA: 5+32.50
PVT: 960.79 PVI STA=4+00.00PVI ELEV=952.14A.D.=6.74K=10.3870.00' VCSTA: 3+65.00
PVC: 951.70
STA: 4+35.00
PVT: 954.94
PVI STA = 0+00.00PVI ELEV = 947.11
PVI STA = 5+65.76
PVI ELEV = 961.4618" RCPPROPOSED GROUNDAT CENTERLINE2.00%1.26%8
.
0
0%
943.9947.11
943.7
948.37
944.0
949.63
940.4
950.89
939.8
952.73
944.1
959.66
1" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS15STORM ANDPAVING PLAN &PROFILE -BURGUNDY AVEC6.0BURGUNDY AVE - PLAN VIEWBURGUNDY AVE - PROFILE VIEW
WWWWWWWWWWWWWWWSSW
W
W
W
WS DDDDDDSDSSSSDD0+001+002+003+004+005+005+66BURGUNDY AVE7891011121314222120191817161523242528.0'961.31 TC961.28 TC948.74 TC948.22 TC946.83 TC947.79 TC947.79 TCSTORM LINE - ASTORM LINE - B947.56 TC952.80 TC952.80 TC959.69 TC959.69 TC946.53 TC948.41 TC948.41 TC949.66 TC950.92 TC950.92 TC949.66 TCSTORM LINE - C(SEE DETAIL)R=25.0'R=100.0'R=128.0'R=128.0'R=100.0'R=28.0'R=2
8
.0
'B6.18 C>RANSITION FROM TYPES C&G TO B6.18 C>RANSITION FROM TYPES C&G TO B6.18 C>YPE S C&GPROPOSEDSTORMWATEREASEMENTFES-4STA: 2+04.42OS: 0.00'FES-1STA: 0+11.26OS: 0.00'FES-2STA: 0+07.34OS: 0.00'ST-5STA: 0+73.29OS: 0.00'ST-6STA: 1+00.51OS: 0.04' RST-3STA: 2+00.35OS: 0.07' RST-2STA: 1+00.35OS: 0.01' LST-1STA: 0+60.90OS: 0.00'FES-3STA: 0+03.77OS: 0.00' RST-4STA: 3+50.35OS: 0.00'70 LF 18" RCP @ 0.25%27 LF 18" RCP @ 0.25%104 LF 18" RCP @ 0.25%50 LF 15" RCP @ 4.00%100 LF 15" RCP @ 2.00%93 LF 15" RCP @ 3.66%150 LF 15" RCP @ 2.00%EMERGENCY OUTLETCONTROL STRUCTURE(SEE SKIMMER DETAIL)RIM = 942.0 G6" ORIFICE = 936.00WEIR WALL = 941.44INV OUT = 935.65PROPOSED INFILTRATION BASINREQ. VOLUME = 4.34 AC-FTPROV. VOLUME = 5.04 AC-FTNWL = 934.00HWL = 941.94SNOW HWL = 941.13BOTTOM ELEV = 935.00NURP BOTTOM ELEV = 924.00ADJUST RIMGRADE TO 934.0 GINV = 935.005 LF 18" RCP @ 2.00%10 LF 18" RCP @ 0.00%930935940945950955960965930935940945950955960965-0+250+001+002+002+50ST-5, 4' DIA MHSTA: 0+73.29RIM 954.30INV IN 948.83 (NW-18")INV OUT 948.83 (E-18")ST-6, 4' DIA MHSTA: 1+00.51RIM 953.87INV IN 948.76 (W-18")INV OUT 948.76 (E-18")PROPOSEDGROUNDOVER SEWER70 LF 18" RCP @ 0.25%27 LF 18" RCP @ 0.25%104 LF 18" RCP @ 0.25%FES-3STA: 0+03.77INV OUT 949.00 (SE-18")8" PVC SDR 35FES-4STA: 2+04.42INV IN 948.50 (W-18")925930935940945950955925930935940945950955-0+500+001+00PROPOSED GROUNDOVER SEWER50 LF 15" RCP @ 4.00%ST-1, 4' DIA ENVIRO CB
STA: 0+60.90
RIM 946.21
INV OUT 937.99 (S-15")
FES-1
STA: 0+11.26
INV IN 936.00 (N-15")930935940945950955960965930935940945950955960965-0+500+001+002+003+004+00ST-3, 4' DIA MH
STA: 2+00.35
RIM 949.23
INV IN 942.50 (N-15")
INV OUT 942.40 (S-15")
ST-2, 4' DIA ENVIRO CB
STA: 1+00.35
RIM 950.73
INV IN 940.40 (N-15")
INV OUT 939.40 (S-15")93 LF 15"
RCP
@
3.66%100 LF 15" RCP @ 2.00%PROPOSED GROUNDOVER SEWERFES-2
STA: 0+07.34
INV IN 936.00 (N-15")150 LF 15" RCP @ 2.00%ST-4, 4' DIA MH
STA: 3+50.35
RIM 950.50
INV OUT 945.50 (S-15")8" PVC SDR 26STRUCTURE TABLESTRUCTURENAME:ST-1ST-2ST-3ST-4ST-5ST-6ST-7ST-8ST-9ST-10ST-11RIM:RIM = 946.21RIM = 950.73RIM = 949.23RIM = 950.50RIM = 954.30RIM = 953.87RIM = 959.60RIM = 962.44RIM = 962.44RIM = 966.24RIM = 966.24PIPES IN:15" RCP INV IN=940.4015" RCP INV IN=942.5018" RCP INV IN=948.8318" RCP INV IN=948.7615" RCP INV IN=956.1215" RCP INV IN=956.6815" RCP INV IN=956.6815" RCP INV IN=958.2815" RCP INV IN=958.18PIPES OUT15" RCP INV OUT=937.9915" RCP INV OUT=939.4015" RCP INV OUT=942.4015" RCP INV OUT=945.5018" RCP INV OUT=948.8318" RCP INV OUT=948.7615" RCP INV OUT=956.1215" RCP INV OUT=956.6815" RCP INV OUT=956.9115" RCP INV OUT=958.1815" RCP INV OUT=958.46SUMPELEVATIONSUMP = 935.986SUMP = 937.400SUMP = 942.400SUMP = 945.500SUMP = 948.826SUMP = 948.758SUMP = 954.118SUMP = 956.685SUMP = 956.911SUMP = 958.185SUMP = 958.4551" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS16C6.1BURGUNDY AVE - PLAN VIEWSTORM LINE - A - PROFILE VIEWSTORM LINE - B - PROFILE VIEWSTORM LINE - C - PROFILE VIEWSTORM ANDPAVING PLAN &PROFILE -BURGUNDY AVE
955960965970975980985955960965970975980985-0+500+001+002+003+004+005+006+007+008+00PVI STA = 0+00.00PVI ELEV = 976.02
PVI STA = 3+50.00
PVI ELEV = 965.52
PVI STA = 6+00.00
PVI ELEV = 962.72
PVI STA = 7+18.63
PVI ELEV = 959.74PROPOSED GROUNDAT CENTERLINE-5.50%-2.00%-1.12%-2.51%976.0976.02971.9970.96968.3968.52
965.1
966.52
964.9
964.96
964.4
963.84
961.7
962.72
960.1
960.21 PVI STA=1+00.00PVI ELEV=970.52A.D.=3.50K=28.60100.00' VCSTA: 0+50.00PVC: 973.27STA: 1+50.00PVT: 969.52
WWXXXX
X
SWDDDWWWWDDGTWWWWWWWWW WWSOWSO
DWTVTVTVEEEEEEEEETVTVTVTVT TBRAZIL AVE39976.19 TC976.15 TC0+001+002+003+004+005+006+007+007+19971.13 TC971.13 TC968.69 TC968.69 TC966.69 TC966.69 TC965.13 TC965.13 TC964.01 TC964.01 TC962.89 TC962.89 TC960.38 TC960.38 TCSTORM LINE - DPROPOSEDMAINTENANCESHEDPROPOSEDSTORM SHELTER29.0'66.0'ROW50'R50'R25'R
35'
R45'R1" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS17C6.2BRAZIL AVE - PLAN VIEWBRAZIL AVE - PROFILE VIEWSTORM ANDPAVING PLAN &PROFILE - BRAZILAVE
950955960965970975950955960965970975-0+500+001+002+003+004+004+50ST-10, 4' DIA MH
STA: 0+05
RIM 966.24
INV IN 958.28 (W-15")
INV IN 958.18 (SE-15")
INV OUT 958.18 (NE-15")
ST-8, 4' DIA MH
STA: 3+05
RIM 962.44
INV IN 956.68 (SW-15")
INV IN 956.68 (NE-15")
INV OUT 956.68 (NE-15")300 LF 15" RCP @ 0.50%113 LF 15" RCP @ 0.50%PROPOSED GROUNDOVER SEWERFES-5
STA: 4+41.84
INV IN 956.00 (S-15")
ST-7, 4' DIA CB
STA: 4+18.33
RIM 959.60
INV IN 956.12 (SW-15")
INV OUT 956.12 (N-15")24 LF 15" RCP @ 0.50%WWXXXX
X
SDDDDDWWWWWDTVTVTVEEEEEETVTVTVTVBRAZIL AVE39959.33 MEET EX. P959.41 MEET EX. P2+003+004+005+006+007+007+19968.69 TC968.69 TC966.69 TC966.69 TC965.13 TC965.13 TC964.01 TC964.01 TC962.89 TC962.89 TC960.38 TC960.38 TCSTORM LINE - DFES-5INV = 956.00 (S - 15")ST-11INV = 958.46 (NW - 15")STA: 0+05OS: 27.00' RST-10STA: 0+05OS: 0.00' RST-8STA: 3+05OS: 0.00'ST-9INV = 956.91 (NW - 15")STA: 3+05OS: 27.00' RPROPOSEDMAINTENANCESHED29.0'66.0'ROW27 LF 15" RCP @ 1.00%15" RCP27 LF 15" RCP @ 1.00%15" RCP50'R50'R25'R
35'
R45'RST-7STA: 4+18.33OS: 0.00'15" RCPSTRUCTURE TABLESTRUCTURENAME:ST-1ST-2ST-3ST-4ST-5ST-6ST-7ST-8ST-9ST-10ST-11RIM:RIM = 946.21RIM = 950.73RIM = 949.23RIM = 950.50RIM = 954.30RIM = 953.87RIM = 959.60RIM = 962.44RIM = 962.44RIM = 966.24RIM = 966.24PIPES IN:15" RCP INV IN=940.4015" RCP INV IN=942.5018" RCP INV IN=948.8318" RCP INV IN=948.7615" RCP INV IN=956.1215" RCP INV IN=956.6815" RCP INV IN=956.6815" RCP INV IN=958.2815" RCP INV IN=958.18PIPES OUT15" RCP INV OUT=937.9915" RCP INV OUT=939.4015" RCP INV OUT=942.4015" RCP INV OUT=945.5018" RCP INV OUT=948.8318" RCP INV OUT=948.7615" RCP INV OUT=956.1215" RCP INV OUT=956.6815" RCP INV OUT=956.9115" RCP INV OUT=958.1815" RCP INV OUT=958.46SUMPELEVATIONSUMP = 935.986SUMP = 937.400SUMP = 942.400SUMP = 945.500SUMP = 948.826SUMP = 948.758SUMP = 954.118SUMP = 956.685SUMP = 956.911SUMP = 958.185SUMP = 958.4551" = ' (HORIZONTAL)1" = ' (VERTICAL)''40804004REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS18C6.3BRAZIL AVE - PLAN VIEWBRAZIL AVE - PROFILE VIEWSTORM ANDPAVING PLAN &PROFILE - BRAZILAVE
XXTVTVTVTVTVTV TV 950955960965970935940945950955960
965970960965960960960 960960
9609
6
5970975
BR
A
Z
I
L
A
V
E
N
U
E139TH STREET W.BRIANBORU AVENUEUPPER 138TH STREET W.BUNRATTY AVENUE
BURGUNDY AVE LOWER 138TH STREET W.CONNEMARA TRAILS. ROBERT TRAILPROPOSEDINFILTRATION BASIN3433393635373831321234567891011121314222120191817161523242526272829301" = ' (HORIZONTAL)''80160800REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS19OVERALLGRADING PLANC7.0SEE SHEETS C7.1 FORDETAILED GRADING -NORTHWESTSEE SHEETS C7.2 FORDETAILED GRADING -SOUTHWESTSEE SHEETS C7.3 FORDETAILED GRADING -SOUTHEASTSEE SHEETS C7.1 FORDETAILED GRADING -NORTHEAST
SSD950955960BURGUNDY AVENUE 123456962.17 MEET EX. TC964.56 MEET EX. TC964.00 MEET EX. TC963.50 MEET EX. TC962.94 MEET EX. TC962.45 MEET EX. TC960.1 G960.3 G960.9 G963.6 G966.1 T/WALL966.1 B/WALL969.0 T/WALL966.6 B/WALL965.6 GCONNEMARA TRAIL W.FSG=966.8FSG=966.3FSG=964.8FSG=962.6FSG=962.4FSG=963.1960.0 T/WALL958.0 B/WALL961.95 MEET EX. TC965970 975 966.0 T/WALL965.7 B/WALL960.0 T/WALL958.0 B/WALL960.0 T/WALL960.0 B/WALL0.8%0.5%0.6%3.0%4.9%4.8%TS = 962.06 TS = 962.39TS = 963.38TS = 964.86960955965 SANITARYACCESS ROUTESANITARY ACCESS ROUTEDDD953.01 MEET EX. P953.49 MEET EX. PBRIANBORU AVENUE
949.4 G950.2 GMEET EX. WALL952.59 T/WALL950.38 B/WALL951.30 T/WALL950.20 B/WALL954.17 TC953.83 P953.69 TC953.36 P954.11 TW953.39 TW953.60 TWPLAYGROUND ADDITION953.61 TW953.67 TWADA RAMP W/ DEP C&G953.26 P953.32 P953.54 P1.5%948.1 G949.7 G953.59 P953.46 TWLEGENDSANITARY ACCESS ROUTE1" = ' (HORIZONTAL)''4080400REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS20DETAILEDGRADINGPLANC7.1DETAIL GRADING - NORTHWESTDETAIL GRADING -NORTHEAST
SSSSSSDDDDDDSD957.93 MEET EX. PGMEMACEMGMACEMGMDDDDDDDDDTVTV3433925925930930935935940945
965
965965970
950
950
955960950
955950955960BUNRATTY AVENUEBURGUNDY AVENUE960945955955UPPER 138TH ST. W.3132789101112131422212019181716152324252627282930961.31 MEET EX. TC961.19 MEET EX. TC959.3 G959.1 G958.9 G957.3 G958.3 G958.3 G959.4 G959.5 G960.5 G960.1 G960.9 G961.5 G945.6 G946.0 G946.6 G947.2 G947.9 G948.5 G948.6 G950.3 G951.3 G953.9 G952.4 G951.2 G950.5 G951.2 G950.2 G949.2 G950.0 G950.7 G948.74 TC948.22 TC946.53 TC946.83 TC947.10 TC948.08 TC948.08 TC948.67 TC948.71 TC948.71 TC950.60 TC950.60 TC951.23 TC951.23 TC951.90 TC951.90 TC954.43 TC953.99 TC953.2 G954.90 P960.67 MEET EX. TC960.27 MEET EX. TC959.40 MEET EX. TC959.87 MEET EX. TC960.03 MEET EX. TC960.46 MEET EX. TC961.00 MEET EX. TC961.07 MEET EX. TC962.05 MEET EX. TC962.71 MEET EX. TC963.00 MEET EX. TC963.08 MEET EX. TC963.81 MEET EX. TC951.7 G949.97 TC950.8 G949.34 TC949.34 TC949.97 TC950.3 G950.0 G951.7 G952.3 G960.97 TC957.4 G947.56 TC960.49 MEET EX. TC961.06 MEET EX. TC947.79 TC947.79 TC964.33 MEET EX. P964.28 MEET EX. PEX. BLDGFSG=950.9FSG=950.5FSG=951.0FSG=951.9FSG=951.9FSG=952.5FSG=953.4FSG=955.1FSG=954.1FSG=952.1FSG=951.4FSG=950.8FSG=950.2FSG=949.5FSG=948.9FSG=948.3FSG=961.3FSG=960.9FSG=960.7FSG=960.4FSG=960.3FSG=960.6FSG=960.9FSG=961.3FSG=962.9FSG=963.2FSG=963.5FSG=964.0968.7 T/WALL962.2 B/WALL964.5 T/WALL963.6 B/WALL960950950955
1.4%1.3%
1.2%
1.4%
1.3%
1.2%
1.4%
3.2%
5.3%
5.8%
4.9%
5.0%
7.1%
6.2%
6.6%
8.0%1.6%0.9%0.9%4.6%2.1%1.8%0.5%1.7%
2.6%1.9%2.9%2.7%SANITARY ACCESS ROUTESANITARYACCESS ROUTEPOND ACCESS ROUTETS = 960.31TS = 960.39TS = 960.91TS =961.11TS = 962.06TS = 960.21TS = 961.61TS = 962.15TS = 962.03TS = 963.23TS = 963.56TS = 963.65TS = 964.14TS = 964.43TS = 964.80958.13 MEET EX. P957.85 MEET EX. P958.05 MEET EX. P964.11 TW964.17 TW958.13 TW958.24 TW7.5%PROPOSED INFILTRATION BASINREQ. VOLUME = 4.34 AC-FTPROV. VOLUME = 5.04 AC-FTNWL = 934.00HWL = 941.94SNOW HWL = 941.13BOTTOM ELEV = 935.00NURP BOTTOM ELEV = 924.00TRANSITION FROMTYPE S C&G TO B6.187.5%962.37 TWOVERFLOWSPILLWAY 942.0 GINSTALL ADA TRAIL APRONPER MNDOT SPECIFICATIONLANDINGLANDINGTRAIL CONNECTION SHALL BE CONSTRUCTED IN ACCORDANCEWITH THE MNDOT BICYCLE FACILITY DESIGN MANUAL959.50 TW959.57 TW960960955962.27 TWLEGENDSANITARY ACCESS ROUTE1" = ' (HORIZONTAL)''4080400REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS21DETAILEDGRADINGPLANC7.2DETAIL GRADING - SOUTHWESTNOTE:1.CONTRACTOR SHALL PROTECT THESURROUNDING VEGETATION DURING THECONSTRUCTION OF THE TRAILCONNECTION TO ERICKSON PARK. IN THEEVENT THAT IT IS NECESSARY TO IMPACTTHE VEGETATION SURROUNDING THEPATH, THE CONTRACTOR SHALL NOTIFYTHE OWNER AND ENGINEER PRIOR TO ANYDEMOLITION.
XXX XXSDDDDDDDG DWSOWSODDTVTVTVTVTVTVTVTVTVTV TV TV TV TV
39957.84 MEET EX. TC958.31 MEET EX. TC958.83 MEET EX. TC959.39 MEET EX. TC960.02 MEET EX. TC956.2 G956.1 G956.8 GBR
A
Z
I
L
A
V
E
N
U
E 139TH STREET W.BRIANBORU AVENUEBREMEN AVENUE 36353738959.4 G959.1 G959.0 G960.4 G957.7 G958.0 G957.8 G960.60 MEET EX. TC960965970975976.90 MEET EX. TC976.95 MEET EX. TCPROP.STORMSHELTERFF = 962.0961.00 MEET EX. P961.45 MEET EX. PPROPOSEDMAINTENANCE SHEDF.F = 962.50FSG=959.2FSG=959.6FSG=959.6FSG=960.1FSG=960.53.6%3.0%1.3%0.9%0.8%TS = 961.91TS = 962.53TS = 963.06TS = 963.20TS = 963.51TS = 960.51TS = 959.50TS = 955.32TS = 955.17TS = 955.06957.11 MEET EX. P957.14 MEET EX. P959.37 MEET EX. P959.50 MEET EX. P1.5%SANITARYACCESS ROUTE961.5 G961.45 G962964 961.85 TW961.90 TW961.98 TW961.17 G960.89 MEET EX. TC960.89 MEET EX. TC962.50 P962.50 P961.98 TW961.30 PSEE RIGHT FOR CDSDETAILED GRADING961.38 P961.55 P961.47 P961.82 TW961.96 TW961.8 GDTVTV960959.30 MEET EX. P959.06 MEET EX. P958.47 MEET EX. P958.02 MEET EX. P957.11 MEET EX. P958.07 MEET EX. P957.49 MEET EX. P957.82 MEET EX. P957.53 MEET EX. P957.43 MEET EX. PDEP. C&G958.66 MEET EX. P957.14 MEET EX. P959.35 MEET EX. P959.50 MEET EX. PINSTALL B6-12 C&G AROUNDEX. CDS PAVEMENT. MATCHEXISTING DRAINAGELEGENDSANITARY ACCESS ROUTE1" = ' (HORIZONTAL)''4080400REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS22DETAILEDGRADINGPLANC7.3DETAIL GRADING - SOUTHEASTCDS INTERSECTION DETAILNOTES:1.CONTRACTOR SHALL PROVIDE POSITIVEDRAINAGE AROUND THE PROPOSED STORMSHELTER
D
S
D
D
D
GM
EM
AC
EMGM
AC
EM
GM
T
T
TT
E
E
TTTS
S
S
S
S
S
S
S
D
D
D
D
D
D
D
D
D
D
D
D
S
S SWWWWWWWWWWWWWWW
WWWWWWWWD
D
S
WSO
WSO
D
D
WD
D EEE E E E
E E
E E
EEETV TV TV TV
E E
E E EEEEEETV TVTVTXXD
D
D
D
D
D
D
D
D
D
D
D
IP
IP
IP
IP
34
33
3936353738
31
32
1
2
3
4
5
6
7
8
9
10
11
12
13
14
22
21
20
19
18
17
16
15
23 24 25
26
27
28
29
30
IP
IP
950
955
960970
950955960950
955
960
960
965
960
965955 IP
IP
IP IP
IP
IP
IP
IP
IP
IP IP IP
925
930
935
940
945
PROPOSED
INFILTRATION BASIN
IP
XXXX
EROSION CONTROL
BLANKET (TYP.)
EROSION CONTROL
BLANKET (TYP.)
TEMPORARY
CONSTRUCTION
ENTRANCE
TREE PROTECTION
FENCE (TYP.)
INSTALL SILT FENCE
AT TOE OF SLOPE
IMMEDIATELY AFTER
GRADING SLOPE
RIPRAP AT
FES (TYP.)
CONCRETE
WASHOUT
INSTALL SILT FENCE WITH J HOOKS
AT TOE OF SLOPE IMMEDIATELY
AFTER GRADING SLOPE
CONCRETE
WASHOUT
INLET PROTECTION
(TYP)
SILT FENCE (TYP.)
SILT FENCE (TYP)
SILT FENCE (TYP.)
SEDIMENT LOG (TYP)
SEDIMENT LOG (TYP)
SEDIMENT LOG (TYP)
SEDIMENT LOG (TYP)
SEDIMENT LOG (TYP)
SILT FENCE (TYP.)
SEDIMENT LOG (TYP)
RIPRAP AT
FES (TYP.)
INLET PROTECTION
(TYP)
EROSION CONTROL
BLANKET (TYP.)
RIPRAP AT
FES (TYP.)
SILT FENCE
EROSION CONTROL BLANKET
INLET PROTECTION
FILTER BASKET
SEDIMENT LOG
RIPRAP
SESC LEGEND
TREE PROTECTION FENCE
CONCRETE WASHOUT
TEMPORARY
CONSTRUCTION ENTRANCE
IP
X
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
CP 2020-12
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
1" = ' (HORIZONTAL)
''
80
160800
23
EROSION
CONTROL
PLAN
C8.0
DSSBURGUNDY AVENUE 123456CONNEMARA TRAIL W.950955960965970 975965965955960EROSION CONTROLBLANKET (TYP.)INSTALL SILT FENCE AT TOEOF SLOPE IMMEDIATELYAFTER GRADING SLOPETREE PROTECTIONFENCE (TYP.)SEDIMENT LOG (TYP)DDDBRIANBORU AVENUEIP
SILT FENCE (TYP.)INLET PROTECTION (TYP.)SEDIMENT LOG (TYP)SILT FENCEEROSION CONTROL BLANKETINLET PROTECTIONFILTER BASKETSEDIMENT LOGRIPRAPSESC LEGENDTREE PROTECTION FENCECONCRETE WASHOUTTEMPORARYCONSTRUCTION ENTRANCEIPX1" = ' (HORIZONTAL)''4080400REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS24DETAILEDEROSIONCONTROL PLANC8.1DETAIL SOIL EROSION ANDSEDIMENT CONTROL -NORTHWESTDETAIL SOIL EROSION ANDSEDIMENT CONTROL-NORTHEAST
GMEMACEMGMACEMGMDDDDDDDDDTVTV3433DDDDDDDBUNRATTY AVENUEBURGUNDY AVENUEUPPER 138TH ST. W.3132789101112131422212019181716152324252627282930IPIPIPIPIPIPIPIPXXXXXXXXXPROPOSEDINFILTRATIONBASIN925930 935 940 945
965
965965970
95095
0
950955960950
955950955960960945 955955960950950955INSTALL SILT FENCE AT TOPOF SLOPE IMMEDIATEDLYAFTER GRADING SLOPESEDIMENT LOG (TYP.)TREE PROTECTIONFENCE (TYP.)EROSIONCONTROLBLANKET(TYP.)INLET PROTECTION (TYP.)TEMPORARYCONSTRUCTIONENTRANCE (TYP.)CONCRETEWASHOUTTREE PROTECTIONFENCE (TYP.)SEDIMENT LOG (TYP)SEDIMENT LOG (TYP)SEDIMENT LOG (TYP)EROSIONCONTROLBLANKET(TYP.)RIPRAP ATFES (TYP.)SILT FENCEEROSION CONTROL BLANKETINLET PROTECTIONFILTER BASKETSEDIMENT LOGRIPRAPSESC LEGENDTREE PROTECTION FENCECONCRETE WASHOUTTEMPORARYCONSTRUCTION ENTRANCEIPX1" = ' (HORIZONTAL)''4080400REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS25DETAILEDEROSIONCONTROL PLANC8.2DETAIL SOIL EROSION ANDSEDIMENT CONTROL - SOUTHWEST
DDG DWSOWSODDTVTVTVTVTVTVTVTVTVTV TV TV TV TV
39XXX XXDDDDD139TH STREET W.BRIANBORU AVENUE
BREMEN AVENUE 36353738960965970975IPIPIPIPIPIPIPIPIPIPSILT FENCE (TYP.)TREE PROTECTIONFENCE (TYP.)SILT FENCE (TYP.)SILT FENCE (TYP.)INLET PROTECTION(TYP.)INLET PROTECTION(TYP.)INLET PROTECTION(TYP.)BR
A
Z
I
L
A
V
E
N
U
E CONCRETEWASHOUTSEDIMENT LOG (TYP)SEDIMENTLOG (TYP)RIPRAP AT FES (TYP)SILT FENCEEROSION CONTROL BLANKETINLET PROTECTIONFILTER BASKETSEDIMENT LOGRIPRAPSESC LEGENDTREE PROTECTION FENCECONCRETE WASHOUTTEMPORARYCONSTRUCTION ENTRANCEIPX1" = ' (HORIZONTAL)''4080400REVISIONSTHIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OFCAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BEREPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROMCAGE ENGINEERING, INC.SHEET NUMBERPROJ NO:ENG :DATE : SHEET TITLEOF323110 WOODCREEK DRIVE
DOWNERS GROVE, IL 60515
P: 630.598.0007
WWW.CAGECIVIL.COMCAGE
CIVIL ENGINEERING05/15/20 REVISED PER CITYCOMMENTSROSEMOUNT WOODS
EXPANSION
13925 BUNRATTY AVE
ROSEMOUNT, MNAMS03-11-2020190087CP 2020-1206/01/20 REVISED PER CITYCOMMENTS06/16/20 REVISED PER CITYCOMMENTS06/19/20 REVISED PER CITYCOMMENTS06/24/20 REVISED PER CITYCOMMENTS07/02/20 REVISED PER CITYCOMMENTS26DETAILEDEROSIONCONTROL PLANC8.3DETAIL SOIL EROSION AND SEDIMENT CONTROL - SOUTHEAST
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
Scale:
SLOPE TRACKING DETAIL
NOT TO SCALE
Scale:
TEMPORARY CONSTRUCTION ENTRANCE DETAIL
NOT TO SCALE
Scale:
SEDIMENT LOG DETAIL
NOT TO SCALE
Scale:
INLET PROTECTION DETAIL
NOT TO SCALE 27
EROSION
CONTROL
DETAILS
C8.4
Scale:
SILT FENCE J-HOOK DETAIL
NOT TO SCALE
Scale:
SILT FENCE DETAIL
NOT TO SCALE
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
Scale:
STANDARD MANHOLE FOR SANITARY SEWER
NOT TO SCALEScale:
RIPRAP DETAIL
NOT TO SCALE
Scale:
TYPICAL SERVICE CONNECTIONS FOR SANITARY SEWER
NOT TO SCALEScale:
TYPICAL HYDRANT INSTALLATION
NOT TO SCALEScale:
FES SHEET PILING
NOT TO SCALE
Scale:
PRECAST COVER DETAIL
NOT TO SCALE
28
CONSTRUCTION
DETAILS
C9.0
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
Scale:
TYPICAL WATER SERVICE
NOT TO SCALE
Scale:
STANDARD MANHOLE FOR STORM DRAIN
NOT TO SCALEScale:
ENVIRONMENTAL CATCH BASIN DETAIL
NOT TO SCALE
Scale:
PERMANENT BARRICADE DETAIL
NOT TO SCALE
*OR APPROVED EQUAL*
Scale:
PEDESTRIAN CURB DETAIL
NOT TO SCALE
Scale:
TRAFFIC SIGN DETAIL
NOT TO SCALE 29
CONSTRUCTION
DETAILS
C9.1
WIDTH PER PLANS
X X X X4"2"2"
FINISHED
GRADE
COMPACTED SUBGRADE
SUB-BASE GRANULAR MATERIAL, TYPE B
6 X 6 - W1.4 X W1.4 WWM @ MIDPOINT
OF CONCRETE THICKNESS
P.C. CONCRETE SIDEWALK
LIGHT BROOM FINISH
SLOPE (2% MAX.)
XXX
EXPANSION JOINT CONTRACTION JOINT
4" P.C. CONCRETE
SIDEWALK
SUB-BASE GRANULAR
MATERIAL, TYPE B, 2"
1/8"1"TOOLED JOINT
6 X 6 - W1.4 X W1.4 WWM @ MIDPOINT
OF CONCRETE THICKNESS
4"2"HOT POURED
JOINT SEALER
PREFORMED FLEXIBLE
FOAM JOINT FILLER
1/2"
1.PROVIDE EXPANSION JOINTS AT 30'-0" O.C. MAXIMUM AND AT
INTERSECTION WITH STRUCTURES AND ABRUPT CHANGES.
2.PROVIDE CONTRACTION JOINTS AT 5' INTERVALS OR AS
NOTED ON PLANS OR SHOWN IN DETAILS.
= 936.0INV=935.0INV=935.65
BASIN CROSS SECTION
FINISHED
GRADE
EXISTING SOIL
MNDOT GRADE 2 COMPOST, PER
MINNESOTA STORM WATER MANUAL
12" OR MINIMUM
REQUIRED DEPTH
OUTLINE IN SOIL
AMENDMENT PLAN
ON SHEET C0.1
WIDTH PER PLANS3"6"2 FT
FINISHED
GRADECOMPACTED SUBGRADE
6" CLASS 5 AGGREGATE BASE
3" TYPE LV4 WEARING COURSE MIXTURE
(LVWE 45030). EDGES TAMPED AT 45 DEGREES
SLOPE (2% MAX.)2 FT
CLASS 5 AGGREGATE,
TURF SHOULDER, OR
CONCRETE SHOULDERCLASS 5 AGGREGATE,
TURF SHOULDER, OR
CONCRETE SHOULDER
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
CP 2020-12
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
30
CONSTRUCTION
DETAILS
C9.2
Scale:
CONSERVATION EASEMENT MOMUMENT
NOT TO SCALE
Scale:
BIKE TRAIL DETAIL
NOT TO SCALE
Scale:
SIDEWALK JOINT DETAIL
NOT TO SCALE
Scale:
TRENCH BACKFILL DETAIL
NOT TO SCALE
Scale:
TRENCH BACKFILL DETAIL
NOT TO SCALE
Scale:
AMMENDED BASIN BOTTOM CROSS SECTION
NOT TO SCALE
Scale:
CONCRETE CURB AND GUTTER
NOT TO SCALE
Scale:
SIDEWALK DETAIL
NOT TO SCALE
B6.12
C&G
24" SELECT
GRANULAR
BORROW
6" CLASS 5
AGGREGATE
BASE
2" TYPE SP 12.5
WEAR COURSE MIX
SPWEB240C
2357 BITUMINOUS
TACK COAT
2" TYPE SP 12.5
NON-WEAR COURSE
MIX SPNWB230CTYPE S
C&G
PROPOSED WM
PROPOSED
SAN SEWER7.5' MIN24" SELECT
GRANULAR
BORROW6" CLASS 5
AGGREGATE
BASE
2" TYPE SP 12.5
WEAR COURSE MIX
SPWEB240C
2357 BITUMINOUS
TACK COAT
2" TYPE SP 12.5
NON-WEAR COURSE
MIX SPNWB230C
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
Scale:
BRAZIL AVE ROADWAY CROSS SECTION
NOT TO SCALE 31
CONSTRUCTION
DETAILS
C9.3
Scale:
BURGUNDY AVE ROADWAY CROSS SECTION
NOT TO SCALE
Scale:
SURMOUNTABLE CURB & GUTTER AT CATCH BASIN DETAIL
NOT TO SCALE
Scale:
TYPICAL RESIDENTIAL DRIVEWAY DETAIL
NOT TO SCALE
= 936.0
INV=935.0
INV=935.65
10'
4
:
1
EMERGENCY SPILLWAY
942.0 G
TOP OF BERM = 946.3 G
4:1EXISTING GROUND
SURFACE
PROPOSED NURP POND
BOTTOM = 924.0
INSTALL BASIN LINER WITHIN
PROPOSED NURP BASIN PER
CITY OF ROSEMOUNT
ENGINEERING GUIDELINES
OUTLET STRUCTURE,
SEE SKIMMER DETAIL
100YR SNOW HWL = 941.10
3
:
1 3:110'
NWL = 934.0
INFLOW
OUTFLOW
100YR HWL = 941.94
REVISIONS
THIS DESIGN AND THESE DRAWINGS ARE THE PROPERTY OF
CAGE ENGINEERING, INC. NO PART OF THIS WORK MAY BE
REPRODUCED WITHOUT PRIOR WRITTEN PERMISSION FROM
CAGE ENGINEERING, INC.
SHEET NUMBER
PROJ NO:
ENG :
DATE :
SHEET TITLE
OF 323110 WOODCREEK DRIVEDOWNERS GROVE, IL 60515P: 630.598.0007WWW.CAGECIVIL.COMCAGECIVIL ENGINEERING05/15/20 REVISED PER CITY
COMMENTS
ROSEMOUNT WOODSEXPANSION13925 BUNRATTY AVEROSEMOUNT, MNAMS
03-11-2020
190087
CP 2020-12
06/01/20 REVISED PER CITY
COMMENTS
06/16/20 REVISED PER CITY
COMMENTS
06/19/20 REVISED PER CITY
COMMENTS
06/24/20 REVISED PER CITY
COMMENTS
07/02/20 REVISED PER CITY
COMMENTS
Scale:
DROP MANHOLE DETAIL
NOT TO SCALE 32
CONSTRUCTION
DETAILS
C9.4
Scale:
STRUCTURE MARKER SIGN DETAIL
NOT TO SCALEScale:
STREET RADIUS CURB AND GUTTER DETAIL
NOT TO SCALE Scale:
SKIMMER STRUCTURE DETAIL
NOT TO SCALE
Scale:
PROPOSED INFILTRATION BASIN CROSS SECTION DETAIL
NOT TO SCALE
WWWWW
W
DSDDDGMEMACEMGMACEMGMTTTTTTEEE
T T T T XSSSSSSSSSDDDDDDDDDDDXSSSW W W W W WWWWWWW W W W
WWWWWWWWWWWWWWWWWW
DX
X
XXXXDSW
SOWSODDWWDD EEEEEEEEEEEEEEEEEEEEEEEEE E E E E E
E EETWWWWW
W
W W W
W W
SSSSW W W W W
W W
W W W W W WWWWXX XSSWSSSDDDDDDDDDSWWD
DDBURGUNDY AVE.UPPER 138TH STREETCONNEMARA TRAIL W.S. ROBERT TRAIL
BUNRATTY AVE.
B
R
A
Z
I
L
A
V
E
N
U
E 139TH STREET W.BRIANBORU AVENUE
TITLESHEET23217 PLANTINGPROJECT NO.FILE NAMEDRAWN BYDESIGNED BYREVIEWED BYORIGINAL ISSUE DATECLIENT PROJECT NO.BYDESCRIPTIONREVISION SCHEDULEDATEPROJECTWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,XX-XX SHEET TITLE 300 PROJ. NO (no year) XX-XXMWBR-JF03/11/2020PROJ. NOL-1OVERALLLANDSCAPE PLAN0SCALE IN FEET60120ROSEMOUNTWOODSEXPANSION1.ALL PAVING (ASPHALT DRIVE AISLES AND PARKING LOT, CONCRETE SIDEWALKS, CURBS,ETC.) PER CIVIL ENGINEER.2.ALL RETAINING WALLS PER CIVIL ENGINEER.GENERAL NOTES:1.LOCATE ALL UTILITIES PRIOR TO CONSTRUCTION. REPORT ANY DISCREPANCIES TOOWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION.2.PROTECT ALL LANDSCAPE MATERIAL NOT NOTED TO BE REMOVED. IF ANY LANDSCAPEMATERIAL IS DAMAGED DURING CONSTRUCTION, REPLACE IN KIND.3.REMOVE ALL CONSTRUCTION DEBRIS AND MATERIALS INJURIOUS TO PLANT GROWTH FROMPLANTING PITS AND BEDS PRIOR TO BACKFILLING WITH PLANTING MIX.4.LAWN AREAS SHALL HAVE 6" MINIMUM DEPTH OF TOPSOIL. TOPSOIL SHALL BE COMPACTEDTO 85% MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT.5.FIELD STAKE PLANTINGS ACCORDING TO PLAN. OWNER'S REPRESENTATIVE SHALLAPPROVE ALL PLANT LOCATIONS PRIOR TO INSTALLATION. OWNER RESERVES THE RIGHTTO REVISE PLANTING LAYOUT AT TIME OF INSTALLATION.6.ALL PLANT MATERIALS SHALL BE TRUE TO THEIR SCIENTIFIC NAME AND SIZE AS INDICATEDIN THE PLANT SCHEDULE.7.IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE PLANTINGPLAN AND THE NUMBER OF PLANTS IN THE SCHEDULE, THE PLANTING PLAN SHALL GOVERN.8.OWNER RESERVES THE RIGHT TO REVISE QUANTITIES FOR CONSTRUCTION BUDGETBALANCING. CONTRACTOR'S UNIT BID PRICES SHALL HOLD TRUE FOR ANY CHANGES INQUANTITIES.9.ANY PROPOSED SUBSTITUTIONS OF PLANT SPECIES REQUIRE WRITTEN APPROVAL OF THEOWNER'S REPRESENTATIVE AND OWNER.10.ALL PLANT MATERIALS MUST CONFORM TO AMERICAN STANDARDS FOR NURSERY STOCK(A.N.S.I.), LATEST EDITION PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN,WASHINGTON D.C. LARGER SIZED PLANT MATERIALS OF THE SPECIES LISTED MAY BE USEDIF THE STOCK CONFORMS TO A.N.S.I.11.ALL PLANT MATERIAL SHALL BE GUARANTEED TO BE IN A LIVE AND HEALTHY GROWINGCONDITION FOR ONE FULL GROWING SEASON (ONE YEAR) AFTER FINAL PROJECTACCEPTANCE. ALL DEAD DISEASED SHALL BE REPLACED FREE OF CHARGE WITH THE SAMEGRADE AND SPECIES.12.SPADED EDGE TO BE PLACED AROUND AROUND ALL PLANTING BEDS THAT ABUT TURFAREAS UNLESS OTHERWISE NOTED ON PLANS.13.ANY LANDSCAPE AREAS DISTURBED BY CONSTRUCTION RELATED ACTIVITIES NOTINDICATED ON REMOVAL PLANS SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NOCOST TO THE OWNER. OWNER'S REPRESENTATIVE TO APPROVE ALL REPLACEMENTLANDSCAPING.14.ALL PLANTING BEDS AND TREE RINGS TO RECEIVE 3" SHREDDED HARDWOOD MULCHUNLESS OTHERWISE SHOWN ON PLANS. MULCH IS INCIDENTAL TO PLANTING.15.ALL LANDSCAPE BEDS TO BE SPADE EDGE UNLESS OTHERWISE CALLED OUT ON PLAN.16.CONFIRM PEA ROCK AND 6" TIMBER EDGING PRODUCT TYPE WITH OWNER BEFOREPURCHASING PRODUCT.LANDSCAPING NOTESPLANTING ENLARGEMENT 1PLANTING ENLARGEMENT 2PLANTING ENLARGEMENT 5PLANTING ENLARGEMENT 3PLANTING ENLARGEMENT 45/15/20CITY COMMENTSMWCP 2020-123/11/20FINAL LANDSCAPE PLANBR
TTTTTTTTT T TTTEEEEE
EEXXXSSSSDXXXWWWWWW W W W W W W W
WWWWWWEEEEEEEEEEEEEEEEW W W SSBURGUNDY AVE.CONNEMARA TRAIL W.S. ROBERT TRAIL QB - (2)LIMITS OFDISTURBANCE-SEE CIVIL, TYP.(2) UP(2) UP(3) UPQB - (1)BN - (3)BP - (4)BP - (4)BP - (3)PW - (5)PW - (3)PW - (9)PW - (3)BUILDINGAREA, TYP.WWWWWWWWWW W WSSSWWWWWWD
DWWWEEEEEEE
E E E E EEE
SDDD139TH STREET W.BRIANBORU AVENUE
(5) - CP(1) - QBLIMITS OFDISTURBANCE-SEE CIVIL, TYP.BUILDINGAREA,TYP.SOD/SEEDQTYCOMMON / BOTANICAL NAME285,000SFMN-DOT Seed Mix '25-131' - Low Maintenance Turf40,500SFMN-DOT Seed Mix '33-261' - Stormwater South & WestGROUNDCOVERBSCHEDULETREESQTYCOMMON / BOTANICAL NAMESIZEROOT29River Birch Multi-TrunkBetula nigra2" CALB & B40Paper BirchBetula papyrifera2" CALB & B15Prairie Sentinel HackberryCeltis occidentalis `Prairie Sentinel`2.5" CALB & B61White PinePinus alba2.5" CALB & B21Swamp White OakQuercus bicolor2.5" Cal.B & B37American ElmUlmus americana `Princeton`2.5" CALB & BSHRUBSQTYCOMMON / BOTANICAL NAMESIZEROOT63Bud`s Yellow DogwoodCornus alba `Bud`s Yellow`5 GALCONTPLANT SCHEDULE(8) PWWWWWWWWWE E E E E E E E
XXXX XXDLIMITS OFDISTURBANCE-SEE CIVIL, TYP.PROPOSEDMAINTENANCESHED(5) CBSPADEEDGE, TYP.(6) PWG WWWWWWWWWXWSOWSOWEEEEEEE
TTT WWWWW
W LIMITS OFDISTURBANCE-SEE CIVIL, TYP.STORMSHELTER(6) CBINSTALL SHRUBS ONUPHILL SIDE OFPROPOSED DRAINAGESWALE. DO NOT IMPEDEON EXISTING FENCE.SPADE EDGE, TYP.TITLESHEET23217 PLANTINGPROJECT NO.FILE NAMEDRAWN BYDESIGNED BYREVIEWED BYORIGINAL ISSUE DATECLIENT PROJECT NO.BYDESCRIPTIONREVISION SCHEDULEDATEPROJECTWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,XX-XX SHEET TITLE 300 PROJ. NO (no year) XX-XX-PROJ. NOPLANTING ENLARGEMENT 1PLANTING ENLARGEMENT 2PLANTINGENLARGEMENTPLANNOTE: LANDSCAPE SCHEDULES INCLUDE TOTALS FOR ALL PLANTING, NOT SOLELYPLANTINGS SHOWN ON THIS SHEET.L-2PLANTING ENLARGEMENT 3PLANTING ENLARGEMENT 4MWBRJF03/11/2020ROSEMOUNTWOODSEXPANSION5/15/20CITY COMMENTSMWCP 2020-123/11/20FINAL LANDSCAPE PLANBR0SCALE IN FEET3060
(43) CB(9) CBW W
GMEMACEMGMACEMGMT
T T T T T T T T SSSSDDDDWWW W W W W W W WDEEEE
EW W W W W W
W
W
W
W
W
W
W W W W W W W
SSSSW W W W W W W W W W
WW W W
W
W W W W W W W W W WWWWWWWWWSSDDDDDDSDUPPER 138TH STREETBUNRATTY AVE.(1) - QB(5) - BP(2) - QB(6) - BN(2) - BN(1) - CP(1) - UP(5) - BP(4) - UP(5) - UP(5) - UP(2) - CP(4) - BP(1) - CP(2) - BP(2) - QB(1) - QB(4) - BP(1) - BP(1) - QB(3) - BP(1) - BP(4) - QB(1) QB(2) PW(4) PW(9) PWSTORMWATERMANAGEMENTAREA(SEE CIVIL)LIMITS OFDISTURBANCE-SEE CIVIL, TYP.LIMITS OFDISTURBANCE-SEE CIVIL, TYP.(12) BNUP - (15)QB - (3)QB - (1)QB - (1)CP - (2)CP - (2)CP - (1)BP - (3)BP - (1)CP - (1)PW - (3)BN - (3)PW - (9)PROPOSEDMAILBOXRELOCATIONBUILDINGAREA, TYP.SOD/SEEDQTYCOMMON / BOTANICAL NAME285,000SFMN-DOT Seed Mix '25-131' - Low Maintenance Turf40,500SFMN-DOT Seed Mix '33-261' - Stormwater South & WestGROUNDCOVERBSCHEDULETREESQTYCOMMON / BOTANICAL NAMESIZEROOT29River Birch Multi-TrunkBetula nigra2" CALB & B40Paper BirchBetula papyrifera2" CALB & B15Prairie Sentinel HackberryCeltis occidentalis `Prairie Sentinel`2.5" CALB & B61White PinePinus alba2.5" CALB & B21Swamp White OakQuercus bicolor2.5" Cal.B & B37American ElmUlmus americana `Princeton`2.5" CALB & BSHRUBSQTYCOMMON / BOTANICAL NAMESIZEROOT63Bud`s Yellow DogwoodCornus alba `Bud`s Yellow`5 GALCONTPLANT SCHEDULETITLESHEET23217 PLANTINGPROJECT NO.FILE NAMEDRAWN BYDESIGNED BYREVIEWED BYORIGINAL ISSUE DATECLIENT PROJECT NO.BYDESCRIPTIONREVISION SCHEDULEDATEPROJECTWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,XX-XX SHEET TITLE 300 PROJ. NO (no year) XX-XX-PROJ. NOL-3PLANTINGENLARGEMENTPLANPLANTING ENLARGEMENT 5NOTE: LANDSCAPE SCHEDULES INCLUDE TOTALS FOR ALL PLANTING, NOT SOLELYPLANTINGS SHOWN ON THIS SHEET.MWBRJF03/11/2020ROSEMOUNTWOODSEXPANSION5/15/20CITY COMMENTSMWCP 2020-123/11/20FINAL LANDSCAPE PLANBR0SCALE IN FEET3060
TITLESHEET23217 PLANTINGPROJECT NO.FILE NAMEDRAWN BYDESIGNED BYREVIEWED BYORIGINAL ISSUE DATECLIENT PROJECT NO.BYDESCRIPTIONREVISION SCHEDULEDATEPROJECTWITHOUT PRIOR WRITTEN CONSENT.INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,XX-XX SHEET TITLE 300 PROJ. NO (no year) XX-XX-PROJ. NOL-4PLANTINGDETAILSSHRUB PLANTING DETAILSCALE: 1" = 1'-0"BACKFILL PLANTING PIT PER SHRUB PLANTINGSPECIFICATIONS WHEN PROVIDED, OR WITH NATIVESOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDEDTOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOILEXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THEDEPTH OF THE ROOTBALL / CONTAINER MINUS 3" ANDA MINIMUM TWICE THE DIAMETER OF THE ROOTBALL/ CONTAINER - TILL ALL PLANTING BEDS TO AMINIMUM DEPTH OF 6" THROUGHOUTPLACE ROOTBALL ON UNDISTURBED SOIL ANDENSURE PLANT IS PLUMBALL PLANTS TO BE INSTALLED SO THAT THE TOP OFTHE CROWN OF THE PLANT IS SLIGHTLY ABOVEFINISH GRADE 3"ROOTBALL DIA1.5 X ROOTBALL DIADEPTH OFROOTBALLCUT AND REMOVE AT MINIMUM THE TOP HALF OFWIRE BASKETS, BURLAP AND/OR TWINE, OR ENTIRECONTAINER, AND REMOVE FROM THE PLANTING PIT,SCARIFY ROOTS FOR ALL CONTAINERIZED PLANTS 5GALLONS FOR SMALLERCONTAINER DIA1.5 X CONTAINER DIA3" LAYER OF MULCH, PER PLANS/NOTESPLANPERENNIAL PLANTING DETAILSCALE: 1" = 1'-0"SECTIONSYMMETRICALSPACING1/2 SPECIFIEDPLANT SPACINGRIP AND TILL EXISTING SUBGRADE TO A 6" DEPTHALL PLANTS TO BE INSTALLED SO THAT THE TOP OFTHE CROWN OF THE PLANT IS SLIGHTLY ABOVEFINISH GRADE 3"CUT AND REMOVE THE ENTIRE CONTAINER ANDSCARIFY, AS NECESSARY, ROOTS FOR ALLCONTAINERIZED PLANTS 5 GALLONS OR SMALLEREDGE OF PLANTING BED / GROUND COVER AREAINSTALL PLANTS PER PLANS AND PLANT LISTSPACING - ALL PLANTS SHALL BE EQUALLY SPACEDTO ACHIEVE A SYMMETRICAL LAYOUT FOR BOTHTRIANGULAR AND LINEAR PLANTING SCHEMESSUBGRADE3" LAYER OF MULCH, PER PLANS/NOTESCONIFER / EVERGREEN TREE PLANTING DETAILSCALE: 1" = 1'-0"TIE NYLON STRAP AROUND TRUNK AS SHOWNCUT AND REMOVE AT MINIMUM THE TOP HALF OF WIRE BASKETS,BURLAP AND/OR TWINE AND REMOVE FROM THE PLANTING PIT.AVOID CUTTING OR SCARING ROOTS. ANY ROOTS THAT ARESCARED OR BROKEN DURING PLANTING SHOULD BE CUT CLEANAT 90 DEGREESBACKFILL PLANTING PIT PER TREE PLANTING SPECIFICATIONSWHEN PROVIDED, OR WITH NATIVE SOIL-EXCEPT WHEN IN HEAVYCLAY, MIX AMENDED TOPSOIL FROM A LOCAL SOURCE WITHNATIVE SOILEXCAVATE PLANTING PIT TO A DEPTH EQUAL TO THE DEPTH OFTHE ROOTBALL MINUS 3" AND A MINIMUM TWICE THE DIAMETER OFTHE ROOTBALL3" LAYER OF SHREDDED HARDWOOD MULCH MOUNDED AT EDGETO FORM A SHALLOW SAUCER - DO NOT PLACE MULCH DIRECTLYON TREE TRUNK, LEAVE A MIN. 3" RING AROUND CROWNROOTBALL DIA1.5 X ROOTBALL DIADEPTH OFROOTBALLNEVER CUT PRIMARY LEADERPRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBS ANDBRANCHES IMMEDIATELY AFTER PLANTING - ALL PRUNING CUTSCLEAN AT 90 DEGREESTREES 8'+TREES 6'-8'TOP OF ROOTBALL TO BE SET ABOVE GRADE 3"1/2" WIDE NYLON STRAPPING - COLOR TO BE APPROVED BYLANDSCAPE ARCHITECT*NOTE: DO NOT STAKETREES UNLESSINDICATED.STAKING DIAGRAM,NO STAKING TREES UNDER6'REMOVE AT MINIMUM THE TOP HALF OF WIREBASKETS, BURLAP, TWINE - REMOVE THESE AND ALLNON-BIODEGRADIBLE MATURIALS FROM THEPLANTING PIT. AVOID CUTTING OR SCARING ROOTS.ANY ROOTS THAT ARE SCARED OR BROKEN DURINGPLANTING SHOULD BE CUT CLEAN AT 90 DEGREESBACKFILL PLANTING PIT PER TREE PLANTINGSPECIFICATIONS WHEN PROVIDED, OR WITH NATIVESOIL-EXCEPT WHEN IN HEAVY CLAY, MIX AMENDEDTOPSOIL FROM A LOCAL SOURCE WITH NATIVE SOIL.DO NOT TAMP SOIL, BUT SATURATE WITH WATERTHROUGHOUT BACKFILL PROCESS.EXCAVATE PLANTING PIT TO A DEPTH EQUAL TOTHE DEPTH OF THE ROOTBALL MINUS 3" AND AMINIMUM TWICE THE DIAMETER OF THE ROOTBALL3" LAYER OF SHREDDED HARDWOOD MULCHMOUNDED AT EDGE TO FORM A SHALLOW SAUCER -DO NOT PLACE MULCH WITHIN 3" OF TRUCK. WHEN INPLANT BED, SUBSTITUTE WITH PLANT BED MULCH.ROOTBALL DIA2X ROOTBALL DIADEPTH OFROOTBALLNEVER CUT PRIMARY LEADERPRUNE ALL BROKEN, DAMAGED, OR RUBBING LIMBSAND BRANCHES IMMEDIATELY AFTER PLANTING -ALL PRUNING CUTS CLEAN AT 90 DEGREESTREES 8'+TREES 6'-8'SET ROOT FLAIR ABOVE GRADE 3"WHEN STAKED, ATTACH 1/2" WIDE NYLONSTRAPPING SNUGLY AROUND TRUCK AND, WITHSOME LOOSENESS, TO STAKES AS SHOWNNOTE: * AVOID STAKING UNLESS NECESSARY. * NO STAKING TREES UNDER 6'.STAKING DIAGRAMMUST MAINTAIN TRUNK IN VERTICAL ORIENTATIONTREE PLANTING DETAILNO SCALEUNDISTURBED SOILMWBRJF03/11/2020ROSEMOUNTWOODSEXPANSION5/15/20CITY COMMENTSMW3/11/20FINAL LANDSCAPE PLANBRCP 2020-12SPADE EDGING DETAILSCALE: 1" = 1'-0"PLANTING BED - SOIL PREPARATION PER PLANS& NOTESSUBGRADE - PER PLANS & NOTESSPADE / NATURAL EDGEMULCH - PER PLANS & NOTESLAWN OR GROUND COVERFINISH GRADE