Loading...
HomeMy WebLinkAbout4.c. Bella Vista 7 EXECUTIVE SUMMARY Planning Commission Meeting: July 28, 2020 Tentative City Council Meeting: August 4, 2020 AGENDA ITEM: 20-40-FP Request by Lennar for Final Plat Approval of Bella Vista 7th Addition AGENDA SECTION: Consent PREPARED BY: Kyle Klatt, Senior Planner AGENDA NO. 4.c. ATTACHMENTS: Location Map; Preliminary Plat Area; Final Plat; Updated Construction Plans (Grading, Streets, Details); Autumn Path Connection Detail; Landscape Plan; Parks and Recreation Memo; Engineer Review Memo APPROVED BY: KL RECOMMENDED ACTION: Motion to recommend that the City Council approve the Final Plat for Bella Vista 7th Addition subject to the following conditions: 1. Execution of a Subdivision Agreement. 2. Drainage and utility easements with storm sewer infrastructure may contain fences but shall be required to include gates to provide truck access; shall prohibit sheds or other accessory structures; and shall prohibit landscaping that would impede drainage. 3. The construction plans for 7th Addition shall include the gravel trail in the area north and east of Horseshoe Lake as shown on the grading plans. 4. Lot 19, Block 2 is unbuildable until the future extension of Autumn Path north of the temporary road access is completed and the temporary road across this lot is removed. 5. The City Engineer must approve a final turn-around design for the western terminus of Street A/Almeria Trail. Depending on the final location of the turn-around area, either Lot 1, Block 2, Lot 2, Block 2, or both will be deemed unbuildable until the road is extended into the property to the west. 6. The final plat shall include all easements as requested by City. 7. Provision of $44,880 for landscaping surety. 8. Payment of $3,300 for landscaping to be installed on Lot 19, Block 2 after removal of the temporary road connection into Bella Vista 7th Addition. 9. Payment of $88,400 for Fee-In-Lieu of Park Dedication. 10. Plans submitted with the building permits for custom grading of lots in the western portion of the subdivision are subject to review and approval by the City Engineer. 11. The construction plans shall be updated to include a temporary sidewalk or trail connection to Autumn Path through Lot 19, Block 2 in a location satisfactory to the City Engineer. 12. Compliance with the conditions and standards within the City Engineer’s Memorandum dated July 28, 2020. 2 SUMMARY Applicant: Lennar Corporation Comp. Guide Plan Designation: LDR – Low Density Residential Current Zoning: R-1, Low Density Residential with the Bella Vista Planned Unit Development (R-1: PUD) Gross Area: 10.74 Acres Net Area: 10.74 Acres Lots/Units: 26 Single Family Lots Gross Density: 2.42 units/acre Net (Met Council) Density: 2.42 units/acre The Planning Commission is being asked to consider a request from Lennar Corporation (Lennar) for approval of a Final Plat for Bella Vista 7th Addition to allow development of 26 single family lots. This plat represents the last project phase of a multi-phase preliminary plat first approved by the City in 2013. The final plat is necessary to facilitate subdivision of the subject property into individual residential lots, outlots, and public streets. Staff finds the application consistent with the Bella Vista Preliminary Plat and recommends approval of this application subject to the conditions detailed in the attachments and the motion above. BACKGROUND In July 2013, the City Council approved a preliminary plat, Planned Unit Development (PUD) master development plan with rezoning, and zoning ordinance amendment for the 158 single family lot Bella Vista development. In November 2013, the City approved the first phase of Bella Vista, a 28 lot subdivision named Bella Vista 2nd Addition. The City approved the first half of Phase 2, Bella Vista 3rd Addition in April 2015 and the second half of Phase 2, Bella Vista 4th Addition, in March of 2016. The third phase of Bella Vista (5th Addition) with 41 additional single family lots was platted in the latter portion of 2016. Roughly half of the last phase (Phase 4-south), which included 19 lots, was platted as Bella Vista 6th Addition in early 2019. The lots approved to date represent all portions of the original preliminary plat area that can be developed before Autumn Path is constructed along the eastern boundary of Bella Vista. The City has recently received easements for the portions of Autumn Path outside of Bella Vista (about half of the roadway) as part of the lot spilt to facilitate the neighboring Caramore Crossing development. The City has ordered the improvements to build Autumn Path approximately ½ mile north from its starting point along Bonaire Path West. With the road scheduled for construction this year, the applicant can proceed with the request to final plat the last phase within Bella Vista with access directly on to the newly constructed segment of Autumn Path. ISSUE ANALYSIS Legal Authority . This application is a Quasi-Judicial action. The final plat application is Quasi-Judicial because the City has a set of standards and requirements for reviewing this type of application that is described in detail below. Generally, if the final plat meets the ordinance requirements it must be approved. Land Use and Zoning . The proposed 26-lot single family final plat is consistent with the current land use and zoning classifications. The subject property is guided LDR – Low Density Residential and zoned R-1PUD, Low Density Residential Planned Unit Development. As a result, the property is subject to all the standards of the R-1, Low Density Residential zoning districts as well as the standards for detached single family units contained in the approved PUD. While this development is subject to all of the 3 conditions and development standards contained in the PUD, the most notable deviations from the requirements of the Low Density Residential zoning districts are provided below. All these items were anticipated in the preliminary plat approval and were part of the initial PUD approval. 1. Section 11-4-5 F. 1. R-1 Minimum Lot Area: The minimum lot area shall be 9,250 square feet. 2. Section 11-4-5 F. 2. R-1 Minimum Lot Width: The minimum lot width shall be 75 feet. 3. Section 11-4-5 F. 4. R-1 Minimum Front Yard Setback: The minimum front yard setback shall be 25 feet. 4. Section 11-4-5 F. 5. R-1 Minimum Side Yard Setback: The minimum side yard setback shall be 7.5 feet. 5. Comprehensive Wetland Management Plan Section IX. B. Structural Setback from Wetland Buffers: The structural setback for lots containing wetland buffers shall be a minimum of 20 feet. 6. Section 11-4-5 F. 9. R-1 Maximum Lot Coverage: The maximum lot coverage shall be 40% for lots below 11,250 square feet and 35% for lots between 11,250 and 15,000 square feet. The maximum lot coverage for lots over 15,000 square feet remains at 30%. Final Plat. Standards for reviewing subdivision requests are detailed in Title 12 of the Rosemount City Code. This section of the Code outlines the two-step Preliminary and Final Plat process for land subdivision. In this case, the preliminary plat was approved in July 2013 consisting of 158 single family lots and various outlots. The Bella Vista Final Plat subdivided land to be transferred to the City and future development phases into outlots. The 7th Addition final plat will subdivide Outlot D of Bella Vista into 26 lots, allowing development on most but not all due to temporary access issues. Streets & Access. Bella Vista 7th Addition lies at the northern most portion of the Bella Vista subdivision, and all access into the subject property was planned from a future extension of Autumn Path running north and south between Bella Vista and the adjacent property to the east. All other plat phases accessed internal roads or connected directly to Bacardi Avenue to the west or Bonaire Path to the south. Because Lennar did not secure all the right-of-way necessary to plat Autumn Path in its entirety, the preliminary plat included the following condition of approval: Phase 4N cannot be developed until the entirety of Autumn Path is constructed and the temporary sanitary sewer lift station is installed. Lots 1 and 2, Block 2 are unbuildable until Street G is constructed to the west and the temporary cul-de-sac is removed. The first part of the condition will be addressed this year since the City is proceeding with a project to construct Autumn Path up to the 7th Addition area. Please note that the easements granted to the City stop short of the planned street connection into the proposed subdivision, therefore, the applicant is proposing a temporary street connection that crosses one of the planned residential lots along the road. The temporary road will be designed to meet all City street specifications and will be able to provide full access to the development area until such time that Autumn Path is extended further north. Temporary road easements are needed across the impacted lot, which will not be buildable until the road is relocated to its permanent position to the east of this lot. Staff’s recommendation includes conditions to address the future relocation of the road, and notes that Lot 19, Block 2 of the subdivision will be unbuildable until the relocation occurs. The developer will also need to coordinate with the City on the timing of improvements to ensure that the planned 7th Addition improvements will not adversely affect the City’s Autumn Path road and utility construction project. All lots within Bella Vista 7th Addition will front on to a new east/west street (labeled as “Street A” on the applicant’s plans and to be assigned the name Almeria Trail by the City) connecting back into Autumn Path. The street terminates at the adjacent property boundary to the west but is planned to continue into the adjoining property once it is developed. As noted in the condition referenced above, the applicant is planning to build a temporary cul-de-sac to provide a suitable turn-around at the end of the street until it is 4 extended into the adjacent property. The lots impacted by the cul-de-sac will not be buildable until the road is extended and the cul-de-sac is removed. Water and Sanitary Sewer. Public utilities serving the subdivision will connect into the sanitary sewer line being installed within Autumn Path or the water lines running parallel with the road south of the 7th Addition area. The sewer and water extensions into the proposed subdivision will follow the temporary road alignment and will also need to be relocated when the temporary road connection is removed. The sanitary sewer will flow into the temporary lift station constructed with the 6th Addition. All required securities associated with the future removal of this lift station were addressed with the earlier project phases. Landscaping and Berming . The approved landscape plan (from the preliminary plat submission) is consistent with the minimum number of plantings required by City Code (one per interior lot and two per corner lot). The plan includes 26 boulevard trees, 51 additional boulevard trees used to meet replacement tree requirements, and 70 trees (50 ornamental or evergreen and 20 overstory) along the Autumn Path right-of-way. The additional trees were included in the preliminary landscape plan as part of the required tree replacement for trees removed by the developer during grading activity. The northernmost portion of Autumn Path will not be constructed with the current project because a portion of this right-of-way is located on the adjoining parcel. The overall grading plan takes the future road construction into account, and because all planned trees are outside of the right-of-way, the developer should be able to plant the trees along with the other 7th Addition improvements. The trees planned for Lot 19, Block 2 will be impacted by the temporary street connection and will need to be planted when the future extension of Autumn Path is completed. Staff is recommending that the developer make a payment to the City for any trees that will need to be planted in the future. The trees would then be planted by the City following construction of Autumn Path. At $300 per tree based on the City fee schedule the required landscaping security totals $44,880 (136 trees plus 10%). The cost of the trees and landscaping within Lot 19, Block 2 that will need to be planted in the future totals $3,300 (for 11 trees). Storm Water Management. The proposed storm water management plan will tie into the overall Bella Vista storm water system that has been constructed with previous additions. Some of the storm water will be directed into the ponds immediately south of the project site, while some will be directed into the system within Autumn Path. A small portion of the storm sewer will need to be relocated along with other public infrastructure when the temporary access road is reconfigured with the northernmost extension of Autumn Path. Grading . The grading plans adhere to the overall grading plans for the Bella Vista project. Some of the lots in the western portion of 7th Addition were not graded with the mass grading that took place under previous permits, and the applicant is proposing to come forward with custom grading plans for these lots that would be submitted in conjunction with future building permits. The delay in grading should allow a larger number of existing trees to be preserved in this area. Parks and Open Space. Parks and Recreation staff reviewed the plans for final plat of Bella Vista 7th Addition and found them to be consistent with the previous Bella Vista plans. The park dedication requirement for 26 single family lots is 1.04 acres of land (26 units x .04 acres) or cash in-lieu of land. Because no more land is required for parks within Bella Vista, staff is recommending that the City collect cash in-lieu of land for the 26 units. This amount totals $88,400 (26 units x $3400 per unit). Sidewalks, Trails, and Pathway. The applicant’s plan indicate sidewalks will be placed consistent with the requirements of the preliminary plat. The plans include a sidewalk along the southern side of Street A/ Almeria Trail that will connect to the planned sidewalk along Autumn Path. One of the issues created by 5 the temporary street connection into the subdivision; however, is that the current plans do not provide for a temporary connection to either the sidewalk or trail along Autumn Path. Staff is recommending that the applicant work with staff to include a temporary trail or sidewalk connection through Lot 19, Block 2 that can provide pedestrian access to the Autumn Path sidewalk and trail until the road is extended further north. The Parks and Recreation Director also notes that the developer will need to grade the planned gravel trail around the north end of Horseshoe Lake per the approved grading plan. Engineering Comments. The Project Engineer has reviewed the proposed Bella Vista 7th Addition final plat and has provided comments in the Engineer’s Memo dated July 28, 2020. Notable comments include: the developer will need to pay the full share of its portion of the Autumn Path street construction costs based on the actual construction costs minus any previous payments for the roadway, paying the estimated costs for the removal of the temporary road, and modification to the grading plan to address engineering concerns. Development fees as detailed in the Engineer’s Memo dated July 28, 2020, are due with the final plat and subdivision agreement. CONCLUSION & RECOMMENDATION Staff recommends approval of the Final Plat for Bella Vista 7th Addition creating 26 single family lots. This recommendation is based on the information submitted by the applicant, findings made in this report, and the conditions detailed in the attached memorandums. Dakota County, MN Property Information July 24, 2020 0 875 1,750437.5 ft 0 270 540135 m 1:9,600 Disclaimer: Map and parcel data are believed to be accurate, but accuracy is not guaranteed. This is not a legal document and should not be substituted for a title search,appraisal, survey, or for zoning verification. Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 Phone (952) 937-5150 12701 Whitewater Drive, Suite #300 Fax (952) 937-5822 Minnetonka, MN 55343 Toll Free (888) 937-5150 SKIMMER STRUCTURE ROSEMOUNT 915 920 925 930 935 940 945 950 955 960 915 920 925 930 935 940 945 950 955 960 -4.00% -1.00% 1.00%PVIS:1040+00.00PVIE:939.57END STA:1036+30.00ELEV:946.94PVIS:1037+25.00 PVIE:947.89 AD:5.00 K:29.98 150.00' VC BVCS:1036+50.00BVCE:947.14EVCS:1038+00.00EVCE:944.89HP STA:1036+80.06 HP ELEV:947.29 PVIS:1039+10.71 PVIE:940.46 AD:3.00 K:39.95 120.00' VC BVCS:1038+50.71BVCE:942.86EVCS:1039+70.71EVCE:939.868' MIN. PROPOSED C/L ELEVATION EXISTING C/L ELEVATION PROPOSED C/L PROFILE EXISTING C/L PROFILE 6003STA 1036+00.000.00'RIM=946.6418" PVC C900 SANITARY SEWER INV: 929.59 (S) INV: 929.59 (N) 292' - 8" DI WATERMAIN, CLASS 52 2' STUB WITH PLUG 12" HIGH PRESSURE PIPELINE FUTURE SANITARY SEWER FUTURE SANITARY SEWER FUTURE STORM SEWER FUTURE WATERMAIN FUTURE C/L PROFILE 943.7943.7945.1946.6948.0947.7946.5944.9943.9944.63945.13945.63946.14946.64947.14947.22946.47944.89942.89941.19940.12939.571034+50 1035+00 1035+50 1036+00 1036+50 1037+00 1037+50 1038+00 1038+50 1039+00 1039+50 1040+00 1040+50 1041+00 1041+50 1042+00 18" CLEAR MIN. 4:1 1035+00 1036+00 1037+00 1038+00 1039+0 0 1040+0 0 1035+00 1036+00 1037+00 1038+00 1039+0 0 1040+0 0 PC:1037+82.97MID:1038+36.12PT:1038+89.26ss 6003 s11039943.96misc POTHOLE D=80" S=8"ss1035+00 1036+00 1037+00 1038+00 1039+0 0 1040+0 0GASGASGASGASG A S GA S G A S END AUTUMN PATH STA: 1036+00.00STSTA 1035+57.02, 10.00' LT 8"x45° BEND STA 1035+64.12, 17.18' LT HYDRANT 10'-8" DIP 8" x 6" REDUCER 2' HYDRANT EXTENSION TNFH:948.63 1034+001034+00 937.87 937.87 1034+00 SCALE IN FEET 0 H: 30 60 SCALE IN FEET 0 V: 5 10 WSB PROJECT NO.:REVISIONSNO.DATEDESCRIPTIONK:\013594-000\Cad\Plan\013594-000-C-SSWR_WATR-PLAN.dwg 7/7/2020 8:47:13 AMNR-013594-000 SCALE: PLAN BY: DESIGN BY: CHECK BY: AS SHOWN GMD GMD XXX I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:MONICA HEIL1/31/202047497AUTUMN PATHROSEMOUNT, MINNESOTASANITARY SEWER & WATERMAIN PLANS SHEET OF 41 14R WARNING! HIGH PRESSURE PIPELINE(S) Excavation and Construction Prohibited Without Written Permission From NORTHERN NATURAL GAS EASEMENT 13/26/2020SANITARY PIPE MATERIAL& HYDRANT LOCATIONMATCHLINE STA: 1034+50SEE SHEET 13RAUTUMN PATH LOCATION FUTURE AUTUMN PATH FUTURE AUTUMN PATH 25/26/2020WATERMAIN37/6/2020WATERMAIN 915 920 925 930 935 940 945 950 955 960 915 920 925 930 935 940 945 950 955 960 943.7943.7945.1946.6948.0947.7946.5944.9943.9944.63945.13945.63946.14946.64947.14947.22946.47944.89942.89941.19940.12939.571034+50 1035+00 1035+50 1036+00 1036+50 1037+00 1037+50 1038+00 1038+50 1039+00 1039+50 1040+00 1040+50 1041+00 1041+50 1042+00 -4.00% -1.00% 1.00% 1.00%PVIS:1036+30.00PVIE:946.94PVIS:1040+00.00PVIE:939.57PVIS:1037+25.00 PVIE:947.89 AD:5.00 K:29.98 150.00' VC BVCS:1036+50.00 BVCE:947.14 EVCS:1038+00.00 EVCE:944.89 HP STA:1036+80.06 HP ELEV:947.29 PVIS:1039+10.71 PVIE:940.46 AD:3.00 K:39.95 120.00' VC BVCS:1038+50.71 BVCE:942.86 EVCS:1039+70.71 EVCE:939.86 LP STA:1039+70.71 LP ELEV:939.86 PROPOSED C/L ELEVATION EXISTING C/L ELEVATION PROPOSED C/L PROFILE EXISTING C/L PROFILE 24" RCP CL III 5201STA 1035+27.2321.67 RTRIM=945.43(84"Ø)FUTURE STORM SEWER INV: 936.37 (S) INV: 936.27 (W) INV: 937.87 (N) 12" HIGH PRESSURE PIPELINE FUTURE WATERMAIN FUTURE SANITARY SEWER FUTURE SANITARY SEWER FUTURE C/L PROFILE 73' - 15" RCP CL V @ 0.82% PROPOSED SUBGRADE 4:1 CONSTRUCT BULKHEAD INV: 938.47 1035+00 1036+00 1037+00 1038+00 1039+0 0 1040+0 0 1035+00 1036+00 1037+00 1038+00 1039+0 0 1040+0 0 PC:1037+82.97MID:1038+36.12PT:1038+89.26sssST FUTURE 5213 FUTURE 5214 FUTURE 5215 5201 5200-EX(53) W SOEND AUTUMN PATH STA: 1038+00.00 ssss1035+00 1036+00 1037+00 1038+00 1039+0 0 1040+0 0GASGASGASGASG A S GA S G A S 11039943.96misc POTHOLE D=80" S=8"5200A PROPOSED CURB AND GUTTER BITUMINOUS ROAD LEGEND PROPOSED BITUMINOUS EDGE PROPOSED CONCRETE EDGE BITUMINOUS PATH CONCRETE WALK CONSTRUCTION LIMITS EXISTING CONTOURS PROPOSED CONTOURS 1034+001034+001034+00 937.87 937.87 MATCHLINE STA: 1034+50SEE SHEET 18AUTUMN PATH LOCATION SCALE IN FEET 0 H: 30 60 SCALE IN FEET 0 V: 5 10 WSB PROJECT NO.:REVISIONSNO.DATEDESCRIPTIONK:\013594-000\Cad\Plan\013594-000-C-STRT_STRM-PLAN.dwg 7/7/2020 8:48:23 AMNR-013594-000 SCALE: PLAN BY: DESIGN BY: CHECK BY: AS SHOWN GMD GMD XXX I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION,OR REPORT WAS PREPARED BY ME OR UNDER MYDIRECT SUPERVISION AND THAT I AM A DULYLICENSED PROFESSIONAL ENGINEER UNDER THELAWS OF THE STATE OF MINNESOTA.LIC. NO:DATE:MONICA HEIL1/31/202047497AUTUMN PATHROSEMOUNT, MINNESOTASTREET & STORM SEWER PLANS SHEET OF 41 19R R25.0' R25.0' WARNING! HIGH PRESSURE PIPELINE(S) Excavation and Construction Prohibited Without Written Permission From NORTHERN NATURAL GAS CONNECT TO EXISTING DRAINAGE STRUCTURE 42' FACE TO FACE FUTURE AUTUMN PATH FUTURE AUTUMN PATH 25/26/2020WATERMAIN37/6/2020STREET END AND STORM SEWERSTA 1034+50 END CURB AND GUTTER AND STREET CONSTRUCTION EASEMENT STA 1036+00.00 CONSTRUCT BULKHEAD MEMORANDUM To: Kim Lindquist, Community Development Director Kyle Klatt, Senior Planner Anthony Nemcek, Planner Brian Erickson, City Engineer Stephanie Smith, Assistant City Engineer From: Dan Schultz, Parks and Recreation Director Date: July 23, 2020 Subject: Bella Vista 7th Addition – Final Plat The Parks and Recreation Department recently received a final plat for the Bella Vista 7th Addition. After reviewing the plat, the Parks and Recreation Department staff has the following comments: Parks Dedication Staff is recommending that the City collect cash dedication for this final plat to satisfy the parks dedication requirement for the Bella Vista 7th Addition. The cash dedication will be $88,400 (26 units x $3,400 per unit). Trail Development The developer will implement the grading plan for the area east and north of Horseshoe Lake and will grade in the trail around the lake per the approved grading. Please let know if you have any questions about this memo. MEMORANDUM To: Kyle Klatt, Senior Planner CC: Kim Lindquist, Community Development Director Stacy Bodsberg, Planning & Personnel Secretary Brian Erickson, Director of Public Works/City Engineer From: Stephanie Smith, Assistant City Engineer Date: July 28, 2020 Subject: Bella Vista 7th Final Plat- Engineering Review SUBMITTAL: The plans for Bella Vista 7th have been prepared by Westwood. Engineering review comments were generated from the following documents included in the submittal: ▫ Construction Plans (dated 8/1/2019) ▫ Revised ▫ Drainage Map and Stormwater Report (dated 10/11/19) ▫ Final Plat and Lot Areas (dated 10/11/19) GENERAL COMMENTS: This area of Bella Vista was referred to as Phase 4 North when the Bella Vista development was originally reviewed by staff in 2013. 1. The development fees below are estimated based on the current Schedule of Rates and Fees. These fees are due with the final plat and subdivision agreement. § Sanitary Sewer Trunk Charge: $1075/acre § Watermain Trunk Charge: $6500/acre § Storm Sewer Trunk Charge: $6865/acre 2. The cost for the western half of the Autumn Path street is anticipated to be $644,661.88 and shall be paid with the development of Bella Vista. A portion of this cost has been collected with Bella Vista 5th Addition and 6th Addition. The amount due with the final plat of Bella Vista 7th shall cover the balance that has not been collected with the previous developments: $242,781.88. 3. The developer shall pay an estimated cost for the removal of the temporary street and utility connection to Autumn Path and the western half of construction of Autumn Path from the current project 2019-07 construction limits to the northern property line of Bella Vista 7th. This extension is not being constructed at the time because the City does not have an easement on the eastern property. 4. The plan shall be revised to coordinate with the City’s Autumn Path Extension project. 5. Due to poor soils on the site, the roadway section may need to be increased. The road section should be reviewed in final design and verified during construction. 6. The developer shall work with the gas line companies to obtain any required permits. 7. Revise label at the upper right hand corner to “City Project 2020-05”. RIGHT OF WAY AND EASEMENTS: The plat includes dedication of right-of-way for Autumn Path, Street A and easement at the back of lots in Block 2 for the stormwater basin and wetlands. 8. Outlot A shall be deeded to the City. 9. The part of the street that will permanently intersect Autumn Path is outside the property owned by the applicant. Until that area develops, the applicant shall dedicate a temporary roadway and utility easement for the construction of a temporary connection to Autumn Path. 10. Temporary roadway easement shall be dedicated for the temporary cul-de-sac constructed at the end of Street A until the adjacent property develops and the road can connect to Bacardi Ave. 11. Conservation easement is required over the wetland and buffer area. Signage shall be installed for the conservation easements prior to the sale of the adjacent properties. 12. Easements are required over all ponding and infiltration areas, and shall encompass at minimum the HWL and all naturally vegetated areas. Signage for easements shall be provided by the developer prior to sale of properties, and an extended maintenance warranty shall be required to ensure establishment of the naturally vegetated areas. 13. Storm sewer is proposed along the side and back lot lines of many properties to convey rear yard drainage. Drainage and utility easements along these lines shall prohibit the construction of structures such as sheds to ensure that access can be provided for storm sewer maintenance. Fences are allowed but shall not restrict drainage and are required to include gates for truck access over the drainage and utility easement. Also, landscaping that will block access should be prohibited. 14. Trees are not allowed to be planted within drainage and utility easements, over the proposed storm sewer, or within a pond access location. Trees located on individual properties shall not be planted near the sanitary sewer and water service lines. 15. The developer shall work with their sales staff to ensure that homebuyers have knowledge of their easements. Easement restrictions should be added as a restriction on the property deed. 16. The width of drainage and utility easements over all public utilities shall be verified during final design. STREET AND SIDEWALK This development proposes construction of Street A to run from southeast at Autumn Path, northwest to end in a temporary cul-de-sac. Street A is longer than our cul-de-sac length standard, but it is a temporary cul-de-sac. The cul-de-sac will be removed and Street A will be extended to Bacardi Avenue when the property to the west develops. Street A’s permanent connection to Autumn Path cannot be constructed at this time, so a temporary connection through Lot 19, Block 2 is proposed. When the property to the northeast develops, the temporary connection will be removed and Autumn Path can be extended to a permanent connection with Street A. 17. The street construction plans shall show directional arrows for drainage. High points shall be labeled as such. 18. The applicant shall install type-three barricades with “Future Thru-Street” signage at the end of Street A and east of the intersection with Autumn Path. 19. Construction plans shall show the name of Street A, to be determined by City staff. 20. Concrete curb and gutter shall be extended on the cul-de-sac until the curve of the bubble. 21. 25’ radius is required on public streets. 22. B618 curb shall be used on the temporary connection to Autumn Path. 23. Label the street width of the temporary connection. 24. An ADA-compliant pedestrian curb ramp is required when sidewalk or trails intersect with curbs. 25. Intersection details shall be included in the plan. 26. The ramps shall be constructed according to the current MnDOT detail plates. 27. Applicant shall submit a street light and signage plan for review. WATER AND SANITARY SEWER A temporary sanitary lift station was constructed with Bella Vista 6th to service both the 6th and 7th Additions until the property to the east is developed and a regional sanitary connection can provide service for these lots. 28. Applicant’s engineer shall submit a sketch to confirm sanitary pipe elevations are compatible with the future regional pipe. 29. Connections to active mains shall be wet taps. 30. Additional gate valves are required at 800-foot minimum spacing. 31. Hydrant spacing may be increased up to 500 feet. 32. Label watermain plug. 33. The applicant shall submit plans for watermain and sanitary sewer that are consistent with City of Rosemount Engineering Guidelines and Standard Specifications and Detail Plates. STORMWATER Stormwater design on this site is consistent with the preliminary plat. A storm basin will be constructed between Block 2 and Horseshoe Lake. WSB Engineering reviewed the Biscayne Business Park plans on behalf of the City. The full memorandum, dated November 1, 2019, is included as an attachment. The recommendations are summarized below: 34. 100-yr HWLs and snowmelt HWLs for Ponds 5 and 8 should be updated to the following: Pond 5: • 100-yr HWL = 942.3 • Snowmelt HWL = 938.7 Note that the NWL for Pond 5 is a 936.0 per the overall Bella Vista development plan. However, details from the Bella Vista 6th Addition Utility Plans show the invert of the outlet pipe from the Pond 5 OCS at a 938.0. Applicant should confirm if the outlet structure from Pond 5 has already been constructed and if so, what the normal water level is. Pond 8: • 100-yr HWL = 938.5 • Snowmelt HWL = 938.6 35. The overflow pipe from Basin 1424 (Horseshoe Lake) does not need to be constructed at this time due to modifications to the lift station north of the development. No further action required. 36. Note the ultimate EOF location for the roadway. It appears that it is going north near the low point at station 23+25 but applicant should confirm. 37. Applicant shall submit a restoration plan for review. 38. The silt fence should be shown on the outside of the proposed grading on the south side of Pond 8. 39. Riprap and filter material quantities based on City Standard Plate SD-9 should be called out at each outlet. 40. Add a spot elevation along lot line between Lots 11 and 12 to confirm that the EOF for the low point in the road will not be between the houses. 41. Contours in the backyards of Lots 3 and 4 should be labeled to confirm the grading is showing high points in the backyards. 42. Driveway locations and proposed slopes should be added to the grading plans. Storm sewer downstream of the planned connection from future Autumn Path storm sewer will need to be sized to accommodate an additional 6 cfs for a future force main connection. The exiting pipes from EX. STMH-53 to Pond 5 are shown without capacity for the additional 6 cfs. 43. There are inconsistencies between the pipe slopes called out in the plans and the slope used in the storm sewer sizing calculations. Applicant should update the storm sewer sizing calculations to be representative of what is shown in the plans. 44. A skimmer outlet structure will be required for the outlet control structure (OCS 700). The pipe coming into OCS 700 from Pond 8 should be inverted so that the pipe is a minimum of 6 inches below the water surface per the City’s Engineering Guidelines. A detail of the outlet control structure should be included in the plans. All utility crossings should be shown in the profile view for both the sanitary and watermain plans and the street and storm sewer plans. The existing gas main should be added to the profile above storm sewer from TEMP. CBMH-84 to EX. STMH-53. 45. It is recommended structures STMH 706-708 be moved to the curb line and changed to catch basins. 46. A 0.1 ft drop is shown at each permanent storm structure. A 0.1 ft drop between inverts should also be added at each temporary storm structure where possible. 47. Label structure STMH 701A in plan view on sheet 7. 48. Lots 17 and 18 shall be revised to meet freeboard requirements with respect to Pond 5’s HWL of 942.3. Should you have any questions or comments regarding the items listed above, please contact me at 651-322-2015. K:\014675-000\Admin\Docs\Stormwater Review\20191022\MEMO - Bella Vista 7th Plan Review Comments_20191101.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM Memorandum To: Stephanie Smith, City of Rosemount From: Bill Alms, PE Kendra Fallon, EIT Date: November 1, 2019 Re: Bella Vista 7th Addition Construction Plan Review WSB Project No. 014675-000 I have reviewed the documents provided by Westwood, on 10/22/19 for Bella Vista 7th Construction Plans. Documents reviewed include: · 19-10-03 BELLA VISTA 7TH CONSTRUCTION PLANS · 19-10-11 0000586.07 DRAN AREA MAP · 19-10-11 0000586.07FPF01 – 7th Addn · 19-10-11 hagen to KLATT- Bella Vista 7th Addition-Final Plat Sub Transmittal · 19-10-11 REVISED Bella Vista 7th Add TIME CONC COMP AND PIPE DESIGN · 19-10-11 w- TEMP CB’S BELLA VISTA 6TH ADD TIME CONC COMP AND PIPE DESIGN · 2019-10-11 Final Lot Tab 7th Addn An updated grading and erosion control plan were not submitted so those initial comments remain. Based on my review of the plan and its revisions I offer the following comments for your consideration. Please provide a response to these comments. Grading, Drainage, and Erosion Control Comments: 1. General a. No Additional Comments 2. Ponds and Wetlands a. 100-yr HWLs and snowmelt HWLs for Ponds 5 and 8 should be updated to the following: i. Pond 5: 1. 100-yr HWL = 942.3 2. Snowmelt HWL = 938.7 3. Note that the NWL for Pond 5 is a 936.0 per the overall Bella Vista development plan. However, details from the Bella Vista 6th Addition Utility Plans show the invert of the outlet pipe from the Pond 5 OCS at a 938.0. Applicant should confirm if the outlet structure from Pond 5 has already been constructed and if so, what the normal water level is. ii. Pond 8: 1. 100-yr HWL = 938.5 2. Snowmelt HWL = 938.6 Stephanie Smith 11/1/2019 Page 2 K:\014675-000\Admin\Docs\Stormwater Review\20191022\MEMO - Bella Vista 7th Plan Review Comments_20191101.docx 3. Emergency Overflow Routes: a. The overflow pipe from Basin 1424 does not need to be constructed at this time due to modifications to the lift station north of the development. No further action required. b. Note the ultimate EOF location for the roadway. It appears that it is going north near the low point at station 23+25 but applicant should confirm. 4. Retaining Walls: a. No Additional Comments 5. Erosion Control: a. No restoration plan was included in this submittal. b. The silt fence should be shown on the outside of the proposed grading on the south side of Pond 8. c. Riprap and filter material quantities based on City Standard Plate SD-9 should be called out at each outlet. 6. Grading: a. Add a spot elevation along lot line between Lots 11 and 12 to confirm that the EOF for the low point in the road will not be between the houses. b. Contours in the backyards of Lots 3 and 4 should be labeled to confirm the grading is showing high points in the backyards. c. Driveway locations and proposed slopes should be added to the grading plans. Stormwater Management Plan: 1. General Storm Sewer Design a. Storm sewer downstream of the planned connection from future Autumn Path storm sewer will need to be sized to accommodate an additional 6 cfs for a future force main connection. The exiting pipes from EX. STMH-53 to Pond 5 are shown without capacity for the additional 6 cfs. b. There are inconsistencies between the pipe slopes called out in the plans and the slope used in the storm sewer sizing calculations. Applicant should update the storm sewer sizing calculations to be representative of what is shown in the plans. c. A skimmer outlet structure will be required for the outlet control structure (OCS 700). The pipe coming into OCS 700 from Pond 8 should be inverted so that the pipe is a minimum of 6 inches below the water surface per the City’s Engineering Guidelines. A detail of the outlet control structure should be included in the plans. d. All utility crossings should be shown in the profile view for both the sanitary and watermain plans and the street and storm sewer plans. The existing gas main should be added to the profile above storm sewer from TEMP. CBMH-84 to EX. STMH-53. e. It is recommended structures STMH 706-708 be moved to the curb line and changed to catch basins. f. A 0.1 ft drop is shown at each permanent storm structure. A 0.1 ft drop between inverts should also be added at each temporary storm structure where possible. g. Label structure STMH 701A in plan view on sheet 7. 2. Water Quantity a. No Additional Comments Stephanie Smith 11/1/2019 Page 3 K:\014675-000\Admin\Docs\Stormwater Review\20191022\MEMO - Bella Vista 7th Plan Review Comments_20191101.docx 3. Rate/Volume Control a. No Additional Comments 4. Freeboard a. Lots 17 and 18 do not meet freeboard requirements with respect to Pond 5’s HWL of 942.3. 5. Water Quality a. No Additional Comments 6. Easements a. No Additional Comments