HomeMy WebLinkAbout15784 CARDINAL CIRJUN I_ Ji flu L I 'L. •i
EROSION CONTROL
MUST BE IN PLACE
BEFORE FOOTINGS
PASS INSPECTION
Enyineeri
Date:
II,1 C jLII 1 L 1LJ I
a
g, Reviewed
t
C ciZA! (JO--
LOT. 2, BLOCK 1,
SHANNON POMP
EAST APvlrION,
PA C duNTY j
M INNESOTA
�A�6tJ�EN'(
E'C U
Date t 44. li l557
REVIS J 1arc iy %7
IL) HUI U!LIL)JL I UUU
x, 9443
22 FOOT MAXIMUM
DRIVEWAY WIDTH
I UL/ UL
NORTH
SCALE 1 "730'
ALL BEARINGS ASSUMED
a PENOTES IKON MONUMENT
z hereby certify that this survey was prepared by me or
under my direct supervision and that 1 am a duly Registered
Lana Surveyor under the laws or the State of Minnesota.
Left° H. Bohlen
Registered Land Surveyor No. 10795
EPT
/7/7 :04