Loading...
HomeMy WebLinkAbout15784 CARDINAL CIRJUN I_ Ji flu L I 'L. •i EROSION CONTROL MUST BE IN PLACE BEFORE FOOTINGS PASS INSPECTION Enyineeri Date: II,1 C jLII 1 L 1LJ I a g, Reviewed t C ciZA! (JO-- LOT. 2, BLOCK 1, SHANNON POMP EAST APvlrION, PA C duNTY j M INNESOTA �A�6tJ�EN'( E'C U Date t 44. li l557 REVIS J 1arc iy %7 IL) HUI U!LIL)JL I UUU x, 9443 22 FOOT MAXIMUM DRIVEWAY WIDTH I UL/ UL NORTH SCALE 1 "730' ALL BEARINGS ASSUMED a PENOTES IKON MONUMENT z hereby certify that this survey was prepared by me or under my direct supervision and that 1 am a duly Registered Lana Surveyor under the laws or the State of Minnesota. Left° H. Bohlen Registered Land Surveyor No. 10795 EPT /7/7 :04