HomeMy WebLinkAbout9.a. Flint Hills Athletic Complex – Field Lighting EXECUTIVE SUMMARY City Council Regular Meeting: August 4, 2020 AGENDA ITEM: Flint Hills Athletic Complex – Field Lighting AGENDA SECTION: New Business PREPARED BY: Dan Schultz, Parks and Recreation Director AGENDA NO. 9.a. ATTACHMENTS: Field Lighting Quote APPROVED BY: LJM RECOMMENDED ACTION: Motion for the City Council to approve purchasing the Field Lighting for one field at the Flint Hills Athletic Complex from Musco Lighting through the Sourcewell purchasing cooperative in the amount of $255,209. BACKGROUND In the City Council goals, one of the projects and initiatives in “Grow Rosemount” is to add field lighting to one field at the Flint Hills Athletic Complex. By adding the field lighting, the City can offer expanded play opportunities during the spring, summer and fall sports seasons. The field that staff is recommending the lights be added to is the field just east of the upper parking lot. The attached quote sheet includes a map of the location of the lighting. The lights that staff is proposing to install would be LED lights affixed to four poles. Staff proposes that the City Council purchase and install LED field lighting from Musco Lighting through the purchasing cooperative Sourcewell in the amount of $255,209. Sourcewell is a purchasing cooperative which holds hundreds of competitively solicited cooperative contracts that are ready for use by government agencies, educational institutions, tribal nations, and nonprofit organizations. If approved, the lighting equipment takes six to eight weeks to arrive and the installation would take place in October of 2020. The funding for the project would come from the Parks Improvement Fund which currently has a balance of $2,408,730. RECOMMENDATION Staff recommends the City Council authorize the acquisition of field lighting for one field at the Flint Hills Athletic Complex from Musco Lighting through the Sourcewell purchasing cooperative in the amount of $255,209 MUSCO LIGHTING PROPOSAL PREPARED FOR: Flint Hills Athletic Complex Lighting Project Rosemount, MN July 28, 2020 Project #206394 Submitted by: Musco Sports Lighting, LLC Attn: Treavor Ruckles 2107 Stewart Road Muscatine, Iowa 52761 Toll Free: 800-756-1205 Fax: 800-374-6402 This information Is provided by Musco exclusively For this project.Reproduction or distribution of the enclosed documents or information withough the written permission of Musco Sports Lighting,LLC is prohibited.M-1164-enUS-5 TABLE OF CONTENTS Flint Hills Athletic Complex Project Submittal:Table of Contents A. QUOTE / SCOPE OF WORK B. LIGHTING DESIGN C. CONTROLS AND MONITORING Flint Hills Athletic Complex,206394 A. QUOTE / SCOPE OF WORK Flint Hills Athletic Complex,206394 ©2016, 2020 Musco Sports Lighting, LLC - 1 - M-2168- enUS-8 Quote Quote Flint Hills Athletic Complex Rosemount, Minnesota July 24, 2020 Sourcewell Master Project: 199030, Contract Number: 071619-MSL, Expiration: 08/27/2023 Category: Sports lighting with related supplies and services All purchase orders should note the following: Sourcewell purchase – contract number: 071619-MSL Quotation Price – Materials Delivered to Job Site and Turnkey Installation Soccer Field – 30 Footcandles Materials ........................................................................................................ $ 192,359.00 Installation ..................................................................................................... $ $62,850.00 Total ............................................................................................................... $ 255,209.00 Sales tax and bonding are not included. Pricing furnished is effective for 60 days unless otherwise noted and is considered confidential. Light-Structure System with Total Light Control – TLC for LED™ technology System Description • (4) Pre-cast concrete bases with integrated lightning grounding • (4) Galvanized steel poles • Factory wired and tested remote electrical component enclosures • Pole length, factory assembled wire harnesses • (26) Factory aimed and assembled luminaires, (2) OSQ area luminaires • UL Listed assemblies Control Systems and and Warranty Services • Control-Link® Control and Monitoring system to provide remote on/off and dimming (high/medium/low) control and performance monitoring with 24/7 customer support • Product assurance and warranty program that covers materials and onsite labor, eliminating 100% of your maintenance costs for 25 years • Support from Musco’s Lighting Services Team – over 170 Team members dedicated to operating and maintaining your lighting system – plus a network of 1800+ contractors Installation Services Provided See attached scope of work Payment Terms Musco’s Credit Department will provide payment terms. Email or fax a copy of the Purchase Order to Musco Sports Lighting, LLC: Musco Sports Lighting, LLC ©2016, 2020 Musco Sports Lighting, LLC - 2 - M-2168- enUS-8 Quote Quote Attn: Amanda Hudnut Fax: 800-374-6402 Email: musco.contracts@musco.com All purchase orders should note the following: Sourcewell purchase – contract number: 071619-MSL Delivery Timing 6 - 8 weeks for delivery of materials to the job site from the time of order, submittal approval, and confirmation of order details including voltage, phase, and pole locations. Due to the built-in custom light control per luminaire, pole locations need to be confirmed prior to production. Changes to pole locations after the product is sent to production could result in additional charges. Notes Quote is based on: • Shipment of entire project together to one location. • Structural code and wind speed = 2015 IBC, 115MPH, Exposure C, Importance Factor 1.0. • Owner is responsible for getting electrical power to the site, coordination with the utility, and any power company fees. • Includes supply and installation of Musco system including underground wiring and conduit, service entrance panel board, and controls by a licensed contractor. • Standard soil conditions – rock, bottomless, wet or unsuitable soil may require additional engineering, special installation methods and additional cost. • Confirmation of pole locations prior to production. Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional details. Scott Peitz Sales Representative Musco Sports Lighting, LLC Phone: 612-368-9286 E-mail: scott.peitz@musco.com ©2016, 2020 Musco Sports Lighting, LLC - 3 - M-2168- enUS-8 Quote Quote Flint Hills Athletic Complex Rosemount, MN Musco Project #206394 Turnkey Scope of Work Customer Responsibilities: 1. Complete access to the site for construction using standard 2-wheel drive rubber tire equipment. 2. Locate existing underground utilities not covered by your local utilities. (i.e. water lines, electrical lines, irrigation systems, and sprinkler heads). Musco or Subcontractor will not be responsible for repairs to unmarked utilities. 3. Locate and mark field reference points per Musco supplied layout. (i.e. home plate, center of FB field) 4. Pay for extra costs associated with foundation excavation in non-standard soils (rock, caliche, high water table, collapsing holes, etc.) or soils not defined in geo-technical report. Standard soils are defined as soils that can be excavated using standard earth auguring equipment. 5. Provide area on site for disposal of spoils from foundation excavation. 6. Provide area on site for dumpsters. 7. Provide sealed Electrical Plans. (If required) Musco Responsibilities: 1. Provide required foundations, poles, electrical enclosures, luminaires, pole harnesses, and control cabinets. 2. Provide layout of pole locations and aiming diagram. 3. Provide Project Management as required. 4. Provide stamped foundation designs based on 2500 psf soils. 5. Assist our installing subcontractor and ensure our responsibilities are satisfied. Musco Subcontractor Responsibilities General: 1. Provide labor, equipment, and materials to off load equipment at jobsite per scheduled delivery. 2. Provide storage containers for material, (including electrical components enclosures), as needed. 3. Provide necessary waste disposal and daily clean up. 4. Provide adequate security to protect Musco delivered products from theft, vandalism or damage during the installation. 5. Obtain any required permitting. 6. Confirm the existing underground utilities and irrigation systems have been located and are clearly marked in order to avoid damage from construction equipment. Repair any such damage during construction. 7. Keep all heavy equipment off playing fields when possible. 8. Provide startup and aiming as required to provide complete and operating sports lighting system. 9. Installation to commence upon delivery and proceed without interruption until complete. Musco to be immediately notified of any breaks in schedule or delays. Foundations, Poles, and Luminaires: 1. Mark and confirm pole locations per the aiming diagram provided. If there are any issues, immediately notify your Musco Project Manager. 2. Provide labor, materials, and equipment to install (4) LSS foundations as specified on Layout and per the stamped foundation drawings, if applicable. 3. Remove spoils to owner designated location at jobsite. ©2016, 2020 Musco Sports Lighting, LLC - 4 - M-2168- enUS-8 Quote Quote 4. Provide labor, materials, and equipment to assemble Musco TLC-LED luminaires, electrical component enclosures, poles, and pole harnesses. 5. Provide labor, equipment, and materials to erect (4) dressed LSS Poles and aim utilizing the pole alignment beam. Electrical: 1. Provide labor, materials, and equipment to reuse existing electrical service panels as permitted. 2. Provide labor, materials, and equipment to install all underground conduit, wiring, pull boxes etc. and terminate wiring as required. 3. Provide as-built drawings on completion of installation, (if required). Control System: 1. Provide labor, equipment, and materials to install (1) Musco Control and Monitoring cabinet and terminate all necessary wiring. 2. Provide a dedicated 120V 20A controls circuit or a step-down transformer for 120 V control circuit if not available. 3. Provide a dedicated 20A breaker connected to all available phases for powerline communication. 4. Check all zones to make sure they work in both auto and manual mode. 5. Commission Control-Link® by contacting Control Link Central™ at 877-347-3319. ©2016, 2020 Musco Sports Lighting, LLC - 5 - M-2168- enUS-8 Quote Quote CODE OF CONDUCT In order to maintain a high-quality jobsite and installation, Subcontractor represents to Musco that it has the supervision necessary to, and shall train, manage, supervise, monitor, and inspect the activities of its employees for the purpose of enforcing compliance with these safety requirements. Subcontractor acknowledges that Musco does not undertake any duty toward Subcontractor’s employees to train, manage, supervise, monitor, and inspect their work activities for the purpose of enforcing compliance with these safety requirements, but Subcontractor agrees to abide by any reasonable recommendations made by Musco or Musco representatives with respect to safety. Subcontractor agrees that it is or will be familiar with and shall abide by the safety rules and regulations of Musco and the Owner, including, but not limited to the Occupational Safety and Health Act of 1970 (OSHA), all rules and regulations established pursuant thereto, and all amendments and supplements thereto. Subcontractor further agrees to require all its employees, subcontractors, and suppliers to comply with these requirements. Subcontractor shall also observe and comply with all laws with respect to environmental protection applicable to the Project. Subcontractor shall require all its subcontractors, employees, visitors, suppliers, and agents under its direction to comply with the following: 1. GENERAL JOBSITE SAFETY AND CLEANLINESS. a. Subcontractor’s employees and agents shall be required to wear appropriate personal protective equipment including, but not limited to, safety glasses with side shields, work shoes, fall protection devices, and hard hats. b. Where a walking or working surface has an unprotected side or edge which is six feet or more above a lower level, Subcontractor shall use guardrail systems, safety net systems, or personal fall arrest systems. c. Jobsite shall be kept free of debris including, but not limited to, cardboard and packing materials which can become windborne. d. Construction equipment shall be parked during non-use in an orderly fashion so as not to create inconvenience to others using the jobsite. e. Subcontractor shall provide for and ensure the use of safety equipment for the Project in accordance with Musco’s and Owner’s safety requirements, to the extent these may be stricter than federal, state, or local standards, or generally recognized industry applicable standards. f. Subcontractor shall provide the Musco project manager with an “Emergency List” showing Subcontractor’s designated medical doctor, hospital, insurance company, and any other health service providers, such list to be updated within 24 hours of any change in the information provided. g. Within eight (8) hours from the time of an accident (or such shorter period as laws may require), Subcontractor shall advise Musco of any accident resulting in injury to any person or damage to any equipment or facility. Upon request, Subcontractor shall promptly furnish Musco with a written report of any such accident as well as a copy of all insurance and worker’s compensation claims involving the Project. h. Subcontractor shall maintain and inspect all construction equipment, including cranes and other lifting equipment, prior to each use. Subcontractor warrants that all equipment operators shall be qualified for each piece of construction equipment they intend to operate. Documentation of specific training is the responsibility of the Subcontractor. i. Jobsite shall be policed daily for compliance to the above conditions. ©2016, 2020 Musco Sports Lighting, LLC - 6 - M-2168- enUS-8 Quote Quote j. Subcontractor’s employees and agents are prohibited from using drugs and alcohol on the Project property or being under the influence of alcohol or drugs while performing work on the Project. Anyone observed participating in or observed under the influence will be removed from the Project immediately and prohibited from returning, with no exceptions. 2. CONFORMANCE TO STANDARD MUSCO INSTALLATION GUIDELINES. a. Review and understand installation instructions are provided with every product installation. b. Education of installation personnel to allow for highest efficiency and lowest possibility of failure. c. Verify that components have been assembled per Musco installation instructions. d. Verify plumb of concrete foundations prior to standing of poles. 3. PROVIDING A QUALITY INSTALLATION TEAM. a. Subcontractor’s work directly reflects the quality of the installation and may indirectly relate to the quality of the product upon which Musco’s reputation is built. b. Provide and maintain quality installation equipment. Records of maintenance and/or calibration shall be provided upon request. c. Personnel shall be knowledgeable in operation of equipment as well as installation of Musco product. d. All personnel provided by Subcontractor shall understand the relationship developed by and between Subcontractor and Musco, also by and between Musco and the customer, and act accordingly. B. LIGHTING DESIGN Flint Hills Athletic Complex,206394 PROJECT SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2020 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: Joe Seda • File #206394A • 26-Jun-20 Flint Hills RecreaƟon Complex Rosemount, MN USA LighƟng System Pole / Fixture Summary Pole ID Pole Height Mtg Height Fixture Qty Luminaire Type Load Circuit S1-S2 80'80'7 FUTURE 10.01 kW A 80'7 TLC-LED-1500 10.01 kW A S3-S4 80'80'6 TLC-LED-1500 8.58 kW A 60'1 CREE OSQ 0.13 kW A 4 42 57.46 kW Circuit Summary Circuit Description Load Fixture Qty A Athletic Field 4 57.46 kW 42 Fixture Type Summary Type Source Wattage Lumens L90 L80 L70 Quantity TLC-LED-1500 LED 5700K - 75 CRI 1430W 160,000 >120,000 >120,000 >120,000 26 CREE OSQ LED 5700K - 70 CRI 130W 16,599 ------2 Light Level Summary Calculation Grid Summary IlluminationGrid Name Calculation Metric Ave Min Max Max/Min Ave/Min Circuits Fixture Qty Athletic Field 4 Spill Horizontal Illuminance 0.04 0 0.24 134.92 A 42 Athletic Field 4 Spill Max Candela Metric 2507 460 7873 17.12 5.45 A 42 Athletic Field 4 Spill Max Vertical Illuminance Metric 0.09 0.01 0.37 29.83 8.57 A 42 Athletic Field 4 Horizontal Illuminance 30.3 21 39 1.84 1.44 A 42 Parking Lot Horizontal 0.05 0 1 1424.89 A 42 West General Lighting Horizontal 5.88 0 20 48.96 A 42 ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2020 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: Joe Seda • File #206394A • 26-Jun-20 S1 S2 S3S4 28 36 28 22 21 25 31 36 28 26 37 32 27 27 31 37 39 34 24 31 29 29 29 32 35 35 34 24 31 30 30 30 31 34 34 32 29 33 30 28 29 30 33 33 31 26 33 29 27 27 29 31 34 31 23 33 30 27 27 29 31 33 32 26 33 29 27 27 29 31 34 31 29 33 30 28 29 30 33 33 31 24 30 30 30 30 31 34 34 32 24 31 29 29 29 32 35 35 34 26 37 32 27 27 31 37 39 34 28 35 28 21 21 25 31 36 28174'133'174'133'150'133'150'133'FSSCALE IN FEET 1 : 80 0'80'160' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LUMINAIRE TYPE QTY / POLE THIS GRID OTHER GRIDS2S1-S2 80'-80'TLC-LED-1500 7/7*7 7 2 S3-S4 80'-60' 80' CREE OSQ TLC-LED-1500 1 6 1 6 0 0 4 TOTALS 42 28 14 * This structure uƟlizes a back-to-back mounƟng conĮguraƟon Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) Flint Hills RecreaƟon Complex Rosemount, MN USA GRID SUMMARY Name:AthleƟc Field 4 Size: 380' x 260' Spacing: 30.0' x 30.0' Height: 3.0' above grade ILLUMINATION SUMMARY MAINTAINED HORIZONTAL FOOTCANDLES EnƟre Grid Guaranteed Average:30 Scan Average:30.34 Maximum:39 Minimum:21 Avg / Min:1.43 Guaranteed Max / Min:2.5 Max / Min:1.84 UG (adjacent pts):1.44 CU:0.52 No. of Points:117 LUMINAIRE INFORMATION Color / CRI: 5700K - 75 CRI / 5700K - 70 CRI Luminaire Output: 160,000 / 16,599 lumens No. of Luminaires: 28 Total Load: 37.44 kW Lumen Maintenance Luminaire Type L90 hrs L80 hrs L70 hrs TLC-LED-1500 >120,000 >120,000 >120,000 CREE OSQ ------ Reported per TM-21-11. See luminaire datasheet for details. Guaranteed Performance:The ILLUMINATION described above is guaranteed per your Musco Warranty document and includes a 0.95 dirt depreciaƟon factor. Field Measurements:Individual Įeld measurements may vary from computer-calculated predicƟons and should be taken in accordance with IESNA RP-6-15. Electrical System Requirements:Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements:Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locaƟons. ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2020 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: Joe Seda • File #206394A • 26-Jun-20 S3S4 TNH=961.18FS0 1 1 2 3 5 9 18 0 1 1 2 3 5 10 17 0 1 1 2 3 6 10 17 0 1 1 2 3 6 10 16 0 1 1 2 3 6 10 16 0 1 1 2 3 6 10 16 0 1 1 2 4 7 11 16 1 1 1 3 4 7 11 16 1 1 2 3 5 8 12 17 1 1 2 3 5 8 12 16 1 1 2 3 5 8 12 17 1 1 2 4 5 8 12 18 1 2 2 4 6 9 14 20 1 2 2 4 6 9 14 20 1 2 2 4 6 9 14 20 1 2 2 4 6 9 13 19 1 2 2 4 6 8 13 18 1 1 2 3 5 8 12 17 1 1 2 3 5 8 12 16 1 1 2 3 5 8 12 16 1 1 2 3 5 8 12 17 1 2 2 4 6 8 13 18 1 2 2 4 6 9 13 19 1 2 2 4 6 9 14 20 1 2 2 4 6 9 14 20 1 2 2 4 6 9 14 20 1 1 2 4 5 8 12 18 1 1 2 3 5 8 12 17 1 1 2 3 5 8 12 16 1 1 2 3 5 8 12 17 1 1 1 3 5 7 11 17 0 1 1 2 4 7 11 16 0 1 1 2 3 6 10 16 0 1 1 2 3 6 10 15 0 1 1 2 3 6 10 16 0 1 1 2 3 6 10 17 0 1 1 2 3 5 10 17 0 1 1 2 3 5 9 18 SCALE IN FEET 1 : 80 0'80'160' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LUMINAIRE TYPE QTY / POLE THIS GRID OTHER GRIDS2S1-S2 80'-80'TLC-LED-1500 7/7*7 7 2 S3-S4 80'-60' 80' CREE OSQ TLC-LED-1500 1 6 1 6 0 0 4 TOTALS 42 28 14 * This structure uƟlizes a back-to-back mounƟng conĮguraƟon Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) Flint Hills RecreaƟon Complex Rosemount, MN USA GRID SUMMARY Name:West General LighƟng Spacing: 10.0' x 10.0' Height: 3.0' above grade ILLUMINATION SUMMARY MAINTAINED HORIZONTAL FOOTCANDLES EnƟre Grid Scan Average:5.88 Maximum:20 Minimum:0 Avg / Min:14.45 Max / Min:48.96 UG (adjacent pts):1.97 CU:0.03 No. of Points:304 LUMINAIRE INFORMATION Color / CRI: 5700K - 75 CRI / 5700K - 70 CRI Luminaire Output: 160,000 / 16,599 lumens No. of Luminaires: 28 Total Load: 37.44 kW Lumen Maintenance Luminaire Type L90 hrs L80 hrs L70 hrs TLC-LED-1500 >120,000 >120,000 >120,000 CREE OSQ ------ Reported per TM-21-11. See luminaire datasheet for details. Guaranteed Performance:The ILLUMINATION described above is guaranteed per your Musco Warranty document and includes a 0.95 dirt depreciaƟon factor. Field Measurements:Individual Įeld measurements may vary from computer-calculated predicƟons and should be taken in accordance with IESNA RP-6-15. Electrical System Requirements:Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements:Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locaƟons. ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2020 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: Joe Seda • File #206394A • 26-Jun-20 S1 S2 S3S4 0.01 0.02 0.02 0.02 0.04 0.06 0.07 0.06 0.04 0.02 0.02 0.02 0.01 0.01 0.01 0.02 0.02 0.02 0.01 0.02 0.02 0.02 0.03 0.04 0.05 0.05 0.05 0.05 0.05 0.05 0.03 0.02 0.02 0.01 0.01 0.000.000.000.010.020.050.110.170.240.200.130.070.020.010.010.000.00 0.00 0.01 0.02 0.02 0.03 0.05 0.05 0.05 0.05 0.05 0.05 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.02 0.02 0.01 0.01 TNH=961.18ATHLETIC FIELD #3\pxqc;{\fArial|b0|i1|c0|p34;ATHLETICFIELD #5260' X380'}FSSCALE IN FEET 1 : 120 0'120'240' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LUMINAIRE TYPE QTY / POLE THIS GRID OTHER GRIDS2S1-S2 80'-80'TLC-LED-1500 7/7*7 7 2 S3-S4 80'-60' 80' CREE OSQ TLC-LED-1500 1 6 1 6 0 0 4 TOTALS 42 28 14 * This structure uƟlizes a back-to-back mounƟng conĮguraƟon Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) Flint Hills RecreaƟon Complex Rosemount, MN USA GRID SUMMARY Name:AthleƟc Field 4 Spill Spacing: 30.0' Height: 3.0' above grade ILLUMINATION SUMMARY HORIZONTAL FOOTCANDLES EnƟre Grid Scan Average:0.0360 Maximum:0.24 Minimum:0.00 No. of Points:74 LUMINAIRE INFORMATION Color / CRI: 5700K - 75 CRI / 5700K - 70 CRI Luminaire Output: 160,000 / 16,599 lumens No. of Luminaires: 28 Total Load: 37.44 kW Lumen Maintenance Luminaire Type L90 hrs L80 hrs L70 hrs TLC-LED-1500 >120,000 >120,000 >120,000 CREE OSQ ------ Reported per TM-21-11. See luminaire datasheet for details. Guaranteed Performance:The ILLUMINATION described above is guaranteed per your Musco Warranty document. Field Measurements:Individual Įeld measurements may vary from computer-calculated predicƟons and should be taken in accordance with IESNA RP-6-15. Electrical System Requirements:Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements:Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locaƟons. ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2020 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: Joe Seda • File #206394A • 26-Jun-20 S1 S2 S3S4 0.03 0.04 0.04 0.04 0.07 0.11 0.13 0.12 0.08 0.05 0.04 0.04 0.04 0.03 0.02 0.04 0.05 0.04 0.04 0.05 0.05 0.07 0.09 0.11 0.13 0.14 0.14 0.16 0.14 0.16 0.09 0.07 0.05 0.04 0.02 0.010.020.020.040.070.120.200.270.370.320.220.150.090.050.030.020.01 0.01 0.03 0.05 0.06 0.08 0.13 0.16 0.15 0.16 0.14 0.14 0.12 0.10 0.08 0.06 0.05 0.05 0.04 0.05 0.05 0.03 0.02 TNH=961.18ATHLETIC FIELD #3\pxqc;{\fArial|b0|i1|c0|p34;ATHLETICFIELD #5260' X380'}FSSCALE IN FEET 1 : 120 0'120'240' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LUMINAIRE TYPE QTY / POLE THIS GRID OTHER GRIDS2S1-S2 80'-80'TLC-LED-1500 7/7*7 7 2 S3-S4 80'-60' 80' CREE OSQ TLC-LED-1500 1 6 1 6 0 0 4 TOTALS 42 28 14 * This structure uƟlizes a back-to-back mounƟng conĮguraƟon Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) Flint Hills RecreaƟon Complex Rosemount, MN USA GRID SUMMARY Name:AthleƟc Field 4 Spill Spacing: 30.0' Height: 3.0' above grade ILLUMINATION SUMMARY MAX VERTICAL FOOTCANDLES EnƟre Grid Scan Average:0.0857 Maximum:0.37 Minimum:0.01 No. of Points:74 LUMINAIRE INFORMATION Color / CRI: 5700K - 75 CRI / 5700K - 70 CRI Luminaire Output: 160,000 / 16,599 lumens No. of Luminaires: 28 Total Load: 37.44 kW Lumen Maintenance Luminaire Type L90 hrs L80 hrs L70 hrs TLC-LED-1500 >120,000 >120,000 >120,000 CREE OSQ ------ Reported per TM-21-11. See luminaire datasheet for details. Guaranteed Performance:The ILLUMINATION described above is guaranteed per your Musco Warranty document. Field Measurements:Individual Įeld measurements may vary from computer-calculated predicƟons and should be taken in accordance with IESNA RP-6-15. Electrical System Requirements:Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements:Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locaƟons. ILLUMINATION SUMMARY Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2020 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: Joe Seda • File #206394A • 26-Jun-20 S1 S2 S3S4 666 736 741 772 879 2521 2927 2854 1408 827 740 745 696 601 495 915 1382 1187 771 1180 1817 2354 2449 3976 5191 5492 5045 3962 3430 4753 1973 1439 1435 1239 1570 14091315136223963598468255736045787364765712511740752893172713331346 1502 1362 1320 1465 1543 3693 4560 3516 4607 5265 5660 4743 2855 2418 2098 1463 759 997 1375 1191 460 554 TNH=961.18ATHLETIC FIELD #3\pxqc;{\fArial|b0|i1|c0|p34;ATHLETICFIELD #5260' X380'}FSSCALE IN FEET 1 : 120 0'120'240' EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION SIZE GRADE ELEVATION MOUNTING HEIGHT LUMINAIRE TYPE QTY / POLE THIS GRID OTHER GRIDS2S1-S2 80'-80'TLC-LED-1500 7/7*7 7 2 S3-S4 80'-60' 80' CREE OSQ TLC-LED-1500 1 6 1 6 0 0 4 TOTALS 42 28 14 * This structure uƟlizes a back-to-back mounƟng conĮguraƟon Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) Flint Hills RecreaƟon Complex Rosemount, MN USA GRID SUMMARY Name:AthleƟc Field 4 Spill Spacing: 30.0' Height: 3.0' above grade ILLUMINATION SUMMARY CANDELA (PER FIXTURE) EnƟre Grid Scan Average:2506.8481 Maximum:7873.17 Minimum:459.93 No. of Points:74 LUMINAIRE INFORMATION Color / CRI: 5700K - 75 CRI / 5700K - 70 CRI Luminaire Output: 160,000 / 16,599 lumens No. of Luminaires: 28 Total Load: 37.44 kW Lumen Maintenance Luminaire Type L90 hrs L80 hrs L70 hrs TLC-LED-1500 >120,000 >120,000 >120,000 CREE OSQ ------ Reported per TM-21-11. See luminaire datasheet for details. Guaranteed Performance:The ILLUMINATION described above is guaranteed per your Musco Warranty document. Field Measurements:Individual Įeld measurements may vary from computer-calculated predicƟons and should be taken in accordance with IESNA RP-6-15. Electrical System Requirements:Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements:Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locaƟons. EQUIPMENT LAYOUT Not to be reproduced in whole or part without the written consent of Musco Sports Lighting, LLC. ©1981, 2020 Musco Sports Lighting, LLC.ENGINEERED DESIGN By: Joe Seda • File #206394A • 26-Jun-20 Athletic Field 4 380' x 260' S1 S2 S3S4 TP200' EASEMENT PERDOC NO. 37222025' NSP EASEMENT PEREND S.P. 208-080-01STA.73+63.78MATCH EXISTING+34VARIES VARIES1:50TAPER+991:30TAPER19.3'VARIES33'33'28'COUNTY ROAD 73CONSTRUCTION LIMITSCONSTRUCTION LIMITSTNH=961.18ATHLETIC FIELD #1ATHLETIC FIELD #2ATHLETIC FIELD #3\pxqc;{\fArial|b0|i1|c0|p34;ATHLETICFIELD #5260' X380'}\pxqc;{\fArial|b0|i1|c0|p34;ATHLETICFIELD #6260' X380'}\pxqc;{\fArial|b0|i1|c0|p34;ATHLETICFIELD #7\pq*;260' X380'}FSSCALE IN FEET 1 : 200 0'200'400' Pole locaƟon(s)dimensions are relaƟve to 0,0 reference point(s) Flint Hills RecreaƟon Complex Rosemount, MN USA EQUIPMENT LAYOUT INCLUDES: · AthleƟc Field 4 Electrical System Requirements:Refer to Amperage Draw Chart and/or the "Musco Control System Summary" for electrical sizing. InstallaƟon Requirements:Results assume ± 3% nominal voltage at line side of the driver and structures located within 3 feet (1m) of design locaƟons. EQUIPMENT LIST FOR AREAS SHOWN Pole Luminaires QTY LOCATION CLASS GRADE ELEVATION MOUNTING HEIGHT LUMINAIRE TYPE QTY / POLE 2 S1-S2 LSS80C -80'TLC-LED-1500 7/7* 2 S3-S4 LSS80B -60' 80' CREE OSQ TLC-LED-1500 1 6 4 TOTALS 42 * This structure uƟlizes a back-to-back mounƟng conĮguraƟon SINGLE LUMINAIRE AMPERAGE DRAW CHART Ballast SpeciĮcaƟons(.90 min power factor)Line Amperage Per Luminaire(max draw) Single Phase Voltage 208 (60) 220 (60) 240 (60) 277 (60) 347 (60) 380 (60) 480 (60) TLC-LED-1500 8.5 8.1 7.4 6.4 5.1 4.7 3.7 Cree OSQ ----0.4 -0.3 C. CONTROLS AND MONITORING Flint Hills Athletic Complex,206394 Control System Summary Project Information Project #:206394 Project Name: Flint Hills Athletic Complex Date:07/20/20 Project Engineer:Joe Seda Sales Representative:Scott Peitz Control System Type: Control-Link TM Control and Monitoring System Communication Type: PowerLine-ST Scan:206394A Document ID: 206394P1V1-0720113049 Distribution Panel Location or ID: Service 1 Total # of Distribution Panel Locations for Project: 1 Design Voltage/Hertz/Phase: 480/60/3 Control Voltage:120 Equipment Listing DESCRIPTION APPROXIMATE SIZE 1.Control and Monitoring Cabinet 24 X 48 QTY SIZE (AMPS) Total Contactors 2 30 AMP Total Contactors 2 60 AMP Total Off/On/Auto Switches: 1 Project Specific Notes: Materials Checklist Contractor/Customer Supplied: A dedicated control circuit must be supplied per distribution panel location If the control voltage is NOT available, a control transformer is required Electrical distribution panel to provide overcurrent protection for circuits HID rated or D-curve circuit breaker sized per full load amps on Circuit Summary by Zone Chart Wiring See chart on page 2 for wiring requirements Equipment grounding conductor and splices must be insulated (per circuit) Lightning ground protection (per pole), if not Musco supplied Electrical conduit wireway system Entrance hubs rated NEMA 4, must be die-cast zinc, PVC, or copper-free die-cast aluminum Mounting hardware for cabinets Breaker lock-on device to prevent unauthorized power interruption to control power and powerline connection (if present) Anti-corrosion compound to apply to ends of wire, if necessary Call Control-Link CentralTM operations center at 877/347-3319 to schedule activation of the control system upon completion of the installation. Note: Activation may take up to 1 1/2 hours. IMPORTANT NOTES 1. Please confirm that the design voltage listed above is accurate for this facility. Design voltage/phase is defined as the voltage/phase being connected and utilized at each lighting pole's electrical components enclosure disconnect. Inaccurate design voltage/phase can result in additional costs and delays. Contact your Musco sales representative to confirm this item. 2. In a 3 phase design, all 3 phases are to be run to each pole. When a 3 phase design is used Musco's single phase luminaires come pre-wired to utilize all 3 phases across the entire facility. 3. One contactor is required for each pole. When a pole has multiple circuits, one contactor is required for each circuit. All contactors are 100% rated for the published continuous load. All contactors are 3 pole. 4. If the lighting system will be fed from more than one distribution location, additional equipment may be required. Contact your Musco sales representative. 5. A single control circuit must be supplied per control system. 6. Size overcurrent devices using the full load amps column of the Circuit Summary By Zone chart- Minimum power factor is 0.9. NOTE: Refer to Installation Instructions for more details on equipment information and the installation requirements. C 1999,2020 Musco Sports Lighting,LLC Form: T-5030-1T:\206\206394P1V1-0720113049.pdf Control System Summary Flint Hills Athletic Complex / 206394 - 206394A Service 1 - Page 2 of 4 T:\206\206394P1V1-0720113049.pdf Control System Summary Flint Hills Athletic Complex / 206394 - 206394A Service 1 - Page 3 of 4 T:\206\206394P1V1-0720113049.pdf CONTROL POWER CONSUMPTION 120V Single Phase VA loading of Musco Supplied Equipment INRUSH: 1553.0 SEALED: 179.8 SWITCHING SCHEDULE Field/Zone Description Zones Athletic Field 4 1 CIRCUIT SUMMARY BY ZONE POLE CIRCUIT DESCRIPTION # OF FIXTURES # OF DRIVERS *FULL LOAD AMPS CONTACTOR SIZE (AMPS) CONTACTOR ID ZONE S1 Athletic Field 4 14 14 32.0 60 C1 1 S2 Athletic Field 4 14 14 32.0 60 C2 1 S3 Athletic Field 4 7 7 12.8 30 C3 1 S4 Athletic Field 4 7 7 12.8 30 C4 1 *Full Load Amps based on amps per driver. Control System Summary Flint Hills Athletic Complex / 206394 - 206394A Service 1 - Page 4 of 4 T:\206\206394P1V1-0720113049.pdf PANEL SUMMARY CABINET # CONTROL MODULE LOCATION CONTACTOR ID CIRCUIT DESCRIPTION FULL LOAD AMPS DISTRIBUTION PANEL ID (BY OTHERS) CIRCUIT BREAKER POSITION (BY OTHERS) 1 1 C1 Pole S1 32.04 1 1 C2 Pole S2 32.04 1 1 C3 Pole S3 12.82 1 1 C4 Pole S4 12.82 ZONE SCHEDULE CIRCUIT DESCRIPTION ZONE SELECTOR SWITCH ZONE DESCRIPTION POLE ID CONTACTOR ID Zone 1 1 Athletic Field 4 S1 C1 S2 C2 S3 C3 S4 C4