HomeMy WebLinkAbout7.b. Stormwater Pond Maintenance
EXECUTIVE SUMMARY
Utility Commission Meeting: August 24, 2020
AGENDA SECTION:
AGENDA ITEM: Stormwater Pond Maintenance
New Business
PREPARED BY: Brian Erickson, P.E. Director of Public Works
AGENDA NO. 7.b.
/ City Engineer
ATTACHMENTS: None APPROVED BY: BLE
RECOMMENDED ACTION: None, informational only
BACKGROUND
The City of Rosemount has numerous constructed and naturally occurring stormwater ponds. As part of
the stormwater management program, the city has several ponds inspected annually and receives a
numerical rating (0 – 100) for each of these ponds. In addition, the consultant provides an estimated cost
for necessary improvements. At the meeting, staff will present additional information regarding the
planned work as well as discuss the process for prioritizing, funding and completing these maintenance
projects.
C:\\Users\\jab\\AppData\\Local\\Temp\\7.b. Stormwater Pond Maintenance_610747\\7.b. Stormwater Pond Maintenance.docx