HomeMy WebLinkAbout7.b. Autumn Path Extension Project, City Project 2019-07 Assessment HearingI:\City Clerk\Agenda Items\Approved Items\7.b. Autumn Path Extension Project, City Project 2019-07 Assessment Hearing.docx
EXECUTIVE SUMMARY
City Council Regular Meeting: September 15, 2020
AGENDA ITEM: Autumn Path Extension Project, City
Project 2019-07 Assessment Hearing
AGENDA SECTION:
Public Hearing
PREPARED BY: Brian Erickson, PE, Director of Public
Works/City Engineer
Stephanie Smith, PE, Assistant City
Engineer
AGENDA NO. 7.b.
ATTACHMENTS: Resolution, Assessment Roll APPROVED BY: LJM
RECOMMENDED ACTION: Motion to
1. Re-Open Public Hearing on Assessment
2. Adopt a Resolution Approving the Assessment Roll for the Autumn Path Extension
Project, City Project 2019-07.
BACKGROUND
The Autumn Path Improvement Project, City Project 2019-07, would consist of construction of a
42-foot wide asphalt collector roadway with curb and gutter. Pedestrian facilities will include a trail
on the east side and sidewalk on the west side of the road. Storm pipe will be constructed to ponds
within the Bella Vista development. Raw and potable watermain will be installed along the road
along with some sanitary sewer.
On December 3, 2019, several of the property owners of the property proposed for assessment
attended the improvement hearing with concerns. Staff has sent a Petition and Waiver to the
property owners to execute if they would like to defer the assessed amount for 10 years, or until the
subdivision of the property, whichever occurs first.
On May 19, 2020, the Rosemount City Council awarded the contractor for this project.
The City received a letter dated June 12, 2020 on behalf of the owners of the property proposed for
assessment, which disputes the special benefit to their property. To obtain more information to
present to the concerned property owners, the Council continued the assessment hearing to the
September 15, 2020 meeting.
The City’s consulting appraiser has completed an unrestricted special benefit analysis, which
confirms the original appraisal amount. This report is available upon request for review at the
Rosemount Engineering Department.
2
COSTS & FUNDING
The estimated total project cost is $1,963,172.90. This amount includes 5% for contingency and
25% for incidentals such as engineering, legal, financing and administrative costs. The cost by
improvement type is shown in the table below.
Construction
Cost
Contingency
(5%)
Indirect
(25%) Total
Street
Improvements $991,787.50 $49,589.38 $247,946.88 $1,289,323.75
Stormwater $195,224.00 $9,761.20 $48,806.00 $253,791.20
Sanitary Sewer $55,403.50 $2,770.18 $13,850.88 $72,024.55
Water $267,718.00 $13,385.90 $66,929.50 $348,033.40
Total $1,963,172.90
The funding anticipated for the project is shown in the table below. The street improvements will be
funded by developer fees and assessment of abutting property. The City used a restricted special
benefit appraisal of the benefitting property to assist with determination of the assessment amount.
That benefit appraisal was updated to an unrestricted version and it confirms the initial
determination of special benefit. Utility work would be funded by the respective utility core funds.
PROJECT FUNDING ESTIMATE
Developer Fees (to be collected with Bella Vista
subdivisions) $644,661.88
Special Assessment (PID 34-02200-25-010) $644,661.88
Sanitary Core Fund $72,024.55
Water Core Fund $348,033.40
Storm Core Fund $253,791.20
TOTAL $1,963,1722.90
RECOMENDATION
Staff recommends Council re-open the public hearing for the purposes of assessment and pass upon
all objections. Following that staff is recommending recommends Council adopt the assessment roll
for the Autumn Path Extension Project, City Project 2019-07.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2020 – 100
A RESOLUTION ADOPTING THE ASSESSMENT ROLL
FOR AUTUMN PATH EXTENSION, CITY PROJECT 2019-07
WHEREAS, pursuant to proper notice duly given as required by law, the council has met and heard and
passed upon all objections to the proposed assessment for Autumn Path Extension, City Project 2019-07,
the improvement of Autumn Path from Bonaire Path to approximately 2600 feet north of Bonaire Path.
NOW THEREFORE BE IT RESOLVED by the City Council of the City of Rosemount, Minnesota:
1. Such proposed assessment, a copy of which is attached hereto and made a part hereof, is hereby
accepted and shall constitute the special assessment against the lands named therein, and each tract
of land therein included is hereby found to be benefited by the proposed improvement in the
amount of the assessment levied against it.
2. Such assessment shall be payable in equal annual installments extending over a period of 10 years,
the first of the installments to be payable on or before the first Monday in January 2021, and shall
bear interest at the rate of 3.45 percent per annum from the date of the adoption of this assessment
resolution. To the first installment shall be added interest on the entire assessment from the date of
this resolution until December 31, 2020. To each subsequent installment, when due, shall be added
interest for one year on all unpaid installments.
3. The owner of any property so assessed may, at any time prior to certification of the assessment to
the county auditor, pay the whole of the assessment on such property, with interest accrued to the
date of payment, to the city treasurer, except that no interest shall be charged if the entire
assessment is paid by October 31, 2020; and the owner may, at any time thereafter, pay to the city
treasurer the entire amount of the assessment remaining unpaid, with interest accrued to December
31 of the year in which such payment is made. Such payment must be made before November 15 or
interest will be charged through December 31 of the next succeeding year.
4. On October 31, 2020, the City Clerk shall transmit a certified duplicate of this assessment to the
county auditor to be extended on the property tax lists of the county. Such assessments shall be
collected and paid over in the same manner as other municipal taxes.
ADOPTED this 15th day of September, 2020
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
FINAL ASSESSMENT ROLL
Autumn Path Extension - City Project 2019-07
Parcel #PID Owner Site Address Owner Mailing Address Owner City, State, Zip Proposed Assessment Notes
1 344746000010 John E McMenomy 1283 Bonaire Path W 1283 Bonaire Path W Rosemount MN 55068 $644,661.88 Rate Based on Special Benefit Appraisal