HomeMy WebLinkAbout6.g. Receive Feasibility Report and Call for Improvement Hearing for the 2021 Street Improvement Project, City Project 2021-01
EXECUTIVE SUMMARY
City Council Meeting: October 20, 2020
AGENDA ITEM: Receive Feasibility Report and Call for
Improvement Hearing for the 2021 Street AGENDA SECTION:
Improvement Project, City Project 2021-Consent
01
PREPARED BY: Brian Erickson, PE, Director of Public
Works / City Engineer
AGENDA NO. 6.g.
Stephanie Smith, MN PE, Assistant City
Engineer
ATTACHMENTS: Resolution, Location Map APPROVED BY: LJM
RECOMMENDED ACTIONS: Motion to Adopt a Resolution Receiving the Feasibility
Report and Calling for the Improvement Public Hearing for 2021 Street Improvement
Project, City Project 2021-01.
BACKGROUND
The 2021 Street Improvement Project, City Project 2021-01, is proposed to consist of an asphalt mill and
overlay on the following streets:
th
Upper 149 St W between Crandall Ave and Colorado Ave
thth
Covington Ave between 147 St W and Upper 149 St W
Colorado Ave
th
157 Ct W
th
157 St W
th
Darling Path between Danbury Ave and 200 feet south of Upper 156 St W
th
156 St W between Darling Path and Shannon Parkway
th
Upper 156 St W
th
156 Ct W
Dapple Ct
Dapple Cir
thth
Danville Ave between 156 St W and 156 Ct W
Cumberland Ave
Crocus Ave
Crocus Ct
Crystal Ct
Crystal Path between Danville Ave and Shannon Parkway
Minor utility work, rehabilitation of pedestrian ramps to meet current ADA requirements, and boulevard
ash tree removals within the project limits will also be included.
On August 4, 2020 the Council approved a contract for engineering services with Bolton & Menk, Inc.
(BMI) for 2021 Street Improvement Project, City Project 2021-01. BMI authored a report on the feasibility
c:\\users\\jab\\appdata\\local\\temp\\6.g. receive feasibility report and call for improvement hearing for the 202_617989\\6.g. receive feasibility report and call for
improvement hearing for.docx
of this project. Detailed project information is included in the Feasibility Report available on file in the
Engineering Department. The report found this project, as proposed, to be feasible, cost effective, and
necessary.
City staff hosted a neighborhood meeting on October 8, 2020. Residents within the project area asked
questions about the assessment amounts and policies for payment along with the construction timeline
and proposed ash tree removals.
The resolution calls the Public Improvement Hearing on November 17, 2020, which is a necessary step
under the Minnesota Statutes Chapter 429. A full presentation of the proposed improvements will be
made at the Hearing.
COSTS & FUNDING
The Feasibility Report estimated the project cost at $1,705,000 as tabulated below:
The project is proposed to be funded by a combination of MN State-Aid funds, general funds, utility
funds, and special assessments of benefitting properties.
This project is scheduled in the 2020-2029 CIP. The estimated cost from the Feasibility Report is
approximately 19% higher than the CIP estimate. Most of the cost increase is due to water utility and
pedestrian improvements. Because of the project location staff recommends that the improvement hearing
and design work proceed. During the bidding process, staff anticipates that the project would be bid with
additive alternates in order to allow a reduced scope and thus reduced cost. The portion not awarded
would then be fully designed and could be rebid at a future date.
A preliminary assessment roll is included in the Feasibility Report. Assessments are proposed in
accordance with the Rosemount Special Assessment Policy. 35% of the Street Improvement costs will be
assessed and the remaining 65% will be paid by the Street CIP Fund. The assessments are proposed as a
unit assessment, meaning the amount will be the same for all single-family properties with a driveway
access to a street within the project area.
2
SCHEDULE
Should the Council approve this resolution, the proposed project schedule is shown below. Items marked
“CC” will require City Council approval in order to move forward.
CC Receive Feasibility Report and Set Improvement Hearing October 20, 2020
CC Improvement Hearing, Order Improvement and November 17, 2020
Authorize Preparation of Plans & Specs
CC Approve Plans & Specs and Order Advertisement for Bid January 19, 2021
Bid Opening February 2021
CC Set Assessment Hearing February 2021
Public Open House July 2019
CC Assessment Hearing, Award Contract March 2021
Construction Start Summer 2021
Substantial Completion Fall 2021
RECOMMENDATION
Staff recommends Council adoption of the attached resolution receiving the feasibility report, calling for
the improvement public hearing for the 2021 Street Improvement Project, City Project 2021-01.
3
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2020 - 116
A RESOLUTION ACCEPTING THE FEASIBILITY REPORT AND
CALLING A PUBLIC HEARING FOR IMPROVEMENT FOR THE
2021 STREET IMPROVEMENT PROJECT, CITY PROJECT 2021-01
WHEREAS, pursuant to Resolution 2020-88 adopted August 4, 2020, a report has been prepared
by Bolton and Menk, Inc. with reference to proposed Improvement No. 2021-01, the following
streets with a mill and overlay:
th
Upper 149 St W between Crandall Ave and Colorado Ave
thth
Covington Ave between 147 St W and Upper 149 St W
Colorado Ave
th
157 Ct W
th
157 St W
th
Darling Path between Danbury Ave and 200 feet south of Upper 156 St W
th
156 St W between Darling Path and Shannon Parkway
th
Upper 156 St W
th
156 Ct W
Dapple Ct
Dapple Cir
thth
Danville Ave between 156 St W and 156 Ct W
Cumberland Ave
Crocus Ave
Crocus Ct
Crystal Ct
Crystal Path between Danville Ave and Shannon Parkway
WHEREAS, this report was received by the council on October 20, 2020, and
WHEREAS, the report provides information regarding whether the proposed improvement is
necessary, cost-effective, and feasible; whether it should best be made as proposed or in connection
with some other improvement; the estimated cost of the improvement as recommended; and a
description of the methodology used to calculate individual assessments for affected parcels.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ROSEMOUNT, MINNESOTA:
1. The Council will consider the improvement of such street in accordance with the report and
the assessment of abutting property for all or a portion of the cost of the improvement
pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvement
of $1,705,000.
2. A public hearing shall be held on such proposed improvement on the 17th day of
November, 2020, in the Council Chambers of the City Hall at 7:00 p.m. and the clerk shall
give mailed and published notice of such hearing and improvement as required by law.
th
ADOPTED this 20 day of October, 2020.
William H. Droste, Mayor
ATTEST:
_______________________________
Erin Fasbender, City Clerk
CAMERO LNCLARET AVECRANDALL AVECHIANTIDELMAR CTPA
T
H
CTPKWY TH ST W (CSAH 42)AVESHANNONDARTMOORCT
DECEMBER TRL
BOULDER AVEBISCAYNE AVEU 145THST W
CIMARRONAVEWDAW
S
O
N
P
L
DENVER CTBITTER
-SWEETCT150TH ST W (CSAH 42)DECEMBERBI
T
T
E
R
-S
W
E
E
T
CI
RBLOOOMFIELDWAY
U. 149TH ST W
153RD ST W
151ST ST W
STATION TRLBRAZIL AVE
156TH ST W
144TH ST W
DIAMOND PATH (CR 33)155TH ST W
147TH ST W
146TH
BLOOOMFIELDPL
BLOOMFIELD
CIRCOBBLER AVEDELFT AVE WCAMEO AVE148TH ST WDALLARA BLANCA AVE154TH ST W
CT
COBALT DR
CRYSTALPATH
152ND ST WDANVILLE AVE WBOULDER TRL BLOOMFIELDDARLING PATH CANADAAVE145TH ST W
BOXWOOD PATHCORNELL TRL
158TH ST W
148TH ST W
COVINGTON AVEBEECH ST W
CT147TH ST W
CAMBRIAN AVEBURMA AVECOLORADO AVEDAVENPORTAVECHIPPENDALE AVEST
STW COBAL
TLANE154TH CT W CARROUSELWAYU. 147TH ST W
B AY B E R RY T R L
CARDINAL
L. 147THDAWSON CT
CASCADE
158TH CT W
157TH CT W
D
A
M
A
S
K
153RD ST WDAMASK AVEDAKOTA DR159TH CT W
157TH ST WDANBURYAVEW
160TH ST W (CSAH 46)CROCUSAVEU. 148TH ST WDAHOMEY AVE W149TH ST W
CRESTVIEW152ND CT W
COLUMBIAL. 150TH ST W
DANBURYDANVILLE
AVEWCHI LI CT BUSINESSPKWYBAYBERRY
BURNLEY AVEBOYSENBERRY CTCHROME
CRESTONEAVEBLACKBERRY
AVECIR150C OLU
MBIA151ST CT W
CUMBERLANDCANTATA AVE WCHORLEYCAMFIELDU 145TH ST W
CHARLSTON AVEAVEST WCARDINAL PATHAVECICERONECIRCLEB LU EB ER R YC TCROCUS
C TBI S C A Y NEWAYDAKOTALNBAYBERRYST W
156 T H STW
153RD ST W CANADA AVE148TH ST W147TH ST W
U.149TH
154TH ST W
149TH
158TH ST W
151ST ST W
156TH ST W
146TH ST W
DODD CIMARRONAVEWUPPER 149TH ST W
U.149H ST W
155TH ST W
147TH ST W
CIMARRONAVEW152ND
144TH ST W
151ST
ST W CIMARRON
A
V
E
146TH ST W
DANVILLEAVEDANVILLE AVE WLOWER 147TH ST W
CHILI AVECLARET AVEU. 148THST W
CICERONEPATHWAY S
ROB
ER
T
TR
L
DECEMBERWAY
CHERRYCOLUMBARY
CTCTCORNELLCT SCRYSTALDAPPLECIRDAPPLE CTCARDINALCIREVER
L
E
I
G
H
C
I
R
DERBYCIR
CRESTONECIRCRESTVIEWCIRCLARETCIR CIMARRON CIMARRON CTCTDEWBERRY CT
DARJEE
L
I
N
G
CT
155TH
CT W
COLUMBARY CIR
CHOKECHERRY AVEU. 149TH CTBRENNER CT
BOSTONCIR
CRESCENT CIR
CHASEWOOD CTC
H
E
S
T
N
U
TWA
Y
CIRCTWAY
WAY
U. 156TH
W156TH
C
T
WDARLING PATHDARLING PATH
CINN A M ONWAYCORNELLCT N
CTCRESTONECTCRESTONEPATHTRL
CANADA CIRCHEVELLECT151ST
S
T
WDAMASKC
T WAYPATHBLVD ATWATER WAY
AVEB ENTLEYST W
CIC E RONEPATHBOISECIR
DARJEELINGPATHCO R N E LL
AZALEA P A THC
O
B
A
L
T
A
V
E
D
A
LLARAAVEW144THST W
TRL (STH 3)160TH ST W (CSAH
4
6
)S ROBERT(STH 3)U 145TH ST W
146THST W
145TH ST W
CHRYSLERDAYBREAK AVEAURORA AVE
160TH ST W (CSAH 46)
B
O
U
L
D
E
R
CT---- 149TH ST WL 147THCT
149TH ST W ALLINGHAMAVEALMAAVE158TH CIR W
2021 Street CIP
5/12/2020
2021 Street Rehabilitation Project
Document Path: T:\Project\Engineering\Derick\2021_Street_CIP.mxd