HomeMy WebLinkAbout6.h. 2021-2025 Dakota County Capital Improvement Program EXECUTIVE SUMMARY City Council Regular Meeting: October 20, 2020 AGENDA ITEM: 2021-2025 Dakota County Capital AGENDA SECTION: Improvement Program Consent PREPARED BY: Brian Erickson, PE, Director of Public AGENDA NO. 6.h. Works/City Engineer ATTACHMENTS: Resolution; Dakota County 2021-2025 APPROVED BY: LJM Capital Improvement Plan RECOMMENDED ACTION: Motion to Adopt a Resolution Supporting the Dakota County 2021-2025 Capital Improvement Program BACKGROUND Dakota County has prepared their 2021-2025 Capital Improvement Plan (CIP), a copy of which is attached. Highlighted in the draft CIP are the Dakota County projects programmed within the City of Rosemount. As in the past, the County is requesting a City resolution of support for the projects identified in their CIP. The following projects are included in the 2021-2025 CIP:  CSAH 33 Intersection at Connemara: This project improves the intersection by constructing a roundabout. Dakota County’s CIP shows final design in 2020. Right of way acquisition follows in 2021 and construction to start in 2022. This is a State Aid eligible project and is currently programmed in the city’s 2021 – 2030 Capital Improvement Program.  CR 73/CSAH 42 Intersection Improvements: This project is planned for design in 2020 with construction following in 2021. It will install a signal at this intersection; complete improvements along Akron south of CSAH 42 and perform median work along CSAH 42. There is a planned city cost share, which is eligible for MSAS funding. In addition, Rosemount has requested that water main be extended under CSAH 42 in preparation for anticipated development south. This is in the city’s 2021 – 2030 Capital Improvement Program.  MN Trunk Highway 3 Corridor Review: No city cost share. This project provides for a review of the MN Highway 3 corridor from CSAH 42 to I-494 through Rosemount, Eagan and Inver Grove Heights.  CSAH 42 Corridor Visioning Study: This project provides for a corridor review of CSAH 42 from the western Dakota County line to MN Trunk Highway 52 through Burnsville, Apple Valley and Rosemount. This is in the city’s 2021 – 2030 Capital Improvement Program.  CSAH 46 – 2 to 4 Lane Expansion: Currently the City has entered into a Joint Powers Agreement with Dakota County for a corridor study and preliminary engineering. Study and design work has begun and will continue into 2021. This will provide for a better cost estimate for the expansion of CSAH 46 between MN Highway 3 and MN Highway 52. Final design and construction would be approved at a future date. Currently the estimated cost is $27,600,000 total and estimated city share of $2,584,000. Currently Rosemount has right-of-way acquisition and C:\\Users\\jab\\AppData\\Local\\Temp\\6.h. 2021-2025 Dakota County Capital Improvement Program_618515\\6.h. 2021-2025 Dakota County Capital Improvement Program.docx construction shown as a Future (unprogrammed) project with no estimated start date. This work would be eligible for MSAS funding.  Mississippi River Greenway (formerly Mississippi River Regional Trail): This project is planned as the final portion of the trail connection between South Saint Paul and Hastings. As part of this project Dakota County is proposing to reconstruct a portion of Pine Bend Trail at no cost to the city. Rosemount has requested that the remainder or Pine Bend Trail be reconstructed between MN Trunk Highway 55 and the easterly end of the existing trail thus providing a new pavement for the length. This would be solely funded by the City of Rosemount. This is in the city’s 2021 – 2030 Capital Improvement Program.  CSAH 33 Scoping Study: This is shown in 2024 as a corridor review between Connemara Trail and Pilot Knob Road. City cost portion would be shared between Rosemount and Apple Valley. This project is not in the city’s 2021-2030 Capital Improvement Plan.  Robert Trail Library: No city cost share. This project is a planned renovation for 2022/2023. Those projects that require a city cost share based on the county cost share policy are currently in the City of Rosemount’s 2021-2030 Capital Improvement Plan. Those projects that are in the out years will require a joint powers agreement that will be negotiated at a future date and brought before Council for approval. RECOMMENDATION Staff recommends Council approval of the attached resolution supporting the Dakota County 2021-2025 Capital Improvement Plan. 2 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2020 – 118 A RESOLUTION SUPPORTING THE DAKOTA COUNTY 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PLAN WHEREAS, Dakota County has asked cities and townships for input on the Dakota County 2021-2025 Transportation Capital Improvement Plan, and; WHEREAS, the following transportation projects and policies are important to the City of Rosemount: th  CSAH 33 Intersection at Connemara/140 St – continue to support this project through the planning, design in 2021, right of way acquisition in 2022 and construction in 2023  CR 73/CSAH 42 Intersection Improvements – continue to support this project through design in 2020 and construction 2021.  MN Trunk Highway 3 Corridor Review – continue to support this project through the planning and study process.  CSAH 42 Corridor Visioning Study – continue to support this project thought the study process.  CSAH 46 – 2 to 4 Lane Expansion – continue to support this project thought the study and preliminary design process. Final design and construction will require future approvals.  Mississippi River Greenway (formerly Mississippi River Regional Trail) – continue to support this project through the planning, design and construction process.  CSAH 33 Scoping Study – support this review in the planning process with future approval and city capital plan approval provided at a later date.  Robert Trail Library – support this project through the design and construction WHEREAS, the City of Rosemount intends to participate in costs associated with these projects in accordance with the applicable county cost sharing policies. WHEREAS, the City of Rosemount has funding programmed for the various Dakota County projects based on the estimated cost share per the Dakota County cost share policy. NOW THEREFORE BE IT RESOLVED, the City of Rosemount hereby supports the above mentioned projects for inclusion in the Dakota County 2021-2025 Transportation Capital Improvement Plan. th ADOPTED this 20 day of October, 2020. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk TABLE OF CONTENTS Transportation 2 Parks and Greenways 11 Buildings 16 Environmental Resources 22 Data Networks 24 Regional Railroad Authority 25 Byllesby Dam 26 1 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021 Section PRESERVATION: Paved Highway Surface (Wheelage Tax $ & Gravel Tax $)7,710,000 - - - 6,560,000 1,150,000 - - Transportation Fund Dakota County Gravel Highway Surface (CR's 83, 94 & possibly 73)620,000 - - - - 620,000 - - Transportation Fund Dakota County Gravel Highway Surface - Repairs Spot Locations 50,000 - - - - 50,000 - - Transportation Fund Dakota County Traffic Safety & Operation Durable Pavement Markings 350,000 - - - 300,000 50,000 - - Transportation Fund Dakota County Pedestrian & Bicycle Facilities 1,100,000 - - - - 1,100,000 - - Transportation Fund Retaining Wall Maintenance 330,000 - - - 230,000 100,000 - - Transportation Fund Storm Sewer Maintenance 400,000 80,000 - - - 320,000 - - Transportation Fund 2021 Sales and Use Tax Preservation SubTotal:- - - - - - - - 2021 Transportation Preservation SubTotal:10,560,000 80,000 - - 7,090,000 3,390,000 - - 2021 Preservation Total 10,560,000 80,000 - - 7,090,000 3,390,000 - - MANAGEMENT: T09062 9-62 CSAH 9 At 210th Street (1 of 2), L'ville Lead only Co $ROW Acquisition Roundabout Lakeville 104,000 - - - - 104,000 - - Transportation Fund Lakeville T30039 30-39 CSAH 30 CSAH 43 (Lexington) to Trenton Rd ROW Acquisition/Construction Eagan 5,820,000 400,000 - 4,620,000 400,000 400,000 - - Transportation Fund Dakota County T32091 32-91 CSAH 32 DuPont Ave to I-35 (B'ville lead only Co $ shown)ROW Acquisition Roundabout Burnsville 1,050,000 - - - 1,050,000 - - - Transportation Fund Burnsville T32093 32-93 CSAH 32 At Thomas Center/Beacon Hill (access rev.) At Thomas Lake/Stone Cliff Rd (signal)ROW Acquisition (TBD Study Rec)Eagan 200,000 100,000 - - 100,000 - - - Transportation Fund Dakota County T33015 33-15 CSAH 33 At 140th St/Connemara Trail Roundabout ROW Acquisition Roundabout Apple Valley, Rosemount 350,000 157,500 - - 172,500 20,000 - - Transportation Fund Dakota County T38060 38-60 CSAH 38 Eveleth Path to Diamond Path/126th (1 of 2)Construction Median Modifications Apple Valley 150,000 - - - - 150,000 - - Transportation Fund Dakota County T47045 47-45 CSAH 47 At CSAH 85 (Goodwin Ave)ROW Acquisition Vermillion Township 450,000 - - - 450,000 - - - Transportation Fund Dakota County T66018 66-18 CSAH 66 At TH 3 (Only Co $ shown, MnDOT lead)Construct Roundabout (MnDOT)Farmington, Empire Twp 1,480,000 - - - 1,440,000 40,000 - - Transportation Fund MnDOT xx-xx Trails Bike, Ped, Transit, Trail Gap Set Aside To Be Determined To Be Determined - - - - - - - - Transportation Fund T56012 56-12 "new"CSAH 56 Concord Turnback Pass-Thru MnDOT/SSP (County $ for Construct by SSP)South St Paul 4,320,000 - - 4,320,000 - - - - Transportation Fund Pass Through $ xx-xx Trails Trail Gap Set Aside (TBD)Design/ROW/Construct Trail Gaps To Be Determined 700,000 105,000 - - - 595,000 - - Transportation Fund TBD Jurisdictional Classification - - - - - - - - Transportation Fund Dakota County ROW Preservation & Management 500,000 225,000 - - - 275,000 - - Transportation Fund Dakota County Safety & Management 1,500,000 - - - 500,000 1,000,000 - - Transportation Fund Dakota County Signal Projects Signal Revisions/Communications 300,000 150,000 - - 150,000 - - - Transportation Fund Dakota County NEW Roberts Trail S (TH 3) CSAH 42 and I-494 Scoping/Preliminary Engineering Eagan, Rosemount, IGH 300,000 - - 150,000 - - 150,000 - Sales and Use Tax Fund Dakota County NEW TH 316 TH 61 to Tuttle Drive Roadway Construction Hastings 1,100,000 - - - - - 1,100,000 - Sales and Use Tax Fund MnDOT NEW 42-156 CSAH 42 at CR 73 (Akron Ave)Intersection improvements at CSAH 42 & CR 73 Construction Rosemount 2,700,000 750,000 - - - - 1,950,000 - Sales and Use Tax Fund Dakota County ST00010 99-012 CSAH 23 At 140th Street Design Apple Valley 700,000 105,000 - - - - 595,000 - Sales and Use Tax Fund Dakota County NEW 42-144 CSAH 42 W. Dakota County Line to TH 52 Design Burnsville, AV, RSMT 730,000 248,000 - - - - 482,000 - Sales and Use Tax Fund Dakota County NEW Reimburse Parks CIP MN River Greenway FT Snelling Construction Eagan 1,000,000 - - - - - 1,000,000 - Sales and Use Tax Fund Dakota County 2021 Sales and Use Management SubTotal:6,530,000 1,103,000 - 150,000 - - 5,277,000 - 2021 Transportation Management SubTotal:16,924,000 1,137,500 - 8,940,000 4,262,500 2,584,000 - - 2021 Management Total 23,454,000 2,240,500 - 9,090,000 4,262,500 2,584,000 5,277,000 - REPLACEMENT & MODERNIZATION: T78012 78-12 CSAH 78 CSAH 79 (Blaine) to CSAH 47, includes Replace Bridge L3166 (Chesley Tr)Construction, bit over to 50 & Replace Bridge L3166 (Chesley Trail)Castle Rock Twp, Hampton 4,900,000 - 150,000 4,701,000 49,000 - - Transportation Fund Dakota County T88020 88-20 CSAH 88 West of Finch Ct to TH 52 (split into Ph 1 & 2)Construction - Phase 1 Randolph Township 6,100,000 - - - 6,100,000 - - Transportation Fund Dakota County T96007 96-07 CR 96 W Dak Co line to CSAH 23 (Rice Co $80K)ROW Acq (Wheelage $, less Rice Co)Greenvale Twp 1,632,400 - - - 1,632,400 - - Transportation Fund Dakota County T80021 80-21 CSAH 80 Replace Bridge L3164, CSAH 80 (255th St)Replace Bridge L3164 Castle Rock Twp 300,000 - 150,000 150,000 - - - Transportation Fund Dakota County Traffic Signal Replacement Replace/New/Geometrics 1,000,000 475,000 - 525,000 - - - Transportation Fund Dakota County NEW 86-34 CSAH 86 (280th St)East of CSAH 23 (Foliage Avenue) to Trunk Highway 3 Construction Castle Rock, Eureka, Greenvale and Waterford 11,000,000 - 4,200,000 - - - 6,800,000 - Sales and Use Tax Fund Dakota County 2021 Sales and Use Tax Replacement & Modernization SubTotal:11,000,000 - 4,200,000 - - - 6,800,000 - 2021 Transportation Replacement & Modernization SubTotal:13,932,400 475,000 - 300,000 5,376,000 7,781,400 - - 2021 Replacement & Modernization Total 24,932,400 475,000 4,200,000 300,000 5,376,000 7,781,400 6,800,000 - EXPANSION: T26054 26-54 CSAH 26 TH 55 to TH 3 (SP 019-626-026)Construction Eagan, Inver Grove Heights 16,500,000 5,255,000 7,000,000 - 4,080,000 165,000 - - Transportation Fund Dakota County T97206 97-206 New CR 60 New 185: Highview to Hamburg (Only Co $)Design/ROW Acq/Construction Lakeville 716,000 - - - - 716,000 - - Transportation Fund Lakeville T63027 63-27 New CR 63 CSAH 28 (Amana Tr) to N new alignment Construction Inver Grove Heights 8,340,000 1,806,000 - - 2,967,000 903,613 - 2,663,387 Transportation Fund Dakota County ST00011 99-013 CSAH 46 TH 3 to TH 52 Design Rosemount, Empire 1,600,000 144,000 - - - - 1,456,000 - Sales and Use Tax Fund Dakota County NEW 99-017 CSAH 70 CSAH 9 (Dodd Boulevard) to Humboldt Court Construction Lakeville 1,125,000 - - - - - 1,125,000 - Sales and Use Tax Fund Dakota County 2021 Sales and Use Tax Expansion SubTotal:2,725,000 144,000 - - - - 2,581,000 - 2021 Transportation Expansion SubTotal:25,556,000 7,061,000 7,000,000 - 7,047,000 1,784,613 - 2,663,387 2021 Expansion Total 28,281,000 7,205,000 7,000,000 - 7,047,000 1,784,613 2,581,000 2,663,387 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM 2 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM RESOURCES: T09062 9-62 CSAH 9 At 210th Street (2 of 2), L'ville Lead only Co $Design Roundabout Lakeville 61,000 - - - - 61,000 - - Transportation Fund Lakeville T28044 28-44 CSAH 28 At Elrene Rd, at Mike Collins Dr Design Consultant Eagan 40,000 18,000 - - 22,000 - - - Transportation Fund Dakota County T38058 38-58 CSAH 38 CSAH 5 to CSAH 31 (Pilot Knob)Design ATMS Consultant Apple Valley, Burnsville 200,000 90,000 - - 110,000 - - - Transportation Fund Dakota County T38060 38-60 CSAH 38 Eveleth Path to Diamond Path/126th (2 of 2)Design Consultant Apple Valley 40,000 - - - - 40,000 - - Transportation Fund Dakota County T38061 38-61 CSAH 38 CSAH 5 to east of Burnhaven Corridor Study Burnsville 50,000 22,500 - - 27,500 - - - Transportation Fund Dakota County T46058 46-58 CSAH 46 At CSAH 33 (Diamond Path)Design Consultant AV, LV, RSMT & Empire Twp 160,000 - - - - 160,000 - - Transportation Fund Dakota County T59005 59-05 CR 59 TH 19 to CSAH 47 (Northfield Blvd) Design (Wheelage Tax $)Sciota Township 100,000 - - - - 100,000 - - Transportation Fund Dakota County T81014 81-14 "New" 81 CSAH 66 (200th St) to CSAH 46/48 Design Consultant (Wheelage Tax $)Empire/Vermillion Twp 1,200,000 - - - - 1,200,000 - - Transportation Fund Dakota County T83010 83-10 CR 83 CSAH 88 (292nd St) to Cannon River Design (Wheelage Tax $)Randolph City/Twp 53,000 - - - - 53,000 - - Transportation Fund Dakota County T88023 88-23 CSAH 88 CR 94 (Cooper Ave) to TH 56 Design Consultant City of Randolph 272,200 - - - 272,200 - - - Transportation Fund Dakota County T97xxx 97-xx Various Retaining Wall Design Burnsville, Apple Valley 150,000 - - - - 150,000 - - Transportation Fund Dakota County Attorney Reimbursement 251,842 - - - - 251,842 - - Transportation Fund Dakota County CIP Reimbursement to Operations (Wheelage Tax $ @$275K)4,692,210 576,846 - - 2,476,977 1,638,387 - - Transportation Fund Dakota County Future Studies/Professional Services 400,000 60,000 - - - 340,000 - - Transportation Fund Dakota County Township Road Distribution 20,900 - - - - 20,900 - - Transportation Fund Dakota County Consultant Communication Service (only list in 2021)150,000 - - - - 150,000 - - Transportation Fund Dakota County Consultant Construction Administration 600,000 - - - 300,000 300,000 - - Transportation Fund Dakota County ST00009 Reimburse Transit Operations 1,121,112 - - - - - 1,121,112 - Sales and Use Tax Fund 2021 Sales and Use Tax Resources SubTotal:1,121,112 - - - - - 1,121,112 - 2021 Transportation Resources SubTotal:8,441,152 767,346 - - 3,208,677 4,465,129 - - 2021 Resources Total 9,562,264 767,346 - - 3,208,677 4,465,129 1,121,112 - TRANSIT: ST00003 Various Various Bus Shelter Pad Construction TBD 50,000 - - - - - 50,000 - Sales and Use Tax Fund Dakota County/MVTA ST00005 Transit Service Expansion Set Aside Various/TBD 213,000 - - - - - 213,000 - Sales and Use Tax Fund NEW NEW Burnsville Transit Station Transit - Construction Burnsville 82,000 - - - - - 82,000 - Sales and Use Tax Fund MVTA NEW NEW Eagan Transit Station Transit - Construction Eagan 55,000 - - - - - 55,000 - Sales and Use Tax Fund MVTA 2021 Sales and Use Tax Transit SubTotal:400,000 - - - - - 400,000 - 2021 Transportation Transit SubTotal:- - - - - - - - 2021 Transit Total 400,000 - - - - - 400,000 - 2021 Sales and Use Tax SubTotal:21,776,112 1,247,000 4,200,000 150,000 - - 16,179,112 - 2021 Transportation SubTotal:75,413,552 9,520,846 7,000,000 9,240,000 26,984,177 20,005,142 - 2,663,387 97,189,664 10,767,846 11,200,000 9,390,000 26,984,177 20,005,142 16,179,112 2,663,387 2021 Grand Total 3 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM 2022 Section PRESERVATION: Highway Surface - Bituminous (Wheelage Tax $ & Gravel Tax $)7,710,000 - - - 6,560,000 1,150,000 - Transportation Fund Dakota County Highway Surface - Gravel Liquid Chloride Application Only 350,000 - - - - 350,000 - Transportation Fund Dakota County Highway Surface - Gravel Repairs Spot Locations 50,000 - - - - 50,000 - Transportation Fund Dakota County Traffic Safety & Operation Durable Pavement Markings 350,000 - - - 300,000 50,000 - Transportation Fund Dakota County Pedestrian & Bicycle Facilities 1,100,000 - - - - 1,100,000 - Transportation Fund Retaining Wall Maintenance 330,000 - - - 230,000 100,000 - Transportation Fund Storm Sewer Maintenance 400,000 80,000 - - - 320,000 - Transportation Fund 2022 Sales and Use Tax Preservation SubTotal:- - - - - - - - 2022 Transportation Preservation SubTotal:10,290,000 80,000 - - 7,090,000 3,120,000 - - 2022 Preservation Total 10,290,000 80,000 - - 7,090,000 3,120,000 - - MANAGEMENT: T09056 9-56 CSAH 9 Hayes to CSAH 31 (Pilot Knob)Construction Lakeville 8,000,000 1,600,000 - - 3,200,000 3,200,000 - Transportation Fund T09062 9-62 CSAH 9 At 210th Street, L'ville Lead only Co $ shown Construct Roundabout Lakeville 1,182,500 - - - - 1,182,500 - Transportation Fund T23081 23-81 CSAH 23 240th St to 280th St Rt Turnlane/Bypass ROW Acq/Construct RT LT/ Bypass Eureka Township 1,050,000 - - - 1,000,000 50,000 - Transportation Fund T26063 26-63 CSAH 26 At TH 13 (CSAH 26 + Park's Ent $150K)Signal/Intersect Const (MnDOT lead)Eagan 232,500 - - - 82,500 150,000 - Transportation Fund T28044 28-44 CSAH 28 At Elrene Rd, at Mike Collins Dr ROW Acquisition Eagan 400,000 180,000 - - 220,000 - - Transportation Fund T28062 28-62 CSAH 28 W of TH 149 (Dodd)Progressive RR x-ing Install Gates & Flashing Lights 19-00151 Eagan (MnDOT TIP 2022)230,000 - - 207,000 - 23,000 - Transportation Fund T31079 31-79 CSAH 31 At CSAH 32 Signal Rep-Lt Turn lane extensions Construction Eagan 750,000 40,000 - - 710,000 - - Transportation Fund T32091 32-91 CSAH 32 DuPont Ave to I-35 (B'ville lead only Co $ shown)Construct Roundabout Burnsville $ Need to Update 802,000 - - - 782,000 20,000 - Transportation Fund T32093 32-93 CSAH 32 At Thomas Center/Beacon Hill (access rev.) At Thomas Lake/Stone Cliff Rd (signal)Construction (TBD Study Rec)Eagan 750,000 225,000 - - 525,000 - - Transportation Fund T38058 38-58 CSAH 38 CSAH 5 to CSAH 31 (Pilot Knob)Construct ATMS Apple Valley, Burnsville 1,800,000 162,000 1,440,000 - 178,000 20,000 - Transportation Fund T46058 46-58 CSAH 46 At CSAH 33 (Diamond Path) Intersection Modifications/U-Turn AV, LV, RSMT & Empire Twp 600,000 - - - - 600,000 - Transportation Fund T47045 47-45 CSAH 47 At CSAH 85 (Goodwin Ave)Construction Vermillion Township 2,000,000 - - - 1,980,000 20,000 - Transportation Fund T83010 83-10 CR 83 CSAH 88 (292nd St) to Cannon River ROW Acquisition Randolph City/Twp 265,300 - - - - 265,300 - Transportation Fund T850xx 85-xx CSAH 85 At TH 50 (only Co $ shown)ROW Acquisition City of New Trier 300,000 - - - 150,000 150,000 - Transportation Fund T88023 88-23 CSAH 88 CR 94 (Cooper Ave) to TH 56 ROW Acquisition City of Randolph 1,371,300 - - - 1,371,300 - - Transportation Fund xx-xx Trails Trail Gap Set Aside CSAH 42 Design/ROW/Construct Trail Gaps Apple Valley 1,656,000 163,000 569,000 - - 924,000 - Transportation Fund Jurisdictional Classification - - - - - - Transportation Fund ROW Preservation & Management 500,000 225,000 - - - 275,000 - Transportation Fund Safety & Management 1,500,000 - - - 500,000 1,000,000 - Transportation Fund Signal Projects Signal Revisions/Communications 300,000 150,000 - - 150,000 - - Transportation Fund ST00002 Reimburse Parks CIP: MRG - Rosemount East Construction Rosemount 400,000 - - - - - 400,000 - Sales and Use Tax Fund Dakota County NEW I 35 I 35 Mn PASS Feasibility Study Burnsville, Lakeville 300,000 - - - - - 300,000 - Sales and Use Tax Fund MnDOT ST00010 99-012 CSAH 23 At 140th Street Construction Apple Valley 3,324,000 498,600 - - - - 2,825,400 - Sales and Use Tax Fund Dakota County NEW 42-144 CSAH 42 W. Dakota County Line to TH 52 ROW Burnsville, AV, RSMT 2,275,000 956,250 - - - - 1,318,750 - Sales and Use Tax Fund Dakota County ST00013 99-014 Reimburse Parks CIP: NC Greenway 42 UP Construction Apple Valley 600,000 - - - - - 600,000 - Sales and Use Tax Fund Dakota County 2022 Sales and Use Tax Management SubTotal:6,899,000 1,454,850 - - - - 5,444,150 - 2022 Transportation Management SubTotal:23,689,600 2,745,000 2,009,000 207,000 10,848,800 7,879,800 - - 2022 Management Total 30,588,600 4,199,850 2,009,000 207,000 10,848,800 7,879,800 5,444,150 - REPLACEMENT & MODERNIZATION: T32087 32-87 CSAH 32 CSAH 43 (Lexington Ave) to E of Dodd Rd Construction Eagan 10,900,000 735,000 7,000,000 - 2,915,000 250,000 - Transportation Fund Dakota County T380AV 38-AV CSAH 38 Placeholder-limits TBD Repair/Replace Retaining Walls Apple Valley 800,000 - - - 780,000 20,000 - Transportation Fund Dakota County T59005 59-05 CR 59 TH 19 to CSAH 47 (Northfield Blvd)ROW Acquisition (Wheelage Tax $)Sciota Township 1,000,000 - - - - 1,000,000 - Transportation Fund Dakota County T81014 81-14 "New" 81 CSAH 66 (200th St) to CSAH 46/48 ROW Acquisition Empire/Vermillion Twp 1,500,000 - - - - 1,500,000 - Transportation Fund Dakota County T88020 88-20B CSAH 88 TH 56 to West of Finch Ct Construction - Phase 2 Randolph Township 6,800,000 - - 580,562 - 6,219,438 - Transportation Fund Dakota County T89007 89-07 CR 89 TH 50 (240th St) to CSAH 62 ROW Acquisition (Wheelage Tax $)Hampton, Douglas, Marshan 2,407,800 - - - - 2,407,800 - Transportation Fund Dakota County T91029 91-29 CSAH 91 210th St to TH 316 ROW Acquisition Marshan Township 1,500,000 - - - 1,500,000 - - Transportation Fund Dakota County T96007 96-07 CR 96 West Dakota County line to CSAH 23 Construction (Rice Co $630K)Greenvale Twp (&Rice Co)6,300,000 - - - - 3,609,979 2,690,021 Transportation Fund Dakota County T97144 97-144 Twp Bridge Replace Bridge L3285, Inga Ave Construction Bridge Hampton/Douglas Twp 200,000 - - 180,000 - 20,000 - Transportation Fund Dakota County T97164 97-164 Twp Bridge Replace Bridge L3249, 205th St Construction Bridge Marshan Township 200,000 - - 180,000 - 20,000 - Transportation Fund Dakota County Traffic Signal Replacement Replace/New/Geometrics 1,650,000 747,500 - - 902,500 - - Transportation Fund Dakota County NEW 86-41 CSAH 86 West Dakota County line to CSAH 23 (Galaxie Ave)Design Eureka & Greenvale Twp (Scott Co) 120,000 - - - - - 120,000 - Sales and Use Tax Fund Dakota County 2022 Sales and Use Tax Replacement & Modernization SubTotal:120,000 - - - - - 120,000 - 2022 Transportation Replacement & Modernization SubTotal 33,257,800 1,482,500 7,000,000 940,562 6,097,500 15,047,217 - 2,690,021 2022 Replacement & Modernization Total 33,377,800 1,482,500 7,000,000 940,562 6,097,500 15,047,217 120,000 2,690,021 EXPANSION: ST00006 117th street CSAH 71 (Rich Valley Boulevard) and Trunk Highway 52 Roadway Construction Inver Grove Heights 4,000,000 - - - - - 4,000,000 - Sales and Use Tax Fund Inver Grove Heights NEW 66-15 CSAH 66 New CSAH 66 alignment and a new CSAH 66 AND TH 52 Interchange location Design Castle Rock, Eureka, Greenvale and Waterford 650,000 - - - - - 650,000 - Sales and Use Tax Fund Dakota County ST00011 99-013 CSAH 46 TH 3 to TH 52 ROW Rosemount, Empire 4,000,000 360,000 - - - - 3,640,000 - Sales and Use Tax Fund Dakota County 2022 Sales and Use Tax Expansion SubTotal:8,650,000 360,000 - - - - 8,290,000 - 2022 Transportation Expansion SubTotal:- - - - - - - - 2022 Expansion Total 8,650,000 360,000 - - - - 8,290,000 - 4 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM RESOURCES: T11027 11-27 CSAH 11 At Burnsville Pkwy Design Roundabout Consultant Burnsville 200,000 90,000 - - 110,000 - - Transportation Fund T46057 46-57 CSAH 46 At CSAH 85 (Goodwin Ave)Design Roundabout Nininger & Vermillion Twps 200,000 - - - 200,000 - - Transportation Fund T54009 54-09 CSAH 54 At CSAH 68 (200th St) Design Roundabout Ravenna Twp 20,000 - - - 20,000 - - Transportation Fund T600xx 60-xx New 60 Extend CH 60/185th-CSAH 9 to Highview Design Consultant Lakeville 340,000 153,000 - - - 187,000 - Transportation Fund T810xx 81-xx CR 81 TH 50 (220th St) to CSAH 66 (200th St)Design Empire & Vermillion Twps 150,000 - - - - 150,000 - Transportation Fund T94005 94-05 CR 94 CSAH 47 to CSAH 88 (292nd St)Design Randolph, Sciota, Waterford 200,000 - - - - 200,000 - Transportation Fund Attorney Reimbursement 256,879 - - - - 256,879 - Transportation Fund CIP Reimbursement to Operations 4,926,820 605,688 - - 2,600,826 1,720,306 - Transportation Fund Future Studies/Professional Services 400,000 60,000 - - - 340,000 - Transportation Fund Township Road Distribution 20,900 - - - - 20,900 - Transportation Fund Consultant Construction Administration 600,000 - - - 300,000 300,000 - Transportation Fund ST00009 Reimburse Transportation Operations 1,177,168 - - - - - 1,177,168 - Sales and Use Tax Fund 2022 Sales and Use Tax Resources SubTotal:1,177,168 - - - - - 1,177,168 - 2022 Transportation Resources SubTotal:7,314,599 908,688 - - 3,230,826 3,175,085 - - 2022 Resources Total 8,491,767 908,688 - - 3,230,826 3,175,085 1,177,168 - TRANSIT: ST00003 Various Various Bus Shelter Pad Construction TBD 50,000 - - - - - 50,000 - Sales and Use Tax Fund Dakota County/MVTA ST00005 Transit Service Expansion Set Aside Various/TBD 350,000 - - - - - 350,000 - Sales and Use Tax Fund 2022 Sales and Use Tax Transit SubTotal:400,000 - - - - - 400,000 - 2022 Transportation Transit SubTotal:- - - - - - - - 2022 Transit Total 400,000 - - - - - 400,000 - 2022 Sales and Use Tax SubTotal 17,246,168 1,814,850 - - - - 15,431,318 - 2022 Transportation SubTotal 74,551,999 5,216,188 9,009,000 1,147,562 27,267,126 29,222,102 - 2,690,021 91,798,167 7,031,038 9,009,000 1,147,562 27,267,126 29,222,102 15,431,318 2,690,021 2022 Grand Total 5 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM 2023 Section PRESERVATION: Paved Highway Surface (Wheelage Tax $ & Gravel Tax $)7,710,000 - - - 6,560,000 1,150,000 - Transportation Fund Dakota County Gravel Highway Surface (CR's 76,89,91,93)750,000 - - - - 750,000 - Transportation Fund Dakota County Gravel Highway Surface - Repairs Spot Locations 50,000 - - - - 50,000 - Transportation Fund Dakota County Traffic Safety & Operation Durable Pavement Markings 350,000 - - - 300,000 50,000 - Transportation Fund Dakota County Pedestrian & Bicycle Facilities 1,100,000 - - - - 1,100,000 - Transportation Fund Retaining Wall Maintenance 330,000 - - - 230,000 100,000 - Transportation Fund Storm Sewer Maintenance 400,000 80,000 - - - 320,000 - Transportation Fund 2023 Sales and Use Tax Preservation SubTotal:- - - - - - - - 2023 Transportation Preservation SubTotal:10,690,000 80,000 - - 7,090,000 3,520,000 - - 2023 Preservation Total:10,690,000 80,000 - - 7,090,000 3,520,000 - - MANAGEMENT: T11027 11-27 CSAH 11 At Burnsville Parkway ROW Acquisition Roundabout Burnsville 325,000 146,250 - - 178,750 - - Transportation Fund Dakota County T28044 28-44 CSAH 28 At Elrene Rd, at Mike Collins Dr Construction Eagan 400,000 180,000 - - 200,000 20,000 - Transportation Fund Dakota County T33015 33-15 CSAH 33 At 140th St/Connemara Trail Roundabout Construct Roundabout Apple Valley/Rosemount 1,950,000 877,500 - - 1,052,500 20,000 - Transportation Fund Dakota County T46057 46-57 CSAH 46 At CSAH 85 (Goodwin Ave)ROW Acquisition Roundabout Nininger & Vermillion Twps 150,000 - - - 150,000 - - Transportation Fund Dakota County T54009 54-09 CSAH 54 At CSAH 68 (200th St) ROW Acquisition Roundabout Ravenna Twp 130,000 - - - 115,000 15,000 - Transportation Fund Dakota County T83010 83-10 CR 83 CSAH 88 (292nd St) to Cannon River Construction Randolph City/Twp 975,000 - - - - 975,000 - Transportation Fund Dakota County T850xx 85-xx CSAH 85 At TH 50 (only Co $ shown)Construction (only Co $ shown)City of New Trier 900,000 - - - 450,000 450,000 - Transportation Fund MnDOT T88023 88-23 CSAH 88 CR 94 (Cooper Ave) to TH 56 Construction City of Randolph 3,265,300 - - - 3,232,300 33,000 - Transportation Fund Dakota County T94005 94-05 CR 94 CSAH 47 to CSAH 88 (292nd St)ROW Acquisition Randolph, Sciota, Waterford Twps 2,000,000 - - - - 2,000,000 - Transportation Fund Dakota County Trails Trail Gap Set Aside - Location TBD Design/ROW/Construct Trail Gaps TBD 2,000,000 300,000 - - - 1,700,000 - Transportation Fund Dakota County Jurisdictional Classification (CSAH 88, CR 83, CR 6)Randolph, WSP 3,175,000 - - - - 3,175,000 - Transportation Fund Dakota County ROW Preservation & Management 500,000 225,000 - - - 275,000 - Transportation Fund Dakota County Safety & Management 1,500,000 - - - 500,000 1,000,000 - Transportation Fund Dakota County Signal Projects Signal Revisions/Communications 300,000 150,000 - - 150,000 - - Transportation Fund Dakota County NEW 42-144 CSAH 42 W. Dakota County Line to TH 52 Safety and Capacity Improvements Burnsville, Apple Valley, Rosemount 5,150,000 1,795,000 - - - - 3,355,000 - Sales and Use Tax Fund Dakota County NEW Reimburse Parks CIP: Parks & GW Improvements - TBD Construction 1,000,000 - - - - - 1,000,000 - Sales and Use Tax Fund Dakota County 2023 Sales and Use Tax Management SubTotal:6,150,000 1,795,000 - - - - 4,355,000 - 2023 Transportation Management SubTotal:17,570,300 1,878,750 - - 6,028,550 9,663,000 - - 2023 Management Total 23,720,300 3,673,750 - - 6,028,550 9,663,000 4,355,000 - REPLACEMENT & MODERNIZATION: T59005 59-05 CR 59 TH 19 to CSAH 47 (Northfield Blvd)Construction Sciota Township 5,760,000 - - - - 3,043,079 2,716,921 Transportation Fund Dakota County T81014 81-14 "New" 81 CSAH 66 (200th St) to CSAH 46/48 Construction Empire/Vermillion Twp 6,000,000 - - - 5,940,000 60,000 - Transportation Fund Dakota County T810xx 81-xx CR 81 TH 50 (220th St) to CSAH 66 (200th St)ROW Acquisition Empire & Vermillion Twps 1,585,600 - - - - 1,585,600 - Transportation Fund Dakota County T89007 89-07 CR 89 TH 50 (240th St) to CSAH 62 Construction (Wheelage Tax $)Hampton, Douglas, Marshan Twps 8,850,000 - - - - 8,850,000 - Transportation Fund Dakota County T91029 91-29 CSAH 91 210th St to TH 316 (Flex Hwy $)Construction (Flex Hwy $)Marshan Township 4,500,000 - - - 4,455,000 45,000 - Transportation Fund Dakota County T91030 91-30 CSAH 91 Miesville Tr to TH 61 ROW Acquisition Miesville, Douglas Twp 825,000 - - - 825,000 - - Transportation Fund Dakota County 97-CR1 Twp Bridge Replace Bridge L3253, 230th St Construction Bridge Castle Rock Twp 200,000 - - 180,000 - 20,000 - Transportation Fund Dakota County 97-CR2 Twp Bridge Replace Bridge L3254, 230th St Construction Bridge Castle Rock Twp 200,000 - - 180,000 - 20,000 - Transportation Fund Dakota County Traffic Signal Replacement Replace/New/Geometrics 1,250,000 587,500 - - 662,500 - - Transportation Fund Dakota County NEW 86-41 CSAH 86 West Dakota County line to CSAH 23 (Galaxie Ave)ROW Eureka & Greenvale Twp (Scott Co) 1,500,000 - - - - - 1,500,000 - Sales and Use Tax Fund Dakota County 2023 Sales and Use Tax Replacement & Modernization SubTotal:1,500,000 - - - - - 1,500,000 - 2023 Transportation Replacement & Modernization SubTotal 29,170,600 587,500 - 360,000 11,882,500 13,623,679 - 2,716,921 2023 Replacement & Modernization Total 30,670,600 587,500 - 360,000 11,882,500 13,623,679 1,500,000 2,716,921 EXPANSION: NEW 66-15 CSAH 66 New CSAH 66 alignment and a new CSAH 66 AND TH 52 Interchange l ti ROW Empire Township, Vermillion Township d V illi 2,000,000 - - - - - 2,000,000 - Sales and Use Tax Fund Dakota County ST00011 99-013 CSAH 46 TH 3 to TH 52 Construction Rosemount, Empire 22,000,000 1,980,000 - - - - 20,020,000 - Sales and Use Tax Fund Dakota County 2023 Sales and Use Tax Expansion SubTotal:24,000,000 1,980,000 - - - - 22,020,000 - 2023 Transportation Expansion SubTotal:- - - - - - - - 2023 Expansion Total 24,000,000 1,980,000 - - - - 22,020,000 - RESOURCES: T26060 26-60 CSAH 26 Trunk Highway 3 to CSAH 73 (Babcock Tr)Design Study Consultant Inver Grove Heights 300,000 135,000 - - 165,000 - - Transportation Fund Dakota County T53004 53-04 CR 53 CSAH 47 (Northfield Blvd) to CSAH 86 Design Sciota & Waterford Twp 100,000 - - - - 100,000 - Transportation Fund Dakota County T63xxx 63-xx CSAH 63 Marie Ave to TH 149 (Dodd Rd)Design Consultant Mendota Heights, West St Paul 600,000 150,000 - - 450,000 - - Transportation Fund Dakota County T80027 80-27 CSAH 80 TH 3 to 1 mile W of CSAH 79 (Blaine Ave)Design Castle Rock Township 200,000 - - - 200,000 - - Transportation Fund Dakota County Attorney Reimbursement 262,017 - - - - 262,017 - Transportation Fund Dakota County CIP Reimbursement to Operations 5,173,161 635,972 - - 2,730,867 1,806,322 - Transportation Fund Dakota County Future Studies/Professional Services 400,000 60,000 - - - 340,000 - Transportation Fund Dakota County Township Road Distribution 20,900 - - - - 20,900 - Transportation Fund Dakota County Consultant Construction Administration 600,000 - - - 300,000 300,000 - Transportation Fund Dakota County ST00009 Reimburse Transportation Operations 1,236,026 - - - - - 1,236,026 - Sales and Use Tax Fund 2023 Sales and Use Tax Resources SubTotal:1,236,026 - - - - - 1,236,026 - 2023 Transportation Resources SubTotal:7,656,078 980,972 - - 3,845,867 2,829,239 - - 2023 Resources Total 8,892,104 980,972 - - 3,845,867 2,829,239 1,236,026 - 6 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM TRANSIT: ST00003 Various Various Bus Shelter Pad Construction TBD 50,000 - - - - - 50,000 - Sales and Use Tax Fund Dakota County/MVTA ST00005 Transit Service Expansion Set Aside Various/TBD 350,000 - - - - - 350,000 - Sales and Use Tax Fund 2023 Sales and Use Tax Transit SubTotal:400,000 - - - - - 400,000 - 2023 Transportation Transit SubTotal:- - - - - - - - 2023 Transit Total 400,000 - - - - - 400,000 - 2023 Sales and Use Tax SubTotal 33,286,026 3,775,000 - - - - 29,511,026 - 2023 Transportation SubTotal 65,086,978 3,527,222 - 360,000 28,846,917 29,635,918 - 2,716,921 98,373,004 7,302,222 - 360,000 28,846,917 29,635,918 29,511,026 2,716,921 2023 Grand Total 7 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM 2024 Section PRESERVATION: Paved Highway Surface (Wheelage Tax $ & Gravel Tax $)7,710,000 - - - 6,560,000 1,150,000 - Transportation Fund Dakota County Gravel Highway Surface (No Resurfacing)350,000 - - - - 350,000 - Transportation Fund Dakota County Gravel Highway Surface - Repairs Spot Locations 50,000 - - - - 50,000 - Transportation Fund Dakota County Traffic Safety & Operation Durable Pavement Markings 350,000 - - - 300,000 50,000 - Transportation Fund Dakota County Pedestrian & Bicycle Facilities 1,100,000 - - - - 1,100,000 - Transportation Fund Retaining Wall Maintenance 330,000 - - - 230,000 100,000 - Transportation Fund Storm Sewer Maintenance 400,000 80,000 - - - 320,000 - Transportation Fund 2024 Sales and Use Tax Preservation SubTotal:- - - - - - - - 2024 Transportation Preservation SubTotal:10,290,000 80,000 - - 7,090,000 3,120,000 - - 2024 Preservation Total:10,290,000 80,000 - - 7,090,000 3,120,000 - - MANAGEMENT: T11027 11-27 CSAH 11 At Burnsville Parkway Construct Roundabout Burnsville 1,750,000 157,500 1,400,000 - 172,500 20,000 - Transportation Fund Dakota County T46057 46-57 CSAH 46 At CSAH 85 (Goodwin Ave)Construct Roundabout Nininger & Vermillion Twps 1,200,000 - - - 1,100,000 100,000 - Transportation Fund Dakota County T54009 54-09 CSAH 54 At CSAH 68 (200th St)Construct Roundabout Ravenna Twp 1,550,000 - 1,395,000 - 100,000 55,000 - Transportation Fund Dakota County T86xxx 86-xx CSAH 86 At TH 56 (Co Advance Fund MnDOT)ROW Acq Roundabout (MnDOT lead)Randolph Twp 150,000 - -75,000 75,000 - - Transportation Fund MnDOT T94005 94-05 CR 94 CSAH 47 to CSAH 88 (292nd St)Construction Randolph, Sciota, Waterford Twps 7,950,000 - -- - 5,205,910 2,744,090 Transportation Fund Dakota County xx-xx Trails Trail Gap Set Aside - CSAH 73, CSAH 32 Design/ROW/Construct Trail Gaps IGH, WSP, Burnsville 2,796,160 81,324 2,239,040 - - 475,796 - Transportation Fund City Jurisdictional Classification (CP 94-05)1,000,000 - - - - 1,000,000 - Transportation Fund Dakota County ROW Preservation & Management 500,000 225,000 - - - 275,000 - Transportation Fund Dakota County Safety & Management 1,500,000 - - - 500,000 1,000,000 - Transportation Fund Dakota County Signal Projects Signal Revisions/Communications 300,000 150,000 - - 150,000 - - Transportation Fund Dakota County NEW Reimburse Parks CIP: Parks & GW Improvements - TBD Construction 1,000,000 - - - - - 1,000,000 - Sales and Use Tax Fund Dakota County 2024 Sales and Use Tax Management SubTotal:1,000,000 - - - - - 1,000,000 - 2024 Transportation Management SubTotal:18,696,160 613,824 5,034,040 75,000 2,097,500 8,131,706 - 2,744,090 2024 Management Total 19,696,160 613,824 5,034,040 75,000 2,097,500 8,131,706 1,000,000 2,744,090 REPLACEMENT & MODERNIZATION: T53004 53-04 CR 53 CSAH 47 (Northfield Blvd) to CSAH 86 ROW Acquisition Sciota & Waterford Twp 700,000 - - - - 700,000 - Transportation Fund Dakota County T63xxx 63-xx CSAH 63 Marie Ave to TH 149 (Dodd Rd)ROW Acquisition Mendota Heights, West St Paul 2,000,000 500,000 - - 1,500,000 - - Transportation Fund Dakota County T80027 80-27 CSAH 80 TH 3 to 1 mile W of CSAH 79 (Blaine Ave)ROW Acquisition Castle Rock Township 1,400,000 - - - 1,400,000 - - Transportation Fund Dakota County T81xxx 81-xx CR 81 TH 50 (220th St) to CSAH 66 (200th St)Construction (Wheelage Tax $)Empire & Vermillion Twps 5,500,000 - - - - 5,500,000 - Transportation Fund Dakota County T91030 91-30 CSAH 91 Miesville Tr to TH 61 (Flex Hwy $)Construction (Flex Hwy $)Miesville, Douglas Twp 3,000,000 - - - 2,970,000 30,000 - Transportation Fund Dakota County Traffic Signal Replacement Replace/New/Geometrics 1,000,000 500,000 - - 500,000 - - Transportation Fund Dakota County NEW 86-41 CSAH 86 West Dakota County line to CSAH 23 (Galaxie Ave)Construction Eureka & Greenvale Twp (Scott Co) 6,000,000 - - - - - 6,000,000 - Sales and Use Tax Fund Dakota County 2024 Sales and Use Tax Replacement & Modernization SubTotal:6,000,000 - - - - - 6,000,000 - 2024 Transportation Replacement & Modernization SubTotal:13,600,000 1,000,000 - - 6,370,000 6,230,000 - - 2024 Replacement & Modernization Total 19,600,000 1,000,000 - - 6,370,000 6,230,000 6,000,000 - EXPANSION: T60xxx 60-xx New 60 Extend CH 60/185th-CSAH 9 to Highview Construction Lakeville 2,250,000 1,012,500 - - 1,112,500 125,000 - Transportation Fund NEW 66-15 CSAH 66 New CSAH 66 alignment and a new CSAH 66 AND TH 52 Interchange location Construction Empire Township, Vermillion Township and Vermillion 10,000,000 - - - - - 10,000,000 - Sales and Use Tax Fund Dakota County 2024 Sales and Use Tax Expansion SubTotal:10,000,000 - - - - - 10,000,000 - 2024 Transportation Expansion SubTotal:2,250,000 1,012,500 - - 1,112,500 125,000 - - 2024 Expansion Total 12,250,000 1,012,500 - - 1,112,500 125,000 10,000,000 - RESOURCES: T26xxx 26-xx CSAH 26 Trunk Highway 13 to CSAH 31 (Pilot Knob)Roadway Study Consultant Eagan 175,000 78,750 - - 96,250 - - Transportation Fund T33xxx 33-xx CSAH 33 140th St/Connemara to CSAH 31 (Pilot Knob)(Roadway) Scoping Study Consultant Apple Valley/Rosemount 175,000 78,750 - - 96,250 - - Transportation Fund Attorney Reimbursement 262,017 - - - - 262,017 - Transportation Fund CIP Reimbursement to Operations 5,431,819 667,771 - - 2,867,411 1,896,637 - Transportation Fund Future Studies/Professional Services 400,000 60,000 - - - 340,000 - Transportation Fund Township Road Distribution 20,900 - - - - 20,900 - Transportation Fund Consultant Construction Administration 600,000 - - - 300,000 300,000 - Transportation Fund ST00009 Reimburse Transportation Operations 1,297,828 - - - - - 1,297,828 - Sales and Use Tax Fund 2024 Sales and Use Tax Resources SubTotal:1,297,828 - - - - - 1,297,828 - 2024 Transportation Resources SubTotal:7,064,736 885,271 - - 3,359,911 2,819,554 - - 2024 Resources Total 8,362,564 885,271 - - 3,359,911 2,819,554 1,297,828 - TRANSIT: ST00003 Various Various Bus Shelter Pad Construction TBD 50,000 - - - - - 50,000 - Sales and Use Tax Fund Dakota County/MVTA ST00005 Transit Service Expansion Set Aside Various/TBD 350,000 - - - - - 350,000 - Sales and Use Tax Fund 2024 Sales and Use Tax Transit SubTotal:400,000 - - - - - 400,000 - 2024 TransportationTransit SubTotal:- - - - - - - - 2024 Transit Total 400,000 - - - - - 400,000 - 2024 Sales and Use Tax SubTotal 18,697,828 - - - - - 18,697,828 - 2024 Transportation SubTotal 51,900,896 3,591,595 5,034,040 75,000 20,029,911 20,426,260 - 2,744,090 70,598,724 3,591,595 5,034,040 75,000 20,029,911 20,426,260 18,697,828 2,744,090 2024 Grand Total 8 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM 2025 Section PRESERVATION: Paved Highway Surface (Wheelage Tax $ & Gravel Tax $)7,710,000 - - - 6,560,000 1,150,000 - Transportation Fund Dakota County Gravel Highway Surface (CR's 83,94 & maybe 73)800,000 - - - - 800,000 - Transportation Fund Dakota County Gravel Highway Surface - Repairs Spot Locations 50,000 - - - - 50,000 - Transportation Fund Dakota County Traffic Safety & Operation Durable Pavement Markings 350,000 - - - 300,000 50,000 - Transportation Fund Dakota County Pedestrian & Bicycle Facilities 1,100,000 - - - - 1,100,000 - Transportation Fund Retaining Wall Maintenance 330,000 - - - 230,000 100,000 - Transportation Fund Storm Sewer Maintenance 400,000 80,000 - - - 320,000 - Transportation Fund 2025 Sales and Use Tax Preservation SubTotal:- - - - - - - - 2025 Transportation Preservation SubTotal:10,740,000 80,000 - - 7,090,000 3,570,000 - - 2025 Preservation Total 10,740,000 80,000 - - 7,090,000 3,570,000 - - MANAGEMENT: T86xxx 86-xx CSAH 86 At TH 56 (Co Advance Fund MnDOT)Construct Roundabout (MnDOT lead)Randolph Twp 1,500,000 - - 750,000 750,000 - - Transportation Fund MnDOT xx-xx Trails Trail Gap Set Aside - Location TBD Design/ROW/Construct Trail Gaps TBD 2,000,000 300,000 - - - 1,700,000 - Transportation Fund Dakota County Jurisdictional Classification (CP 53-04, CR 45, CR 48)2,000,000 - - - - 2,000,000 - Transportation Fund Dakota County ROW Preservation & Management 500,000 225,000 - - - 275,000 - Transportation Fund Dakota County Safety & Management (Wheelage Tax $)1,500,000 - - - 500,000 1,000,000 - Transportation Fund Dakota County Signal Projects Signal Revisions/Communications 300,000 150,000 - - 150,000 - - Transportation Fund Dakota County NEW TH 13 TH 13 Grade Seperated Ped Crossing DC Share Burnsville 305,800 - - - - - 305,800 - Sales and Use Tax Fund Burnsvillle Reimburse Parks CIP: Parks & GW Improvements - TBD Construction 1,000,000 - - - - - 1,000,000 - Sales and Use Tax Fund Dakota County 2025 Sales and Use Tax Management SubTotal:1,305,800 - - - - - 1,305,800 - 2025 Transportation Management SubTotal:7,800,000 675,000 - 750,000 1,400,000 4,975,000 - - 2025 Management Total 9,105,800 675,000 - 750,000 1,400,000 4,975,000 1,305,800 - REPLACEMENT & MODERNIZATION: T53004 53-04 CR 53 CSAH 47 (Northfield Blvd) to CSAH 86 Construction (Wheelage Tax $)Sciota & Waterford Twp 3,844,000 - - - - 1,072,469 2,771,531 Transportation Fund Dakota County T63xxx 63-xx CSAH 63 Marie Ave to TH 149 (Dodd Rd)Construction Mendota Heights, West St Paul 6,900,000 1,035,000 - - 5,865,000 - - Transportation Fund Dakota County T80027 80-27 CSAH 80 TH 3 to 1 mile W of CSAH 79 (Blaine Ave)Construction Castle Rock Township 7,284,000 - - - 7,209,000 75,000 - Transportation Fund Dakota County Traffic Signal Replacement Replace/New/Geometrics 1,000,000 500,000 - - 500,000 - - Transportation Fund Dakota County 2025 Sales and Use Tax Replacement & Modernization SubTotal:- - - - - - - - 2025 Transportation Replacement & Modernization SubTotal 19,028,000 1,535,000 - - 13,574,000 1,147,469 - 2,771,531 2025 Replacement & Modernization Total 19,028,000 1,535,000 - - 13,574,000 1,147,469 - 2,771,531 EXPANSION: ST00004 NEW TH 77 TH 77 Capacity Improvements Apple Valley, Eagan 20,000,000 - - - - - 20,000,000 - Sales and Use Tax Fund MnDOT 2025 Sales and Use Tax Expansion SubTotal:20,000,000 - - - - - 20,000,000 - 2025 Transportation Expansion SubTotal:- - - - - - - - 2025 Expansion Total 20,000,000 - - - - - 20,000,000 - RESOURCES: T28048 28-48 CSAH 28 TH 3 to 0.62 mile east Design Consultant Inver Grove Heights 150,000 67,500 - - 82,500 - - Transportation Fund Dakota County Attorney Reimbursement 262,017 - - - - 262,017 - Transportation Fund Dakota County CIP Reimbursement to Operations (Wheelage Tax $)5,431,819 667,771 - - 2,867,411 1,896,637 - Transportation Fund Dakota County Future Studies/Professional Services 400,000 60,000 - - - 340,000 - Transportation Fund Dakota County Township Road Distribution 20,900 - - - - 20,900 - Transportation Fund Dakota County Consultant Construction Administration 600,000 - - - 300,000 300,000 - Transportation Fund Dakota County ST00009 Reimburse Transportation Operations 1,362,719 - - - - - 1,362,719 - Sales and Use Tax Fund 2025 Sales and Use Tax Resources SubTotal:1,362,719 - - - - - 1,362,719 - 2025 Transportation Resources SubTotal:6,864,736 795,271 - - 3,249,911 2,819,554 - - 2025 Resources Total 8,227,455 795,271 - - 3,249,911 2,819,554 1,362,719 - TRANSIT: ST00003 Various Various Bus Shelter Pad Construction TBD 50,000 - - - - - 50,000 - Sales and Use Tax Fund Dakota County/MVTA NEW Kenrick Park and Ride Expansion Lakeville 750,000 - - - - - 750,000 - Sales and Use Tax Fund Metro Transit 2025 Sales and Use Tax Transit SubTotal:800,000 - - - - - 800,000 - 2025 Transportation Transit SubTotal:- - - - - - - - 2025 Transit Total 800,000 - - - - - 800,000 - 2025 Sales and Use Tax SubTotal 23,468,519 - - - - - 23,468,519 - 2025 Transportation SubTotal 44,432,736 3,085,271 - 750,000 25,313,911 12,512,023 - 2,771,531 67,901,255 3,085,271 - 750,000 25,313,911 12,512,023 23,468,519 2,771,531 2025 Grand Total 9 DRAFT JL Key Project Number Road Segment Short Description City Location Annual Cost City Federal State CSAH County Funding Sales and Use Tax County Levy Fund Category Lead Agency 2021-2025 TRANSPORTATION CAPITAL IMPROVEMENT PROGRAM 5 Year Summary Annual Cost City Federal State CSAH Co Funds, Gravel Tax & Other Sales and Use Tax County Levy 2021 97,189,664 10,767,846 11,200,000 9,390,000 26,984,177 20,005,142 16,179,112 2,663,387 2022 91,798,167 7,031,038 9,009,000 1,147,562 27,267,126 29,222,102 15,431,318 2,690,021 2023 98,373,004 7,302,222 - 360,000 28,846,917 29,635,918 29,511,026 2,716,921 2024 70,598,724 3,591,595 5,034,040 75,000 20,029,911 20,426,260 18,697,828 2,744,090 2025 67,901,255 3,085,271 - 750,000 25,313,911 12,512,023 23,468,519 2,771,531 Total 425,860,814 31,777,972 25,243,040 11,722,562 128,442,042 111,801,445 103,287,803 13,585,950 5 Year Summary: Transportation Annual Cost City Federal State CSAH Co Funds, Gravel Tax & Other Sales and Use Tax County Levy 2021 75,413,552 9,520,846 7,000,000 9,240,000 26,984,177 20,005,142 - 2,663,387 2022 74,551,999 5,216,188 9,009,000 1,147,562 27,267,126 29,222,102 - 2,690,021 2023 65,086,978 3,527,222 - 360,000 28,846,917 29,635,918 - 2,716,921 2024 51,900,896 3,591,595 5,034,040 75,000 20,029,911 20,426,260 - 2,744,090 2025 44,432,736 3,085,271 - 750,000 25,313,911 12,512,023 - 2,771,531 Total 311,386,161 24,941,122 21,043,040 11,572,562 128,442,042 111,801,445 - 13,585,950 5 Year Summary: Sales and Use Tax Annual Cost City Federal State CSAH Co Funds, Gravel Tax & Other Sales and Use Tax County Levy 2021 21,776,112 1,247,000 4,200,000 150,000 - - 16,179,112 - 2022 17,246,168 1,814,850 - - - - 15,431,318 - 2023 33,286,026 3,775,000 - - - - 29,511,026 - 2024 18,697,828 - - - - - 18,697,828 - 2025 23,468,519 - - - - - 23,468,519 - Total 114,474,653 6,836,850 4,200,000 150,000 - - 103,287,803 - 5 Year Summary: By Type Annual Cost City Federal State CSAH Co Funds, Gravel Tax & Other Sales and Use Tax County Levy Preservation 52,570,000 400,000 - - 35,450,000 16,720,000 - - Management 106,564,860 11,402,924 7,043,040 10,122,000 24,637,350 33,233,506 17,381,950 2,744,090 Replacement & Modernization 127,608,800 5,080,000 11,200,000 1,600,562 43,300,000 43,829,765 14,420,000 8,178,473 Expansion 93,181,000 10,557,500 7,000,000 - 8,159,500 1,909,613 62,891,000 2,663,387 Resources 43,536,154 4,337,548 - - 16,895,192 16,108,561 6,194,853 - Transit 2,400,000 - - - - - 2,400,000 - Total 425,860,814 31,777,972 25,243,040 11,722,562 128,442,042 111,801,445 103,287,803 13,585,950 10 DRAFT 2021-2025 PARKS CAPITAL IMPROVEMENT PROGRAM Project #Project Description Annual Cost City AOF PTLF RP Bonding Other MC/State Federal DOT Federal DOI ELF SUT CPA General Fund Interest Earnings Levy 2021 Section PLANNING P80000 Park and Greenway Planning (Set-Aside)200,000 200,000 Planning Subtotal 200,000 - - - - - - - 200,000 - - - - - ACQUISITION P00040 Park and Greenway Acquisitions (Set-Aside)3,400,000 1,133,333 Acquisition Subtotal 4,533,333 - 3,400,000 - - - - - - - - 1,133,333 - - GENERAL P00117 Grant Match (Set-Aside)500,000 P40000 Systemwide Asset Preservation (Set-Aside)450,000 TBD TBD Park/Greenway Improvements (Placeholder) General Subtotal 950,000 - - - - - - - 500,000 - 450,000 - - - GREENWAY DEVELOPMENT P50000 Greenway Collaborative (Set-Aside)464,009 P62000 Greenway Enhancements (Set-Aside)250,000 P00109 MRG - Rosemount East 600,000 P00153 MRG - Wakota Trailhead 700,000 P00127 MnRGW - Ft Snelling Segment 1,100,174 180,714 1,000,000 452,904 1,000,000 191,347 P00146 NCGW - Lakeville and Farmington 150,000 P00147 VMGW - Phase 1 2,500,000 Greenway Development Subtotal 8,589,148 700,000 - 1,100,174 - - - 600,000 2,930,714 1,000,000 1,066,913 - 1,000,000 191,347 PARK DEVELOPMENT P61000 Park Enhancements (Set-Aside)250,000 Park Development Subtotal 250,000 - - - - - - - 250,000 - - - - - NATURAL RESOURCES P70000 Base Program Funding (Set-Aside)1,119,286 NEW SLPR - Bison Range 560,000 Natural Resources Subtotal 1,679,286 - - - - 560,000 - - 1,119,286 - - - - - 2021 Parks CIP Total 16,201,767 700,000 3,400,000 1,100,174 - 560,000 - 600,000 5,000,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 11 DRAFT Project #Project Description Annual Cost City AOF PTLF RP Bonding Other MC/State Federal DOT Federal DOI ELF SUT CPA General Fund Interest Earnings Levy 2022 Section PLANNING P80000 Park and Greenway Planning (Set-Aside)200,000 200,000 Planning Subtotal 200,000 - - - - - - - 200,000 - - - - - ACQUISITION P00040 Park and Greenway Acquisitions (Set-Aside)4,533,333 3,400,000 1,133,333 Acquisition Subtotal 4,533,333 - 3,400,000 - - - - - - - - 1,133,333 - - GENERAL P00117 Grant Match (Set-Aside)500,000 500,000 P40000 Systemwide Asset Preservation (Set-Aside)450,000 450,000 General Subtotal 950,000 - - - - - - - 500,000 - 450,000 - - - GREENWAY DEVELOPMENT P50000 Greenway Collaborative (Set-Aside)487,209 487,209 P62000 Greenway Enhancements (Set-Aside)250,000 250,000 P00109 MRG - Rosemount East 400,000 400,000 P00153 MRG - Wakota Trailhead 300,000 300,000 P00127 MnRGW - Ft Snelling Segment 4,824,687 1,100,174 3,508,000 216,513 P00145 NCGW - Apple Valley CSAH 42 Crossing 2,329,892 1,256,000 139,354 600,000 143,191 191,347 P00146 NCGW - Lakeville and Farmington 1,500,000 480,000 220,000 800,000 Greenway Development Subtotal 10,091,788 - - 1,100,174 - - 5,244,000 300,000 389,354 1,000,000 1,066,913 - 800,000 191,347 PARK DEVELOPMENT P61000 Park Enhancements (Set-Aside)250,000 250,000 P00148 SLPR - MP Improvements - Phase 1 1,700,034 1,700,034 P00063 LHRP - MP Improvements - Sustainable Trails & Internal Connector 200,000 200,000 Park Development Subtotal 2,150,034 - - - 1,700,034 - - - 250,000 - - - 200,000 - NATURAL RESOURCES P70000 Base Program Funding (Set-Aside)1,160,646 1,160,646 Natural Resources Subtotal 1,160,646 - - - - - - - 1,160,646 - - - - - 2022 Parks CIP Total 19,085,801 - 3,400,000 1,100,174 1,700,034 - 5,244,000 300,000 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 12 DRAFT Project #Project Description Annual Cost City AOF PTLF RP Bonding Other MC/State Federal DOT Federal DOI ELF SUT CPA General Fund Interest Earnings Levy 2023 Section PLANNING P80000 Park and Greenway Planning (Set-Aside)250,000 250,000 Planning Subtotal 250,000 - - - - - - - 250,000 - - - - - ACQUISITION P00040 Park and Greenway Acquisitions (Set-Aside)4,533,333 3,400,000 1,133,333 Acquisition Subtotal 4,533,333 - 3,400,000 - - - - - - - - 1,133,333 - - GENERAL P00117 Grant Match (Set-Aside)500,000 500,000 P40000 Systemwide Asset Preservation (Set-Aside)750,000 750,000 TBD TBD Park/Greenway Improvements (Placeholder)1,000,000 1,000,000 General Subtotal 2,250,000 - - - - - - - 500,000 1,000,000 750,000 - - - GREENWAY DEVELOPMENT P50000 Greenway Collaborative (Set-Aside)516,913 516,913 P62000 Greenway Enhancements (Set-Aside)275,000 275,000 Greenway Development Subtotal 791,913 - - - - - - - 275,000 - 516,913 - - - PARK DEVELOPMENT P61000 Park Enhancements (Set-Aside)275,000 275,000 P00148 SLPR - MP Improvements - Phase 1 1,188,176 1,100,174 88,002 P00063 LHRP - MP Improvements - Sustainable Trails & Internal Connector 1,350,000 250,000 1,000,000 100,000 Park Development Subtotal 2,813,176 - - 1,100,174 - - - - 363,002 - 250,000 - 1,000,000 100,000 NATURAL RESOURCES P70000 Base Program Funding (Set-Aside)1,203,345 1,111,998 91,347 Natural Resources Subtotal 1,203,345 - - - - - - - 1,111,998 - - - - 91,347 2023 Parks CIP Total 11,841,767 - 3,400,000 1,100,174 - - - - 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 13 DRAFT Project #Project Description Annual Cost City AOF PTLF RP Bonding Other MC/State Federal DOT Federal DOI ELF SUT CPA General Fund Interest Earnings Levy 2024 Section PLANNING P80000 Park and Greenway Planning (Set-Aside)250,000 250,000 Planning Subtotal 250,000 - - - - - - - 250,000 - - - - - ACQUISITION P00040 Park and Greenway Acquisitions (Set-Aside)4,533,333 3,400,000 1,133,333 Acquisition Subtotal 4,533,333 - 3,400,000 - - - - - - - - 1,133,333 - - GENERAL P00117 Grant Match (Set-Aside)607,752 607,752 P40000 Systemwide Asset Preservation (Set-Aside)1,000,000 979,765 20,235 TBD TBD Park/Greenway Improvements (Placeholder)1,000,000 1,000,000 General Subtotal 2,607,752 - - - - - - - 607,752 1,000,000 979,765 - 20,235 - GREENWAY DEVELOPMENT P50000 Greenway Collaborative (Set-Aside)537,148 537,148 P62000 Greenway Enhancements (Set-Aside)303,877 303,877 Greenway Development Subtotal 841,025 - - - - - - - 303,877 - 537,148 - - - PARK DEVELOPMENT P61000 Park Enhancements (Set-Aside)303,877 303,877 P00148 SLPR - MP Improvements - Phase 1 960,661 769,314 191,347 NEW MRPR - MP Improvements - Phase 1 2,800,208 1,100,174 1,700,034 Park Development Subtotal 4,064,746 - - 1,100,174 1,700,034 - - - 303,877 - - - 769,314 191,347 NATURAL RESOURCES P70000 Base Program Funding (Set-Aside)1,244,945 1,034,494 210,451 Natural Resources Subtotal 1,244,945 - - - - - - - 1,034,494 - - - 210,451 - 2024 Parks CIP Total 13,541,801 - 3,400,000 1,100,174 1,700,034 - - - 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 14 DRAFT Project #Project Description Annual Cost City AOF PTLF RP Bonding Other MC/State Federal DOT Federal DOI ELF SUT CPA General Fund Interest Earnings Levy 2025 Section PLANNING P80000 Park and Greenway Planning (Set-Aside)250,000 250,000 Planning Subtotal 250,000 - - - - - - - 250,000 - - - - - ACQUISITION P00040 Park and Greenway Acquisitions (Set-Aside)4,533,333 3,400,000 1,133,333 Acquisition Subtotal 4,533,333 - 3,400,000 - - - - - - - - 1,133,333 - - GENERAL P00117 Grant Match (Set-Aside)638,141 577,366 60,775 P40000 Systemwide Asset Preservation (Set-Aside)1,093,956 952,908 141,048 TBD TBD Park/Greenway Improvements (Placeholder)1,000,000 1,000,000 General Subtotal 2,732,097 - - - - - - - 577,366 1,000,000 952,908 - 201,823 - GREENWAY DEVELOPMENT P50000 Greenway Collaborative (Set-Aside)564,005 564,005 P62000 Greenway Enhancements (Set-Aside)319,070 319,070 NEW MRG - Master Plan Improvements 1,839,789 1,100,174 739,615 Greenway Development Subtotal 2,722,864 - - 1,100,174 - - - - 319,070 - 564,005 - 739,615 - PARK DEVELOPMENT P61000 Park Enhancements (Set-Aside)319,070 319,070 Park Development Subtotal 319,070 - - - - - - - 319,070 - - - - - NATURAL RESOURCES P70000 Base Program Funding (Set-Aside)1,284,403 1,034,494 58,562 191,347 Natural Resources Subtotal 1,284,403 - - - - - - - 1,034,494 - - - 58,562 191,347 2025 Parks CIP Total 11,841,767 - 3,400,000 1,100,174 - - - - 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 5 Year Summary Annual Cost City AOF PTLF RP Bonding Other MC/State Federal DOT Federal DOI ELF SUT CPA General Fund Interest Earnings Levy 2021 16,201,767 700,000 3,400,000 1,100,174 - 560,000 - 600,000 5,000,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 2022 19,085,801 - 3,400,000 1,100,174 1,700,034 - 5,244,000 300,000 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 2023 11,841,767 - 3,400,000 1,100,174 - - - - 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 2024 13,541,801 - 3,400,000 1,100,174 1,700,034 - - - 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 2025 11,841,767 - 3,400,000 1,100,174 - - - - 2,500,000 1,000,000 1,516,913 1,133,333 1,000,000 191,347 Total 72,512,903 700,000 17,000,000 5,500,870 3,400,068 560,000 5,244,000 900,000 15,000,000 5,000,000 7,584,565 5,666,665 5,000,000 956,735 Summary by Category Annual Cost City AOF PTLF RP Bonding Other MC/State Federal DOT Federal DOI ELF SUT CPA General Fund Interest Earnings Levy Planning 1,150,000 - - - - - - - 1,150,000 - - - - - Acquistion 22,666,665 - 17,000,000 - - - - - - - - 5,666,665 - - General 9,489,849 - - - - - - - 2,685,118 3,000,000 3,582,673 - 222,058 - Greenway Development 23,036,738 700,000 - 3,300,522 - - 5,244,000 900,000 4,218,015 2,000,000 3,751,892 - 2,539,615 382,694 Park Development 9,597,026 - - 2,200,348 3,400,068 - - - 1,485,949 - 250,000 - 1,969,314 291,347 Natural Resources 6,572,625 - - - - 560,000 - - 5,460,918 - - - 269,013 282,694 Total 72,512,903 700,000 17,000,000 5,500,870 3,400,068 560,000 5,244,000 900,000 15,000,000 5,000,000 7,584,565 5,666,665 5,000,000 956,735 15 DRAFT 2021 - 2025 Buildings Capital Improvement Program Project Number Short Description Project Title Annual Cost State-Bonding DCC Construction Fund County Funding Total Project Cost 2021 Section INFRASTRUCTURE MAINTENANCE: B70041 Countywide Projects Carpet Replacement Program 531,000 - - 531,000 3,750,000 B70076 Countywide Projects Miscellaneous Projects 185,000 - - 185,000 1,480,000 B70054 Countywide Projects Adjustable Work Stations 400,000 - - 400,000 2,000,000 New Countywide Projects Roof Replacement Program 798,500 - - 798,500 3,749,000 B70073 Countywide Projects Special Assessments 20,000 - - 20,000 160,000 B70074 Countywide Projects Storm Water Improvements 25,000 - - 25,000 200,000 B70040 Countywide Projects Parking Lots Seal & Repair 112,000 - - 112,000 1,097,500 New Countywide Projects Programmed Security Camera Replacement 187,000 - - 187,000 187,000 B70072 Countywide Projects Countywide Elevator Study and Phase 1 Improvements 110,000 - - 110,000 770,000 New Western Service Center Western Service Center Chiller Rebuild 55,000 - - 55,000 55,000 New Countywide Projects Accessibility Barrier Removal Program 250,000 - - 250,000 2,500,000 New Countywide Projects Countywide Building Envelope Inspection Program 50,000 - - 50,000 345,000 New Countywide Projects Countywide Security Improvement Program 100,000 - - 100,000 200,000 New Law Enforcement Center LEC Mechanical Room Flooring 110,000 - - 110,000 110,000 JDC Air Handler Access Project 120,000 - - 120,000 120,000 LEC Laundry Equipment Replacement 175,000 - - 175,000 175,000 LEC Intake Garage Door Replacement 200,000 - - 200,000 200,000 LEC Housing Unit Replacement Finishes 540,000 - - 540,000 540,000 NSC Loading Dock and Fuel Storage Room Improvements 150,000 - - 150,000 150,000 2021 Infrastructure Maintenance Subtotal:4,118,500 - - 4,118,500 NEW CONSTRUCTION: New Recycling Zone Recycling Zone Study Implementation Plan 4,607,448 4,607,448 - - 9,355,756 2021 New Construction Subtotal:4,607,448 4,607,448 - - RENOVATION: Juvenile Service Center New Chance Kitchen Renovation 250,000 - - 250,000 250,000 Community Corrections Restroom Renovation 225,000 - - 225,000 225,000 New Countywide Projects Community Services Operational Revisions 310,000 - - 310,000 340,000 New Law Enforcement Center Law Enforcement Center Work Release and Health Area Renovations 2,200,000 - - 2,200,000 14,300,000 New Law Enforcement Center Law Enforcement Center - Second Floor Renovations 110,000 - - 110,000 120,000 B70056 Countywide Projects Countywide Office Space Reconfigurations 483,350 - - 483,350 9,272,673 2021 Renovation Subtotal:3,578,350 - - 3,578,350 2021 Total 12,304,298 4,607,448 - 7,696,850 16 DRAFT 2021 - 2025 Buildings Capital Improvement Program Project Number Short Description Project Title Annual Cost State-Bonding DCC Construction Fund County Funding Total Project Cost 2022 Section INFRASTRUCTURE MAINTENANCE: B70041 Countywide Projects Carpet Replacement Program 547,000 - - 547,000 3,750,000 B70076 Countywide Projects Miscellaneous Projects 185,000 - - 185,000 1,480,000 New Countywide Projects Roof Replacement Program 315,000 - - 315,000 3,749,000 B70073 Countywide Projects Special Assessments 20,000 - - 20,000 160,000 B70074 Countywide Projects Storm Water Improvements 25,000 - - 25,000 200,000 B70040 Countywide Projects Parking Lots Seal & Repair 112,000 - - 112,000 1,097,500 B70063 Countywide Projects Open Office Space Sound Masking 800,000 - - 800,000 3,480,000 B20024 Dakota Communications Center Dakota Communications Center Programmed Equipment Replacement 111,985 - 111,985 - 280,910 B70072 Countywide Projects Countywide Elevator Study and Phase 1 Improvements 110,000 - - 110,000 770,000 New Juvenile Services Center Juvenile Service Center Generator Replacement 40,000 - - 40,000 450,000 New Countywide Projects Accessibility Barrier Removal Program 250,000 - - 250,000 2,500,000 New Countywide Projects Countywide Building Envelope Inspection Program 55,000 - - 55,000 345,000 2022 Infrastructure Maintenance Subtotal:2,570,985 - 111,985 2,459,000 NEW CONSTRUCTION: New Recycling Zone Recycling Zone Study Implementation Plan 3,455,888 3,455,888 - - 9,355,756 2022 New Construction Subtotal:3,455,888 3,455,888 - - RENOVATION: New Law Enforcement Center Law Enforcement Center Work Release and Health Area Renovations 6,000,000 - - 6,000,000 14,300,000 New Wentworth Library Wentworth Library Design and Renovation 618,008 - - 618,008 6,180,088 B70056 Countywide Projects Countywide Office Space Reconfigurations 1,002,551 - - 1,002,551 9,272,673 2022 Renovation Subtotal:7,620,559 - - 7,620,559 2022 Total 13,647,432 3,455,888 111,985 10,079,559 17 DRAFT 2021 - 2025 Buildings Capital Improvement Program Project Number Short Description Project Title Annual Cost State-Bonding DCC Construction Fund County Funding Total Project Cost 2023 Section INFRASTRUCTURE MAINTENANCE: B70041 Countywide Projects Carpet Replacement Program 563,000 - - 563,000 3,750,000 B70076 Countywide Projects Miscellaneous Projects 185,000 - - 185,000 1,480,000 New Countywide Projects Roof Replacement Program 372,000 - - 372,000 3,749,000 B70073 Countywide Projects Special Assessments 20,000 - - 20,000 160,000 B70074 Countywide Projects Storm Water Improvements 25,000 - - 25,000 200,000 B70040 Countywide Projects Parking Lots Seal & Repair 112,000 - - 112,000 1,097,500 B70063 Countywide Projects Open Office Space Sound Masking 800,000 - - 800,000 3,480,000 New Juvenile Services Center Juvenile Service Center Generator Replacement 410,000 - - 410,000 450,000 New Countywide Projects Accessibility Barrier Removal Program 250,000 - - 250,000 2,500,000 New Countywide Projects Countywide Building Envelope Inspection Program 60,000 - - 60,000 345,000 New Law Enforcement Center LEC Boiler Replacement 100,000 - - 100,000 900,000 2023 Infrastructure Maintenance Subtotal:2,897,000 - - 2,897,000 NEW CONSTRUCTION: New Lebanon Ground Maintenance Shop Lebanon Hills Grounds Maintenance Shop 843,711 - - 843,711 6,106,197 New South Maintenance Shop South Grounds and Transportation Maintenance Shop 1,680,818 - - 1,680,818 12,159,779 2023 New Construction Subtotal:2,524,529 - - 2,524,529 RENOVATION: New Robert Trail Library Robert Trail Library Design and Renovation 519,594 - - 519,594 5,195,540 New Wentworth Library Wentworth Library Design and Renovation 5,562,080 - - 5,562,080 6,180,088 B70056 Countywide Projects Countywide Office Space Reconfigurations 1,101,270 - - 1,101,270 9,272,673 New Law Enforcement Center Law Enforcement Center Work Release and Health Area Renovations 6,000,000 - - 6,000,000 14,300,000 2023 Renovation Subtotal:13,182,944 - - 13,182,944 2023 Total 18,604,473 - - 18,604,473 18 DRAFT 2021 - 2025 Buildings Capital Improvement Program Project Number Short Description Project Title Annual Cost State-Bonding DCC Construction Fund County Funding Total Project Cost 2024 Section INFRASTRUCTURE MAINTENANCE: B70041 Countywide Projects Carpet Replacement Program 580,000 - - 580,000 3,750,000 B70076 Countywide Projects Miscellaneous Projects 185,000 - - 185,000 1,480,000 New Countywide Projects Roof Replacement Program 600,000 - - 600,000 3,749,000 B70073 Countywide Projects Special Assessments 20,000 - - 20,000 160,000 B70074 Countywide Projects Storm Water Improvements 25,000 - - 25,000 200,000 B70040 Countywide Projects Parking Lots Seal & Repair 112,000 - - 112,000 1,097,500 B70063 Countywide Projects Open Office Space Sound Masking 800,000 - - 800,000 3,480,000 New Countywide Projects Accessibility Barrier Removal Program 250,000 - - 250,000 2,500,000 New Countywide Projects Countywide Building Envelope Inspection Program 65,000 - - 65,000 345,000 New Law Enforcement Center LEC Boiler Replacement 800,000 - - 800,000 900,000 New Administration Center Administration Center Chiller Upgrade 60,000 - - 60,000 60,000 New Western Service Center Western Service Center Cooling Tower Reconstruction 200,000 - - 200,000 200,000 New Western Service Center Western Service Center Redundant Chiller Addition 500,000 - - 500,000 500,000 New Law Enforcement Center LEC Chiller Upgrade 125,000 - - 125,000 125,000 New Northern Service Center NSC Condensing Boiler Replacement 75,000 - - 75,000 75,000 New Historical Museum Lawshe Memorial Museum Great Room RTU replacement 25,000 - - 25,000 25,000 2024 Infrastructure Maintenance Subtotal:4,422,000 - - 4,422,000 NEW CONSTRUCTION: New Lebanon Ground Maintenance Shop Lebanon Hills Grounds Maintenance Shop 3,008,913 - - 3,008,913 6,106,197 New South Maintenance Shop South Grounds and Transportation Maintenance Shop 5,992,776 - - 5,992,776 12,159,779 2024 New Construction Subtotal:9,001,689 - - 9,001,689 RENOVATION: B70056 Countywide Projects Countywide Office Space Reconfigurations 1,063,606 - - 1,063,606 9,272,673 New Robert Trail Library Robert Trail Library Design and Renovation 4,675,946 - - 4,675,946 5,195,540 New Burnhaven Library Burnhaven Library Design and Renovation 616,597 - - 616,597 6,165,965 2024 Renovation Subtotal:6,356,149 - - 6,356,149 2024 Total 19,779,838 - - 19,779,838 19 DRAFT 2021 - 2025 Buildings Capital Improvement Program Project Number Short Description Project Title Annual Cost State-Bonding DCC Construction Fund County Funding Total Project Cost 2025 Section INFRASTRUCTURE MAINTENANCE: B70041 Countywide Projects Carpet Replacement Program 597,000 - - 597,000 3,750,000 B70076 Countywide Projects Miscellaneous Projects 185,000 - - 185,000 1,480,000 New Countywide Projects Roof Replacement Program 500,000 - - 500,000 3,749,000 B70073 Countywide Projects Special Assessments 20,000 - - 20,000 160,000 B70074 Countywide Projects Storm Water Improvements 25,000 - - 25,000 200,000 B70040 Countywide Projects Parking Lots Seal & Repair 112,000 - - 112,000 1,097,500 B70063 Countywide Projects Open Office Space Sound Masking 800,000 - - 800,000 3,480,000 New Countywide Projects Accessibility Barrier Removal Program 250,000 - - 250,000 2,500,000 New Countywide Projects Countywide Building Envelope Inspection Program 70,000 - - 70,000 345,000 2025 Infrastructure Maintenance Subtotal:2,559,000 - - 2,559,000 NEW CONSTRUCTION: New Lebanon Ground Maintenance Shop Lebanon Hills Grounds Maintenance Shop 2,253,573 - - 2,253,573 6,106,197 New South Maintenance Shop South Grounds and Transportation Maintenance Shop 4,486,185 - - 4,486,185 12,159,779 2025 New Construction Subtotal:6,739,758 - - 6,739,758 RENOVATION: B70056 Countywide Projects Countywide Office Space Reconfigurations 1,094,764 - - 1,094,764 9,272,673 New Burnhaven Library Burnhaven Library Design and Renovation 5,549,368 - - 5,549,368 6,165,965 2025 Renovation Subtotal:6,644,132 - - 6,644,132 2025 Total 15,942,890 - - 15,942,890 20 DRAFT 2021 - 2025 Buildings Capital Improvement Program Project Number Short Description Project Title Annual Cost State-Bonding DCC Construction Fund County Funding Total Project Cost Summary by year:Year Annual Cost State-Bonding DCC Construction Fund County Funding 2021 12,304,298 4,607,448 - 7,696,850 2022 13,647,432 3,455,888 111,985 10,079,559 2023 18,604,473 - - 18,604,473 2024 19,779,838 - - 19,779,838 2025 15,942,890 - - 15,942,890 Total 80,278,931 8,063,336 111,985 72,103,610 Summary by type: Type Annual Cost State-Bonding DCC Construction Fund County Funding Infrastructure Maintenance 16,567,485 - 111,985 16,455,500 New Construction 26,329,312 8,063,336 - 18,265,976 Renovation 37,382,134 - - 37,382,134 Total 80,278,931 8,063,336 111,985 72,103,610 21 DRAFT 2021 - 2025 Environmental Resources Capital Improvement Program Project Number Project Title Annual Cost City of West St. Paul Board of Water and Soil Resources Environment and Natural Resources Trust Fund Department of Employment and Economic Development Environmental Legacy Fund Total Project Cost 2021 Section NEW Wetlands and Water Retention 1,800,000 - 1,000,000 - - 800,000 7,200,000 NEW Water Quality Capital Projects 350,000 - -- - 350,000 2,700,000 NEW Thompson Oaks Wetland Restoration, Water Quality Improvement, Contamination Remediation, and Greenway Enhancement Project 1,760,000 580,000 - - 300,000 880,000 1,655,000 NEW Environmental Assessment and Remediation 500,000 - - - - 500,000 3,000,000 2021 Total 4,410,000 580,000 1,000,000 - 300,000 2,530,000 2022 Section NEW Land Acquisition and Restoration 4,000,000 - - 3,200,000 - 800,000 8,000,000 NEW Water Quality Capital Projects 350,000 - - - - 350,000 2,700,000 NEW Environmental Assessment and Remediation 500,000 - - - - 500,000 3,000,000 2022 Total 4,850,000 - - 3,200,000 - 1,650,000 2023 Section NEW Wetlands and Water Retention 1,800,000 - 1,000,000 - - 800,000 7,200,000 NEW Water Quality Capital Projects 350,000 - -- - 350,000 2,700,000 NEW Environmental Assessment and Remediation 500,000 - -- - 500,000 3,000,000 2023 Total 2,650,000 - 1,000,000 - - 1,650,000 2024 Section NEW Land Acquisition and Restoration 4,000,000 - - 3,200,000 - 800,000 8,000,000 NEW Water Quality Capital Projects 350,000 - - - - 350,000 2,700,000 NEW Environmental Assessment and Remediation 500,000 - - - - 500,000 3,000,000 2024 Total 4,850,000 - - 3,200,000 - 1,650,000 2025 Section NEW Land Acquisition and Restoration - - - - - - 8,000,000 NEW Wetlands and Water Retention 1,800,000 - 1,000,000 - - 800,000 7,200,000 NEW Water Quality Capital Projects 350,000 - - - - 350,000 2,700,000 NEW Environmental Assessment and Remediation 500,000 - - - - 500,000 3,000,000 2025 Total 2,650,000 - 1,000,000 - - 1,650,000 22 DRAFT 2021 - 2025 Environmental Resources Capital Improvement Program Project Number Project Title Annual Cost City of West St. Paul Board of Water and Soil Resources Environment and Natural Resources Trust Fund Department of Employment and Economic Development Environmental Legacy Fund Total Project Cost 2021 4,410,000 580,000 1,000,000 - 300,000 2,530,000 2022 4,850,000 - - 3,200,000 - 1,650,000 2023 2,650,000 - 1,000,000 - - 1,650,000 2024 4,850,000 - - 3,200,000 - 1,650,000 2025 2,650,000 - 1,000,000 - - 1,650,000 Total 19,410,000 580,000 3,000,000 6,400,000 300,000 9,130,000 Year Annual Cost City of West St. Paul Board of Water and Soil Resources Environment and Natural Resources Trust Fund Department of Employment and Economic Development Environmental Legacy Fund 23 DRAFT 2021 - 2025 Data Networks Capital Improvement Program Project Number Project Title Annual Cost County Funds Total Project Costs 2021 Section New Dakota Broadband Joint Projects 1,100,000 1,100,000 1,100,000 2021 Total 1,100,000 1,100,000 2022 Section New Dakota Broadband Projects 1,100,000 1,100,000 4,400,000 2022 Total 1,100,000 1,100,000 2023 Section New Dakota Broadband Projects 1,100,000 1,100,000 4,400,000 2023 Total 1,100,000 1,100,000 2024 Section New Dakota Broadband Projects 1,100,000 1,100,000 4,400,000 2024 Total 1,100,000 1,100,000 2025 Section New Dakota Broadband Projects 1,100,000 1,100,000 4,400,000 2025 Total 1,100,000 1,100,000 Year Annual Cost County Funds 2021 1,100,000 1,100,000 2022 1,100,000 1,100,000 2023 1,100,000 1,100,000 2024 1,100,000 1,100,000 2025 1,100,000 1,100,000 Total 5,500,000 5,500,000 24 DRAFT 2021 - 2025 Regional Rail Capital Improvement Program JL Key Project Title City Location Annual Cost Minnesota Department of Transportation Regional Rail Authority Funds Total Project Cost Lead Agency 2021 Section NEW Reimburse Transportation Operations 32,500 - 32,500 179,581 NEW METRO Orange Line - Phase I (Operations)Burnsville 30,000 - 30,000 1,293,831 Met Council 2021 Total 62,500 - 62,500 2022 Section RR00004 Bicycle and Pedestrian Improvements - METRO Red Line (AV)Apple Valley, Eagan 98,000 - 98,000 98,000 City of Apple Valley NEW Reimburse Transportation Operations 34,125 - 34,125 179,581 NEW METRO Orange Line - Phase I (Operations)Burnsville 416,182 - 416,182 1,293,831 Met Council 2022 Total 548,307 - 548,307 2023 Section NEW Reimburse Transportation Operations 35,831 - 35,831 179,581 NEW METRO Orange Line - Phase I (Operations)Burnsville 414,701 - 414,701 1,293,831 Met Council 2023 Total 450,532 - 450,532 2024 Section NEW Cliff Road Walk-up Station - METRO Red Line 433,000 - 433,000 649,500 Met Council NEW METRO Red Line/ Cedar Avenue Transitway Implementation Plan Update 492,000 246,000 246,000 492,000 Dakota County NEW Reimburse Transportation Operations 37,622 - 37,622 179,581 NEW METRO Orange Line - Phase I (Operations)Burnsville 432,948 - 432,948 1,293,831 Met Council 2024 Total 1,395,570 246,000 1,149,570 2025 Section RR00002 METRO Orange Line Extension Burnsville 311,500 - 311,500 611,500 Met Council NEW Cliff Road Walk-up Station - METRO Red Line Eagan 216,500 - 216,500 649,500 Met Council NEW Reimburse Transportation Operations 39,503 - 39,503 179,581 2025 Total 567,503 - 567,503 Year Annual Cost Minnesota Department of Transportation Regional Rail Authority Funds 2021 62,500 - 62,500 2022 548,307 - 548,307 2023 450,532 - 450,532 2024 1,395,570 246,000 1,149,570 2025 567,503 - 567,503 Total 3,024,412 246,000 2,778,412 25 DRAFT dŚĞƌĞĂƌĞŶŽŶĞǁƉƌŽũĞĐƚƐƌĞƋƵĞƐƚĞĚĨŽƌLJůůĞƐďLJĂŵĨŽƌϮϬϮ1ͲϮϬϮ526DRAFT