Loading...
HomeMy WebLinkAbout6.h. 145th Street Pedestrian Improvements, City Project 447 Final Acceptance and Authorization of Final Paymenti:\city clerk\agenda items\approved items\6.h. 145th street pedestrian improvements, city project 447 final acceptance and authorization of final payment.docx EXECUTIVE SUMMARY City Council Meeting: November 4, 2020 AGENDA ITEM: 145th Street Pedestrian Improvements, City Project 447 Final Acceptance and Authorization of Final Payment AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works / City Engineer AGENDA NO. 6.h. ATTACHMENTS: Resolution, Payment Voucher, WSB Recommendation Letter APPROVED BY: LJM RECOMMENDED ACTIONS: Motion to Approve Final Payment to Ryan Contracting Company for 145th Street Improvement Project, City Project 447 and Accepting the Improvements for Perpetual Maintenance BACKGROUND On October 10, 2019, the City Council awarded a contract to Ryan Contracting Company for construction of 145th Street Pedestrian Improvements, City Project 447. This project constructed sidewalk east of Brazil Avenue on the northern side of 145th Street across both Progressive Rail and Union Pacific Railroad lines. Because of rail signal work and the significant expense and time required, the southern sidewalk connection will be constructed with the 145th Street pavement improvement project, planned for 2023. At the beginning of construction in late 2019, Union Pacific had several sections of crossing material removed due to maintenance work. This material was not replaced until late summer of 2020 at which time Ryan Contracting was finally able remobilize and complete the required work. Ryan also corrected two minor punch list items. At this time the project is complete and all close out paper work has been received. As a result, this project is recommended for final acceptance and issuance of final payment. A two-year warranty period will begin with final acceptance. RECOMMENDATION Staff recommends that the City Council adopt the attached resolution accepting the improvements and authorizing final payment to Ryan Contracting Company for 145th Street Pedestrian Improvement Project, City Project 447. Description Amount Original Contract Amount 80,800.00$ Work Order 1 - Additional bituminous removal 2,494.50$ Work Order 2 - Patching 2,475.00$ Work Order 3 - Railroad insurance 1,300.00$ Change Order 1 - Remobilization and unit cost increases 13,158.00$ Quantity Adjustments 6,455.10$ TOTAL CONSTRUCTION COST 106,682.60$ 145th Street Pedestrian Improvements CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2020 – 119 A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR 145TH PEDESTRIAN IMPROVEMENTS CITY PROJECT 447 WHEREAS, the contractor for for 145th Street Pedestrian Improvements has submitted documentation and a final pay request for City acceptance of the public improvements, and; WHEREAS, the City received a letter from WSB & Associates confirming the public improvements were installed in accordance with the approved plans and specifications and finds the improvements acceptable. BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota. The work completed under said agreement is hereby accepted for perpetual maintenance and ownership. ADOPTED this 4th day of November, 2020. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk