EXECUTIVE SUMMARY
City Council Meeting: November 17, 2020
AGENDA ITEM: 2021 Street Improvement Project, City
Project 2021-01: Improvement Public
Hearing
AGENDA SECTION:
Public Hearing
PREPARED BY: Brian Erickson, PE, Director of Public
Works / City Engineer
Derick Anderson, PE, Senior Engineer
Technician
AGENDA NO. 7.a.
ATTACHMENTS: Resolution; Map APPROVED BY: LJM
RECOMMENDED ACTIONS: Motion to Adopt a Resolution Ordering the 2021 Street
Improvement Project, City Project 2021-01.
BACKGROUND
The 2021 Street Improvement Project, City Project 2021-01, is proposed to consist of an asphalt mill and
overlay or full-depth reclamation for streets that require more rehabilitation. During final design, streets
will be evaluated to determine the proper maintenance procedure appropriate for each street. Proposed
streets include:
• Upper 149th St W between Crandall Ave and Colorado Ave
• Covington Ave between 147th St W and Upper 149th St W
• Colorado Ave
• 157th Ct W
• 157th St W
• Darling Path between Danbury Ave and 200 feet south of Upper 156th St W
• 156th St W between Darling Path and Shannon Parkway
• Upper 156th St W
• 156th Ct W
• Dapple Ct
• Dapple Cir
• Danville Ave between 156th St W and 156th Ct W
• Cumberland Ave
• Crocus Ave
• Crocus Ct
• Crystal Ct
• Crystal Path between Danville Ave and Shannon Parkway
Minor utility work, rehabilitation of pedestrian ramps to meet current ADA requirements and boulevard
ash tree removals with the project limits will also be included.
On August 4, 2020, the Council approved a contract for engineering services with Bolton & Menk, Inc.
for the 2021 Street Improvement Project, City Project 2021-01. Bolton & Menk, Inc. authored a report on
2
the feasibility of this project. Detailed project information is included in the Feasibility Report available on
file in the Engineering Department. The report found this project, as proposed, to be feasible, cost
effective, and necessary.
On October 8, 2020, staff hosted a virtual open house for property owners to address questions and
comment regarding the project and the proposed assessment roll.
On October 20, 2020, the Council accepted the Feasibility Report and called for the Public Improvement
Hearing for the 2021 Street Improvement Project, City Project 2021-01, which is a necessary step under
the Minnesota Statutes Chapter 429.
Staff will provide additional information for the proposed improvements, existing conditions, costs and
funding as part of the public hearing on improvements. As the conclusion of the hearing, City Council
will be asked to adopt a resolution ordering the improvement and preparation of plans and specifications.
COSTS & FUNDING
The Feasibility Report estimated the project cost at $1,705,000 as tabulated below.
Table 1 – Estimated Cost Summary 2021 Street Improvements
Location
Construction Cost Indirect Cost
(20%)
Total Estimated
Cost (Includes 10%
Contingency)
Street Improvements $1,219,000 $244,000 $1,463,000
Storm Sewer Improvements $65,000 $13,000 $78,000
Sanitary Sewer Improvements $20,000 $4,000 $24,000
Water Improvements $117,000 $23,000 $140,000
Estimated Project Total $1,421,000 $284,000 $1,705,000
This project is scheduled in the 2020-2029 CIP. The proposed project funding is shown in the following
table.
Table 2 – Funding Summary 2021 Street Improvements Project
Item Total Estimated Cost
Street Fund $951,000
Storm Sewer Utility Fund $78,000
Sanitary Sewer $24,000
Water Utility Fund $140,000
Special Assessments $512,000
TOTALS $1,705,000
This project is scheduled in the 2020-2029 CIP. The estimated cost from the Feasibility Report is
approximately 19% higher than the CIP estimate. Most of the cost increase is due to water utility and
pedestrian improvements. Because of the project location staff recommends that the improvement hearing
and design work proceed. During the bidding process, staff anticipates that the project would be bid with
additive alternates in order to allow a reduced scope and thus reduced cost. The portion not awarded
would then be fully designed and could be rebid at a future date.
A preliminary assessment roll is included in the Feasibility Report. Assessments are proposed in
accordance with the Rosemount Special Assessment Policy. 35% of the Street Improvement costs will be
3
assessed and the remaining 65% will be paid by the Street CIP Fund. The assessments are proposed as a
unit assessment, meaning the amount will be the same for all single-family properties with a driveway
access to a street within the project area.
SCHEDULE
Should the Council approve this resolution, the proposed project schedule is shown below. Items marked
“CC” will require City Council approval in order to move forward.
CC Improvement Hearing, Order Improvement and November 17, 2020
Authorize Preparation of Plans & Specs
CC Approve Plans & Specs and Order Advertisement for Bid January 19, 2021
CC Order Preparation of Proposed Assessment January 2021
Bid Opening February 2021
CC Set Assessment Hearing February 2021
CC Assessment Hearing, Award Contract March 2021
Public Open House Summer 2021
Construction Start Summer 2021
Substantial Completion Fall 2021
RECOMMENDATION
Staff recommends that the City Council open the public hearing on improvements and address comments
regarding the planned improvements. At the conclusion of the hearing, staff recommends the Council
adopt the attached resolution ordering the project for the 2021 Street Improvement Project, City Project
2021-01.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2020 - 122
A RESOLUTION ORDERING THE PROJECT AND
AUTHORIZING THE PREPARATION OF PLANS AND SPECIFICATIONS
2021 STREET IMPROVEMENTS PROJECT
CITY PROJECT 2021-01
WHEREAS, Resolution 2020-116 was adopted by the City Council on October 20, 2020, fixed a
date for the Council hearing on Improvement number 2020-01, the proposed improvement of:
• Upper 149th St W between Crandall Ave and Colorado Ave
• Covington Ave between 147th St W and Upper 149th St W
• Colorado Ave
• 157th Ct W
• 157th St W
• Darling Path between Danbury Ave and 200 feet south of Upper 156th St W
• 156th St W between Darling Path and Shannon Parkway
• Upper 156th St W
• 156th Ct W
• Dapple Ct
• Dapple Cir
• Danville Ave between 156th St W and 156th Ct W
• Cumberland Ave
• Crocus Ave
• Crocus Ct
• Crystal Ct
• Crystal Path between Danville Ave and Shannon Parkway; and,
WHEREAS, ten days’ mailed notice and two weeks’ published notice of the hearing was given, and
the hearing was held thereon on the 17th day of November 2020, as which all persons desiring to be
heard were given an opportunity to be heard thereon,
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
ROSEMOUNT, MINNESOTA:
1. Such improvement is necessary, cost effective and feasible as detailed in the feasibility report.
2. Such improvement is hereby ordered as proposed in Council Resolution 2020-116 adopted on
October 20, 2020.
3. The City Engineer is hereby designated as the engineer for this improvement. The City Engineer
shall have plans and specifications prepared for the making of such improvement.
BE IT FURTHER RESOLVED, that the City Council of the City of Rosemount orders the
preparation of plans and specifications for said improvements of City Project 2021-01.
ADOPTED this 17th day of November 2020.
William H. Droste, Mayor
ATTEST:
Erin Fasbender, City Clerk
CAMERO LNCLARET AVECRANDALL AVECHIANTIDELMAR CTPA
T
H
CTPKWY TH ST W (CSAH 42)AVESHANNONDARTMOORCT
DECEMBER TRL
BOULDER AVEBISCAYNE AVEU 145THST W
CIMARRONAVEWDAW
S
O
N
P
L
DENVER CTBITTER
-SWEETCT150TH ST W (CSAH 42)DECEMBERBI
T
T
E
R
-S
W
E
E
T
CI
RBLOOOMFIELDWAY
U. 149TH ST W
153RD ST W
151ST ST W
STATION TRLBRAZIL AVE
156TH ST W
144TH ST W
DIAMOND PATH (CR 33)155TH ST W
147TH ST W
146TH
BLOOOMFIELDPL
BLOOMFIELD
CIRCOBBLER AVEDELFT AVE WCAMEO AVE148TH ST WDALLARA BLANCA AVE154TH ST W
CT
COBALT DR
CRYSTALPATH
152ND ST WDANVILLE AVE WBOULDER TRL BLOOMFIELDDARLING PATH CANADAAVE145TH ST W
BOXWOOD PATHCORNELL TRL
158TH ST W
148TH ST W
COVINGTON AVEBEECH ST W
CT147TH ST W
CAMBRIAN AVEBURMA AVECOLORADO AVEDAVENPORTAVECHIPPENDALE AVEST
STW COBAL
TLANE154TH CT W CARROUSELWAYU. 147TH ST W
B AY B E R RY T R L
CARDINAL
L. 147THDAWSON CT
CASCADE
158TH CT W
157TH CT W
D
A
M
A
S
K
153RD ST WDAMASK AVEDAKOTA DR159TH CT W
157TH ST WDANBURYAVEW
160TH ST W (CSAH 46)CROCUSAVEU. 148TH ST WDAHOMEY AVE W149TH ST W
CRESTVIEW152ND CT W
COLUMBIAL. 150TH ST W
DANBURYDANVILLE
AVEWCHI LI CT BUSINESSPKWYBAYBERRY
BURNLEY AVEBOYSENBERRY CTCHROME
CRESTONEAVEBLACKBERRY
AVECIR150C OLU
MBIA151ST CT W
CUMBERLANDCANTATA AVE WCHORLEYCAMFIELDU 145TH ST W
CHARLSTON AVEAVEST WCARDINAL PATHAVECICERONECIRCLEB LU EB ER R YC TCROCUS
C TBI S C A Y NEWAYDAKOTALNBAYBERRYST W
156 T H STW
153RD ST W CANADA AVE148TH ST W147TH ST W
U.149TH
154TH ST W
149TH
158TH ST W
151ST ST W
156TH ST W
146TH ST W
DODD CIMARRONAVEWUPPER 149TH ST W
U.149H ST W
155TH ST W
147TH ST W
CIMARRONAVEW152ND
144TH ST W
151ST
ST W CIMARRON
A
V
E
146TH ST W
DANVILLEAVEDANVILLE AVE WLOWER 147TH ST W
CHILI AVECLARET AVEU. 148THST W
CICERONEPATHWAY S
ROB
ER
T
TR
L
DECEMBERWAY
CHERRYCOLUMBARY
CTCTCORNELLCT SCRYSTALDAPPLECIRDAPPLE CTCARDINALCIREVER
L
E
I
G
H
C
I
R
DERBYCIR
CRESTONECIRCRESTVIEWCIRCLARETCIR CIMARRON CIMARRON CTCTDEWBERRY CT
DARJEE
L
I
N
G
CT
155TH
CT W
COLUMBARY CIR
CHOKECHERRY AVEU. 149TH CTBRENNER CT
BOSTONCIR
CRESCENT CIR
CHASEWOOD CTC
H
E
S
T
N
U
TWA
Y
CIRCTWAY
WAY
U. 156TH
W156TH
C
T
WDARLING PATHDARLING PATH
CINN A M ONWAYCORNELLCT N
CTCRESTONECTCRESTONEPATHTRL
CANADA CIRCHEVELLECT151ST
S
T
WDAMASKC
T WAYPATHBLVD ATWATER WAY
AVEB ENTLEYST W
CIC E RONEPATHBOISECIR
DARJEELINGPATHCO R N E LL
AZALEA P A THC
O
B
A
L
T
A
V
E
D
A
LLARAAVEW144THST W
TRL (STH 3)160TH ST W (CSAH
4
6
)S ROBERT(STH 3)U 145TH ST W
146THST W
145TH ST W
CHRYSLERDAYBREAK AVEAURORA AVE
160TH ST W (CSAH 46)
B
O
U
L
D
E
R
CT---- 149TH ST WL 147THCT
149TH ST W ALLINGHAMAVEALMAAVE158TH CIR W
2021 Street CIP
5/12/2020
2021 Street Rehabilitation Project
Document Path: T:\Project\Engineering\Derick\2021_Street_CIP.mxd