Loading...
HomeMy WebLinkAbout6.h. 2021 Storm Basin Maintenance, City Project 2021-02 Receive Bids and Award Contract6.h. 2021 Storm Basin Maintenance, City Project 2021-02 Receive Bids and Award Contract.docx EXECUTIVE SUMMARY City Council Meeting: December 1, 2020 BACKGROUND Per the NPDES MS4 General Permit administered by the Minnesota Pollution Control Agency (MPCA), the City is required to inspect every stormwater pond and outfall at least once per permit term and develop a method to assess the effectiveness of all stormwater ponds for preventing/capturing pollution. Inspections performed in 2015 and subsequent modeling indicated that pond 1935 (Broback Industrial Park) and pond 0589 (Dawson CT) were operating at a low efficiency and maintenance was recommended. The project proposes to excavate 1640 cubic yards of accumulated sediment from pond 1935 and 1,285 cubic yards of accumulated sediment from pond 0589. An additional 520 cubic yards of soil will be removed from upland areas of pond 1935 to reduce slope steepness as a safety precaution for equipment, such as mowers, that accesses the site regularly for maintenance. Approximately 1,985 cubic yards of the sediment being removed have contaminant levels that require special disposal (e.g. not for use as fill in residential areas or disposal at a landfill). Phosphorus removal efficiency is expected to improve by 12% in pond 0589 and by 29% in pond 1935. Suspended solids removal is expected to improve by 15% in pond 0589 and by 43% in pond 1935. Additional benefits of the project include removal of voluntary trees for better inspection and maintenance access and increased flood storage capacity. COSTS & FUNDING A summary of the Bid Tabulation including the Engineer’s Estimate is shown in the following table. The low bid received is $136,409.40. This is approximately $78,000 below the Engineer’s Estimate. AGENDA ITEM: 2021 Storm Basin Maintenance, City Project 2021-02: Receive Bids and Award Contract AGENDA SECTION: Consent PREPARED BY: Brian Erickson, PE, Director of Public Works / City Engineer Jane Byron, PE, Storm Water Specialist AGENDA NO. 6.h. ATTACHMENTS: Resolution; Letter or Recommendation; Bid Tabulation; Bid Summary; Map APPROVED BY: LJM RECOMMENDED ACTIONS: Motion to Adopt a Resolution Receiving Bids and Awarding Contract for 2021 Storm Basin Maintenance Project, City Project 2021-02. 2 Contactor Bid Amount Percentage Above Low Bid Nadeau Companies $136,409.40 Low Bid Fitzgerald Excavating $150,984.00 10.68% Kevitt Excavating $165,995.05 21.69% US SiteWork $166,674.70 22.19% BKJ Land Co II dba BKJ Excavating $171,560.90 25.77% Peterson Companies $176,501.30 29.39% Standard Contracting $180,064.25 32.00% Minnesota Dirt Works $187,986.00 37.81% Rachel Contracting, LLC $188,794.00 38.40% JACON LLC $196,674.00 44.18% McNamara Contracting $209,755.25 53.77% Sunram Construction, Inc. $229,003.00 67.88% New Look Contracting, Inc. $229,676.00 68.37% Meyer Contracting, Inc. $243,988.00 78.86% Frattalone Companies $251,198.75 84.15% Veit & Company, Inc. $264,415.00 93.84% Blackstone Contractors LLC $276,553.50 102.74 % This project will be funded using the Storm Water Utility, and the engineer’s estimate of probable project cost was $214,250.00. Stormwater System Improvement is a regular line item in the Storm Water Utility budget. SCHEDULE Should the Council approve this resolution, the proposed project schedule is shown below. Construction Start Winter 2020/21 Substantial Completion February 28, 2021 Restoration May 31, 2021 RECOMMENDATION Staff recommends Council adopt the attached resolutions accepting bids, awarding the contract to Nadeau Companies for the 2021 Storm Basin Maintenance Project, City Project 2021-02. K:\015819-000\Admin\Construction Admin\015819-000 CST LOR_20201124.docx 701 XENIA AVENUE S | SUITE 300 | MINNEAPOLIS, MN | 55416 | 763.541.4800 | WSBENG.COM November 24, 2020 Honorable Mayor and City Council City of Rosemount 2875 145th Street West Rosemount, MN Re: 2020 Rosemount Pond Maintenance Project City of Rosemount Project No. 2021-02 WSB Project No. 015819-000 Dear Mayor and Council Members: Bids were received for the above-referenced project on Tuesday, November 24, 2020, and were opened and read aloud. A total of 17 bids were received. The bids were checked for mathematical accuracy and tabulated and there are no errors made on the Bid Forms. The Engineer’s Estimate was $214,250.00. The bid tabulation indicates the low bidder as Nadeau Companies, LLC., Hampton, MN, in the amount of $136,409.40. We recommend that the City consider these bids and award a contract to Nadeau Companies, LLC., based on the results of the bids received. Sincerely, WSB Bill Alms, PE Project Manager Enclosure cc: Michael Nadeau, Nadeau Companies, LLC Tim Hanson, City of Rosemount Kendra Fallon, WSB alp 2020 Rosemount Pond Maintenance Project City of Rosemount Project No. 2021-02 Bid Opening: November 24, 2020 at 10:00 a.m. local time WSB Project No. 015819-000 DENOTES CORRECTED FIGURE Contractor Bid Docs Bid Security (5%)Grand Total Bid 1 Nadeau Companies X X $136,409.40 2 Fitzgerald Excavating X X $150,984.00 3 Kevitt Excavating X X $165,995.05 4 US SiteWork X X $166,674.70 5 BKJ Land Co II dba BKJ Excavating X X $171,560.90 6 Peterson Companies X X $176,501.30 7 Standard Contracting X X $180,064.25 8 Minnesota Dirt Works X X $187,986.00 9 Rachel Contracting, LLC X X $188,794.00 10 JACON LLC X X $196,674.00 11 McNamara Contracting X X $209,755.25 12 Sunram Construction, Inc.X X $229,003.00 13 New Look Contracting, Inc.X X $229,676.00 14 Meyer Contracting, Inc.X X $243,988.00 15 Frattalone Companies X X $251,198.75 16 Veit & Company, Inc.X X $264,415.00 17 Blackstone Contractors LLC X X $276,553.50 Engineer's Opinion of Cost $214,250.00 BID TABULATION SUMMARY Bill Alms, PE Project Manager I hereby certify that this is a true and correct tabulation of the bids as received on November 24, 2020. K:\015819-000\Admin\Construction Admin\015819-000 CST Bid Tab Summary_20201124.xlsx Bid Tabulation2020 Rosemount Pond Maintenance ProjectCity of Rosemount Project No. 2021-02Bid Opening: Tuesday, November 24, 2020 at 10:00 a.m. Local TimeWSB Project No. 015819-000DENOTES CORRECTED FIGURELine # Mat. # Item Units Qty Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price1 2021.501 MOBILIZATION LS 1 $10,000.00 $10,000.00 $10,100.00 $10,100.00 $12,000.00 $12,000.00 $8,000.00 $8,000.002 2051.501 MAINTENANCE AND RESTORATION OF HAUL ROADS LS 1 $6,000.00 $6,000.00 $3,100.00 $3,100.00 $2,000.00 $2,000.00 $12,560.00 $12,560.003 2101.505 CLEARING ACRE 0.15 $10,000.00 $1,500.00 $26,000.00 $3,900.00 $7,000.00 $1,050.00 $46,960.00 $7,044.004 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 68 $5.00 $340.00 $4.30 $292.40 $4.00 $272.00 $10.20 $693.605 2105.507 POND EXCAVATION (LV) C Y 1,460 $30.00 $43,800.00 $17.20 $25,112.00 $14.00 $20,440.00 $17.90 $26,134.006 2105.507 POND EXCAVATION (SPECIAL 1) (LV) CY 700 $40.00 $28,000.00 $17.20 $12,040.00 $20.00 $14,000.00 $17.90 $12,530.007 2105.509 POND EXCAVATION (SPECIAL 2) (LV) TON 1,800 $45.00 $81,000.00 $29.80 $53,640.00 $40.00 $72,000.00 $30.80 $55,440.008 2105.601 DEWATERING LS 1 $12,000.00 $12,000.00 $3,100.00 $3,100.00 $8,500.00 $8,500.00 $11,830.00 $11,830.009 2511.507 RANDOM RIPRAP CLASS III C Y 34 $125.00 $4,250.00 $44.00 $1,496.00 $50.00 $1,700.00 $119.00$4,046.0010 2511.507 GRANULAR FILTER C Y 17 $50.00 $850.00 $46.00 $782.00 $58.00 $986.00 $118.00 $2,006.0011 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $150.00 $600.00 $170.00 $680.00 $150.00 $600.00 $298.00 $1,192.0012 2573.533 SEDIMENT CONTROL LOG TYPE BIOROLL L F 800 $3.00 $2,400.00 $2.80 $2,240.00 $3.00 $2,400.00 $5.45 $4,360.0013 2105.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 2 $1,000.00 $2,000.00 $2,200.00 $4,400.00 $8.00 $16.00 $1,700.00 $3,400.0014 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 6,150 $2.00 $12,300.00 $1.90 $11,685.00 $2.00 $12,300.00 $2.30 $14,145.0015 2575.505 SEEDING ACRE 1 $5,000.00 $6,500.00 $1,300.00 $1,690.00 $1,500.00 $1,950.00 $704.00 $915.2016 2575.508 SEED MIXTURE 21-111 LB 125 $10.00 $1,250.00 $4.40 $550.00 $2.00 $250.00 $2.75 $343.7517 2575.508 SEEDING MIXTURE 25-151 LB 70 $8.00 $560.00 $6.60 $462.00 $4.00 $280.00 $5.35 $374.5018 2575.508 SEED MIXTURE 33-261 LB 30 $30.00 $900.00 $38.00 $1,140.00 $8.00 $240.00 $32.70 $981.00$214,250.00 $136,409.40 $150,984.00 $165,995.05GRAND TOTAL BIDEngineer's Estimate Fitzgerald ExcavatingNadeau Companies Kevitt Excavating Page 1 of 6K:\015819-000\Admin\Construction Admin\015819-000 CST Bid Tab_20201124.xlsx Bid Tabulation2020 Rosemount Pond Maintenance ProjectCity of Rosemount Project No. 2021-02Bid Opening: Tuesday, November 24, 2020 at 10:00 a.m. Local TimeWSB Project No. 015819-000DENOTES CORRECTED FIGURELine # Mat. # Item Units Qty Unit Price Total Price1 2021.501 MOBILIZATION LS 1 $10,000.00 $10,000.002 2051.501 MAINTENANCE AND RESTORATION OF HAUL ROADS LS 1 $6,000.00 $6,000.003 2101.505 CLEARING ACRE 0.15 $10,000.00 $1,500.004 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 68 $5.00 $340.005 2105.507 POND EXCAVATION (LV) C Y 1,460 $30.00 $43,800.006 2105.507 POND EXCAVATION (SPECIAL 1) (LV) CY 700 $40.00 $28,000.007 2105.509 POND EXCAVATION (SPECIAL 2) (LV) TON 1,800 $45.00 $81,000.008 2105.601 DEWATERING LS 1 $12,000.00 $12,000.009 2511.507 RANDOM RIPRAP CLASS III C Y 34 $125.00 $4,250.0010 2511.507 GRANULAR FILTER C Y 17 $50.00 $850.0011 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $150.00 $600.0012 2573.533 SEDIMENT CONTROL LOG TYPE BIOROLL L F 800 $3.00 $2,400.0013 2105.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 2 $1,000.00 $2,000.0014 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 6,150 $2.00 $12,300.0015 2575.505 SEEDING ACRE 1 $5,000.00 $6,500.0016 2575.508 SEED MIXTURE 21-111 LB 125 $10.00 $1,250.0017 2575.508 SEEDING MIXTURE 25-151 LB 70 $8.00 $560.0018 2575.508 SEED MIXTURE 33-261LB 30 $30.00 $900.00$214,250.00GRAND TOTAL BIDEngineer's EstimateUnit Price Total Price Unit Price Total Price Unit Price Total Price$11,140.00 $11,140.00 $11,500.00 $11,500.00 $17,380.00 $17,380.00$24,560.00 $24,560.00 $9,800.00 $9,800.00 $7,400.00 $7,400.00$29,970.00 $4,495.50 $25,000.00 $3,750.00 $30,800.00 $4,620.00$9.00 $612.00 $1.00 $68.00 $5.60 $380.80$17.00 $24,820.00 $21.63 $31,579.80 $22.50 $32,850.00$12.00 $8,400.00 $23.80 $16,660.00 $18.60 $13,020.00$30.50 $54,900.00 $32.16 $57,888.00 $29.25 $52,650.00$14,110.00 $14,110.00 $7,500.00 $7,500.00 $9,290.00 $9,290.00$112.00 $3,808.00 $105.00 $3,570.00 $127.00 $4,318.00$71.00 $1,207.00 $16.80 $285.60 $130.00 $2,210.00$157.00 $628.00 $5.00 $20.00 $271.00 $1,084.00$3.50 $2,800.00 $4.50 $3,600.00 $4.30 $3,440.00$535.00 $1,070.00 $1,200.00 $2,400.00 $2,040.00 $4,080.00$2.00 $12,300.00 $3.25 $19,987.50 $1.50 $9,225.00$689.00 $895.70 $1,200.00 $1,560.00 $9,980.00 $12,974.00$1.70 $212.50 $2.50 $312.50 $0.94 $117.50$8.00 $560.00 $3.85 $269.50 $3.85 $269.50$5.20 $156.00 $27.00 $810.00 $39.75 $1,192.50$166,674.70 $171,560.90 $176,501.30Peterson CompaniesBKJ Land Co II dba BKJ ExcavatingUS SiteWorkPage 2 of 6K:\015819-000\Admin\Construction Admin\015819-000 CST Bid Tab_20201124.xlsx Bid Tabulation2020 Rosemount Pond Maintenance ProjectCity of Rosemount Project No. 2021-02Bid Opening: Tuesday, November 24, 2020 at 10:00 a.m. Local TimeWSB Project No. 015819-000DENOTES CORRECTED FIGURELine # Mat. # Item Units Qty Unit Price Total Price1 2021.501 MOBILIZATION LS 1 $10,000.00 $10,000.002 2051.501 MAINTENANCE AND RESTORATION OF HAUL ROADS LS 1 $6,000.00 $6,000.003 2101.505 CLEARING ACRE 0.15 $10,000.00 $1,500.004 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 68 $5.00 $340.005 2105.507 POND EXCAVATION (LV) C Y 1,460 $30.00 $43,800.006 2105.507 POND EXCAVATION (SPECIAL 1) (LV) CY 700 $40.00 $28,000.007 2105.509 POND EXCAVATION (SPECIAL 2) (LV) TON 1,800 $45.00 $81,000.008 2105.601 DEWATERING LS 1 $12,000.00 $12,000.009 2511.507 RANDOM RIPRAP CLASS III C Y 34 $125.00 $4,250.0010 2511.507 GRANULAR FILTER C Y 17 $50.00 $850.0011 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $150.00 $600.0012 2573.533 SEDIMENT CONTROL LOG TYPE BIOROLL L F 800 $3.00 $2,400.0013 2105.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 2 $1,000.00 $2,000.0014 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 6,150 $2.00 $12,300.0015 2575.505 SEEDING ACRE 1 $5,000.00 $6,500.0016 2575.508 SEED MIXTURE 21-111 LB 125 $10.00 $1,250.0017 2575.508 SEEDING MIXTURE 25-151 LB 70 $8.00 $560.0018 2575.508 SEED MIXTURE 33-261LB 30 $30.00 $900.00$214,250.00GRAND TOTAL BIDEngineer's EstimateUnit Price Total Price Unit Price Total Price Unit Price Total Price$7,976.00 $7,976.00 $12,000.00 $12,000.00 $24,440.00 $24,440.00$6,545.00 $6,545.00 $5,500.00 $5,500.00 $5,200.00 $5,200.00$45,475.00 $6,821.25 $30,000.00 $4,500.00 $34,666.67 $5,200.00$2.50 $170.00 $2.50 $170.00 $15.00 $1,020.00$17.00 $24,820.00 $22.90 $33,434.00 $18.00 $26,280.00$17.00 $11,900.00 $49.60 $34,720.00 $18.00 $12,600.00$45.95 $82,710.00 $38.30 $68,940.00 $43.50 $78,300.00$7,855.00 $7,855.00 $9,000.00 $9,000.00 $9,632.50 $9,632.50$113.00 $3,842.00 $92.00 $3,128.00 $155.00 $5,270.00$115.50 $1,963.50 $62.00 $1,054.00 $165.00 $2,805.00$183.00 $732.00 $225.00 $900.00 $300.00 $1,200.00$3.65 $2,920.00 $3.10 $2,480.00 $2.50 $2,000.00$2,345.00 $4,690.00 $1,050.00 $2,100.00 $1,500.00 $3,000.00$2.40 $14,760.00 $1.35 $8,302.50 $1.50 $9,225.00$1,090.00 $1,417.00 $500.00 $650.00 $1,100.00 $1,430.00$0.50 $62.50 $0.80 $100.00 $1.10 $137.50$2.50 $175.00 $3.25 $227.50 $5.20 $364.00$23.50 $705.00 $26.00 $780.00 $23.00 $690.00$180,064.25 $187,986.00 $188,794.00Standard Contracting Minnesota Dirt Works Rachel Contracting, LLCPage 3 of 6K:\015819-000\Admin\Construction Admin\015819-000 CST Bid Tab_20201124.xlsx Bid Tabulation2020 Rosemount Pond Maintenance ProjectCity of Rosemount Project No. 2021-02Bid Opening: Tuesday, November 24, 2020 at 10:00 a.m. Local TimeWSB Project No. 015819-000DENOTES CORRECTED FIGURELine # Mat. # Item Units Qty Unit Price Total Price1 2021.501 MOBILIZATION LS 1 $10,000.00 $10,000.002 2051.501 MAINTENANCE AND RESTORATION OF HAUL ROADS LS 1 $6,000.00 $6,000.003 2101.505 CLEARING ACRE 0.15 $10,000.00 $1,500.004 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 68 $5.00 $340.005 2105.507 POND EXCAVATION (LV) C Y 1,460 $30.00 $43,800.006 2105.507 POND EXCAVATION (SPECIAL 1) (LV) CY 700 $40.00 $28,000.007 2105.509 POND EXCAVATION (SPECIAL 2) (LV) TON 1,800 $45.00 $81,000.008 2105.601 DEWATERING LS 1 $12,000.00 $12,000.009 2511.507 RANDOM RIPRAP CLASS III C Y 34 $125.00 $4,250.0010 2511.507 GRANULAR FILTER C Y 17 $50.00 $850.0011 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $150.00 $600.0012 2573.533 SEDIMENT CONTROL LOG TYPE BIOROLL L F 800 $3.00 $2,400.0013 2105.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 2 $1,000.00 $2,000.0014 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 6,150 $2.00 $12,300.0015 2575.505 SEEDING ACRE 1 $5,000.00 $6,500.0016 2575.508 SEED MIXTURE 21-111 LB 125 $10.00 $1,250.0017 2575.508 SEEDING MIXTURE 25-151 LB 70 $8.00 $560.0018 2575.508 SEED MIXTURE 33-261LB 30 $30.00 $900.00$214,250.00GRAND TOTAL BIDEngineer's EstimateUnit Price Total Price Unit Price Total Price Unit Price Total Price$10,728.00 $10,728.00 $16,500.00 $16,500.00 $12,150.50 $12,150.50$10,000.00 $10,000.00 $2,500.00 $2,500.00 $29,000.00 $29,000.00$35,000.00 $5,250.00 $25,000.00 $3,750.00 $36,700.00 $5,505.00$12.00 $816.00 $5.50 $374.00 $5.00 $340.00$27.00 $39,420.00 $35.00 $51,100.00 $28.75 $41,975.00$27.00 $18,900.00 $35.00 $24,500.00 $28.75 $20,125.00$36.00 $64,800.00 $48.00 $86,400.00 $40.50 $72,900.00$16,500.00 $16,500.00 $4,000.00 $4,000.00 $10,600.00 $10,600.00$125.00 $4,250.00 $125.00 $4,250.00 $105.00 $3,570.00$50.00 $850.00 $30.00 $510.00 $90.00 $1,530.00$300.00 $1,200.00 $200.00 $800.00 $150.00 $600.00$3.00 $2,400.00 $2.75 $2,200.00 $6.25 $5,000.00$1,500.00 $3,000.00 $900.00 $1,800.00 $800.00 $1,600.00$2.50 $15,375.00 $1.50 $9,225.00 $3.10 $19,065.00$1,500.00 $1,950.00 $525.00 $682.50 $3,075.00 $3,997.50$1.00 $125.00 $0.75 $93.75 $1.00 $125.00$3.00 $210.00 $3.50 $245.00 $5.00 $350.00$30.00 $900.00 $27.50 $825.00 $19.00 $570.00$196,674.00 $209,755.25 $229,003.00McNamara Contracting Sunram Construction, Inc.JACON LLCPage 4 of 6K:\015819-000\Admin\Construction Admin\015819-000 CST Bid Tab_20201124.xlsx Bid Tabulation2020 Rosemount Pond Maintenance ProjectCity of Rosemount Project No. 2021-02Bid Opening: Tuesday, November 24, 2020 at 10:00 a.m. Local TimeWSB Project No. 015819-000DENOTES CORRECTED FIGURELine # Mat. # Item Units Qty Unit Price Total Price1 2021.501 MOBILIZATION LS 1 $10,000.00 $10,000.002 2051.501 MAINTENANCE AND RESTORATION OF HAUL ROADS LS 1 $6,000.00 $6,000.003 2101.505 CLEARING ACRE 0.15 $10,000.00 $1,500.004 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 68 $5.00 $340.005 2105.507 POND EXCAVATION (LV) C Y 1,460 $30.00 $43,800.006 2105.507 POND EXCAVATION (SPECIAL 1) (LV) CY 700 $40.00 $28,000.007 2105.509 POND EXCAVATION (SPECIAL 2) (LV) TON 1,800 $45.00 $81,000.008 2105.601 DEWATERING LS 1 $12,000.00 $12,000.009 2511.507 RANDOM RIPRAP CLASS III C Y 34 $125.00 $4,250.0010 2511.507 GRANULAR FILTER C Y 17 $50.00 $850.0011 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $150.00 $600.0012 2573.533 SEDIMENT CONTROL LOG TYPE BIOROLL L F 800 $3.00 $2,400.0013 2105.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 2 $1,000.00 $2,000.0014 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 6,150 $2.00 $12,300.0015 2575.505 SEEDING ACRE 1 $5,000.00 $6,500.0016 2575.508 SEED MIXTURE 21-111 LB 125 $10.00 $1,250.0017 2575.508 SEEDING MIXTURE 25-151 LB 70 $8.00 $560.0018 2575.508 SEED MIXTURE 33-261LB 30 $30.00 $900.00$214,250.00GRAND TOTAL BIDEngineer's EstimateUnit Price Total Price Unit Price Total Price Unit Price Total Price$20,000.00 $20,000.00 $24,417.00 $24,417.00 $37,440.00 $37,440.00$10,000.00 $10,000.00 $2,499.95 $2,499.95 $46,630.00 $46,630.00$69,000.00 $10,350.00 $29,866.67 $4,480.00 $31,660.00 $4,749.00$2.00 $136.00 $4.73 $321.64 $13.00 $884.00$33.00 $48,180.00 $16.34 $23,856.40 $19.60 $28,616.00$50.00 $35,000.00 $21.81 $15,267.00 $17.10 $11,970.00$40.00 $72,000.00 $49.86 $89,748.00 $33.75 $60,750.00$12,000.00 $12,000.00 $50,109.76 $50,109.76 $21,300.00 $21,300.00$100.00 $3,400.00 $184.49 $6,272.66 $80.00 $2,720.00$80.00 $1,360.00 $243.29 $4,135.93 $39.75 $675.75$150.00 $600.00 $292.02 $1,168.08 $319.00 $1,276.00$3.00 $2,400.00 $3.00 $2,400.00 $6.25 $5,000.00$1,250.00 $2,500.00 $3,682.04 $7,364.08 $2,420.00 $4,840.00$1.50 $9,225.00 $1.70 $10,455.00 $3.15 $19,372.50$500.00 $650.00 $600.00 $780.00 $3,100.00 $4,030.00$5.00 $625.00 $1.50 $187.50 $0.64 $80.00$5.00 $350.00 $4.50 $315.00 $4.35 $304.50$30.00 $900.00 $7.00 $210.00 $18.70 $561.00$229,676.00 $243,988.00 $251,198.75New Look Contracting, Inc. Meyer Contracting, Inc. Frattalone CompaniesPage 5 of 6K:\015819-000\Admin\Construction Admin\015819-000 CST Bid Tab_20201124.xlsx Bid Tabulation2020 Rosemount Pond Maintenance ProjectCity of Rosemount Project No. 2021-02Bid Opening: Tuesday, November 24, 2020 at 10:00 a.m. Local TimeWSB Project No. 015819-000DENOTES CORRECTED FIGURELine # Mat. # Item Units Qty Unit Price Total Price1 2021.501 MOBILIZATION LS 1 $10,000.00 $10,000.002 2051.501 MAINTENANCE AND RESTORATION OF HAUL ROADS LS 1 $6,000.00 $6,000.003 2101.505 CLEARING ACRE 0.15 $10,000.00 $1,500.004 2105.504 GEOTEXTILE FABRIC TYPE 4 S Y 68 $5.00 $340.005 2105.507 POND EXCAVATION (LV) C Y 1,460 $30.00 $43,800.006 2105.507 POND EXCAVATION (SPECIAL 1) (LV) CY 700 $40.00 $28,000.007 2105.509 POND EXCAVATION (SPECIAL 2) (LV) TON 1,800 $45.00 $81,000.008 2105.601 DEWATERING LS 1 $12,000.00 $12,000.009 2511.507 RANDOM RIPRAP CLASS III C Y 34 $125.00 $4,250.0010 2511.507 GRANULAR FILTER C Y 17 $50.00 $850.0011 2573.502 STORM DRAIN INLET PROTECTION EACH 4 $150.00 $600.0012 2573.533 SEDIMENT CONTROL LOG TYPE BIOROLL L F 800 $3.00 $2,400.0013 2105.602 TEMPORARY ROCK CONSTRUCTION ENTRANCE EACH 2 $1,000.00 $2,000.0014 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 6,150 $2.00 $12,300.0015 2575.505 SEEDING ACRE 1 $5,000.00 $6,500.0016 2575.508 SEED MIXTURE 21-111 LB 125 $10.00 $1,250.0017 2575.508 SEEDING MIXTURE 25-151 LB 70 $8.00 $560.0018 2575.508 SEED MIXTURE 33-261LB 30 $30.00 $900.00$214,250.00I hereby certify that this is an exact reproduction of bids received.Certified By: License No. 54301Date: November 24, 2020GRAND TOTAL BIDEngineer's EstimateUnit Price Total Price Unit Price Total Price$32,700.00 $32,700.00 $40,000.00 $40,000.00$5,800.00 $5,800.00 $32,500.00 $32,500.00$74,000.00 $11,100.00 $35,000.00 $5,250.00$5.50 $374.00 $12.00 $816.00$46.00 $67,160.00 $29.00 $42,340.00$46.00 $32,200.00 $47.00 $32,900.00$43.00 $77,400.00 $42.00 $75,600.00$4,600.00 $4,600.00 $15,000.00 $15,000.00$155.00 $5,270.00 $125.00 $4,250.00$100.00 $1,700.00 $125.00 $2,125.00$165.00 $660.00 $150.00 $600.00$3.65 $2,920.00 $4.00 $3,200.00$1,800.00 $3,600.00 $2,000.00 $4,000.00$2.80 $17,220.00 $2.15 $13,222.50$670.00 $871.00 $2,250.00 $2,925.00$2.00 $250.00 $1.00 $125.00$5.00 $350.00 $5.00 $350.00$8.00 $240.00 $45.00 $1,350.00$264,415.00 $276,553.50Veit & Company, Inc. Blackstone Contractors LLCPage 6 of 6K:\015819-000\Admin\Construction Admin\015819-000 CST Bid Tab_20201124.xlsx SCALE IN FEET 0 200 400 K:\015819-000\Cad\Plan\015819-000-C-TITLE SHEET.dwg 11/10/2020 12:45:28 PMN 2020 ROSEMOUNT POND MAINTENANCE CITY OF ROSEMOUNT PROJECT LOCATION MAP F/O UGT G EXISTING PLAN SYMBOLS PROPERTY LINES/RIGHT-OF-WAY UTILITY EASEMENT TREE LINE SIGN DECIDUOUS TREE SHRUB CONIFEROUS TREE EXISTING UTILITY SYMBOLS FIBER OPTIC CABLE UNDERGROUND TELEPHONE GAS LINE CATV VAULT POWER POLE ELECTRIC BOX CATCH BASIN STORM APRON CND CTV OH UNDERGROUND CABLE CABLE TV OVERHEAD COMMUNICATIONS LINE UGE OHE UNDERGROUND POWER OVERHEAD POWER UGEUNDERGROUND ELECTRIC OHTOVERHEAD TELEPHONE WATER MAIN SANITARY SEWER STORM SEWER GATE VALVE HYDRANT SANITARY SEWER MANHOLE STORM SEWER MANHOLE ST s COUNTY:DAKOTA PROJECT LOCATION THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS UTILITY QUALITY LEVEL D. THIS UTILITY QUALITY LEVEL WAS DETERMINED ACCORDING TO THE GUIDELINES OF CI/ASCE 38-02, ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." GOPHER ONE CALL TICKET NUMBER: 200841695 APPROVED BYSHEET NO.DATE PLAN REVISIONS ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS AND ORDINANCES WILL BE COMPLIED WITH IN THE CONSTRUCTION OF THIS PROJECT. THIS PLAN SET CONTAINS 9 SHEETS I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. LICENSE NUMBER:DATE:11/10/2020 54301 WILLIAM C ALMS, P.E. SHEET 9 OF WSB PROJ. NO. 015819-000 PROJECT LOCATION 1 THIS PLAN SET HAS BEEN PREPARED FOR: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068-4997 (651) 423-4411 A CALL TO GOPHER STATE ONE (651-454-0002) IS REQUIRED A MINIMUM OF 48 HOURS PRIOR TO PERFORMING ANY EXCAVATION. EXCAVATION NOTICE SYSTEM PLAN SET INDEX GOVERNING SPECIFICATIONS UTILITY INFORMATION THE 2015 CITY OF ROSEMOUNT GENERAL SPECIFICATIONS & STANDARD DETAIL PLATES FOR STREET AND UTILITY CONSTRUCTION AND THE 2018 EDITION OF THE MINNESOTA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" SHALL GOVERN. ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE LATEST EDITION OF THE MINNESOTA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, INCLUDING THE LATEST FIELD MANUAL FOR TEMPORARY TRAFFIC CONTROL ZONE LAYOUTS. Sheet List Table SHEET NUMBER SHEET TITLE 1 TITLE SHEET 2 POND 1935 EXISTING CONDITIONS PLAN 3 POND 0589 EXISTING CONDITIONS PLAN 4 POND 1935 GRADING PLAN 5 POND 0589 GRADING PLAN 6 POND 1935 EROSION CONTROL AND RESTORATION PLAN 7 POND 0589 EROSION CONTROL AND RESTORATION PLAN 8 0589 EROSION CONTROL AND ACCESS PLAN 9 MISCELLANEOUS DETAILS CITY PROJ. NO. 2021-02 BRIAN ERICKSON, P.E. - DIRECTOR OF PUBLIC WORKS / CITY ENGINEER DATE 145TH ST W DIAMOND PATH WDAVENPORT AVEDAWSON CT CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2021 – xx A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR 2021 STORM BASIN MAINTENANCE, CITY PROJECT 2021-02. BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the 2021 Storm Basin Maintenance Project, City Project 2021-02, are hereby received and tabulated. 2. Based on the Total Bid, the bid of Nadeau Companies of Hampton, MN in the amount of $136,409.40 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 1st day of December, 2020. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk