Loading...
HomeMy WebLinkAbout6.q. Renewal of the Vesterra, LLC, and Stonex, LLC, Small Scale Mineral Extraction Permit for 2021 EXECUTIVE SUMMARY City Council Regular Meeting: December 15, 2020 AGENDA ITEM: Renewal of the Vesterra, LLC, and Stonex, LLC, Small Scale Mineral Extraction Permit for 2021 AGENDA SECTION: Consent PREPARED BY: Anthony Nemcek, Planner AGENDA NO. 6.q. ATTACHMENTS: Draft 2021 Mining Permit; Excerpt from the November 24 Planning Commission Meeting Minutes; Location Map; Applicant’s Narrative, Mine Plan; Site Photographs; Aerial Images APPROVED BY: LJM RECOMMENDED ACTION: Motion to Approve the Renewal of the Vesterra, LLC., and Stonex, LLC., Small Scale Mineral Extraction Permit for 2021, subject to the terms and conditions in the attached 2021 Conditions for Mineral Extraction. SUMMARY Applicant: Jonathan Wilmshurst of Vesterra, LLC and Stonex, LLC Property Owner: Flint Hills Resources Operator(s): Solberg Aggregates, Bolander and Sons, Frattalone Companies Location: South of Bonaire Path, ¼ mile west of Blaine Ave. Area in acres: Vesterra – Northern 75 Acres along Bonaire Path Stonex – Southern 80 Acres directly south of Vesterra. Comp Plan Designation: LI, Light Industrial Current zoning: AG, Agriculture Material removed in 2019: Approx. 100,000 tons through October, 2020 The Council is being asked to consider an application from Jonathan Wilmshurst of Vesterra LLC/Stonex LLC to renew the the Vesterra and Stonex mineral extraction permit for 2021. The subject properties are located south of Bonaire Path, ¼ mile west of Blaine Avenue (County Road 71). The properties are owned by Flint Hills Resources which leases them back to the applicant to permit mineral extraction. While Flint Hills Resources and Vesterra, LLC/Stonex, LLC are parties to the application, the responsibility for securities and compliance with the conditions remains with Vesterra and Stonex as the property lessee. Upon review of the mineral extraction standards, police records and the information submitted by the applicant, staff and the Planning Commission recommend renewal of the permit for 2021. PLANNING COMMISSION ACTION The Planning Commission reviewed the renewal request at its meeting on November 24th. No public comments were received during the hearing, but the Planning Commission asked if the police department received any complaints about the mining operation. No complaints were received by the police department in 2020. The Commission also inquired about the residential structures in the vicinity, and the applicant provided information with regard to the occupancy status of the houses. The house located on Bonaire Path is occupied by a long-term renter, and the farmstead that had historically been accessed via Blaine Avenue is no longer occupied. 2 Prior to the Planning Commission meeting one of the commissioners pointed out a discrepancy in the description of the haul route, and staff has updated the mining permit to correct that error. The Planning Commission voted unanimously to recommend approval of the Small Scale Mineral Extraction Permit renewal. BACKGROUND Three operators are currently working in the overall mining area. Solberg Aggregates and Bolander and Sons are mining the northwestern portion of the of the mining area, and Frattalone Companies are operating in the southeast corner of the site. The 2021 mine plan shows each operator mining within their designated area, and each active mining area falls within the allowed mining area of 19 acres. The 2020 permit was the first time all three operators were listed on the application materials. When Frattalone was added as an operator in the mine area, the applicant revised the haul route to allow a circular traffic pattern with trucks entering from Bonaire Path to the north and exiting along the farm road to Blaine Avenue to the east. The applicant received their last permit renewal in January of 2020. According to the applicant, mining activity decreased slightly from the 2019 volume of 140,000 tons to 100,000 tons removed in 2020. This is also lower than 2018, but higher than in 2017 when 75,000 tons were removed from the site. No fill was brought into the site, which is consistent with prior years. Mining will continue in the west and south as depicted in the 2021 mine plan. The applicant still expects Solberg, one of the operators, to install an above-ground scale and portable scale house if business levels justify it. ISSUE ANALYSIS Standards for Small Scale Mineral Extraction are detailed in Section 11-10-4 of the City Code. A summary review of the subject property is provided below with detailed conditions of operation listed in the attached Draft 2021 Conditions for Mineral Extraction Permit. The operation of this use meets or exceeds the applicable performance standards for small scale mineral extraction subject to the conditions listed in the attached permit, including submission of an updated phasing plan. Staff has toured the site and checked with the police to ascertain whether there were any complaints relating to the mining operation. The site visit illustrated that the mine appears to be operating in compliance with the permit; there were no public complaints cataloged with the police for 2020. The subject property is zoned AG - Agriculture. Small scale mineral extraction is listed as an interim use within this district. The table below details the zoning, current land use, and future land use information for the surrounding properties. The sites to the west, south, and east are located within the current Metropolitan Urban Service Area (MUSA). It should be noted that some of the agriculture uses include associated residential uses and the applicant has a farming tenant operating on a portion of the subject property outside the active mining area. Surrounding Land Use and Zoning Information Direction Current Land Use Guided Land Use Zoning North Agriculture Agriculture Agriculture South Agriculture Medium Density Residential (west half) Business Park (east half) Agriculture East Agriculture Light Industrial Agriculture West Agriculture Low Density Residential Agriculture Preserve With the commencement of mining in the southern portion of the site immediately west of the existing farmstead (the Frattalone Area), the applicant has revised the previous haul routes to and from the site. Up until last year, all access to the mine occurred at a gated entrance at the northeast corner of the 3 Vesterra property along Bonaire Path. Starting in 2019, all incoming traffic has been routed through the northern entrance along Bonaire Path, while outgoing traffic follows the existing farmstead access road west to Blaine Avenue (County Road 71). This reconfiguration reduces truck traffic on Bonaire Path (a gravel road) and provides more direct access to County Road 42. The applicant is leasing the property, and the current lease runs through 2025. If the applicant and property owner determine that the lease will not be extended beyond that date, an updated reclamation plan should be submitted taking that into account that mining activity will be truncated, should be developed. CONCLUSION AND RECOMMENDATION Upon review of these standards, police records, and the information submitted by the applicant, the Planning Commission and staff recommend renewal of the Vesterra LLC. and Stonex LLC. Mineral Extraction Permit for 2021. The request is subject to the conditions outlined in the attached permit. Site 2021 Mining Permit Vesera, LLC/Stonex, LLC Page 1 of 6 Mineral Extraction Permit 2021 Conditions for Mineral Extraction Permit VESTERRA, LLC and STONEX, LLC A. By their signatures below, Vesterra, LLC and Stonex, LLC (hereinafter collectively referred to as the “Property Lessee") and Flint Hills Resources (herein after “the Property Owner”) consent to these conditions, binding themselves and their successors, heirs or assigns to the conditions of this permit. Vesterra, LLC and Stonex, LLC are jointly and severall y liable and responsible for compliance with all conditions of this permit and all requirements of law relating to the licensed activities. Mineral Extraction is an Interim Use in the Agriculture District of which the permit area is a part according to Ordinance B, the City of Rosemount Zoning Ordinance Regulations. Propert y Owner consents to entry onto the Subject Property by the City, the Cit y’s employees, agents, and contractors, as needed to inspect the work of the permit, enforce the conditions of the permit and undertake an y work needed to compl y with permit conditions including mine closing and reclamation. B. This permit is granted for the area designated as Solberg Phase 1, Bolander Phases 1 and 2, and Frattalone Phase 1on Exhibit 1 Present Conditions and 2021 Mine Plan. C. The completion date of the overall mineral extraction process including site reclamation shall be no later than December 31, 2022 for the northern 75 acres, the Vesterra site. The completion date of the overall mineral extraction process including site restoration shall be no later than December 31, 2024 for the southern 80 acres, the Stonex site. The term of this permit shall extend from January 1, 2021 until December 31, 2021 unless revoked prior to that for failure to comply with the permit requirements. A mining permit fee of $370.00 shall be paid to the City of Rosemount. D. All required permits from the State of Minnesota, County of Dakota and City of Rosemount (hereinafter "City") or an y of their agencies shall be obtained and submitted to the City prior to the issuance of the permit. Failure by the Property Lessee to compl y with the terms and conditions of any of the permits required under this paragraph shall be grounds for the City to terminate said mining permit. E. The final grading for the permit area shall be completed in accordance with the grading plan (Conceptual End Use Plan dated 1/13/05) labeled Exhibit 3, which is attached hereto, or as approved by the City Engineer, and any other conditions that may be imposed by the Cit y from time to time. F. All gravel trucks and other mining related traffic shall enter the mining area from Bonaire Path (County Road 38) and exit via the private drive to Blaine Avenue. It shall be the Propert y Lessee’s responsibility to obtain any access permits or easements necessary for ingress and egress. The location of the accesses and/or easements for ingress and egress shall be subject to approval b y the City, as well as 2021 Mining Permit Vesera, LLC/Stonex, LLC Page 2 of 6 the Dakota County Highway Department or the Minnesota Department of Transportation if applicable or if an y changes occur relative to the mining process. The current locations of the access driveways are indicated on the Present Conditions and 2021 Mining Plan. Warning signs including “Trucks Hauling” shall be installed at the Propert y Owner’s expense as needed in accordance with Dakota Count y requirements. Any street improvements to Bonaire Path, County Road 71 or CSAH 42 necessary to accommodate the generated traffic shall be the sole responsibilit y of the Propert y Lessee. G. A plan for dust control shall be submitted to and subject to approval by the City. The Propert y Lessee shall clean dirt and debris from extraction or hauling operations related to the Mineral Extraction Permit from streets. After the Property Lessee has received 24-hour verbal notice, the City may complete or contract to complete the clean-up at the Propert y Lessee’s expense. In the event of a traffic hazard as determined by the City Administrator (or their designee) or Rosemount Police Department, the Cit y may proceed immediatel y to complete or contract cleanup at Propert y Lessee’s expense without prior notification. H. The surface water drainage of the mining area shall not be altered so as to interfere, contaminate, or otherwise impact the natural drainage of adjacent propert y. I. No topsoil shall be removed from the site and the Property Lessee shall take necessary measures to prevent erosion of the stockpiled topsoil. The location of the stockpiled topsoil is located on Present Conditions and 2021 Mine Plan. J. Any costs incurred now or in the future in changing the location of existing public or private utilities including but not limited to pipelines, transmission structures and sewer infrastructure located within the permit area shall be the sole obligation and expense of the Property Lessee. K. All costs of processing the permit, including but not limited to planning fees, engineering fees and legal fees, shall be paid b y the Propert y Lessee prior to the issuance of the permit. The Propert y Lessee shall reimburse the City for the cost of periodic inspections b y the City Administrator or any other City employee for the purpose of insuring that conditions of the permit are being satisfied. The Property Lessee agrees to reimburse the City for any other costs incurred as a result of the granting or enforcing of the permit. L. The daily hours of operation for the mining area shall be limited to 7:00 a.m. to 7:00 p.m., Monday through Saturday subject to being changed b y the City Council. M. The Propert y Lessee shall deposit with the Planning Department a suret y bond or cash deposit in the amount of Seven Thousand, Five Hundred Dollars per acre ($7,500.00/acre) for any active phase in favor of the City for the cost of restoration, regrading and/or revegetating land disturbed by mining activities and to ensure performance of all requirements of this agreement and City ordinances b y Property Lessee. The required surety bonds must be: 2021 Mining Permit Vesera, LLC/Stonex, LLC Page 3 of 6 (1) With good and sufficient surety b y a surety company authorized to do business in the State of Minnesota. (2) Satisfactory to the City Attorney in form and substance. (3) Conditioned that the Property Lessee will faithfully comply with all the terms, conditions and requirements of the permit; all rules, regulations and requirements pursuant to the permit and as required by the City and all reasonable requirements of the City Administrator (or his designee) or an y other Cit y officials. (4) Conditioned that the Property Lessee will secure the City and its officers harmless against any and all claims, or for which the City, the Council or any City officer may be made liable by reason of any accident or injury to persons or propert y through the fault of the Propert y Lessee. (5) The suret y bond or cash deposit shall remain in effect from January 1, 2021 until J ul y 31, 2021. Upon thirty (30) days’ notice to the Propert y Lessee and suret y compan y, the City may reduce or increase the amount of the bond or cash deposit during the term of this permit in order to insure that the City is adequately protected. N. The Propert y Lessee shall furnish a certificate of comprehensive general liability insurance issued b y insurers duly licensed within the State of Minnesota in an amount of at least Five Hundred Thousand and no/100 ($500,000.00) Dollars for injury or death of an y one person in any one occurrence, and at least One Million Five Hundred Thousand and no/100 ($1,500,000.00) Dollars for injury or death of more than one person arising out of one occurrence and property damage liability in an amount of at least Two Hundred Fift y Thousand and no/100 ($250,000.00) Dollars arising out of an y one occurrence. The policy of insurance shall name the City as an additional insured and shall remain in effect from January 1, 2021 until July 31, 2022. O. No processing or mixing of materials shall occur on the site, except as approved by the Dakota County Environmental Management Department as incidental to a sand and gravel mining operation. Any such activities will be enclosed with snow or cyclone fencing or as approved b y Cit y staff. Construction of any ponding areas, wash plants or other processing or equipment brought to the site shall require additional site and grading plan information subject to review and approval of the City Engineer. P. The Propert y Lessee and the Propert y Owner shall hold the City harmless from all claims or causes of action that may result from the granting of the permit. The Property Lessee shall indemnify the Cit y for all costs, damages or expenses, including but not limited to attorney's fees that the City may pay or incur in consequence of such claims. 2021 Mining Permit Vesera, LLC/Stonex, LLC Page 4 of 6 Q. The Propert y Lessee and the Propert y Owner shall comply with such other requirements of the City Council as it shall from time to time deem proper and necessar y for the protecti on of the citizens and general welfare of the community. R. Complete mining and reclamation is required in all phases before an y additional mining is authorized. Modifications or expansion of the mining areas must be approved in writing to the City. Propert y Lessee shall submit to the City annuall y a written report indicating the amount of material extracted from the site for the prior 12-month period. S. The Propert y Lessee shall incorporate best management practices for controlling erosion and storm water runoff as specified by the Minnesota Pollution Control Agency and the United States Environmental Protection Agency. T. The City of Rosemount shall have the ability to collect independent soil samples U. Reclamation shall include the replacement of the entire stockpile of topsoil on the mined area, reseeding and mulching necessary to re-establish vegetative cover for permanent slope stabilization and erosion control. The minimum depth of topsoil shall not be less than two inches after reclamation. Topsoil for reclamation shall conform to specifications on file with the City. No restored slopes may exceed a gradient of 25% or four to 1 (4:1). V. The Propert y Lessee must show how materials stockpiled for recycling will be processed and inform the City of all stockpiled materials. W. The Propert y Lessee ma y not assign this permit without written approval of the City. The Propert y Lessee will be responsible for all requirements of this permit and all City ordinances on the licensed premises for the permit period unless the Propert y Lessee gives sixty (60) days prior written notice to the City of termination and surrenders the permit to the City. The Property Lessee shall identify all Operators prior to their commencement of mineral extraction-related activities in the pit area. The City shall have the authority to cause all mineral extraction activities to cease at any time there is an apparent breach of the terms of this Permit. X. The Propert y Lessee shall maintain a “stock” gate (or equivalent) at the entrance to the propert y where the mining operation is located. The gate must be secured at 7:00 p.m. and at an y time the pit is not in use. Y. There shall be no “haul-back” of materials from any other propert y or job site that would be imported to the property for fill or other purposes other than incidental concrete recycling as referred to in paragraphs O, V and FF; and topsoil imported for the purpose of re-establishing turf as accepted by the City. Z. Truck operators within the pit area shall not engage in practices involving slamming tailgates, vibrating boxes, using of “jake” or engine brakes (except in emergency situations) or other such activities that result in excessive noise. 2021 Mining Permit Vesera, LLC/Stonex, LLC Page 5 of 6 AA. The Propert y Lessee shall comply with directions from the City Engineer. BB. A landscaping plan shall be prepared subject to approval by City Staff, for the purpose of providing vegetative screening within the setback areas of the various phases of the mining area. Said landscaping shall be installed according to City standards, prior to commencement of operations within an adjacent phase area. CC. No retail activit y is permitted on the site. Materials imported to the site are limited to materials to be rec ycled and mixed with aggregate extracted from the site and topsoil for reestablishing ground cover or turf. DD. Off-site mining connected with the reconstruction of County Road 38 or construction of Connemara Trail shall require separate project approval by the City Council. The site reclamation plan with proposed grades and future street alignments is subject to approval by the City Engineer. EE. The storage of equipment (unrelated to the sand and gravel mining and processing), manure, construction debris, or hazardous materials of any kind shall not be permitted on site. The placement of construction debris, manure, asphalt or hazardous materials in any form within the pit as fill shall be strictly prohibited. FF. The fill area re-grading and reclamation shall follow the procedures described in the Stonex LLC and Vesterra LLC Reclamation Protocol Rosemount, Minnesota. Stonex, LLC and Vesterra, LLC shall compact the entire reclamation site to a minimum compaction of 95% of maximum dry density. Reports shall be submitted to the City b y August 1st and February 1st describing an y fill importation from January 1st through June 30th and July 1st through December 31st respectively. The bi-annual reports submitted shall describe the quantities of material brought in, where the material came from, and the test results, including supporting analytical results of the materials. IN WITNESS WHEREOF, Vesterra, LLC and Stonex, LLC hereb y consents and agrees to the foregoing conditions of said mining permit this day of , 20 . Vesterra, LLC and Stonex, LLC By: Jonathan J. Wilmshurst, Owner 2021 Mining Permit Vesera, LLC/Stonex, LLC Page 6 of 6 STATE OF MINNESOTA ) ) ss COUNTY OF DAKOTA ) The foregoing instrument was acknowledged before me this day of , 20 , by Jonathan J. Wilmshurst, the Owner of Vesterra, LLC and Stonex, LLC Notary Public IN WITNESS WHEREOF, Flint Hills Resources, hereb y consents and agrees to the foregoing conditions of said mining permit this day of , 20 . Flint Hills Resources Its STATE OF MINNESOTA ) )ss COUNTY OF DAKOTA ) The forgoing instrument was acknowledged before me this day of , 20 , by_ , Flint Hills Resources, Its , the Property Owner, on behalf of the company. Notary Public September 2020