HomeMy WebLinkAbout14241 AVALON PATHFOR: CENTEX HOMES
EROSION CONTROL
MUST BE IN PLACE
BEFORE FOOTINGS
PASS INSPECTION
I--- ----------1
�TT
SEP 2 0 2002
TYPE OF U\J
SLAB ON GRADE
ADDRESS
14237 -14243 AVALON PATH
NO SPG,� l -0
IN RIGHT -OF -WAY
f
9 9 0 31 OSQ
G SMH
A
22 FOOT MAXIMU�,,
DRIVEWAY WIDTN93166
STMH
PROPOSED ELEVArrorV9
Top of Foundation 934 6
Garage floor 934 0 Engineering Reviewed
Date- 9
-Z
as
w O`
NO T✓"&
Denotes iron monument fnd
O Denotes iron monument set
Denotes 10 ft offset hub
Denotes direction of
proposed surface drainage
935.0 Denotes proposed elevation
x9350 Denotes existing elevation
Bearings are assumed
NGVD Vertical Datum
Lot 9, Block 5, BLOOMFIELD 4TH ADDITION, Dakota County, Minnesota
I hereby certify that this survey, plan or report was prepared METRO LAND SURVEYING
by me or under my direct supervision and that I am a duly &ENGINEERING
licensed land surveyor under the laws of the state of Minnesota 412 COUNTY ROAD D
Dot tffig 2002 LITTLE CANADA, MN 55#7
B PHONE (65) 766 -0112 FAX (651, 766 -0612
Y
Surveyor, Minnesota License No 17765 Job No 592-220H Scale 1' =40 By J KB