HomeMy WebLinkAbout13914 COPPER CTJUN 2E 'S0 3:35 FROM CLARK ENGINEERING TO OT -HONES PAGE.001i002
ENGINEERING COMPANY ME 2815 WAYZATA BOULEVARD M MINN
CERTIFICATE OF SURVEY FOR:
ORRIN THOMPSON HOMES
A Division of U.S. Home Corporation
0 01 Z
oQQ tR
Q 01
a
ca �4•b 0
3Z•
�5
0
s
Lot 4. Block 3.
COUNTRY HILLS THIRD ADDITION
Dakota County, Minnesota
0
O
MINN. 55405 E (6121374-4740
Scale: 1" 40' I`
Iron monument set 4
Iron monument found
Spike or wood stake set
PROPOSED ELEVATIONS:
FIRST FLOOR:
p El. 966.67 ft.
i BASEMENT SLAB:
o EL 957.99 ft.
S
FRONT`G SLAB:
Fes• E 5.33)f t.
TOP-FOOTING:
2 co EL 957.70 ft.
sr• o r TOP FOUNDATION:
EL 965.70 ft.
TOP CURB (at cce ter.of garage):
9 0 6 Design El. 62.5 fj.
br d
l
MODEL NO. 867 A
4 e'A'o. 1 Co' 94 is'O
C. No. p
flj" S
IN, 00
r p
0
0
u+ o
N e
�Q N
A
5 89' 28' 03" W 160.00
2 hereby certify that this is a true and correct representation of a survey
of the boundaries of the land above described and of the location of all
buildings, if any, thereon, and all visible encroachments, if any, from or
on said land. I further certify that this survey was prepared by me or under
my direct supervision and that I am a duly Registered Land surveyor under the
laws of the State of Minnesota.
Req, No. 15 22 8 Date 6 "4
M
ENGINEERING
COMPANY
Proposed House A As -Built House_ Drawn Dy K A.t. Pro ecc nu- 7w11