Loading...
HomeMy WebLinkAbout13914 COPPER CTJUN 2E 'S0 3:35 FROM CLARK ENGINEERING TO OT -HONES PAGE.001i002 ENGINEERING COMPANY ME 2815 WAYZATA BOULEVARD M MINN CERTIFICATE OF SURVEY FOR: ORRIN THOMPSON HOMES A Division of U.S. Home Corporation 0 01 Z oQQ tR Q 01 a ca �4•b 0 3Z• �5 0 s Lot 4. Block 3. COUNTRY HILLS THIRD ADDITION Dakota County, Minnesota 0 O MINN. 55405 E (6121374-4740 Scale: 1" 40' I` Iron monument set 4 Iron monument found Spike or wood stake set PROPOSED ELEVATIONS: FIRST FLOOR: p El. 966.67 ft. i BASEMENT SLAB: o EL 957.99 ft. S FRONT`G SLAB: Fes• E 5.33)f t. TOP-FOOTING: 2 co EL 957.70 ft. sr• o r TOP FOUNDATION: EL 965.70 ft. TOP CURB (at cce ter.of garage): 9 0 6 Design El. 62.5 fj. br d l MODEL NO. 867 A 4 e'A'o. 1 Co' 94 is'O C. No. p flj" S IN, 00 r p 0 0 u+ o N e �Q N A 5 89' 28' 03" W 160.00 2 hereby certify that this is a true and correct representation of a survey of the boundaries of the land above described and of the location of all buildings, if any, thereon, and all visible encroachments, if any, from or on said land. I further certify that this survey was prepared by me or under my direct supervision and that I am a duly Registered Land surveyor under the laws of the State of Minnesota. Req, No. 15 22 8 Date 6 "4 M ENGINEERING COMPANY Proposed House A As -Built House_ Drawn Dy K A.t. Pro ecc nu- 7w11