E X E C U T I V E S U M M A R Y
City Council Work Session Meeting: January 5, 2021
AGENDA ITEM: Sanitary Sewer Extension Discussion AGENDA SECTION:
Discussion
PREPARED BY: Kim Lindquist Community Development
Director AGENDA NO. 2.b.
ATTACHMENTS: Utility Map, Septic List, Sewershed Map APPROVED BY: LJM
RECOMMENDED ACTION: Discussion Item Only
SUMMARY
At the December worksession, the City Council discussed the potential for a lot split on the property at
2650 130th Street. The issue raised was whether the Council should begin to extend city utilities,
particularly sanitary sewer, to permit hooking up to City services rather than allowing additional rural
residential lots. The property is at the south edge of the cit y interceptor designated to serve the “triangle
area” the neighborhood bounded by Hwy 3, Biscayne Avenue and 130th to the south. The City’s
Comprehensive Sanitary Sewer Plan places this area, along with property to south of 130th and west of
Hwy 3 within the Lan-O-Ken sewershed. Portions of the sewershed are within the MUSA, like the
Harmony neighborhood, and portions north are designated for permanent rural residential in the
Comprehensive Land Use Plan. Other property, like those in the triangle area are designated for
Transitional Residential because of the anticipated need for future public utility extension, rather than
private well and septic.
When discussed in December the Council asked for additional information to assist in deciding whether to
begin extension of public infrastructure. At that time, staff provided potentially three alternatives, do
nothing, extend utilities to 130th, extend utilities further north; into the Blanca neighborhood. The
following provides additional information to assist in decision making.
DISCUSSION
There are 69 properties generally located with this area. Based upon city records, approximately 37 have a
septic system that was constructed in 2000 or after. It is estimated that a septic system generally has a life
of 30 years; although there are always exceptions. The State and Dakota County require pumping of septic
systems on a 3-year cycle to ensure compliance. However, the pumping reports often do not identify non-
compliant systems, only ones where there are significant problems, like surface discharge. Typically, non-
compliance becomes apparent when the property has a pending sale. That compliance inspection provides
better information about the system and whether it meets design requirements. For example, design rules
changed in the mid-90’s requiring three feet of “good” soil. If the system was built prior to 1996, the
compliance inspection requires two feet separation, but many are not meeting that standard and therefore
have a non-compliant system.
Issues often arise when a new system is needed. The lots in this area are smaller for consideration as rural
lots, running from 3.91 acres to .37 acres with the average at 1.37 acres. The sizing limits placement of a
septic and well (with required separation) along with a house, garage, driveway and any other accessory
structures or uses.
2
In the recent past, due to a higher water table, a mound system is required for the replacement system.
This transfers the entire system above ground to obtain appropria te separation. A mound system is more
costly due to importing of soils and additional labor. A mound system, due to its configuration takes up
more space on the site due to side slopes and would typically cost around $20,000. It is estimated an in-
ground system would cost approximately $15,000.
The consulting engineer has provided some cost estimates for extension of sanitary sewer service into the
triangular neighborhood. The first extension would be approximately $250 ,000-300,000 and would bring
the service up to 130th with some extension along 130th. That price is without easement acquisition costs.
The utility would need to traverse 2655 132nd Court W, north to south, for approximately 490’. The City
would obtain needed easements from the Andersons at 2650 130th Street as part of their lot division
request. That would get the main up to 130th. Staff anticipates running water within the same sanitary
sewer trench, which is estimated at an additional $126,000. The total for the two utilities would be
approximately $425,000.
Staff has verified that there is no intention to pave the roads within the neighborhoods north of 130 th. If
that changes in the future, extension of utilities with road paving makes sense. Further extension into
Bolivia and Blanca roadways is estimated at about $1 million with replacement of aggregate roads.
Extension of sanitary sewer from the north, on 125th , 124th, and Blanca Avenue requires installation of a
lift station and forcemain into the south system. That work is estimated at $1.4 million including the lift
station.
In review of existing Core funds, there appears to be enough funding to permit extension of water and
sanitary sewer to 130th. A full assessment of all projects would need to be made to determine expansion
beyond 130th Street. In reviewing the 132nd Court project, the 2655 property was assessed approximately
$15,000 in supplemental water and sewer connection charges. It wo uld be expected as the utilities were
extended to the north, additional charges to individual lots would occur in the same manner. It would be
expected that the new lot on the Anderson property along with the existing structure be required to hook
up to new public utilities.
RECOMMENDATION
At a previous worksession, staff indicated there were three options the Council could explore relating to
public infrastructure in the triangle area; (a) do nothing, (b) do some extension, or (c) bring in the entire
system as briefly explored in the discussion above.
Staff is recommending exploring extension of sanitary sewer to 130th Street, option B above. The first step
would be to approach the most affected property owner at 2655 132nd Court to determine potential cost
and willingness for easement acquisition. That would allow the City to bring the services closer to the area
that will benefit from sanitary sewer and would permit any new home on the Anderson property to hook
up to city sanitary sewer service.
ROSEMOUNT
MINNESOTA
12/29/2020
Proposed Sanitary Sewer Extension
12915 217526652660 12313 122593445
262526802192
1297612261
12380
12730
12205
12370
1280512930
12520
12645
12890 28632680
125752900
2
1
4
1
12545
2686
12525
2500
12976
2813
2275
12960
12773
3080
12365
12375215
9
12086
12590
12845
12430
13100
265527802890
265
5
12895
2743
12600 1223112965
2655
1260512610
2615
12465
2100
26252675
12885
2219
12540
1276921
5
2
12790
12246
12467
234512101
12139
264527832800
12962
20901293012753
12685
12550
240013051 1255012375
2685
12341
216812861
12235
12888
12485
13032 122023025 12895264013086 1297629031279012334
2925 214023292700
13037
12761
3022
12390
2193
12050
126852684 12850282012165
12920 216913136
12175
265012700
1291912610
13088
2200
12795
2416
2990
12255
12766
12310
12890
12445
13054
272
0
2305
12800
123
5
8
12686 26442800
2145
12725
128252740
3143
2261
1297612820
12228
12238
2300
1274112000
12365213512470
12795
3138
12260
12355
211312909
2685
254313046 219912552
2650
1289012385294312890
3087
12450
12865
2200
12255
277121182685257521871239512735
12750
12289
12164
12125
12171
269
5
12490
263512675
12802
2100282312540
12920
129952860SROBERT TRL
MCANDREWS
R
D
W
DODDBLVDDODD
CT
BOLIVIAAVE W
124
T
H
S
T
W
BENGALAVEW128TH ST
W
1
2
5
T
H
S
T
W
BLANCA AVE WCHARLSTON WAY
13
0
THWA
Y
131ST ST W
125TH CT
W
130TH ST W
1 2 6 TH ST
WBISCAYNEAVE
Proposed Lift Station
Proposed Sanitary Forcemain
Proposed Sanitary Sewer
Proposed Water Main
0 400 800200 Feet
ROSEMOUNT
MINNESOTA
12/29/2020
Proposed Sanitary Sewer Extension
12915 266012313 122593445
26802192
1297612261
12380
12730
12205
12370
1280512930
12520
12890 28632680
12575290012545
12525
2500
12976
2275
12960
12773
12055
12365
1237512086
12590
12845
12430
265527802890
265
5
12895
2743
12600 1223112965
1260512610
12465
2625299012885
2219
12540
1276912790
12246
12467
234512101
12139
2783129621293012753
12685
12550
24002980
1255012341
12861
12235
12888
12485 122021289526401297629031279012334 23292700
13037
12761
12390
2193
12050
1268512850282012165
12920
12175
265012700
1291912610
2200
12795
2416
2990
12255
12766
12310
12890
12445
272
0
2305
12800
123
5
8
12686 26442145
2800
12725
128252740
2261
1297612820
12228
12238
2300
1274112000
1236512470
12795
12260
12355
12909
2685
2543219912552
128902943 12450
12865
2200
12255
26852575218712735
12750
12289
12164
12125
12171
269
5
12490
12675
128022823 12540
129952860
0 400 800200 US Feet
HouseNumber Street Pumping
Record PumpDue ISSUES System Install date
2625 130TH ST W 04/30/09 4/30/2012 1994
2575 130TH ST W 11/3 /2016 11/3 /2019 6/9/1905
12802 ROBERT TRL
S 11/17/2016 11/17/2019 1998
12334 ROBERT TRL
S 5 /11/2017 5 /11/2020 1994
12390 BLANCA AVE 7 /5 /2017 7 /5 /2020 unknown
12741 BOLIVIA AVE 8 /8 /2017 8 /8 /2020 2004
12358 ROBERT TRL
S 4 /23/2015 8 /13/2020 2015
12520 BLANCA AVE 8/14/2015 8 /14/2020 2015
12550 ROBERT TRL
S 8 /17/2017 8 /17/2020 unknown
12171 BISCAYNE
AVE 9 /27/2017 9 /27/2020 2003
12231 BISCAYNE
AVE 10/18/2017 10/18/2020 2000
12750 ROBERT TRL
S 11/6 /2017 11/6 /2020 2001
12490 BLANCA AVE 11/14/2017 11/14/2020 as-built from 1979. failed
compliance inspection 2020 1979?
2695 124TH ST W 11/29/2017 11/29/2020 compliance inspection pass
2006 1999
12552 ROBERT TRL
S 5 /18/2018 5 /18/2021 1990
2680 125TH ST W 6 /13/2018 6 /13/2021 2004
12255 BISCAYNE
AVE 6 /25/2018 6 /25/2021 unknown
12540 BLANCA AVE 7 /10/2018 7 /10/2021 compliance inspection pass
2014 1986
12575 BISCAYNE
AVE 7 /17/2018 7 /17/2021 2011
2685 128TH ST W 7 /26/2018 7 /26/2021 2000
2655 128TH ST W 7 /26/2018 7 /26/2021 2010
12888 ROBERT TRL
S 7 /26/2018 7 /26/2021 1989
12238 ROBERT TRL
S 7 /30/2018 7 /30/2021 2002
2640 125TH ST W 8 /3 /2018 8 /3 /2021 1993
12370 BLANCA AVE 8 /9 /2018 8 /9 /2021 as-built from 1979 1979?
12919 BOLIVIA AVE 8 /9 /2018 8 /9 /2021 unknown
12380 BLANCA AVE 8 /13/2018 8 /13/2021 1998
12365 BLANCA AVE 8 /17/2018 8 /17/2021 1993
12976 ROBERT TRL
S 8 /25/2016 8 /25/2021 2016
2655 125TH ST W 9 /6 /2018 9 /6 /2021 address not in Laserfiche
2655 124TH ST W 9/6/2018 9/6/2021 2003
12289 BISCAYNE
AVE 9 /13/2018 9 /13/2021 1987
12259 BISCAYNE
AVE 9 /13/2018 9 /13/2021 compliance inspection pass
2005 1996
12930 BLANCA AVE 9 /28/2018 9 /28/2021 2007
12685 BOLIVIA AVE 10/15/2018 10/15/2021 1987
12790 BLANCA AVE 10/19/2018 10/19/2021 2009
12485 BLANCA AVE 10/22/2018 10/22/2021 2011
12769 BOLIVIA AVE 10/26/2018 10/26/2021 2003
2685 125TH ST W 10/29/2018 10/29/2021 unknown
12139 BISCAYNE
AVE 11/21/2018 11/21/2021 2000
12467 BISCAYNE
AVE 1 /7 /2019 1 /7 /2022 1999
2660 125TH ST W 1 /31/2019 1 /31/2022 1996
12610 ROBERT TRL
S 3 /7 /2019 3 /7 /2022
system replaced in1992 per
2019 compliance inspection.
no record of replacement in
Laserfiche. One tank replaced
2019, treatment area ok per
2019 compliance inspection
1992?
2543 130TH ST W 3 /15/2019 3 /15/2022 2006
12313 BISCAYNE
AVE 5 /6 /2019 5 /6 /2022 2001
12976 BISCAYNE
AVE 5 /10/2019 5 /10/2022 1997
12600 ROBERT TRL
S 5 /15/2019 5 /15/2022 2010
2650 125TH ST W 5 /17/2019 5 /17/2022 1999
12470 BLANCA AVE 5 /21/2019 5 /21/2022 2010
12310 ROBERT TRL
S 5 /29/2019 5 /29/2022 1996
2720 124TH ST W 6 /12/2019 6 /12/2022 1999
12465 BLANCA AVE 7 /17/2019 7 /17/2022 2002
12545 BLANCA AVE 7 /17/2019 7 /17/2022 1987
2500 130TH ST W 8 /2 /2019 8 /2 /2022 compliance inspection pass
2005 1999
12445 BLANCA AVE 9 /3 /2019 9 /3 /2022 2014
12800 ROBERT TRL
S 9 /25/2019 9 /25/2022 1985
12920 BISCAYNE
AVE 10/1 /2019 10/1 /2022 unknown
12525 BISCAYNE
AVE 11/1 /2019 11/1 /2022 1985
12890 BOLIVIA AVE 11/1 /2019 11/1 /2022 2009
12773 BLANCA AVE 12/3 /2019 12/3 /2022 compliance inspection pass
2005 1986
12202 ROBERT TRL
S 12/4 /2019 12/4 /2022 2003
12805 BOLIVIA AVE 12/6 /2019 12/6 /2022 compliance inspection pass
2016 2006
12450 BLANCA AVE 1 /2 /2020 1 /2 /2023 unknown
12909 BISCAYNE
AVE 3 /20/2020 3 /20/2023 1991
12228 ROBERT TRL
S 3 /24/2020 3 /24/2023 2002
2680 128TH ST W 6 /8 /2020 6 /8 /2023 compliance inspection pass
2016 2009
12895 BLANCA AVE 6 /20/2020 6 /20/2023 2018
2345 130TH ST W 6 /30/2020 6 /30/2023 compliance inspection pass
2006 1994
12735 BLANCA AVE 7 /1 /2020 7 /1 /2023 2015
12355 BLANCA AVE 7 /2 /2020 7 /2 /2023 2020
12375 BISCAYNE
AVE 7 /2 /2020 7 /2 /2023 2008
2644 125TH ST W 7 /30/2020 7 /30/2023 2006
12850 BLANCA AVE 8 /5 /2020 8 /5 /2023 2015
12753 BLANCA AVE 8 /12/2020 8 /12/2023 compliance inspection pass
2009 2004
12686 ROBERT TRL
S 9 /3 /2020 9 /3 /2023 unknown
12730 BLANCA AVE 9 /21/2020 9 /21/2023 1994
12766 BOLIVIA AVE 9 /25/2020 9 /25/2023 1997
12341 BISCAYNE
AVE 9 /25/2020 9 /25/2023 2015
12430 BLANCA AVE 11/12/2020 11/12/2023 1986