Loading...
HomeMy WebLinkAbout6.m. Addison Avenue Improvements, City Project 2018-06 Final Acceptance and Authorization of Final Payment TOTAL PROJECT COST Amount Original Contract$ 306,891.50 Final Quantity Adjustments$ (11,309.70) TOTAL COST$ 295,581.80 EXECUTIVE SUMMARY City Council Meeting: January 19, 2021 AGENDA ITEM: Addison Avenue Improvements, City AGENDA SECTION: Project 2018-06 Final Acceptance and Consent Authorization of Final Payment PREPARED BY: Brian Erickson, PE, Director of Public AGENDA NO. 6.m. Works / City Engineer ATTACHMENTS: Resolution, Engineer’s Recommendation, Final Payment APPROVED BY: LJM Application RECOMMENDED ACTIONS: Resolution to Approve Final Payment to Friedges Contracting Co., Inc. for Addison Avenue Improvements, City Project 2018-06 and Accepting the Improvements for Perpetual Maintenance BACKGROUND On May 1, 2018, the City Council approved a contract with Friedges Contracting Co., Inc. for the st construction of Addison Avenue between 141 Street East and Adalyn Avenue. The scope of work included installation of utilities and paving the street surface. Additionally, a temporary cul-de-sac was constructed. After a majority of construction was complete in 2018, development further to the east caused a delay of final paving to reduce the impact adjacent construction would have on the road surface. The wear course of pavement was installed in 2020. DISCUSSION Through the course of construction there were no contract modifications issued and the following table shows the final cost for the work completed which is 3.7% lower than the original contract amount. At this time, Friedges Contracting Co., Inc. has completed all the improvements as detailed in the contract and WSB and Associates has recommended acceptance of the work. Final payment is ready to be issued pending receipt of final administrative paper work. RECOMMENDATION Staff recommends that the City Council adopt the attached resolution accepting the improvements and authorizing final payment to Friedges Contracting Co., Inc. for Addison Avenue Improvements, City Project 2018-06. c:\\users\\jab\\appdata\\local\\temp\\6.m. addison avenue improvements, city project 2018-06 final acceptance and _631218\\6.m. addison avenue improvements, city project 2018-06 final accepta.docx CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2021 – 07 A RESOLUTION ACCEPTING PUBLIC IMPROVEMENT FOR ADDISON AVENUE IMPROVEMENTS CITY PROJECT 2018-06 WHEREAS, Friedges Contracting Co., Inc. has completed the required construction as per the scope of the contract, and; WHEREAS, the City received a concurrence from WSB and Associates that the work has been completed in accordance with the approved plans and specifications and finds the improvements acceptable, and; WHEREAS, the contractor is compiling all necessary administrative requirements to close out the contract. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROSEMOUNT, MINNESOTA: 1. The improvements completed under said agreement are hereby accepted for perpetual maintenance and ownership. 2. Final payment to the contractor is authorized upon receipt of all required administrative paperwork. th ADOPTED this 19 day of January, 2021. William H. Droste, Mayor ATTEST: Erin Fasbender, City Clerk K:\011546-000\Admin\Construction Admin\Pay Vouchers\2021.01.12 Memo - Project Closeout.docx 540 GATEWAY BLVD | BURNSVILLE, MN | 55337 | 952.737.4660 | WSBENG.COM Memorandum To: Brian Erickson, PE, Public Works Director/City Engineer City of Rosemount From: Tim Hanson, PE, Senior Project Manager Date: January 12, 2021 Re: Addison Avenue Improvement Project City Project No. 2018-06 WSB Project No. 011546-000 The City of Rosemount is in the process of closing out and accepting the street and utility improvements for the Addison Avenue Improvement Project. The improvements, consisting of sanitary sewer extension, watermain extension, storm sewer improvements, sidewalk improvements and street construction were designed and inspected by WSB in accordance with the City’s Standard Specifications and Engineering Guidelines. The public improvements were constructed by Friedges Contracting Co., Inc. Improvements were constructed in the summer of 2019 and 2020. Friedges Contracting has submitted most of the paperwork necessary for final payment including IC 134 forms, contractor affidavit, Mechanic’s Lien Waivers, Maintenance Warranty Bond and the signed final pay voucher for final payment. Surety for Payment is being processed by the contractor. The final project cost is $295,581.80. Final Payment amount is $21,987.93. WSB recommends approval and acceptance of the public improvements and final payment to Friedges Contracting Co., Inc. as indicated. Please contact me at thanson@wsbeng.com or 612-219-2553 with any comments or questions. Sincerely, WSB Timothy Hanson, PE Senior Project Manager